Loading...
HomeMy WebLinkAbout2501-1� 10 d"Ad t look" I lsfJAwlf C ai LI' U f4 ✓AWu,E h d � ' vi El � ✓� �.eOJ�L'T '110 11//, 11 f /YE"e_,w fW co VICINITY MAP NO SCALE II Ir -)I Ir-)\ ]I- lu lu lu ]IF lAAuu.c_vu.Au.%T lu IL A Nr". '%s IUCS]IFANA , CAUll CUSIA - E�/.5T. /4 'II _' -r-2 1 2 1 3 4 5 6 7 8 9 10 11 i 12 13 CONSTRUCT VERTICAL 18'1 CMP. WITH TYPE OMPI �t_ -AV r 1\1 J r r �1 � C)IN INDEX MAP SCALE: I = 100 a 1 5 0' 11 f1210,► 2O ,....� r. (' /1, I n _1 Ii1�-/%j== _ �.�� ` _ _=-=_-�-------"" • • � • � • • s.o �_____--���=,---- � � 5li>E WALL K Gs 1 AC. FAVEMr.NT 2 6" cuQ0 Gu -r cF w ( / 1 cvR Go-rTEP- -rc - j 0. 0-11 -12" COMPACTEP -'i-' = � � TC = 4• -f- 0.0-7 ' NATJvE SOIL.._ 1 0,--'3 FoE LD,NI✓ tt TYPICAL. STREET SECT�(ON (6 CF) <0' 003' 023, i2` CoA4A344'i ,e/Gb. G'Q'/CB�c•�C/11F,� ig-0.47' T'I. a 5.5 TYPICAL STREET SECTION (6"CF) TRACT N0. 14682 LIQ � LtI I/) -SEE SHT. NO. 6FOR / p STORM DRAIN E STORM DRAIN QUANTITY ESTIMATES R/W IMPROVE MEN T S 1 R/ W GENERAL, CONSTRUCTION NOTES: 1. THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THESE PIANS ANO TO THE REQUIREMENTS OF THE CITY STANDARD SPEC I F I CAT I ONS, AND INE STAN OARIP 9�'EG(FI CAT10 N FOf2 PUBLIC WORKS C,00TRUCYTOW (CGKE.EN 80Ok) LATEST RI`V151ON S. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM FONTANA PUBLIC WORKS DEPARTMENT PRIOR TO START OF ANY WORK WITHIN THE CITY LIMITS. 3. STATIONING REFERS TO THE CENTERLINES OF STREET. 4. CURB DATA REFERS TO THE FACE OF THE CURB. 5. ALL EXPOSED CONCRETE SHALL CONFORM IN GRADE, COLOR AND FINISH TO ALL ADJOINING CURBS AND SIDEWALKS. 6. PAVEMENT SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY AS REQUIRED BY SOILS TEST TAKEN AFTER COMPLETION OF ROUGH GRADING. 7, ALL UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO PAVING OF STREETS. 8. EXISTING UNDERGROUND UTILITIES ARE AS A PER AVAILABLE RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE FIELD. CONTRACTOR SHALL CALL EACH UTILITY PRIOR TO ANY WORK. 9. ALL M MHOLE AND CLEANOUT FRAMES AND COVERS SHALL BE CONSTRUCTED 6' BELOW FINISHED GRADE BY SEWER CONTRACTOR AND SHALL BE RAISED TO GRADE BY PAVING CONTRACTOR AFTER COMPLETION OF PAVING. 10. ALL VALVE FRAMES AND COVERS SHALL BE CONSTRUCTED 6' BELOW FINISHED GRADE BY NATER CONTRACTOR AND SHALL BE RAISED TO GRADE BY PAVING CONTRACTOR AFTER COMPLETION OF PAVING. I� li ., ,,, , =' iti ' �• •� • � � s1oEwA� K 6 It REFER TO CITY OF FONTANA, UNOERGFi0UN0 UTILITY LOCATION stoE wAt_� ,L , ' ;}; STANDARD DETAIL 129 o6 , r_ ( ) A C PAVEMENT 12. THE CONTRACTOR(S) SHALL COORDINATE CONSTRUCTION WITH ALL o4 CUr 9 • GUTTER ,�5%to ( 8" CURS 8 GUTTER UT I L I T IES AND OTHER IMRPOVEMENTS INCLUD196. BUT NOT ;LIMITED T C E• 0.20' 12 C OMPA C T E b 3 T C• 0.20' TO GAS, TELEPHONE, ELECTRICAL. LIGHTING, TELEVISION,."CABLE, F L= E 0.41 1 NATIVE SOIL FL E 0.4-11 LANDSCAPING, LANDSCAPING I RR I GAT I ON, DOMESTIC WATER, -T- 1. , 5. RECLAIMED WATER, SEWER, STORM DRAINAGE, FLOOD CONTROL SYSTEMS. ETC. TYPICAL STREET S E C T I DIV (8"CF) 13. AS BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE 400 N r s ENGGIWI�EIZ OF 9ECORP. REC091? DRAWINGS SHALL 8E PROVIPSD 'TDTHE N0. ITEM QUANTITY UNIT 15 INSTALL 30�R.C.P. CLASS IV. 513 LF 16 INSTALL 18�R.C.P. CLASS IV. 13 LF. CONSTRUCT VERTICAL 18'1 CMP. WITH TYPE OMPI 17 INLET WITH STEEL COVER PER CALTRANS STD. 2.5 LF. OCONSTRUCT DWG. D-75. ( SEE SHT. NO. 6 FOR DETAILS) 18 CONSTRUCT C.B. NO.3 PER LA.C.FC.D• STD. DWG, 2-D163 L.F 5A W=7 V=4.5 WITH LOCAL QEP PER L.A.C.F.C.D. I EA. STD. DWG. 2-D88 CASE CRESSION 19 CONSTRUCT M.H. NO. I PER L.A.C. F. C.D. STD. DWG. 2-D102 I EA. ® CONST. CONCRETE COLLAR PER. L.A.C.F.C.D. STD. DWG. 2-D393 I EA. PRIVATE ENGINEERS NOTICE TO ALL CONTRACTORS THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY FOR ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY- AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY, A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN, AND ANY OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS, AND IS RESPONSIBLE FOR THE PROTECTION OF, AND ANY DAMAGE TO, THESE LINES OR STRUCTURES. CONSTRUCTION NOTES AND QUANTITY ESTIMATES N4. ITEM QUANTITY UIiMT 1 95°1v C0ONSTRUCT ___4`' _ A . C OVER CUMPACTED NATIVE SOIL e;,49�5 "ty'9E+ Co) 781927 S . F• CONSTRUCT CONCRETE CURET AND MUTTER (6"C.F. PER CITY OF FONTANA STANDARD 1)ETA I L 10 1) A128 L • F, OCONSTRUCT CONCRETE CURES AND GUTTER (8 "C . F . PER CITY OF FONTANA STANDARD DETAIL 101). L.F 5A CONSTRUCT C9055 GUTTER. W. 9FANdR.EL PER L -A -C -12.? -,W 933 S.F STAN PARD. PLAN 1110 - 0- �5 CONSTRUCT STANDARD CROSS GUTTER AND SPANDRELL PER CITY OR FONTANA STANDARD DETAIL 104. 924 S.F. QCONSTRUCT 4" THICK CONCRETE SIDEWALK WIDTH AND LOCATION PER PLAN. 4`P59 GIN 9TD 105A 17,216 S.F. (� CONSTRUCT RAMPED CURB RETURN PER CITY OF v FONTANA STANDARD 104-A. 8 EA. INSTALL STREET LIGHT -5800 LUMEN HIGH PRESSURE O SODIUM LAMPS. C09RA HEADS W/CUT OF LENSE LIGHT • 10 EA, FIXTURE ON OR NAMENTAL POLE WITH G FEET kloksT AK m TES 25 FE6'>l 'FK614 5PACING 125 PEEr MIN. 7b ?Zg mer CONST. RESIDENTIAL DRIVEWAY PER CITY OF FONTANA II STANDARD 102 W=16' TO BE FIELD LOCATED. 64 EA. 1� IN57ALL 5ToF 51GN g, STOr gog ( ►3Y GiTY For. CES) 2 EA• CONSTRUCT UNDER SIDEWALK PRAIKI PE12 CITY (3TC). I�- FlEl2 W LTH A 3' x ." CURD FACE OPEnI NG • 2 EAM00; STORM DRAIN CONSTRUCTION Nth I -E X5�' e.$:r' = �.'�d541tA' iitl.ShcgC.: �'3.� ...�.L... �_�.�.J.:_. • .yam._ _.1._i. �i-..l^� �1't ..ac-_'a.�z-.'�_ .. _ ..= =:- _' _ '.-__ ..._:. i WHEN ENGINEER CALLS FOR THICKENING THE INVERT 01- THE PIPE, THIS SHALL BE ACCOMPLISHED BY THE FOLIl:)WING MANNER. THE SOFFIT SHALL BE INCREASED BY PLACING A BLANKET Of CONCRETE OF THE EXTRA REQUIRED THICKNESS INMEOIAt"ELY FOLLOWING THE PIP[: MACHINE PLACEMENT AND BENEATH THE POLYETHYLENE SHEET, THE INVERT THICKENING WI4L BE OBTAINED BY OVEREXCAVArING THF TRENCH AND 'I --I -- UPS THE PIPE MAC, IINE MANDREL BY THE EXTRA REQUIRED THICKNESS, • MOTE TRANSITION DOES NOT CHANGE TYPICAL STREET SECTION REMAINS PER STANDARD SHOWN ABOVE (F . L .• �- 0 .4 7) GRADE BRAKE OCCURS ON CURB PROFILE ONLY. Ct r FoNTANA . 14. TYPE, LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM WITH THE CITY OF FONTANA STANDARD DETAILS AND DETAILS HEREON. 15. CONTRACTOR IS INSTRUCTED TO REFER TO THESE PLANS AND THE SPECIFICATIONS, AND WHERE THERE IS OR MAY BE A CONFLICT : SHALL IMMEDIATELY REPORT SAID CONFLICT OR POSSIBLE CONFLICT TO THE OWNER'S REPRESENTATIVE. 16. STERILANT REQUIRED UNDER ALL A. C. PAVEMENT. ., 17. NO CONCRETE SHALL BE PLACED UNTIL THE FOAMS AND REINFORCING A1 LT STEEL HAS BEEN PLACED, INSPECTED AND APPROVED. Bp 18. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE pate;,,i (5) FEET IN DEPTH SHALL -BE EFFECTIVELY GUARDED BY A SHORING SYSTEM, SLOPING OF THE GROUND OR OTHER EQUIVALENT MEANS. TRENCHES LESS THAN FIVE (5) FEET IN DEPTH SHALL ALSO BE GUARDED WHEN EXAMINATION INDICATES HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED, 19. THE CONTRACTOR(S) SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK AS DESCRIBED IN NOTE 6 ABOVE FROM CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. SEE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SECT ION 306-1. 1.6. ,.P ILT 20.`NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL ,.=BUOF THE CITY'S INSPECTOR. AS. - 2 ACTUAL PAVEMENT.THICKNESS TO BE DETERMINED BY SOIL ENGINEER AFTER COMPLETION OF ROUGH GRADING. - �- 22. ADEQUATE STAKES SHALL BE -SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. 23. ALL UTILITY COMPANIES SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO WORKING AROUND THEIR FACILITIES. 24. ALL BACKFILL TO BE CERTIFIED BY SOILS ENGINEER. 25. BACKFILL MATERIALS TO HAVE A S. E. OF 30 (MIN) AND MIN. COMPACTION OF 90%. 26. THE CONTRACTOR IS REQUIRED TO HAVE A FULL. SET OF L. A. C. F. C. STANDARDS ON SITE AT ALL TIMES PRIOR TO U - l LI TY NOTIFICATIONS: STORM DRAIN CONTRUCT I ON. . 27. PRIOR TO CONSTRUCTION OF NATER SEWER ANO OA STOAIM•z"OAAIN WATER. SAN GABRI(-- VALLEY WATER COMPANY � _• ._ - _,i:�_ 11142 GARVEY AVENUE LINES THE CONTRACTOR SHALL EXPOSE THE EX I ST I NG�,,,WATEA EL MONTE, CA 91734 SEWER ANO/ OR STORM DAA I N L I NES WHERE CONNECT I ONS- (818) 448---6183 OCCUR AND VERIFY THEIR ELEVATION AND LOCATION APPROVAL BY THE CITY OF FONTANA OF A PROPOSED CONNECTION TO'A`-� �:-,".,. sE W>nR: CITY OF FONTANA 923CITY FACILITY DOES NOT IMPLY APPROVAL OF THE COMECTNE55 FONTANA, CA 92,33 6353 SIERRAAVENUE.8 OF THE ELEVATION AND/OR LOCATION AS SHOWN ON PLANS. (909) 350-7640 28. IF DURING CONSTRUCTION, GROUND WATER IS ENCOUNTERED, A SYSTEM APPROVED BY THE CITY ENGINEER SHALL BE INSTALLED DOWER; SOUTHERN CALIFORNIA EDISON COMPANY' TO DEWATER SAID AREA AT THE DIRECTION OF THE SOILS 7951 REDWOOD AVENUE ENGINEER. FONTANA, CA 92336 9 357-6231 (NO of ME:RR 29.MALL EXPOSED METAL SURFACES SHALL BE GALVANIZED ZED I N 357-�62?3 (NO. OF MCRRI L) LL) ACCORDANCE WITH THE CITY STANDARD SPECIFICATION. GAS: SOUTHERN CALIFORNIA GAS COMPANY 16231 VALLEY BOULEVARD FON-rANA, CA 92335 PRIVATE ENGINEER'S NOTE ATIN: LOU WESTFALL"' t is .. l�rj9;� �.. (909) 889--9711 : THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR SOUTHERN CALIFORNIA GAS COMPANY ASSURING THE ACCURACY AND ACCEPTABILITY OF THE WORK HEREON. TRANSMISSION DIVISION IN THE EVENT OF DISCREPANCIES ARISING MING CONSTRUCTION, 2191 E. BIRCH STREET THE PA I VATE ENG I NEER SHALL BE RESPONS I BLE FOR DETERMINING AN OREA, CA 92621 ACjjfLE SOLUTION AND REVISING THE PLANS FOA APPROVAL BY (714) 529--2889 TI{.