HomeMy WebLinkAbout1155-1------ ------
f T-
t7 -
_77:_
_77
t
L
TYrICAL 9ECTION
LL:
P OF _._C -U ?B
------ E- I al 'I N_ OR
FAt.L-
c KO 6e,
STA. TO STA.
+ A%
7A�
Yc? r i t.9
4 + 2.0
r I mg
.25
lul) - -
J
I_F_ Uf E TTE
10-Tt. A-1
--E-X I ST-, p
F A -7-
A
T
LD
4
tn
sz -
Aa� V 0
'0 -cu ElL____ - ----- ----
113T
0c +I CA
kg
+
Z
rN
W
X Z ED
t
__J
f
j-
owo=
U_ -
L
w
U) (m
PROFILE SCALES vZj j-_
f Ny
____7. H 1 401
V
77-.- C-4 LLJ -7--__
I T,
f
J- -- ----
7i _T -
r__. =_4
3 4 5 6 7 8
u
TYPICAL SECTION
W 0
M Lt. N. T. s.
0
7%
's'. \0'
All
7 IX
AN
<
+
Q
AV
cl
0
b
ui >
FOOTW16L OLVO.
15.119 K. VA.
AKROW VLV 17.
01ZANK. . WAY
MEKKILL AVE,
VRDJFCT LOCATION
_z
I-10 F 12\ E� r-_ WAY
=�� N
SCALE: I"=40'
FOUNDATION S/E CORNER
VALENCI A /SIERRA ELEV. 126Z.83
i .4 35 t p i If 35 1
[=41-
CONSTPUCTION NOTES
rl') CONSTFt"e-T lrTc: 1--vic-rif-d on KI
GENE RAL NOTES
=m
_=7
w %_%jr,%c2, I ALL WORK SHALL OE DONE IN ACCORDANCE WITH THESE PLANS AND
GUTTER SHALL CONFORM TO STP. DETAIL 101 CI-tY STV.
CONs-rFtuc-r CRO55-GUTTEFT PER STO, OF -TAIL 105 T14E STANDARDS AND SPECIFICATIONS 01: THE CITY 01: PONTARA
CONSTRUCT CURB Gu-rTER AS INDICATF-0 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE PONTANA
PUBLIC WORKS DE PARTMENT -'PRIOR TO THE START OF ANY WORK.
LIMI-fS OF l"A-&.0VlF.KLAY 3 MANHOLE FRAME5 AND COVERS, WATER VALVES, COVERS, SHALL BE
f-21%
LIMITO OF COLP IFLANIN&. w ADJU!7TFD TO GRADE AT T14E COMPLETION 01: THE PAVING 13-f THE
PAVING CONTRACTOR.
4. ADF.QUATF_ STAKE5 SHALL BE SET BY THE ENGINEER TO ENABLE
THE CONTRACTOR TO CONSTRUCT THE WORK TO T14E PLAN eRADES
5 ALL PIPELINES OR 5TRUCTURP-5 OF AM'( KIND. AND ALL TELEPHONE
OR POUER POLE5., WATER METERS, VAL\IES OR WiDRANTS, FITC. 514OWN
OR NOT S14OWN ON THE5E PLANS AND LOCATED wirkm THE ARE:A
TO 13E IMPRO\lEP AND INTERFERING \dITH CONSTRUCTION, SHALL BE
RELOCATED AT NO COST TO THE CITY OF FONTANA. IT SHALL BE
THE CONTRACTOR'5 FtESPONSIBILM TO NOTIFY ALL AGENCIE5
CONCERNED , BEFORE CONSTRUCTION .
6 TH6 CONTRACTOR SHALL NOTIFY THE CITY OF FONTANA
IF ANY EXIST'G SIGNAL CONDUIT 15 DAMAGED OR VEXPOSEID
N HE ROCESS OP PLAP44NG OPG
Z4" LmIT OF A.C.RE�IOVAL THF_ AREA 6WOWN IN 9PAVING SWALL P�F_ COLD PLANSD ANV
XF-SURFACED tY CSINITERLINE AMP C90�?E� SECTION CWA_12t!oe, &q
EXIST. CURB -1" A.C. OVERLAY OY -41a-BE rLAN6
EXIST. A.C.
LOWER Ll
.4 T. MITS OF COLD PLANIN&
MATCH - IN A -C,
L
—GUTTER CONST.
_GU TE C ON ST. Q E T A I L n.t.s.
CONTRACTOR SHALL REMOVE 2411 OF EXIST'e, A.C.
CONST. THE GUTTER SECTION TO PLAN GRADE
AND REPLACE � A.C. GF-Tt-JESEN LIP 01= GUTTER
EYISTING PAVEMENT.
r