Loading...
HomeMy WebLinkAbout1215-1885817 ZL I -S /*, 4-4-' 75.79 Q -SYCRM 6RAW, 0- 14 99 groRlw DRAW 9 C11-1, 21 .4 CRA//V 0/ RM bf'WH 7- COIWAMN75- ,0,47A McCUTCHAN CO., INC. 265 N. SAN GABRIEL BLVD. (81$x__-_795-5162 PASADENA, CALIFORNIA -91107 Drawn by Approved - 50signed by: Z,47251,1vA— C.O.c. a GERALD E. TUTT R.C. E. 14375 Date 1030-84 REVISED LATERAL 'I Chocked by REV. DATE DESCRIPTION APP. G sllII,TS BY� DATE- IL- CITY OF - FONTANA- .CALIFORNIA PUBLIC WORKS DEPARTMENT SOUTHRIDGE VILLAGE Scale, STORM DRAIN LINE: "B"Date" Pwg. No. Approved:- CITY ENGINERR.C.EJ00):T G0061 38 /*zo C 50 ,8 3' 52'.56 1.420.00" A- 4.20. o CUA �E I -S /*, 4-4-' 75.79 Q -SYCRM 6RAW, 0- 14 99 groRlw DRAW 9 C11-1, 21 .4 CRA//V 0/ RM bf'WH 7- COIWAMN75- ,0,47A McCUTCHAN CO., INC. 265 N. SAN GABRIEL BLVD. (81$x__-_795-5162 PASADENA, CALIFORNIA -91107 Drawn by Approved - 50signed by: Z,47251,1vA— C.O.c. a GERALD E. TUTT R.C. E. 14375 Date 1030-84 REVISED LATERAL 'I Chocked by REV. DATE DESCRIPTION APP. G sllII,TS BY� DATE- IL- CITY OF - FONTANA- .CALIFORNIA PUBLIC WORKS DEPARTMENT SOUTHRIDGE VILLAGE Scale, STORM DRAIN LINE: "B"Date" Pwg. No. Approved:- CITY ENGINERR.C.EJ00):T %J I -S /*, 4-4-' 75.79 Q -SYCRM 6RAW, 0- 14 99 groRlw DRAW 9 C11-1, 21 .4 CRA//V 0/ RM bf'WH 7- COIWAMN75- ,0,47A McCUTCHAN CO., INC. 265 N. SAN GABRIEL BLVD. (81$x__-_795-5162 PASADENA, CALIFORNIA -91107 Drawn by Approved - 50signed by: Z,47251,1vA— C.O.c. a GERALD E. TUTT R.C. E. 14375 Date 1030-84 REVISED LATERAL 'I Chocked by REV. DATE DESCRIPTION APP. G sllII,TS BY� DATE- IL- CITY OF - FONTANA- .CALIFORNIA PUBLIC WORKS DEPARTMENT SOUTHRIDGE VILLAGE Scale, STORM DRAIN LINE: "B"Date" Pwg. No. Approved:- CITY ENGINERR.C.EJ00):T