Loading...
HomeMy WebLinkAbout2481-11.tifj : *2175*frontage*I ayout*8044bbe7. dgn CO • • • • SW O J A 1 T •• • • • • • • • • • Cr ..t ..T...t J. ..I...t J. ..1.. .1 • d-52 .L. -_y 1 ter Q :•-•� �� :J 01 wor tr.fl..f■1 • 0 • ; • • •• • 1S,: .•(:)J • t...r...r -t • • ••`. 44 T i et - 'yr 4 e- •© 0.1 • : N.: .0. o, • r • : : ::CS 0.. • LA S...t • • • • • • war .wo- • 04.1 • • immimolimenimmibour • • 0:To : : : • • 0 to • Exist In Gedund • Pt c-OntOrl- • • • 0 Let • • • few* • • IT'S 'INE LAIN DIAL WOE YOU DIG! 11400-4111-41311 90+50 Gts 0 C3 1. 91 92 NI 0.3 DN Highland Ave • 93 JUNIPER AVENUE 20+35.11 EC 1506.27 TS 94 XTS- • • 0 • •••,-••, • • • • • • • rot 95 ---Meet.ExIstinq/ End Taber 21+00 (1508.06) End .-t-ructural Sect or? 20.1-34.90 BC /4 1506.08 FS 93+10.48 So. Highland A.Vo 96 97 Curve Data • • 98 99 No Rad I us A Tangent Length 0 8501 37°21134" 287.371 554.241 @ 351 90°06154" . 35.071 ,. 55.05 ' ® 35 ' 89°53106" . 34.931 54.911 @ 351 89°53106" 34.931 54.911 @ _ 351 90°0615411 35.071 55.051 100 101 101+50 21/4 156t;317 FS -101 ii 101 A/4 1505.90 FS IT> 1505.91 FS A/4 1565'... Elev 15017.00 radl 0 99+40 98+00 • IND AW 410. 1 war mow, 101 101 Temporary Easement R/W End Curb & Gutter Begin AC Dike 1506.10 TC Curb & Gutter 1505.57 TC R/W A/4 1505.54 TB '19+25.11 EC orlio rwir40.1 1 End Taper /504.55 TB 19+15 Begln Taper . 19+00 End AC Dike 19+00 Bedin Structurerl Section +61 63 EC CoNSTRUCt NEW ihAVEMENT SECT ION. STRUCTURAL SECT I ON IS 6 1/2 INCHES A. C. PAVEMENT OVER 4 INCHES CRUSHED AGGREGATE BASE. CONSTRUCT 8 CURB AND GUTTER PER CITY STANDARD,OETAIL 101. A/4 1505.48 TB 4/4 1505.30 TB PP CALL AT LEAST WO SORKIN DAYS PRIOR TO EXCAVATING seateigure saw= *err OF SOUTHERN CALIFORNIA inn EAUFAITINEw OINEMOTEN SELL MIFF IS UTILITY lECERINOWID SERVICE ALERT AT 14100.421.4111 18+80 (1503.06) "CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR LIABLE FOR. UNAUTHORIZED CHANGES OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS." JUNIPER AVENUE n aper 19+15 Begin Taper 19+00 Begin AC Dike PLANS PREPARED BY: DRUM PLANNING ARCHITECTURE ENGINEERING PROGRAM MOW. 275 VEST HOSPITALITY LANE. SUITE 314 SAN BERNARDINO CA 92408 (909)889-3466 DMJM JOB NO. 2175.01 /-4\ CONSTRUCT 8 ASPHALT CONCRETE D IKE PER MIN. 0.10 FEET THICK. AP ADDED RECORD DRAWING DATA REVISION DESCRIPTION 001 DA E GR. CITY DATE z_t.,,coNSTRUCT NEW pA.VEMENT SECTION. STRUCTURAL SECTION IS 3 3/4 %INCHES A.C. PAVEMENT OVER 4 INCHES CRUSHED AGGREGATE BASE. 3 CONSTRUCT DRA I NAGE FAC IL I TY PER DETA LS SHEETS 22 THRU 26. 0 INSTALL 411 CONDU I T PER DETA IL SHEET 19. @ POLE AND LUMINA IRE TO BE INSTALLED BY S. C. E. go TO BE RELOCATED BY OTHERS. 3 TICAPSUITJCI-NCII;LR-ra P RESSION TEMPORARY RAMP PER $ DETA I L SHEET 19. / CONSTRUCT AC OVERS I DE DRAIN PER CAL TRANS % - STANDARD PLANS D87B AND PER DETA I LS SHEET 20. RECORD DRAWINGS 0 CC1NSTRUCT GCP MOD IF I ED INLET PER DETA IL SHEET 19. DWG NO. WI SECT 1110F 61 0 0 0 41A. RCE 20975, Exp. 9/30/97 CITY OF FONTANA,CALWORNIA SOUTH HIGHLAND AVENUE MOVEMENT PROJECT DRAWN BY: DRAWN BY: CHECKED BY: mum HIGHLAND AVENUE STA. 90+50 TO STA. 101+50 A7714= CITY ENGINEER R.C.E. 25126 SCALE: DATE: DRAWING NO.: 31