Loading...
HomeMy WebLinkAbout1288-1517 GENERAL COSTRUCTION NOTES 1. THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THESE PLANS AND TO THE REQUIREMENTS OF THE CITY STANDARD SPECIFICATIONS, PUBLIC WORKS DEPARTMENT, CITY OF FONTANA. REFER TO DEFINITIONS AND TERMS IN CITY STANDARD SPECIFICATIONS. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM FONTANA PUBLIC WORKS DEPARTMENT PRIOR TO START OF ANY.WORK WITHIN THE CITY LIMITS. 3. STATIONING REFERS TO THE CENTERLINES OF STREET EXCEPT WHERE OTHERWISE NOTED. 4. CURB DATA REFERS TO THE FACE OF THE CURB. 5. ALL EXPOSED CONCRETE SHALL CONFORM IN GRADE, COLOR AND FINISH TO ALL ADJOINING CURBS AND SIDEWALKS. 6. PAVEMENT SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY AS REQUIRED BY SOILS TEST TAKEN AFTER COMPLETION OF ROUGH GRADING. 7. ALL UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO PAVING OF STREETS. 8. EXISTING UNDERGROUND UTILITIES ARE AS PER AVAILABLE RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE FIELD. CONTRACTOR SHALL CALL EACH UTILITY PRIOR TO ANY WORK. 9. ALL MANHOLE AND CLEANOUT FRAMES AND COVERS SHALL BE CONSTRUCTED 6" BELOW FINISHED GRADE BY SEWER CONTRACTOR AND SHALL BE RAISED TO GRADE BY PAVING CONTRACTOR AFTER COMPLETION OF PAVING. 10. ALL VALVE CANS AND COVERS SHALL BE CONSTRUCTED 6" BELOW FINISHED GRADE BY WATER CONTRACTOR AND SHALL BE RAISED TO GRADE BY PAVING CONTRACTOR AFTER COMPLETION OF PAVING. 11. REFER TO CITY OF=FONTANA, UNDERGROUND UTILITY LOCATION STANDARD DETAIL 129. 12. THE CONTRACTOR(S) SHALL COORDINATE CONSTRUCTION WITH ALL UTILITIES AND OTHER IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRICAL, LIGHTING, TELEVISION CABLE.. LANDSCAPING, LANDSCAPING IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAINAGE, FLOOD CONTROL SYSTEMS, ETC. 13. AS BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE CITY OF FONTANA. 14. TYPE, LOCATION AND -WIDTH OF DRIVEWAY APPROACH APRONS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM WITH THE CITY OF FONTANA STANDARD DETAILS. 15. CONTRACTOR IS INSTRUCTED TO REFER TO THESE PLANS AND THE SPECIFICATIONS, AND WHERE THERE IS OR MAY BE A CONFLICT SHALL IMMEDIATELY REPORT SAID CONFLICT OR POSSIBLE CONFLICT TO THE OWNER'S REPRESENTATIVE. 16. STERILANT REQUIRED UNDER ALL A.C. PAVEMENT 17. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, -COLOR AND FINISH TO ALL ADJOINING CURBS AND SIDEWALKS. 18. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAS BEEN PLACED, INSPECTED AND APPROVED. 19. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING SYSTEM, SLOPING OF THE GROUND OR OTHER EQUIVALENT MEANS. TRENCHES LESS THAN FIVE (5) FEET IN DEPTH SHALL ALSO BE GUARDED WHEN EXAMINATION INDICATES HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED. 20. THE CONTRACTOR(S) SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK AS DESCRIBED IN NOTE19 ABOVE FROM CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. SEE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SECTION 306-1.1.6. 21. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY'S INSPECTOR. } /Y,4T/YE SO/L TYPICAL STREET SECTION NO ECRL[ 51DFWAt,r N 1P�W ST,REET IMPROVEMENT PLANS $ a U.S. NaY 10 TRACT SLOVER`` AVENUE NO, r 12691�1 12691m2wRUM u < AVeuue 41 FONTANA, CALIFORNIA Ave J C1'� iJ� ov ROJ ECT SITE / —— '-.IGH MOUNTAIN oefoia 7' 2 181" �\ LOCATION MAP S 1 29 ,, -- - - MOT TO S ALS 25 2 23 24 25 26 27 28 111 24 p 1 11 3 30 1 23 3 22 21 20 19 18 4 m w 31 > 17 Q: 2 2 4 � o ELIZABETH. COURT 32 5 h o' 21. 5 16 33 v� N �ul 6 W 11 12 p \ 0 20 6 w J 13 14 15 34 \ 7 z35 35-�� �w 7 X. (� 36 8 9 37 18 8 38 39 9 4054 17 41 � - i 16 15 43 42 ! 53 5 52 10 " GLEN AK 5� 51 5Q WEEPING 49 ; WILLOW LANE5 11 48 505 12 13 14 44 45 46 47 • COWS"TRUCTION NOTES AND QUANTITY ESTIMATES R/w 35' ITEM QUAI T•ITY 11WAW0YZ71V6/Y?5 PFR TH/.5 TRACT `L frU E DROP INLET W- 14' (PVC/TY STD. /2/) �, /MPki�V MENTS 25' 25" CO/YSrRvC7' 2 %2"AC. 0Y. --,e /2" coX)o'Ac7-C, &.4T/YE SO/4 . /09,200 SF. L F ONE I � O�0/Y.67RMCT C17 -,,w OF F01Y7A/Y,4 STA/Y0AR,O 0-,57A-11_ /O/,) 57-30 L.F. STAN,034C,O CV0.55 G!/TTE1C A/Y0 SP�lYOrPEL no 1� doe w OC0/Y57'R4/CT ¢ A.C. Rwe, r#T 1-5-75 :oy •� 2 7*/PC/C7' 4 A' TH/C/t� CO/YC/PETE' .61,c y w,4:� W/OTy A/Y,O .�o •or OCONS LOCAT/O/Y PSR /PLAN 2-2, 90Q S.F. ro A,OJUST Y4Z ✓E COYER,S 7'O NEW CiPADE 21 as 79P dy - r ..Di. • is � � •. . �, �. ` � r — '' �'•� �� + '''' +'iia "� �' 1 3 /2 "00,WRAC7EO /A9P/PDYE/YlENTS /YAT/YA' S011- TYPICAL O/LTYPICAL STREET SECTION NO SCALE INDEX MAP SCALE, I 100' BENCH 'MARK RR SPIKE ON PP No. 674320E AT THE INTERSECTION OF JURUPA AVENUE AND MULBERRY AVENUE ELEV. 918.40 N0. ITEM QUAI T•ITY UNIT J CO/Y.ST 61cr-r CONov,672F CU . ® ANO Gl/rrevv B C,F: iAFe C/iY C�'�N •�/Yfi DROP INLET W- 14' (PVC/TY STD. /2/) Or.XNXM9 CO aETA/L E A ,DROP /NLE F W= l 8' (PZR CITY ST¢. 121) 2 CO/YSrRvC7' 2 %2"AC. 0Y. --,e /2" coX)o'Ac7-C, &.4T/YE SO/4 . /09,200 SF. L F C0110AvET� C&vCC 4/YO G.UTTER r6 "C.E' OER I � O�0/Y.67RMCT C17 -,,w OF F01Y7A/Y,4 STA/Y0AR,O 0-,57A-11_ /O/,) 57-30 L.F. STAN,034C,O CV0.55 G!/TTE1C A/Y0 SP�lYOrPEL OC0/Y57'R4/CT ¢ P51P C/TY S741Y0AR,0 LETA/L /Of( 1-5-75 s. F. 7*/PC/C7' 4 A' TH/C/t� CO/YC/PETE' .61,c y w,4:� W/OTy A/Y,O OCONS LOCAT/O/Y PSR /PLAN 2-2, 90Q S.F. ro A,OJUST Y4Z ✓E COYER,S 7'O NEW CiPADE 21 Eft. 7 A.oaasr if94/Yf/OLE COV6•?6 YO a�ewo,--- PE,PDET�J/L /09 2 o EA. /DAMPED CZ11TYE F ffrZ11 '/Y PER C/TY OF' ®COMSrIftlCT `0 N7ANA STA/Y,0AR0 DETq/L /04 4. /0 EA. C0/y5T1?1.1CT ,0.41eRl"ae PER C/TY OF FO1Y;ANAI 5r,4 ,Q4R,,0 O L3ETA/L //8 . 3. EA. 1300 L F C0N,37/?!/C7- CONCR6•" e C&COs!/YO oariFi2 . �� " TO 8 "G'F %R,4/Y3li/GAY /4CP,&iE' C! Of FO T 5r, /y O rr n� A/yA A o.�,eo v�rA�,c / STORM DRAIN QUANTITIES ITEM QUANTITY UNIT DROP INLET W=10' (P,ER C/ TY STD. /2/) J DROP INLET W- 14' (PVC/TY STD. /2/) / E A ,DROP /NLE F W= l 8' (PZR CITY ST¢. 121) 2 ER 181, p C.P. _ 7,S L F IW AYHOL E• (PER CITY S TD. // 2 I �