Loading...
HomeMy WebLinkAbout1063-1MATCH DPtA1tqAGF_ COKFIGURATIOKI - ro-Uff bRAINAGrz_ APPoN OR To CURB AMO GUTTER COKPiGURA'710" g N SIERRA AVENUE t t N 000 0q, 211, W R!; 500Q400 DETAI L" A" DISCHARGE STRUCTURE INLET RO 5CALt it 4 BAR 1=.L. \SEC TIDAY A - A 45 EC_-r10,k �63 -�3 COESTRUCTION NOTES Construct 811 curb and gutter per Std.# 101 Construct 41t thick, 5' wide concrete sidewalk Construct 4" thick, 4.1 w.',.df,,, concrete sidewalk Construct cross gutter per Std. ,# 104 Construct ramped curb return per Std.# 104 A Construct 31f A.C. dike Remove existing A.C. dik('-" Make smooth sawcut* in exiatin6 A.C. pavement Join existing A.C. pavement and construct A.C,-, overlay. Vary thickness to provide a smooth transi tion. &— Cons truct A.C. .oaving per soil report , or minimum As -s-r-q7-,ea o" AloTit-:5 A16.7 0A1 Sq&E-r 1_5 THE Construct 611 curb and gutter per Std .# 101 Remove and repla0c existing paving. TYPICAL SECTION SIERRA AVF.NUF. NO eCALS - /-1-- 01' lq' 54',1,- 116.21 CURB RETURN DATA Rz 20-00' \g 8z 900 Do, 00" L = 31.4Z' 40 T= 20.00' 4. 0' 27' 15' EX15TING A.C-D1Kr_- ISS T 17 to 8 P-XISTIM6 L.L. OF - ORIGINAL C.L.09 GIFIRRR A V E N U 5- — C. L. 3 U \RV C --Y VALLEY BLVD, STAT 6_ NW NOT TO SCALL 5.R I AVENUE r� SAhZTA NNrA PAI F_ M U E cc III I d U R-UPA AV C;_N U a bhall be notified by th-,, contractor 48 hours' prior to construction in the area of the utilities. 5. Existing manhole. frames and covers shall tae raised or lowered as required to finish grade - by paving 'contractor upon completion of pairing . in conformance with Chino Basin Kuniciple Nater District requirements,, 60 Adequate stakes shall b;b, set by th.e engineer to enable the contractor to -construct tlie- work to plan grade.,, T, Mlnimu.m :structVlral sections-, Sierra. Avenue-,, 411 A.0, over compacted native soll, Interior Streets 21t A.C. over compacted native soil. I Structural sections- of the streets shall be constructed as determined by the soil report or the above min.1taums, which ever is the greater, ENG INEERt-03 NOTE TO CONTRACTOR Contractor agrees -that he shall a6sume, sole -and complete respons- ibility,for job site conditions during the course of construction of this project. including safety of all persons and prpperty; and that this requirement shall apply continuoualy and. not be limited to normal working hours- and that the contractor shall defend indemnify and hold the ow,'i er and the engineer harmless from any and all liability,_ real or all 'eged. in connection with the performance of work on this project, lexcept- for liability arising .from the sole negligence of the owner` sir the enginaer,. GARY J. COBS — LAND SURVEYORS 8467 SIERRA AVENUE FONI-TANA , CALIF. 92655 ('1141 £329 1962 G A R . COBB, L. S. 3'762 CITY OF FONTANA mmw"T� PUBLIC WORKS DEPARTMENT DRAWN BY STREET IMPROVEMENT PLAN SCALE: SHOWN TRACT No. I1,61orz­ DLSIGKIED BY' DATE (31 IT. C SIERRA AVENLiE FEB. 5, 81 CHECKED 6Y:1APPRDVC-Q DW R. Md' -OF i•T. 1i CITY ERG(NP_ER,R.C-L-19932 z AWN&— ENGINEY,lill 8 ESTIMATE OF QUANTITIES A. 811 curb and gutter 517.3 j L. F, B. 61, *curb an' gutter 2-4677 L. F, 51 wide concrete sidewa-1.1c 248-7 S.F. D. 41 wide concrete sidewalk 3011 9 . FV E. A.C, pavement removal 1640 S.F. P. A.:. paving _453 TON 11, 4 41 +. 10597 + &597 = 24.636 so F4 G A.C. overlay 7700 S F H. Cross gutterand spandrel 2 A .,,a. 1 Asphalt dike 100 i Driveway approch per. std.#103 S r -Ea* K., Discharge, structure per std. #1224 2 Ea. L. Removal. Of 8°f curb and gut=ter 20 j L.F. M. 41 wide concrete drainage apron 1480 1. 1-70VU-5-r M4"HOL 6 722 2 VALLEY BLVD, STAT 6_ NW NOT TO SCALL 5.R I AVENUE r� SAhZTA NNrA PAI F_ M U E cc III I d U R-UPA AV C;_N U a bhall be notified by th-,, contractor 48 hours' prior to construction in the area of the utilities. 5. Existing manhole. frames and covers shall tae raised or lowered as required to finish grade - by paving 'contractor upon completion of pairing . in conformance with Chino Basin Kuniciple Nater District requirements,, 60 Adequate stakes shall b;b, set by th.e engineer to enable the contractor to -construct tlie- work to plan grade.,, T, Mlnimu.m :structVlral sections-, Sierra. Avenue-,, 411 A.0, over compacted native soll, Interior Streets 21t A.C. over compacted native soil. I Structural sections- of the streets shall be constructed as determined by the soil report or the above min.1taums, which ever is the greater, ENG INEERt-03 NOTE TO CONTRACTOR Contractor agrees -that he shall a6sume, sole -and complete respons- ibility,for job site conditions during the course of construction of this project. including safety of all persons and prpperty; and that this requirement shall apply continuoualy and. not be limited to normal working hours- and that the contractor shall defend indemnify and hold the ow,'i er and the engineer harmless from any and all liability,_ real or all 'eged. in connection with the performance of work on this project, lexcept- for liability arising .from the sole negligence of the owner` sir the enginaer,. GARY J. COBS — LAND SURVEYORS 8467 SIERRA AVENUE FONI-TANA , CALIF. 92655 ('1141 £329 1962 G A R . COBB, L. S. 3'762 CITY OF FONTANA mmw"T� PUBLIC WORKS DEPARTMENT DRAWN BY STREET IMPROVEMENT PLAN SCALE: SHOWN TRACT No. I1,61orz­ DLSIGKIED BY' DATE (31 IT. C SIERRA AVENLiE FEB. 5, 81 CHECKED 6Y:1APPRDVC-Q DW R. Md' -OF i•T. 1i CITY ERG(NP_ER,R.C-L-19932 z AWN&—