HomeMy WebLinkAbout1127-1GENERALNOTES 1.. THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THESE PLANS AND TO THE REQUIREMENTS OF THE CITY STANDARD SPECIFICATIONS, PUBLIC WORKS DEPARTMENT, CITY OF FONTANA. 2. CONSTRUCTION PERMITS 'SHALL BE OBTAINED FROM FONTANA PUBLIC WORKS DEPARTMENT PRIOR TO START OF ANY WORK WITHIN THE CITY LIMITS. 3. STATIONING REFERS TO THE CENTERLINES OF STORM DRAINS EXCEPT WHERE OTHERWISE NOTED. 4. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO ALL ADJOINING CURBS AND SIDEWALKS. 5. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAS BEEN PLACED, INSPECTED AND APPROVED. 6. ALL UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO PAVING OF STREETS. 7.V EXISTING UNDERGROUND UTILITIES ARE AS PER AVAILABLE RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE FIELD. 8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING SYSTEM, SLOPING OF THE GROUND OR OTHER EQUIVALENT MEANS. TRENCHES LESS THAN FIVE (5) FEET IN DEPTH SHALL ALSO BE GUARDED WHEN EXAMINATION -INDICATES HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED. 9. THE CONTRACTOR(S) SHALL ALSO OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK AS DESCRIBED IN NOTE 8 ABOVE FROM CAL/OSHA. 10. ALL MANHOLES SHALL BE CONSTRUCTED .6" BELOW PAVEMENT GRADE AND BROUGHT' TO' FINISH: GRADE' BY THE PAVING CONTRACTOR AFTER PAVEMENT IS IN PLACE. 11. IMMEDIATELY FOLLOWING REMOVAL OF EXISTING PAVEMENT OR DIKE OR CURB AND/OR GUTTER, THE CONTRACTOR SHALL DILIGENTLY PURSUE THAT PORTION OF WORK TO COMPLETION. 12. ALL C.M.P. INSTALLATIONS AND CONNECTIONS SHALL BE MADE PER MANUFACTURER'S SUGGESTED METHOD'UNLESS OTHERWISE SPECIFIED ON THE PLANS. 13. IF DURING CONSTRUCTION, GROUND WATER IS ENCOUNTERED, A SYSTEM APPROVED BY THE CITY ENGINEER SHALL -BE INSTALLED TO DEWATER SAID AREA AT THE DIRECTION OF THE SOILS ENGINEER. 14. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY'S INSPECTOR. 15. ALL EXPOSED METAL SURFACES SHALL BE GALVANIZED IN ACCORDANCE WITH THE CITY STANDARD SPECIFICATIONS. 16, AS BUILT PLANS SHALL BE PROVIDED TO THE CITY BY THS CONTRACTOR.' INDEX' -OF' SHEETS SHEET NO. DESCRIPTION I. TITLE SHEET 2. DETAIL-. SHEET -3, PLAN AND PROFILE FROM STA. 0+00.00 TO STA, /O.ZOO.00 4 P/Or? 0i7d Rrofi/e /rom 510- /o"oo. 00 /0 5/0. /7V100, 00 5: P101? 0,001 ^ Orn 51a. /7-100.00 ?Z� 00. or_ 1010rl oa6l /0r0//% 09-011n 51a 27.10 00 /0 '6167. 29-;3/ I W� m Z W Q. 1:;ikL AIBIALSH ILI E SYSTEM FONTANA , C Ll FOR IA Q,� rF G� I W EDISON EASEMENT y. ---_-'� � W CONSTRUCTION NOTES'AND'QUAN i w Q us VICIN oarrq fie. a�oArrQ �e. V SHADOW DRIVE Q` < V . l � , Ilk k �.�1__JL hz P►1. f, Sj00 z �O O 000 Q`P o/7/er5o YC CHERRY, RIVERSIDE A INDEX MAP. BASIS OF BEARINGS- `BENCH MARK 8ARR spike on PP*674320E at the SLS OF BEARINGS FOR T-HIS- SUR'VEY IS THE. SOUTH LINE OF inter ?section of Jurupa Ave. and THE- S.W,- 1/4"' .S EC. 34 TAKEN AS , S 89° 22' 23" E PER COUNTY Mulberry Ave. Elev. 918.40 SURVEYOR 'S PLAT C, S. 7107 , m 0 SCALE = 1 500 0 (10) -7PROJECT SITE YE ITY MAP NTS TITYESTIMATES, NO. ITEM,,. Y `' '' QUANTITY .UNIT �• Go�'rs�r'ucf f�ri� %o � r l�fzxilcx� Sh�f 2 , . , _ __ - _-- • _ G -r7e;i"uG7L 014ea*-74 17 Sfrt/Gfure r CSG? cji/ ah Sf-iBef - 2 f3o�,/I►� E �xj Corriorat�oln CITY OF FONTANA, CALIFORNIA Co, - C0r7_6lelaCf °-24", . C 4=? lC/ass Z. . 7; _ Cor�"��%�cf _ 30'= �P. C. P. .�C/Qa5 .7TH -• ��' _ G� 1mv s 7-ac744-tz" ® consultlnq engineers / arcriltects PUBLIC WORKS DEPARTMENT 94 ell car�/'Gcf 'r'Q'c/ed Ec�r/h difch er' D��4i/ off' Sh�BfS 2'4 370, �' Drawn by: vo SOUTH R I DGE VILLAGE STORM DRAIN PLANS .Z:71aee, 3"` �irig over corr�pac%/ r�a�i�� grour�d X 20 5 lv C'ar�s��uc1 fjro Ire/ei Ty,� •� ';r�e� ��>`Qi% o� �h�ef z 4 tea. Traced by: Date: WesleyH en R,C.E. 11251 Dates CALABASH ASE. SYSTEM I PRIVATE ENGINEE.RS'NOTICE'TO'CONTRA'CTOR, 1. ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR OTHERS, AND THOSE SHOWN ON THE RECORDS EXAMINED ARE SHOWN WITH THEIR APPROXIMATE LOCATION AND EXTENT. 2. I7 SHALL BE THE CONTRACTOR'S RESPONSIBILITY 70 DETERMINE THE NATURE OF EXISTING GROUND AND/OR THE FINISHED GRADE IN THE VICINITY OF THE PROPOSEDI CONSTRUCTION AREA IMMEDIATELY PRIOR TO CONSTRUCTION. 3. THE CONTRACTOR'IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO -PROTECT THE UTILITIES OR STRUCTURES FOUND AT THE SITE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY 70 NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED BEFORE STARTING WORK. 4. THE CONTRACTOR SHALL UNCOVER ALL UTILITIES THAT HE MAY BE JOINING, CROSSING OR PARALLELING PRIOR TO ANY CONSTRUCTION 70 VERIFY BOTH HORIZONTAL AND VERTICAL LOCATIONS. ANY CONFLICT OR DISCREPANCY SHALL BE BROUGHT 70 THE ENGINEER'9,�= ATTENTION PRIOR 70 CONS7RllCTION, OTHERWISE THE CONTRACTOR ACCEPTS FULL RESPONSIBTLI7Y FOR ANY COSTS OF RELOCATION OR ADDITIONAL COSTS OF CONSTRUCTION. �- f3o�,/I►� E �xj Corriorat�oln CITY OF FONTANA, CALIFORNIA . 1mv ® consultlnq engineers / arcriltects PUBLIC WORKS DEPARTMENT 118 *AIRPORT DRIVE , SUITE 212 (714) 824-5580 SAN BERNARDINO CALIFORNIA 92408 Drawn by: vo SOUTH R I DGE VILLAGE STORM DRAIN PLANS Scale: AS N67fco Approved : CC /"�TOJ� Traced by: Date: WesleyH en R,C.E. 11251 Dates CALABASH ASE. SYSTEM Checked by- Dwg... No.: j V, DATE DESCRIPTION APP. t J T• J• Approved: ITY E_NGINEER R