HomeMy WebLinkAbout1129-1GENERAL' NOTES
1.. THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THESE PLANS AND TO
THE REQUIREMENTS OF THE CITY STANDARD SPECIFICATIONS, PUBLIC WORKS DEPARTMENT,
CITY OF FONTANA.
2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM FONTANA PUBLIC WORKS DEPARTMENT
PRIOR TO START'OF ANY WORK WITHIN THE CITY LIMITS.
3. STATIONING REFERS TO THE CENTERLINES OF STORM DRAINS EXCEPT WHERE OTHERWISE NOTED.
4. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO ALL
ADJOINING CURBS AND SIDEWALKS.
5. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAS BEEN PLACED,
INSPECTED AND APPROVED.
6. ALL UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO PAVING OF STREETS.
7.- EXISTING UNDERGROUND UTILITIES ARE AS PER AVAILABLE RECORDS. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE
FIELD.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL
BE EFFECTIVELY GUARDED BY A SHORING SYSTEM, SLOPING OF THE GROUND OR OTHER
EQUIVALENT MEANS. TRENCHES LESS THAN FIVE (5) FEET IN DEPTH SHALL ALSO BE
GUARDED WHEN EXAMINATION INDICATES HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED.
9. THE CONTRACTOR(S) SHALL ALSO OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH
WORK AS DESCRIBED IN NOTE 8 ABOVE FROM CAL/OSHA.
i10. ALL MANHOLES -sHALL 'BE -CONSTRUCTED 6"BELOW PAVEMENT GRADE AND , BROUGHT TO,
FINISH GRADE^.BY THE PAVING CONTRACTOR AFTER PAVEMENT IS IN PLACE.
11. IMMEDIATELY FOLLOWING REMOVAL OF EXISTING PAVEMENT OR DIKE OR CURB AND/OR GUTTER,
THE CONTRACTOR SHALL DILIGENTLY PURSUE THAT PORTION OF WORK TO COMPLETION.
.12. ALL C.M.P. INSTALLATIONS AND CONNECTIONS SHALL BE MADE PER MANUFACTURER'S
SUGGESTED METHOD UNLESS OTHERWISE SPECIFIED ON THE PLANS.
13. IF DURING CONSTRUCTION, GROUND WATER IS ENCOUNTERED, A SYSTEM APPROVED BY THE
CITY ENGINEER SHALL BE INSTALLED TO DEWATER SAID AREA AT THE DIRECTION OF THE
SOILS ENGINEER.
14: NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY'S INSPECTOR.
15. ALL EXPOSED METAL SURFACES SHALL BE GALVANIZED IN ACCORDANCE WITH THE CITY
STANDARD SPECIFICATIONS.
116.'AS BUILT' PLANS SHALL BE _PROVIDED TO THE CITY BY. THE CONTRACTOR:�
INDEX OFSHEETS.
SHEET N0. DESCRIPTION
I. TITLE SHEET
:
2. DETAIL SHEET
3. PLAN AND PROFI LE FROM STA. 0+00.00 TO STA. 7 + 65.87
Tq
Z
W
Q
�I
W
m
J
t2
STORM DRAIN PLANS
U'THRIDGE VILLAGSOE PHASE I
ALMOND AVENUE SYSTEM
FONTANA , C LIFORIA
JUR PA J U AVENUE
P b
�a � Z
W
W EDIS ON EASEMENT
�� CONSTRUCT
CHERRY,
RIVERSIDE
E
4
Z
INDEX MAP
BASIS OF BEARINGS- BENCH MARK
RR spike on PP -#674320E at the
BA'S.1 -S '0-F .BEAR IN GS FOR THIS
SURVEY IS THE SOUTH LINE .OF intersection of Jurupa Ave. and
THE-S.W.- Ii4 S EQ -34 TAKEN AS ,
S 890 22'. 23" E PER COUNTY Mulberry Ave. Elev. 918.40
SURVEYOR'S PLAT C, S. 7107 REV. DATE
DESCRIPTION
0
SCALE : I"= 500'
i
ION' NOTES' AND QUANTITY' ESTIMATES
NO.
ITEM
OUAN'rITY
UNIT
i,
W
LOCATION AND EXTENT. i
�
G'ons7`rt.�cf ✓'�o�-m ,�raii-�. C/es�r�ou� sorer .a����/ o� Sheep` �
�
d
7 pl
p�I
8
3. THE CONTRACTOR -IS REQUIRED TO TAKE DUE" PRECAUTIONARY MEASURES TO -PROTECT
>•
.
c'arls�rucf 30''00e,G': ,� �C/Q.S S zaJ
RESPONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED
us
W
4. THE CONTRACTOR SHALL UNCOVER ALL UTILITIES THAT HE MAY BE JOINING, CROSSING
!o.
w (10)
LOCATIONS.. ANY CONFLICT OR DISCREPANCY SHALL BE BROUGHT TO THE ENGINEER'S
a,
ATTENTION PRIOR TO CONSTRUCTION, OTHERWISE THE CONTRACTOR ACCEPTS FULL
I ck/� _ l��� / 7`o,,v ,BoX ��e�^ ArPe�'dVl 0/7 15h e e. -
RESPONSIBILITY FOR ANY COSTS OF RELOCATION OR ADDITIONAL COSTS OF CONSTRUCTION.
SLOVER
AVE.
Per
Per Oe a' i/ on 517eef Z
p JURUPA
AVE.
JFrX7&7eer#7X7COM"0 0r7
CITY OF FONTANA CALIFORNIA
X.
:..:.:.:
'PROJECT SITE
.r::..
® consultlnq engineers / arctiltects
RIVERS �
�rrr� AYE
VICINITY
MAP
118 AIRPORT DRIVE , SUITE 212 (714) 824-5580
SAN BERNARDINO , CALIFORNIA 92408
NTS
�� CONSTRUCT
CHERRY,
RIVERSIDE
E
4
Z
INDEX MAP
BASIS OF BEARINGS- BENCH MARK
RR spike on PP -#674320E at the
BA'S.1 -S '0-F .BEAR IN GS FOR THIS
SURVEY IS THE SOUTH LINE .OF intersection of Jurupa Ave. and
THE-S.W.- Ii4 S EQ -34 TAKEN AS ,
S 890 22'. 23" E PER COUNTY Mulberry Ave. Elev. 918.40
SURVEYOR'S PLAT C, S. 7107 REV. DATE
DESCRIPTION
0
SCALE : I"= 500'
i
ION' NOTES' AND QUANTITY' ESTIMATES
NO.
ITEM
OUAN'rITY
UNIT
i,
eol7s; reae Tyne ,e OroJo /r71elA 12er-' 42W6711 -ax'?
LOCATION AND EXTENT. i
�
G'ons7`rt.�cf ✓'�o�-m ,�raii-�. C/es�r�ou� sorer .a����/ o� Sheep` �
�
�8 .
CONSTRUCTION AREA'IMMEDIATELY PRIOR TO CONSTRUCTION.
3. THE CONTRACTOR -IS REQUIRED TO TAKE DUE" PRECAUTIONARY MEASURES TO -PROTECT
_
�'.
c'arls�rucf 30''00e,G': ,� �C/Q.S S zaJ
RESPONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED
BEFORE STARTING WORK.
4. THE CONTRACTOR SHALL UNCOVER ALL UTILITIES THAT HE MAY BE JOINING, CROSSING
!o.
L'o�J✓7�rLlC� Pike C/ost�re Per �e�`��/ d� Sf &e7"
LOCATIONS.. ANY CONFLICT OR DISCREPANCY SHALL BE BROUGHT TO THE ENGINEER'S
a,
ATTENTION PRIOR TO CONSTRUCTION, OTHERWISE THE CONTRACTOR ACCEPTS FULL
I ck/� _ l��� / 7`o,,v ,BoX ��e�^ ArPe�'dVl 0/7 15h e e. -
RESPONSIBILITY FOR ANY COSTS OF RELOCATION OR ADDITIONAL COSTS OF CONSTRUCTION.
Per
Per Oe a' i/ on 517eef Z
JFrX7&7eer#7X7COM"0 0r7
CITY OF FONTANA CALIFORNIA
® consultlnq engineers / arctiltects
PUBLIC WORKS DEPARTMENT
118 AIRPORT DRIVE , SUITE 212 (714) 824-5580
SAN BERNARDINO , CALIFORNIA 92408
Drawn by: SOUTHRIDGE VILLAGE
STORM DRAIN PLANS
Troced: by:
Scale:
AS t4oT dO
Approved
Date.
Wesley H len R.C.E. 11251 Date
ALMOND AVE. SYSTEM
Checked by : j'
J.T.J.T J pp
Dwg. No.:
'
'PRIVATE ENGINEERS'NOTICET02 CONTRACTOR
,1. ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR OTHERS,
AND THOSE SHOWN ON THE RECORDS EXAMINED ARE SHOWN WITH THEIR APPROXIMATE
LOCATION AND EXTENT. i
2. IT SHALL BE. THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE NATURE OF
EXISTING GROUND AND/OR THE FINISHED GRADE IN THE VICINITY OF THE PROPOSEDI
CONSTRUCTION AREA'IMMEDIATELY PRIOR TO CONSTRUCTION.
3. THE CONTRACTOR -IS REQUIRED TO TAKE DUE" PRECAUTIONARY MEASURES TO -PROTECT
_
THE UTILITIES OR STRUCTURES FOUND AT THE SITE. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED
BEFORE STARTING WORK.
4. THE CONTRACTOR SHALL UNCOVER ALL UTILITIES THAT HE MAY BE JOINING, CROSSING
OR PARALLELING PRIOR TO ANY CONSTRUCTION TO VERIFY BOTH HORIZONTAL AND VERTICAL
LOCATIONS.. ANY CONFLICT OR DISCREPANCY SHALL BE BROUGHT TO THE ENGINEER'S
ATTENTION PRIOR TO CONSTRUCTION, OTHERWISE THE CONTRACTOR ACCEPTS FULL
RESPONSIBILITY FOR ANY COSTS OF RELOCATION OR ADDITIONAL COSTS OF CONSTRUCTION.
Q -
JFrX7&7eer#7X7COM"0 0r7
CITY OF FONTANA CALIFORNIA
® consultlnq engineers / arctiltects
PUBLIC WORKS DEPARTMENT
118 AIRPORT DRIVE , SUITE 212 (714) 824-5580
SAN BERNARDINO , CALIFORNIA 92408
Drawn by: SOUTHRIDGE VILLAGE
STORM DRAIN PLANS
Troced: by:
Scale:
AS t4oT dO
Approved
Date.
Wesley H len R.C.E. 11251 Date
ALMOND AVE. SYSTEM
Checked by : j'
J.T.J.T J pp
Dwg. No.:
'
APApproved.
P.
CITY ENGINEER R