Loading...
HomeMy WebLinkAbout2456-10NO T S I. THE HORIZONTAL ANGLE OF CONVERGENCE OR DIVERGENCE, e. SHALL NOT EXCEED 5.45'. ON THE PROJECT 2. DRAWINGS. ELEVATIONOR AND i AND DELEVATION SN ARE SHOWN WHEN D REQUIRED BY NOTE 10. 3. FLOOR OF STRUCTURE SHALL BE STEEL TROWELED TO SPRING LINE. 4. REINFORCEMENT STEEL SHALL CONFORM TO ASTM A 613, GRADE 40. AND SHALL TERMINATE 1 1/2" CLEAR OF CONCRETE SURFACES UNLESS OTHERWISE SHOWN. LONGITUDINAL BARS SHALL BE N3 OR 94 SPACED 18" OC OR LESS. 5. ELEVATIONS APPLIES AT INSIDE WALL OF STRUCTURE. 6. TRANSITION STRUCTURE SHALL BE POURED IN ONE CONTINUOUS OPERATION. EXCEPT THAT THE CONTRACTOR SHALL HAVE THE OPTION OF PLACING AT THE SPRING LINE A CONSTRUCTION JOINT LONGITUDINAL KEYWAY. 7. THE LENGTH OF THE STRUCTURE MAY 9E INCREASED AT THE OPTION OF THE CONTRACTOR TO MEET RCP ENDS. USING D BARS. LONGITUDINAL AND BOTTOM REINFORCEMENT IN EXTENDED PORTION OF SAME DIAMETER TTHE LOCATIONNOFASPUREM SITDBE APPROVED IN THE EB UT ANY CHANGEE BYTHE ENGINEER. S. EMBEDMENT P OWN ON THE PROJECIED IN THE T DRAWINGS. UNLESS OTHERWISE SH 9. WHEN THERE IS NO SPUR REQUIRED. A S B BARS SHALL BE.OMITTED. 10. WHEN ELEVATION R AND ELEVATION S ARE NOT SHOWN ON PROJECT DRAWINGS. INLET PIPE SHALL ENTER MAIN LINE RADIALLY. WHEN INLET PIPE ENTERS MAIN LINE OTHER THAN RADIALLY. ELEVATIONS SHALL BE SHOWN ON PROJECT DRAWINGS. AND INLET PIPE SHALL SE LAID ON A STRAIGHT GRADE FROM ELEVATION S TO CATCH BASIN OR GRADE BREAK IN INLET LINE. ELEVATION R SHALL BE SHOWN ON PROJECT DRAWINGS URE CONSTRUCTION OF 1LETIS OPgPEPROVIDED IN MAIN LINE FOR FU 11. THE MAXIMUM COVER ABOVE THIS STRUCTURE SHALL BE 25'. IF THE COVER EXCEEDS 25' A SPECIAL STRUCTURE SHALL E ED ON THE PROJECT DR AWING S, DESIGNED FOR THE COVER AND DETAILED 9"10IrAL OW Of BLANKET (TYPI ---� --CM921 POIC WftL (9111110C I C OR P"E a UwoISrula D CAM (TYP) Y�) OUTSIDE DF 1041111C WILL EXISTIIIt PIBE CONCRETE BLANKET JFOR EXISTING PIPES CROSSED OVER BY A NW PIM CLAB6 420-00 CONCRETE) •" FBAs 0) W, • 3/400 FOA 8z I!• m 1. CONCRETE BILANKET IS REMMRED NR IEN THE CLEARAINCE WTVVM T MME TOP OF TFIE EM I11A Flt AM ?FIE 80v 1 M OF f NE CROSSING PIPE IS LESS THAN ,C. 2. "Y" = 0/6(6" MON*) WHERE THE CLEARANCE BE I WE TFNE TIP OF THE EXISTING P" AND ?FIE SOTTOIM OF THE C PIPE M LESS THAN "Y", THE CONCRETE SHALL BE PLACED BETWEEN THE PIPES AND AROUND THE SIDES OF THE CROSSING PIPE UP TO A LEVEL EQUAL TO "Y' ABOVE THE EXISTING PIPE, OR AS REQUIRED BY NOTE 3 BELOW, WHICHEVER IS HIGHEFL 3. "X• = D/, 2, MINIMUM, TO PROVIDE BEDDING MATERNAL FOR THE CROSSING CONDUIT. WHEN "X" IS LESS THAN THIS MINIMUM, M ENTIRE TOP SURFACE OF THE BLANKET SHALL BE RAISED TO MAKE CONTACT WITH THE LOWER 90. OF THE CROSSING PIPE. 4. THE BLANKET SHALL EXTENT LONGITUDINALLY TO THE FIRST JOINT BEYOND THE TRENCH EXCAVATION AT EACH END OF THE BLANKET, EXCEPT THAT THE BLANKET NEED NOT BE EXTENDED MORE THAN 4 FEET BEYOND THE TRENCH. S. WHENEVER A PIPE BELL IS ENCOUNTERED WITHIN THE LIMITS OF THE BLANKET, ALL DWENSlIONS SHALL RVEF" TO THE BELL 1) MrvElrt SL AO (v ARCH OR BONN�• 6• �_ 2' TIMM 91 VFW OR OTA UI KCTION (CROSSING CONDT) A"ROVED COMPRESSIBLE MATtOW VMOMSTVI!!!0 [ARTA % ' ~ ( 110 ,NIAIIMtUM me OUT31K IW PIPE KLL txlsTllw ce�reult COMPRESSIBLE BLANK ff (IN EXISTING PIPES CROSSED OVER BY A NEW BOX ON A" M 1. COMPI4ESS*�1NI "ET 98 REQC' RED M TEN THE CLEA01114CE LIETW'M THE TOP OF TME E'XIS'TM PIPE AND THE BOTTOM OF THE CROSSING CONDUIT (BOK OR ARCH) IS LESS THIN i B". t. THE SLAWKET SHALL EXTEND LONGITUDE 4ALLY FOR THE FULL CROSSING CONDUIT TRENCH WIM4. AMERICAN CLIC WORKS ASSOCIATION — SOUTHERN CALIFORNIA CHAPTER 1 4 1/4 c � . IRS PLAN J� COOPERATIVE E BLANKET PROTECTION FOR PIPES 225-0 2 S/2 SMI 1 OF 1 IUBE WITH STANDARD SPECIRCATK MS FOR PUBLIC WORKS CONSTRt1CT1011 •3 OR •4 ® 18' 0 C *OUNO EDGES TO RAOIUS OF APPROXIMATE ID OF LATERAD. MAXIMUM 36' A IS e BARS �. � P SEE I NOTE 8 TABL i FOR DIMENSIONS AND BAR SIZES 7t F w N STATION 2 m u STATION PT.� OR 00m g T ` D B ARS < o (INCHES) (INCMESI 12 4 IS 1 4 1/4 c � . ( 60 -21/2 l ®A 2 S/2 LEV. 10 � 4 c c 10 I/4 A. TA. STA. L03Pgg 24 S 1/4 ;� io OR • 4 ® 18. OC + I 11 27 S 1/2 e 76 II 3/4 ELEV. R 30 6 64 i 33 6 I/4 13 1/4 36 6 1/2 14 ~ •4+l� 18' OC. BOTH 39 7 IS I /?—j 0 0 •4ele• . BOTH WAYS. To BE OC WAYS. TO BE USEQ 42 7 I/2 lob WHEN 02 IS 60' OR 45 7 3/4 16 1/2 n ;p SECTION MORE 48 6 t7ECTIQN LONGITUDINAL, N` SI 1 6 1/2 17 171/2 A BARS w 0 BARS { 03 OR 04 54 9 57 9 1/4 c � . F BARS 60 -21/2 ®A 63 10 � 66 10 I/4 • L03Pgg 10 3/4B OR • 4 ® 18. OC BARS 72 11 ( , ELEv. S 76 II 3/4 ELEV. R 64 90 13 1/4 96 14 ~ --�.----+'- 102 IS I /?—j 0 0 •4ele• . BOTH WAYS. To BE OC 16 lob USED WHEN B IS 60' OR MOR£ �6- MAIN LINE 114 16 1/2 n ;p 120 t7ECTIQN N` -N"-N" 126 13: 17 171/2 `° PROJECTED 0 N M -M -N" 136 17 1/2 144 Is AMERICAN PUBLIC WORKS ASSOCIATION — SOUTHERN CALIFORNIA CHAPTER P�An ='TANDARO ,A�I,A.�C TRANSITION STRUCTURE 340-0 JOINT COOPERATIVE COMMITTEE PIPE TO PIPE 1!!2,SHMT 1 OF 2 116E WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS PROVIDE *'v X 20 NOTCH IN HEADWALL DOM DRAIN (SEE STD. IRR ANO DOHNDRAIN TO RECEIVE GRATING. '' SHT. 2 OF 3) VARMS WITH SLOK , / �`• CONCRET 1060 HEADWALL PIPE 312E , ' — '" AND TYPE , PER PLAN.Owl • 4 a =r � 1. z - F --V*. " �6 60L— SECTION A -A WELD HASHERS TO REMOVABLE CRATE (4 TOTAL) 4r A w A T-1 �ECTION B -Q 1 7 XPOSED 1-1/40 PORTION OF HREADED ANCHOR BOLT f="t — X6 3, fl • '84 P'f"ATEN 04 CALY, SUPPORT BARS. f SUPPORT BARS L AT 9" O.C. 40 I 2,. •4 GALV. BARS AT 3" 4" O.C. WELDED TO GALV. '!/2 • X t' GALV. ANCHORI I 104 SUPPORT BARS. BOLTS SET IN CONCRETE. ---' (4 TOTAL) PLAN VIEW NOTES: 1. Ground $hall be pre -wetted to the satisfaction of the Building Official prior to placement of concrete. 2. Material for construction of downdrain shall be concrete reinforced with 6" x 6" W1.4 x WI.4 welded wire fabric. 3. Oowndroln to pip* transition shall not be used within public rood right-of-way. 4. Grote shalt be hot dip galvanized of ter fobrication. ORANGE COUNTY ENVIRONMENTAL MANAGEMENT AGENCY STD. PLAN H.J. KrIzon. dredor Pv01IC worts ��� Ms.:t-Tn Mvis�o: 1331 DOWNDRAIN TO PIPE TRANSITION SHT. I 4F 1 0 Lo M O? LO I • r