Loading...
HomeMy WebLinkAbout2479-1.tifINSTALL ON STREET6O C LIGHT POST CONSTRUCTION NOTES 1 PAINT 12" WIDE YELLOW X -WALK 2 PANT 12" WIDE WHITE LIMIT LINE 3 PAINT 6" WIDE SOLID WHITE STRIPE 4 PAINT PAVEMENT MARKING AS SHOWN 5 INSTALL NEW R-1 130001 "STOP" SIGN 6(� INSTALL SCHOOL SIGN INSTALLATION [TYPE PER PLANT PER FIG. 10-3 [SEE CALTRANS TRAFFIC MANUALI 7�D INSTALL R -26(S) IRT. OR LT.] "NO STOPPING ANYTIME" �B INSTALL PASSENGER LOADING/UNLOADING SIGN PER DETAIL THIS SHEET EXISTING STRIPING AND PAVEMENT MARKING TO REMAIN RESTRIPE W/RPM PER CALTRANS DETAIL 21 DETAIL Gs BLACK LETTERING ON WHITE BACKGROUND CONSTRUCT HANDICAP RAMP PER CITY STD. 104A GENERAL NOTES: 1. ALL TRAFFIC CONTROL WORK AND DEVICES FOR CONSTRUCTION SHALL CONFORM TO THE "MANUAL OF TRAFFIC CONTROLS", LATEST EDITION, CALTRANS STANDARD SPECIFICATIONS AND STANDARD PLANS, LATEST EDITION. 2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS AND THE CITY OF FONTANA ENGINEERING DIVISION STANDARD SPECIFICATIONS DATED 1915, AND ANY REVISIONS THEREAFTER. 3. CONTRACTOR SHALL REFER TO THE CITY ENGINEER IN THE EVENT OF A CONFLICT OR POTENTIAL CONFLICT WITH THE PLANS AND/OR SPECIFICATIONS FOR THIS PROJECT. 4. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO CONSTRUCTION BEGINNING. 5, ALL WORK AREAS SHALL BE COMPLETELY CONED AND/OR DELINEATED AND/OR BARRICADED. FOR ANY WORK REQUIRING A LANE CLOSURE, CONTRACTOR SHALL FOLLOW THE GUIDELINES IN THE LATEST EDITION OF THE WORK AREA TRAFFIC CONTROL HANDBOOK. 6. ALL ADVANCE WARNING SIGNS SHALL BE REFLECTORIZED. 7. CONSTRUCTION TRUCK TRAFFIC MERGING INTO TRAFFIC LANES SHALL BE BY USE OF QUALIFIED FLAGMEN AND APPROPRIATE SIGNAGE AS DIRECTED BY THE CITY ENGINEER, OR QUALIFIED FLAGGERS SHALL BE USED WHERE CONSTRUCTION REDUCES THE ROAD WAY TO A SINGLE THROUGH LANE OR WHERE THROUGH TRAFFIC MUST STOP FOR EQUIPMENT MOVEMENT SCHOOL SITE CANYON CREST DRIVE S. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATION SHEETS. A M"MUM 12' TRAVEL LANE AND EMERGENCY ACCESS SHALL BE MAINTAINED AT ALL TIMES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT ALL TIMES. MASK OR BAG ALL CONFLICTING SIGNS, AND ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS ARE TO BE REMOVED FROM THE PAVEMENT BY WET SAND BLASTING BY THE CONTRACTOR, OR AS DIRECTED BY THE CITY ENGINEER. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES TO THEM ORIGINAL CONDITION, OR TO THE SATISFACTION OF THE CITY ENGINEER. REMOVAL OF ALL SIGNS AND LEGENDS SHALL BE COORDINATED WITH THE CITY OF FONTANA TRAFFIC SECTION. STOP SIGNS WILL BE REMOVED ONLY BY CITY FORCES. FIVE (5) DAYS ADVANCE WRITTEN NOTICE TO THE CITY TRAFFIC SECTION IS REQUIRED TO COORDINATE WORK WITH CITY FORCES. EXACT LOCATION OF ALL EQUIPMENT AND CONTROL DEVICES TO BE DETERMINED BY THE CITY ENGINEER. ADDITIONAL WARNING AND/OR CONSTRUCTION SIGNS MAY BE REQUIRED BY THE CITY ENGINEER. EXISTING CENTERLINE STRIPING TO REMAIN 10, w w Ln w w Ln QSQf ESS/p;� ��� �• LGo zB No. 13191 Exp. 3-31-01 9�FOF CSL\����� :Z GLEN L. Ll1d M R. C. 1319h DATE REGISTRATION EXPIRES MARCH 31, god