Loading...
HomeMy WebLinkAbout2508-11.tifWW N K �j� W D L N W Q w CURB OPENING - - CATCH BASIN (S) 3i� I NNt7 I I B CURB POINT A - I POINT 8 POINT C Sr,9 POINT D CURB 0 C r i GUTTER) G�tP STRAIGHT GR POINTE 9��P\G K\pGE RIDGE AOIE FY qOF POINT F A Lo.B POINT G u Q DIRECTION OF FLOWP LAN DIRECTION OF FLOW 2 co dao on 9� N K WD - L - N zc� L L 1 POINT D POINT A POINT B POINT C FLOW LINE FLOW LINE PROFILE CASE A jr Z N L WD L - WV W o -- - Q W w CURB OPENING - - - 3 z CATCH BASIN (S) NNC� I I C CURB POINT A -n� POINT B POINT C Sre c POINT E IVY -- POINT D CURB a GUT TERM J QPOINT F PLAN C �' POINT G u a LL DIRECTION OF FLOW�-- 2 a DIRECTION OF FLOW i u- �� zv Z) .- 1 _ � N � L :1 WD L N -..1 � L _ r=====-1 �J POINT D POINT A POINT B POINT C FLOW LINE FLOW LINE PROFILE CASE B M I" 6" M I" 6" M , G , 0 R VAR.- VAR. AR. VAR. � VAR. � VAR. -'� Z1, p RIDGE RY. VALLEY rCURB __ .4: . I� VALLEY I •-I� I FACE + H I SECTION A -A SECTION B -B SECTION C -C AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE APWA-AGC CONCRETE COLLAR FOR RCP STANDARD PLAN PROMULGATED BY THE APWA-AGC JOINT COOPERATIVE COMMITTEE LOCAL DEPRESSIONS AT CATCH BASINS 313-0 1984 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 21 5 I SHEET 1 OF 4 •4 @ 12" L/2 (TYP.) 520-C-2800 CONCRETE I" (TYP.) LA I I � / N I / NEW OR EXIST. PIPE FLOW P / F ow P <A CUT NO. 2 LINE- #4 @ 12" 3-#4 CIRCULAR TIES, SEE NOTE 9 6" MIN. 0 -- o -CUT NO. 2 LINE 6' MIN. CUT NC 3.14 (DD DETAIL "A" (SEE NOTE 10) SONO -TUBE, OR EQUAL, INTERIOR FORM CUT NO. 1: SAW THE TUBE AT AN ANGLE OF A/2 WITH THE TRANS- VERSE PLANE. REVERSE ONE SECTION AND TAPE BOTH SECTIONS TOGETHER FORMING THE DEFLECTION ANGLE A. CUT NO. 2: SAW THE TUBE LONGITUDINALLY REMOVING A STRIP 3.14 (DO -D ) INCHES WIDE ON THE SIDE OPPOSITE THE OPEN JOINT. BEND THE ENDS OF THE CUT TOGETHER AND INSERT THE TUBE IN THE PIPE. 000 a •a. a .. a ,..• e n n a 4. .6 cl. A O. A INTERIOR SURFACE OF PIPE DETAIL "B" REINFORCED CONCRETE PIPE ON HORIZONTAL CURVE AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE APWA-AGC CONCRETE COLLAR FOR RCP STANDARD PLAN JOINT COOPERATIVE COMMITTEE 12 INCHES THROUGH 72 INCHES 380-1 REV. 1993 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 18 4 1/2 21 5 24 5 1/4 27 5 1/2 30 6 33 6 1/4 36 6 1/2 39 7 42 7 1/2 0 14) @ 0 tD @ �n 45 7 3/4 48 8 51 8 1/2 54 9 57 9 I/4 60 9 1/2 63 10 66 1 10 1/4 69 10 3/4 72 11 78 11 3/4 84 12 1/2 90 13 1/4 0 0 @ ►� a •a. a .. a ,..• e n n a 4. .6 cl. A O. A INTERIOR SURFACE OF PIPE DETAIL "B" REINFORCED CONCRETE PIPE ON HORIZONTAL CURVE AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE APWA-AGC CONCRETE COLLAR FOR RCP STANDARD PLAN JOINT COOPERATIVE COMMITTEE 12 INCHES THROUGH 72 INCHES 380-1 REV. 1993 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION W.'\FIESTA\ DVVGS\DETAIL 7 . DWG NOTES: 1. ALL EXPOSED EDGES SHALL BE ROUNDED TO A 1/2 -INCH RADIUS. 2. THE CURB FACE AT POINTS A AND D SHALL BE THE NORMAL CURB FACE OF THE ADJACENT CURB. THE CURB FACE AT POINTS B AND C SHALL BE THE NORMAL CURB FACE OF THE ADJACENT CURB PLUS H (SEE APPLICABLE CATCH BASIN STANDARD PLAN). 3. IN EXISTING STREETS WHERE NO PAVEMENT REMODELING IS INDICATED, THE ELEVATION OF THE OUTER EDGE OF THE LOCAL DEPRESSION SHALL MEET THE FINISHED STREET SURFACE. 4. IN NEW STREETS, OR IN EXISTING STREETS WHERE PAVEMENT REMODELING IS INDICATED: THE ELEVATIONS OF POINTS F AND ,G SHALL BE SET H, HIGHER THAN THE GUTTER FLOW LINE ELEVATIONS AT POINTS A AND D, RESPECTIVELY. THE ELEVATIONS OF POINTS P AND R SHALL BE SET H2 HIGHER THAN THE GUTTER FLOW LINE ELEVATIONS AT POINTS B AND C, RESPECTIVELY. THE ELEVATION OF POINT S SHALL BE SET H2 HIGHER THAN THE ELEVATION AT THE NEAREST GUTTER FLOW LINE. WHERE THERE IS NO GUTTER ADJACENT TO THE LOCAL DEPRESSION, THE ELEVATION OF POINT E SHALL BE SET H3 HIGHER THAN THE ELEVATION AT THE NEAREST TOE OF CURB. 5. DIMENSIONS: H = NOTED ON THE PROJECT PLANS. H, = NOTED ON THE PROJECT PLANS. H2 = NOTED ON THE PROJECT PLANS. H3 = NOTED ON THE PROJECT PLANS. G = 2 FEET. K = 5 FEET. L = 6 FEET. M = 4 FEET. N = 5 FEET. WD = CATCH BASIN W FOR ONE CATCH BASIN OR DISTANCE BETWEEN EXTREME END WALLS FOR MULTIPLE CATCH BASINS. THE THICKNESS OF THE LOCAL DEPRESSION SHALL BE 8 INCHES. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN 313-0 LOCAL DEPRESSIONS AT CATCH BASINS 3 SHEET 4 OF 4 NOTES I. A CONCRETE COLLAR IS REQUIRED WHERE THE CHANGE IN GRADE EXCEEDS 0.10 OF A FOOT PER FOOT. 2. FOR CURVE JOINTS (SEE DETAIL B. SHEET 1) IF THE EXTREME ENDS OF THE PIPE LEAVE A CLEAR SPACE THAT IS GREATER THAN I", BUT IS LESS THAN 3", A CONCRETE COVER IS REQUIRED IN ACCORDANCE WITH SUBSECTION 306-1.2.4 OF THE SSPWC. IF THE EXTREME ENDS OF THE PIPE LEAVE A CLEAR SPACE THAT IS EQUAL TO OR GREATER THAN 3", BUT LESS THAN 6", A CONCRETE COLLAR IS REQUIRED. IF THE CLEAR SPACE IS 6 INCHES OR GREATER, A TRANSITION STRUCTURE IS REQUIRED. 3. CONCRETE COLLAR SHALL NOT BE USED FOR A SIZE CHANGE ON THE MAIN LINE. 4. CONNECTOR PIPES A. WHERE PIPES OF DIFFERENT DIAMETERS ARE JOINED WITH A CONCRETE COLLAR, L AND T SHALL BE THOSE OF THE LARGER PIPE. D= DI OR D2, WHICHEVER IS GREATER. B. WHEN Di IS EQUAL TO OR LESS THAN DZ, JOIN INVERTS AND WHEN Dl IS GREATER THAN D2, JOIN SOFFITS, 5. FOR PIPE LARGER THAN 72" SPECIAL COLLAR DETAILS ARE REQUIRED. 6. FOR PIPE SIZE NOT LISTED USE NEXT SIZE LARGER. 7. REINFORCEMENT SHALL CONFORM TO ASTM A 615. GRADE 40, S. WHERE REINFORCING IS REQUIRED THE DIAMETER OF THE CIRCULAR TIES SHALL BE D+(2X WALL THICKNESS) + T. 9. REINFORCING SHALL BE USED WHERE THE PIPE DIAMETER IS GREATER THAN 21" AND ON ALL PIPES WHERE THE SPACES BETWEEN THE EXTREME ENDS IS 3" OR LARGER. CIRCULAR TIES PIPE DIAMETER N0. OF CIRCULAR TIES 21" OR LESS 3 24" TO 30" 3 33" TO 57" 4 60" TO 72" 5 WHERE THE SPACE BETWEEN PIPE ENDS EXCEEDS 3", THE NUMBER OF CIRCULAR TIES SHALL BE INCREASED TO MAINTAIN AN APPROXIMATE SPACING OF 6" OC. 10. WHERE THE PIPE IS 21" OR LESS IN DIAMETER AN INTERIOR FORM OF UNSEALED SONO -TUBE OR EQUAL SHALL BE USED TO PROVIDE A SMOOTH INTERIOR JOINT. THE PAPER FORM MAY BE LEFT IN PLACE (SEE DETAIL A). WHEN THE PIPE IS 24" OR LARGER A REMOVABLE INTERIOR FORM SHALL BE USED OR THE INTERIOR JOINT SHALL BE COMPLETELY FILLED WITH MORTAR AND NEATLY POINTED. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN 380-1 SHEET 2OF2 CONCRETE COLLAR FOR RCP 12 INCHES THROUGH 72 INCHES FIESTA DEVELOPMENT, INC. 7072 GARFI ELD AVENUE HUNTINGTON BEACH, CA. 92648 (714) 842-5527 ROUND EDGES TO RADIUS OF APPROXIMATE ID OF LATERAL. MAXIMUM 36'- A 6• -A a B BARS - TABLE FOR DIMENSIONS AND BAR SIZES D2 F OR OR B T (INCHES) (INCHES) N a aco m �otO- O a co t�. O o - u X 12 4 0 0 ;n @ 'n io @ • WHEN D2 IS 60" OR IS 1 4 1/4 18 4 1/2 21 5 24 5 1/4 27 5 1/2 30 6 33 6 1/4 36 6 1/2 39 7 42 7 1/2 0 14) @ 0 tD @ �n 45 7 3/4 48 8 51 8 1/2 54 9 57 9 I/4 60 9 1/2 63 10 66 1 10 1/4 69 10 3/4 72 11 78 11 3/4 84 12 1/2 90 13 1/4 0 0 @ ►� @ �n M -M -N"' 96 14 102 15 1/2 108 16 114 16 1/2 120 17 126 17 132 17 1/2 138 17 1/2 144 18 U. P SEE NOTE 8 (\J--.- -- STATION STATION PT. �3 OR •4 0 18' OC N II. 6 t LATERAL / L CONNECTOR PIPE � v ROUND EDGES M 6• TO 3" R LL I P ml � N' NI 3 OR @4, SEE NOTE 4 D BARS PLAN •3 OR »4 LJL t MAIN LINE STATION AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER 'A -4@18' OC, BOTH STANDARD PLAN 340-0 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION WAYS, TO BE USED SHEET 1 OF 2 WHEN D2 IS 60" OR LONGITUDINAL SECTION MORE A BARS ��I D BARS @3 OR 1,4 F BARS P _ I o3 OR #4 00 1 B BARS @ 18" OC- I ELEV. R I ELEV. S 1 I •4018' OC, BOTH WAYS, TO BE USED WHEN B IS 60" OR MORE - Li�� MAIN LINE SECTION N' -N" -N"' PROJECTED ON M -M -N"' AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE APWA-AGC JOINT COOPERATIVE COMMITTEE 1992 TRANSITION STRUCTURE PIPE TO PIPE STANDARD PLAN 340-0 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SHEET 1 OF 2 REVISIONS ENGINEER CITY A P1MMP %/AI MATP _ AP1P1M1 % I A I MATT.... BENCHMARK BM #613 SIERRA AVE. AT MAIN DRIVE JURUPA PARK TOP F.H. 1102.18 ELEVATION: 1102.18 NOTES I. THE HORIZONTAL ANGLE OF CONVERGENCE OR DIVERGENCE, 6, SHALL NOT EXCEED 5045'. 2. VALUES FOR A. B, C. DI AND D2 ARE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S ARE SHOWN WHEN REQUIRED BY NOTE 10. 3. FLOOR OF STRUCTURE SHALL BE STEEL TROWELED TO SPRING LINE. 4. REINFORCEMENT STEEL SHALL CONFORM TO ASTM A 615, GRADE 40, AND SHALL TERMINATE 1 112" CLEAR OF CONCRETE SURFACES UNLESS OTHERWISE SHOWN, LONGITUDINAL BARS SHALL BE #3 OR #4 SPACED 18" OC OR LESS. 5. ELEVATIONS APPLIES AT INSIDE WALL OF STRUCTURE. 6. TRANSITION STRUCTURE SHALL BE POURED IN ONE CONTINUOUS OPERATION, EXCEPT THAT THE CONTRACTOR SHALL HAVE THE OPTION OF PLACING AT THE SPRING LINE A CONSTRUCTION JOINT LONGITUDINAL KEYWAY. 7. THE LENGTH OF THE STRUCTURE MAY BE INCREASED AT THE OPTION OF THE CONTRACTOR TO MEET RCP ENDS, USING D BARS, LONGITUDINAL AND BOTTOM REINFORCEMENT IN EXTENDED PORTION OF SAME DIAMETER AND SPACING AS SPECIFIED IN THE TABLE, BUT ANY CHANGE IN THE LOCATION OF SPUR MUST BE APPROVED BY THE ENGINEER. 8. EMBEDMENT P SHALL BE AS SPECIFIED IN THE TABLE, UNLESS OTHERWISE SHOWN ON THE PROJECT DRAWINGS. 9. WHEN THERE IS NO SPUR REQUIRED, A & B BARS SHALL BE OMITTED. 10. WHEN ELEVATION R AND ELEVATION S ARE NOT SHOWN ON PROJECT DRAWINGS, INLET PIPE SHALL ENTER MAIN LINE RADIALLY. WHEN INLET PIPE ENTERS MAIN LINE OTHER THAN RADIALLY, ELEVATION S SHALL BE SHOWN ON PROJECT DRAWINGS, AND INLET PIPE SHALL BE LAID ON A STRAIGHT GRADE FROM ELEVATION S TO CATCH BASIN OR GRADE BREAK IN INLET LINE, ELEVATION R SHALL BE SHOWN ON PROJECT DRAWINGS ONLY WHEN STUB IS TO BE PROVIDED IN MAIN LINE FOR FUTURE CONSTRUCTION OF INLET PIPE. II. THE MAXIMUM COVER ABOVE THIS STRUCTURE SHALL BE 25'. IF THE COVER EXCEEDS 25' A SPECIAL STRUCTURE SHALL BE DESIGNED FOR THE COVER AND DETAILED ON THE PROJECT DRAWINGS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN 340-0 TRANSITION STRUCTURE PIPE TO PIPE SHEET 2 OF 2 rQ�OFESS/ONq ����� P�p,B NAZ,9�i F�c� L�j C 36943 rTl * Exp. 6/30/00 `l>1 c w qTF OF CITY OF FONTANA CALIFORNIA PUBLIC WORKS DEPARTMENT DRAWN BY: PYH DESIGNED BY: DETAIL SHEETS SN CHECKED BY: APPROVED: • L ,s>-eGe.��--/Z_ 94f SN t-- , CITY ENGINEER R.C.E. 25126 SCALE: AS NOTED DATE: DWG. N0. SHT. N0. 2508 II of 19