HomeMy WebLinkAbout855-1CONSTRUCTION, ` NOTES
CONST. ' Er CORB f GUTTER PER STD. /0/
O2 CoNST 4 PC . C . S/O,EWALK PER TYP/cAL SEC TION
3O CONST 3 A.C. PAVEMENT DVFR G'D/vIPI CTA77V4
4O , CONST CROSS GUTTER PER 'SrD. 4/04
CONST: S/DWALK RAMP PER STD. /044
,EST//`109TE' aF UiwT/T/ES'
Tip. (49.975'8
7A/165887
crc.//q%3
M 7 AL.4
/67..0 L . F.
CAdree 4G'IIr-re -ir a"
6/2.42.0c."
6"/2.404.A:
CyR'a ci a',vrram' e"
2s33.os.111
x774.4 A.F.
$/00'1A/,91.
/4/34 -do s.F:
/48Ga.0S.F.'
14.C. 4V4711LSN7-
427.9,474vs
/.75,07 is
4. C'. .Q6RM
699.0 A..4
4-73.4) A. F:
TYPE ',L" REFLEGTOM
-0.0,441..v ...
;G'Ai,9,t7/NG
4 34 3` ,0 c : Y
4 Ca 8. o c. v.
C/?.o.Ss G'</r7a
` /'47o s.F.
/e9 0 s.F:
I. BENCH MARK B. M.. # 28 / .4 L DER O' MERRY hi TOP OF F H. AT Ni/14 Ni/14CORNER - /2 32. /2
2. ALL WORK S/-/AL..L 8E DONE IN ACCORDANCE W/TH TA/ESE PLANS AND 7/-/L C/TY OF'
FONTAN.4, PUBLIC WDRKS DEPARTMENT C/TY SPEC'/,F/C,4 T/d/t/S1 D4 TED /97.s
3. EARTHWORK OPERAT/DNS W/TIL//N STREET R/GHT-OF--,WAY SHALL CONFORM W/TH 7.y, PROVIS/OA/5
IN SECTION /9 OF 77-lE 'STANDARD SPEC/F/CAT/bNS"' OF THE STATE OF CAL/FORK/A,
D.!V/S/O/V OF H/GA/VVAYS, DATED /964.
4. MAN/-IOLE FRAMES AND COVERS TO 8E CONSTRUCTED ,8Y THE SEWER' CON TRAC70R ,BELOW
F/N/SN GRADE AND UPON c,JMPL,E7'/0N OF PAW/VG TME PAWNG CONTRACTOR SHALL_
SPA/SE ,T1 -/EM O F/N/SN GRADE.
Contractor agrees that he shall assume sole and complete responsibility for job
site conditions during the course of construction of this Project, including safety of all
persons and property; that this requirement shall apply continuously and not be lim-
ited to normal working hours; and that the Contractor shall defend, indemnify and
hold the Owner and the Engineer harmless from any and all liability, real or alleged,
in connection with the performance of work on this Project, excepting for liability
arising from the sole negligence of the Owner or the Engineer.
o POO/110.1. 3i, D.
ALTO., CAtIFORNIA.1