Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2452-1
I i 4 CrYP, ('ET Q� 67T45' -T Br4d,C 4F OO SANDBAG VELOCITY REDUCER N.T.S. NOTES: 1. SANDBAGS SHALL BE STACKED TO 12" MIN. HEIGHT. 2. THE ROWS SHALL BE SPACED AT 100' MAX. INTERVALS. PPOM ..� IE4 1;21 m /o M/h/. l L io '�o'�•� TRACT NO. 15655 EROSION CONTROL PLAN CITY OF FONTANA, CALIFORNIA 1 REBAR WELDED TYP 1/2 at STEEL STRAP MIiT 3/e" BOLT GRATE ASSEMBLY DETAIL ISM IN. FREEDOAIN 1NoI/t' rY'tw*z.t spot TYR a /t" To ai/Y DW 2, MIN. ►�ol.Es. w'• a' or CTR. AND STAGKF" �'rw, a a'rMl• 1 I STQ CA I TEH' E !.,....og.� SET TEE SECTION IN WET I14. �• ��' CONCRETE FOOTI DTR I':•114"MIN. NQ OwEIt '� INSIDE TO DRAIN;:,:: `ANCHOR—STOCK MIN. S SACK / C.Y. CONCRETE OR METHOD APPP40VED BY ARLDMIe O"ICIAL DRAIN PIPE 9 RISER to scALa ORANGE COuNTY ENVIROKWNTNAGEMENT AGENCY STD PLI-N r � &Sod132.7 79-0116 -1442 DESILTING BASIN B PERMANENT DRAINAGE INLET (:C) DETENTION / N.T.S. � NOTE: SANDBAGS TO BE INSTALLED AT ALL CATCH BASINS ON PROJECT SITE FOR PAVED & UNPAVED AREAS. X /D' 4e7/rv_ :6' PG�4iY �i DESILTING BASIN 41 NTS SE�TjDN A -A Z>G4 x: TO " /y)'adep56�� cD N 0 01 r o a z r V) 0 a Q Zc ' it C, LL Q Q • � cz Li V� Q Z m 0 L CL UL O Z m �Q m V v Iz .0lu a GENERAL NOTES v � � D t7 U 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH CITY OF FONTANA STANDARDS & SPECIFICATIONS. ( 0 c ch ch 2. SANDBAGS SHALL BE PLACED FLAT & FIRM AGAINST-� W no EXISTING GROUND AND STACKED TO HEIGHTS & W ° 0 M ca �� �� LENGTHS SHOWN ON DETAILS & SECTIONS HEREON. I C4 x Q) � 41 u- v a� wC.2. a 3. SANDBAGS SHALL BE STAGGERED FOR EXTRA � Q o 0 STRENGTH. CL W U 000 4. THE EROSION CONTROL MEASURES SHOWN HEREON >- © ° o ARE FOR AREAS WHICH ARE ANTICIPATED TO BE E 0 GRADED AT THE TIME OF PREPARATION OF THIS PLAN. REVISIONS TO THIS PLAN WILL BE REQUIRED FOR ANY GRADING OUTSIDE OF THE AREAS, WHERE EROSION CONTROL MEASURES ARE SHOWN. � Q W a� v v O U Q �I u ' ♦J O cO Cma C 06 LAJs LEGEND GRADED OR PAVED STREET • W CATCH BASIN LOCATION REFER TO DETAILS & STREET SECTIONS DETENTION/DESILTING BASIN & TEMPORARY CMP RISER. Z a � p M cn 2p � QLu �C� o Ftlenome: C:\DWG\10201\EROSION1.DWG Dote: September 27, 1996