HomeMy WebLinkAbout1215-1885817
ZL
I -S /*, 4-4-' 75.79 Q -SYCRM 6RAW,
0-
14 99 groRlw DRAW
9 C11-1, 21 .4 CRA//V
0/
RM bf'WH
7- COIWAMN75-
,0,47A
McCUTCHAN CO., INC.
265 N. SAN GABRIEL BLVD. (81$x__-_795-5162
PASADENA, CALIFORNIA -91107 Drawn by
Approved -
50signed by:
Z,47251,1vA— C.O.c. a GERALD E. TUTT R.C. E. 14375 Date
1030-84 REVISED LATERAL 'I
Chocked by
REV. DATE DESCRIPTION APP.
G
sllII,TS
BY�
DATE- IL-
CITY OF - FONTANA- .CALIFORNIA
PUBLIC WORKS DEPARTMENT
SOUTHRIDGE VILLAGE Scale,
STORM DRAIN LINE: "B"Date"
Pwg. No.
Approved:- CITY
ENGINERR.C.EJ00):T
G0061 38
/*zo
C
50
,8
3' 52'.56
1.420.00"
A-
4.20. o
CUA �E
I -S /*, 4-4-' 75.79 Q -SYCRM 6RAW,
0-
14 99 groRlw DRAW
9 C11-1, 21 .4 CRA//V
0/
RM bf'WH
7- COIWAMN75-
,0,47A
McCUTCHAN CO., INC.
265 N. SAN GABRIEL BLVD. (81$x__-_795-5162
PASADENA, CALIFORNIA -91107 Drawn by
Approved -
50signed by:
Z,47251,1vA— C.O.c. a GERALD E. TUTT R.C. E. 14375 Date
1030-84 REVISED LATERAL 'I
Chocked by
REV. DATE DESCRIPTION APP.
G
sllII,TS
BY�
DATE- IL-
CITY OF - FONTANA- .CALIFORNIA
PUBLIC WORKS DEPARTMENT
SOUTHRIDGE VILLAGE Scale,
STORM DRAIN LINE: "B"Date"
Pwg. No.
Approved:- CITY
ENGINERR.C.EJ00):T
%J
I -S /*, 4-4-' 75.79 Q -SYCRM 6RAW,
0-
14 99 groRlw DRAW
9 C11-1, 21 .4 CRA//V
0/
RM bf'WH
7- COIWAMN75-
,0,47A
McCUTCHAN CO., INC.
265 N. SAN GABRIEL BLVD. (81$x__-_795-5162
PASADENA, CALIFORNIA -91107 Drawn by
Approved -
50signed by:
Z,47251,1vA— C.O.c. a GERALD E. TUTT R.C. E. 14375 Date
1030-84 REVISED LATERAL 'I
Chocked by
REV. DATE DESCRIPTION APP.
G
sllII,TS
BY�
DATE- IL-
CITY OF - FONTANA- .CALIFORNIA
PUBLIC WORKS DEPARTMENT
SOUTHRIDGE VILLAGE Scale,
STORM DRAIN LINE: "B"Date"
Pwg. No.
Approved:- CITY
ENGINERR.C.EJ00):T