HomeMy WebLinkAbout1239-1a
4CX/5 --�
—w
S
40
/7
"ve%v L alev o/
..46
YO
N
ato
O
♦ ao2
--
ago
U
✓�GK50N
V�
O
�
MONTG OMC/7Y
/TVC,
"ve%v L alev o/
..46
YO
N
ato
O
♦ ao2
--
GENERAL NOTES
1. All work shall be done in accordance with these plans and the City of Fontana Public Works
Department Standard Specifications dated 1975.
2. Construction permits shall be obtained from the Fontana Public Works Department prior to the
start of any work.
3. All 4" house sewer lateral shall be installed on a 2% minimum grade, unless otherwise approved
by the City Engineer,
4. Terminate all 4" house sewer laterals at the property line with a plug.
5, Sewer Contractor shall chisel an "X" in the curb at the location of the lateral.
6. Manhole frames and covers to be constructed by the Sewer Contractor 6" below finished surface
grade and shall be raised to grade by the Paving Contractor at the completion of paving.
7. Adequate stakes shall be -set by the Engineer to enable the contractor to construct the work
to the plan grades,
8. As -Built plans shall be provided to the City by the Contractor.
NT/T/C�S
9 , VOR 296 L r
14'' VG10 42Co L l
91017Vard l/Ol-2ho%
i
BENCHMARK : No. 356
Co. N& Fin Pole # 1536718E, NE Corner
Oleander and Baseline5 lYilli r f— 2O —850mI,#$ 11fAW12 I
Elevation: 1405.86 t
JAMES X LANGONE CITY OF FONUNA, CALIFORNIA
GANG SURVEYS s C/V/L EN8/NECR/NO DEPARTMENT CFPUBUC WORKS
NEW
582 W. Vo/%y Blvd. Ste. /6 DRAWN BY.SL.I✓`�/, �L�N SCALE
Callan, CA. 92324 '
(714) 825-8309 m4c% No., aZol e Nofdd
DEWNED BY: A10NTOaAICI? Y 14VINU� DATE
/2/,27/8_4_,.
Gin �r� CHECKED Br APPROVED BY: / DWG. M0. SHEET
AMES K. LAN ' NE RCE 33792 F/L!' N0. J. T. J •
-- C,lTY EN8/NEER RCE /d=
ft,, .... 4
y
V
U
✓�GK50N
O
�
MONTG OMC/7Y
/TVC,
✓ 011VTI
---
ro7. SO'
V
G7.30'
�
0
v
M/LLC�P
C4 NIN
�O
///G/N/iY MAR
i
Nof to Sela/el
i
/0
9
8
GENERAL NOTES
1. All work shall be done in accordance with these plans and the City of Fontana Public Works
Department Standard Specifications dated 1975.
2. Construction permits shall be obtained from the Fontana Public Works Department prior to the
start of any work.
3. All 4" house sewer lateral shall be installed on a 2% minimum grade, unless otherwise approved
by the City Engineer,
4. Terminate all 4" house sewer laterals at the property line with a plug.
5, Sewer Contractor shall chisel an "X" in the curb at the location of the lateral.
6. Manhole frames and covers to be constructed by the Sewer Contractor 6" below finished surface
grade and shall be raised to grade by the Paving Contractor at the completion of paving.
7. Adequate stakes shall be -set by the Engineer to enable the contractor to construct the work
to the plan grades,
8. As -Built plans shall be provided to the City by the Contractor.
NT/T/C�S
9 , VOR 296 L r
14'' VG10 42Co L l
91017Vard l/Ol-2ho%
i
BENCHMARK : No. 356
Co. N& Fin Pole # 1536718E, NE Corner
Oleander and Baseline5 lYilli r f— 2O —850mI,#$ 11fAW12 I
Elevation: 1405.86 t
JAMES X LANGONE CITY OF FONUNA, CALIFORNIA
GANG SURVEYS s C/V/L EN8/NECR/NO DEPARTMENT CFPUBUC WORKS
NEW
582 W. Vo/%y Blvd. Ste. /6 DRAWN BY.SL.I✓`�/, �L�N SCALE
Callan, CA. 92324 '
(714) 825-8309 m4c% No., aZol e Nofdd
DEWNED BY: A10NTOaAICI? Y 14VINU� DATE
/2/,27/8_4_,.
Gin �r� CHECKED Br APPROVED BY: / DWG. M0. SHEET
AMES K. LAN ' NE RCE 33792 F/L!' N0. J. T. J •
-- C,lTY EN8/NEER RCE /d=
ft,, .... 4
y
V
U
✓�GK50N
an.
MONTG OMC/7Y
/TVC,
✓ 011VTI
C'L/4/AIeIlk
V
�
0
v
M/LLC�P
�VC�
///G/N/iY MAR
Nof to Sela/el
GENERAL NOTES
1. All work shall be done in accordance with these plans and the City of Fontana Public Works
Department Standard Specifications dated 1975.
2. Construction permits shall be obtained from the Fontana Public Works Department prior to the
start of any work.
3. All 4" house sewer lateral shall be installed on a 2% minimum grade, unless otherwise approved
by the City Engineer,
4. Terminate all 4" house sewer laterals at the property line with a plug.
5, Sewer Contractor shall chisel an "X" in the curb at the location of the lateral.
6. Manhole frames and covers to be constructed by the Sewer Contractor 6" below finished surface
grade and shall be raised to grade by the Paving Contractor at the completion of paving.
7. Adequate stakes shall be -set by the Engineer to enable the contractor to construct the work
to the plan grades,
8. As -Built plans shall be provided to the City by the Contractor.
NT/T/C�S
9 , VOR 296 L r
14'' VG10 42Co L l
91017Vard l/Ol-2ho%
i
BENCHMARK : No. 356
Co. N& Fin Pole # 1536718E, NE Corner
Oleander and Baseline5 lYilli r f— 2O —850mI,#$ 11fAW12 I
Elevation: 1405.86 t
JAMES X LANGONE CITY OF FONUNA, CALIFORNIA
GANG SURVEYS s C/V/L EN8/NECR/NO DEPARTMENT CFPUBUC WORKS
NEW
582 W. Vo/%y Blvd. Ste. /6 DRAWN BY.SL.I✓`�/, �L�N SCALE
Callan, CA. 92324 '
(714) 825-8309 m4c% No., aZol e Nofdd
DEWNED BY: A10NTOaAICI? Y 14VINU� DATE
/2/,27/8_4_,.
Gin �r� CHECKED Br APPROVED BY: / DWG. M0. SHEET
AMES K. LAN ' NE RCE 33792 F/L!' N0. J. T. J •
-- C,lTY EN8/NEER RCE /d=
ft,, .... 4
y