Loading...
HomeMy WebLinkAbout1081-1ARROW ROUTE W w w W > Y > Q U Q VALENCIA m J � W U DC O DORSEY J SITE i QRANGE A, T. a S, F. R. R. VICINITY MAP NO SCALE CITY OF FONTANA COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA TRACT SEWER GENERAL NOTES 10596 PLAN S C A L E c I) All work shall be done in accordance with these plans and City of Fontana Public Works Department MATERIALS Standard Specifications dated 1975. L. F. I = 60' (2) Construction permits shall be obtained from the Fontana Public Works Department prior to the start of any 4" V. C.P. Sewer Lateral work with the City Limits, Construction permits shall also be obtained from the San Bernardino County Pavement repair Transportation Department prior to the start of any work within San Bernardino County area. E A . (3) All 4" house sewer laterals shall be installed on a 2% minimum grade, unless otherwise approved by the per City Std. 128 City Engineer. Terminate all 4" house sewer laterals at the property line with a plug, EA. (4) Sewer contractor shall chisel "X" in the curb at the location of the lateral. 1 +10 L. (5) Manhole frames and covers to be constructed by the sewer contractor 6" below finished surface grade Remodel exist. manhole and upon completion of paving, the paving contractor shall raise the some to finished grade. TONS (6) Adequate stakes shall be set by the Engineer to enable the Contractor to construct the works to the plan grades. 12 (7) As -built plan shall be provided to the City by the contractor. ESTIMATE OF MATERIALS 1334. L. F. 8" V.C.P. Sewer Main 1285 L. F. 4" V. C.P. Sewer Lateral 35 L. F. Pavement repair 2 E A . Sewer Terminal Clean-out 10 0+35 L. per City Std. 128 4 EA. Precast Manhole I I 1 +10 L. per City Std. 112 1 EA. Remodel exist. manhole 7 TONS Sana :s Construction contractor agrees that in accordance with generally accepted construction practices; construction contractor will be required to assume sole and complete responsibility for jQb site conditions during the course of construction of the project, including safety of all persons and property; that this requirement shall be made to apply continuously and not be limited to ColiFornia Council normal working hours, and construction contractor further agrees to defend, indemnify and hold of Civil Engineea design professional harmless from any and all liability, real or alleged, in connection with the & Land Surueyorl '=3 performance of work on this project, excepting liability arising from the sole negligences of design r t professional. 12 341 max. size selected soil - bedding compacted to 90% TYPICAL BEDDING FOR V,C.P, BENCH MARK City BM No. 515 Square headed nail up 1.5' on south side of P. P. # 156715 1 E in N. W. corm r of Arrow Route and Locust Avenue Elevation = 12 6 7. 5 1 ft. A HOUSE 41' V. C. P. LATERAL LOCATION LOT DESIGN STATION AS -BUILT STATION LOT DESIGN STATION t AS -BUILT STATION 9 O407 L. - 3 4 3+ 0 8 L. PETE' OirSlaAl 10 0+35 L. 'r 35 3+75 L. � I I 1 +10 L. 36 4+40 L• r 12 0 W 1 +80 L. 14 0+40 L. , 13 Z oac 2+ 50 L. �� 15 1+ 00 L. 29 2 +35 R. 16 1 +65 L. W 30 0 +75 R. ., 17 2 +30 L. �S 1 4 +55 R. Al 18 2 +95 L. � 2 3+90 R. #& 19 3+60 L. 3 3+23 R. •. 20 4+20 L. }, a 3 4 2468 R. .. 2 1 4+ 50 L. 5 2+00 R. •, 22 470 L. 6 1+37 R. 23 >- 4 4-80 R. W 7 W cD 0+65 R. „ 24 � 0 4+60 R. � 8 0420 R. „ 2 5 4+35 R. 3 1 z 1 425 L. •, 26 3 +75 R. Q 321 +85 L. �� 27 3+I5 R. 33 2+40 L. 28 2460 R.