Loading...
HomeMy WebLinkAbout2453-67PROJECT NAME L�✓� �Ht4 J 1 i T( 1 - , PROJECT ADDRESS + PRINCIPAL DESIGNER - ENVELOPE TELEPHONE DATE OF PLANS BUR DING CONDITIONED FLOOR AREA DATE Pamir Pomo If 0,3 a Z 1CL$MATUONE f o HOTEUMOTEL GUEST ROOM BUIL. LNG TYPE PHASE OF CONSTRUCTION NONRESIDENTIAL NIGH RISE RESIDENTIAL NEW CONSTRUCTION ADDITION ❑ ALTERATION fl UNCONDITIONED (FIN Affidavit) METHOD OF ENVELOPE COMPLIANCE STATEMENT OF COMPLIANCE fCOMPONENT 0 OVERALL ENVELdPE PERFORMANCE • This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building envelope requirements. The documentation preparer hereby certifies that the documentation Is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE The Principal Envelope Designer hereby certifies that the proposed bullding design represented In this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculi:100ns submitted with this permit application. The propesed building has been designed to meet the envelope requirements contained in sections 110, 116 through 118, and 140, 142, 143 or 149 to Title 24, part 6. Please check one: 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer or architect. R 1 1 affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code, to sign this document as the person responsible for its preparation; and that I am a , licensed contractor preparing documents for work that I have contracted to perform. [J] I affirm that 1 am eligible under the exemption to Division 3 of the Business and Professions Code by Section of the Code to sign this document as the person responsible for its preparation; and for the following reason: PRINCIPAL ENVELOPE DESIGNER - NAME al E t°lLi eN .o^s t. earl -7 se 1114 ENVELOPE MANDATORY MEASURES Indicate locatbn on plans Opole Block for Mandatory Measures $NSTKUCTIQNS TQ APPICAN For detailed instructions on the use of this and ant Energy Efclency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission. ENV -1: Required pn plans for all submittals.' Part 2 may be Incorporated in schedules on plans. ENV -2: Used for all submittals; choose appropriate version depending on method of envelope compliance. ENV -3: Optional. Use if default U -values are not used. Choose. appropriate version for assembly U -value to be calculalett NooresMsnSel Compliance fornl l PROJECT NAME ' t'l11 L S 1704440 �tAidl d KI III Z'g•KI-� t--- DATE PROJECT ADDRESS •raill'At.I.JA• J ef4St • :' j , . r i �.. PRINCIPAL DESIGNER - MECN IANICAL 4.4> t'AN16...V-- . TELEPHONE (.$,10)4 2,--G 1Q ' P DOCS NTATiON AUTHOR ' 1 VAti.VAlf-- 4A V, rte,.., 1 ENERAi. INF ARMATQN F. � m�4.,...., .aw.�:: # DATE OF PIANS BUILDING CONDITIONED FLOOR AREA b•3 TELEPNOAiE I Oii4 1l * - �f .•,,; �.,� h..,,,.r 0Z,, BUIt.DING TYPE f 7 NONRESIDENTIAL El HIGH RISE RESIDENTIAL n HOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION + (a NEW CONSTRUCTION ri ADDITION !!M�� iIEATING EQUIP. TYPE [HIGH EFFiC.? ALTERATION ❑ UNCONDITIONED (FIs AMadavij METHOD OF MECHANICAL PRESCRIPTIVE • 0 PERFORMANCE cometimcg PROOF OF ENVELOPE COMPLIANCE RI PREVIOUS ENVELOPE PERMIT STATEMENT OF COMPLIANCE _,.....,. .... .�..,,_ ,. �._........ s,. , ... w,v .:. ....... _, -...,.t•.. This Certificate of Compliance lists the building featured and performance specifications Pads 1 and a of the California Code of Regulations. This certificate applies only to The da cument•atlort prepares hereby 'certifies that the documt#Mation Is accurate and building complete. _ ENVELOPE COMPLIANCE ATTACHED _ — _.x. ...._ m _ .... R,aA... .,...gin:. .Me ., u. t . .... needed to comply{wlth Tule 24, mechanical requirements. r' ' ' DOCUMENTATION AUTHOR _PAVA12.. 14 A 1-2119‘,. S GNATURE N clls.9.9.-"-------- DATE tp - ket _ tic The Principal Mechanical Designer hereby certifies that the proposed bonding design represented in this set of construction documentsis. consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the mechanical requiirements contained in suctions 110 through 115, 120 through 124, 140 through 142, 144 and 145. i Please check one: i M I hereby affirm that 1 am eligible under the provisions o4 Dfviston 3 of the Business and Professions Code to Sip this document as the person responsible for it's preparation; and that I am a civn engineer, mechanical engineer, or archlect. [1 1 affirm that I am e$g ie under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for Ns preparation; and that I am a licensed contractor preparing documents for work that ( have contracted to perform. 11 I affrin that I am eligible under the exemption to Divlslon 3 of the Business and Professions Code by Section • of the Code to sign this document as the person responsible fOtbs preparation; and for the following reason: . PRINCIPAL MECHANICAL DESIGNER - NAME J 2 ?A ,AV..,. SIGNATURE UC. NO. DATE 5 41;111, _lb4�,___-- __-�.._ 14 O i 4, 6, - . ,, MEC ANICA NANDA- OR MEASURES �..._._ �.. �_ .. x ..a ..,v_ .�� `T. Indicate location on plans of Note Block for Mandatory Measures . 1 1 , INSTRUCTIONS TO APP ICAN For detailed Instructions on the use of thls and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manuai published by the California Energy Commission. + , MECII-1: Required on plant for ant submittals. Parts 2 & 3 may be incorporated In schedules on plans. MECH-2: Required for all submittals; choose appropriate version depending on method of mechanical compliance. MECH-3: Required for all submittals, but form does not have to be completed if location of mechanical equipment schedule is indicated on the form per Section 4.3.3. MECH-4: Required for aN submittals unless required outdoor vrntNation rates and airflows are shown on plans per Section 4.3.4. i Nonf. Compliance 'one , t A -• _. _ _.. .A49 ties PROJECT NAME M 11.1.#,02.... 1.1.#,02..- rAto. DATE it ASSEMBLY NAME (ep_ W.11-1, Floor -1) INSULATION R-VAl-UE -- (p. R-19, R-22, Eric.) CONSTRUCTION TYPE (p. Block. Wood, Metal 1OCATION/COMMENTa: (tog. Suspended Ceiling, Dwrisk>r, sec.) I r NMI TO f iELO �.1 NANDOW NAME (.0. Window -1 140. OF PANES 1 #05Y1-1GHT *Mg (p Sky -1) U-VALUE FRAME TYPO lea. MNI. Wood. Wel i .1 1 f,44.1---' _ FAN CONTROL - • .- - HEAT Afro cool SUPPLY RESET? VENTILATION OUTDOOR DAMPER CONTROL? ECONOMIZER TYPE DESIGN AIR CFM (MECi$-41 COLUMN H) iIEATING EQUIP. TYPE [HIGH EFFiC.? MAKE AND MODEL NUMBER _ COOLING EQUIP. TYPE 1 NIGH EFFIC.? MAKE AND MODEL NUMBIR •0- - - DASHED UNE DENOTES EXISTING DUCTWORi( TO REMAIN. 4/7"/-1174144.744CROSS-HATCHED UNE DENOTES EXISTING DUCTWORK TO BE REMOVED. EXTERIOR $HADE j $ATE TO 'fat/ IND,0 f u -VALUE PANES FRAME TYPE 1- 1 a SKYLIGHT MATERIAL (p. Glass, Plastic, etc.) OLAZNNEi `EYP* Op. Clear, Mc. ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? •• FAN CONTROL - VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEAT Afro cool SUPPLY RESET? VENTILATION NATES TQ FIELD - Far Outldln De artrnent Use Dui _...... , 1 Nenr. idrniaf Compliance Fore PROJECT NAME J4 1065, 1Y1M NAME TIME CONTROL. SETBACK CONTROL. 1 ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? •• FAN CONTROL - VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEAT Afro cool SUPPLY RESET? VENTILATION OUTDOOR DAMPER CONTROL? ECONOMIZER TYPE DESIGN AIR CFM (MECi$-41 COLUMN H) iIEATING EQUIP. TYPE [HIGH EFFiC.? MAKE AND MODEL NUMBER _ COOLING EQUIP. TYPE 1 NIGH EFFIC.? MAKE AND MODEL NUMBIR Mw1. vPA-17tt-. DATE LA b- 1 17) A A �100 1 MECHANICAL SYSTEMS l ,r OA, a 15, 4000 -rot-At, I1/ MATE To, FIELD CODE TABLES: Enter code from table below Into columns above. NEAT PUMP THERMOSTAT? e2 pliii II p I + pi* toil EFFICIENCY? I: Wel Vanes P: Variable Pleb V; VFD o: OtMr C: Curve A 4909, , 4_,Aijo..i/f,,./4 14_i_ -tom -; 111 + MATE To, FIELD CODE TABLES: Enter code from table below Into columns above. NEAT PUMP THERMOSTAT? Y: Yes N: No ELECTRIC ►BAT? VAV MINIMUM PoSITmoN CONTROL? SIMULTANEOUS ItEATVCOO+Et HEAT AND CODE. stymy RESET? toil EFFICIENCY? TIME CONTROL- SETBACK CTRL. ISOLATION ZONES FAN CONTROL 5: Prop. scall* 0: Occupancy •mash M: Manual Tknet H: Healing C: Cooling I: Boal ' , Enter rnmlber of IsoMMMon Zones. I: Wel Vanes P: Variable Pleb V; VFD o: OtMr C: Curve VEMTE_ATION OUTDOOR DAMPER ECONOMIZER O.A. CFM 5: Alt Balance C: Outside Air Cert. M: Out. Ak Measure 0: Demand Control, N: Natural ' A: Aute (G: Growily A: Alt W: MIN N: Not Requee4 — Enter Outdoor Air CFM. IoM: This Niel be fie cess than Column G on MECH-4. 10 ' ! Pe s arirnen U, On 1 •1 I ! 1 L ............::...:........ sid�nial Comp/encs Fon* .Ary 103 • ommor SMOKE DETECTORS (LOCATE IN S.A. DUCT DISCHARGE OF UNIT 4 PREWIRED A.C. OR HEAT PUMP UNIT .o 11111 J I111 ▪ I 1 1 1 11111 EXISTING 7 -DAY PROGRAMMABLE THERMOSTAT CIRCUIT BREAKER DISCONN!CT SWITCH E CONTROL WIRING DIAGRAM r.4 C0 \ DITIO\\ G \OTES 1 1. FABRICATE AND INSTALL AU. DUCTS PER "SMACNA" LOW VELOCITY MD DUCT CONSTRUCTION STANDARDS. USE "S AND DRIVERS" FOR JOINTS. "PITTSBURG' SEAMS. SEAL JOINTS W1TH . ARABOL AND CANVAS TAPE. FABRICATE DUCTS WITH GALVANIZED SHEET METAL. ALL EXPOSED DUCTS SHALL BE LINED WITH FIBERGLASS LINER, 1-1/2" THiCK C.S.G. ULTRALINER (R=6). ATTACH LINER WITH DISC AND SPINDLES AND ADHESIVE, PROVIDE TURNING VANES IN ALL 90• ELBOW SUPPLY AND RETURN AiR DUCTS. PLUMBING CONTRACTOR TO PROVIDE CONDENSATE DRAIN PIPE COPPER TYPE M WITH 4" TRAP TO APPROVED RECEPTOR. ALL CEILING DIFFUSERS TO BE MODULAR MANUFACTURED 8Y TITUS OR EQUAL. ALL RETURN MR GRILLES TO MATCH CEIUNG DIFFUSERS AS CLOSELY AS POSSIBLE. ALL GRILLES CONNECTED TO EXPOSED DUCTS SHALL BE TITUS 350 SERIES WITH DOUBLE DEFLECTION. A.C. CC'IItACTOR SHALL PROVIDE THE ARCHITECT WITH 3 COPIES OF CERT ;-1 EU AIR BALANCE REPORT FOR FINAL APPROVAL. FINAL DUCT CONNECTION TO THF GRILLES SHALL BE CASCO SILENT -FLEX, MAX. 7 FT. LENGTH WITH FACTORY END. A FLAME 4,PREAt7 IfJt7x vF pJeT r^oQr,rs-IatJ V, tt A e,tAoKt tt/et-oPMEOT RATA t, or: JdT NiIS 1 4k4 ',v Fats in) Su LA"r l o0 `To APPS- I Et2 To Tilt exletziolt St1RMC4 F U0600aITi ieb Po: mo of bLb'oe. PROJECT NAME i1I-Lo2__ p& e,e7, V. DATE AUG NSU A ON SYSTEM NAME -fried ,41,-;-(1-2 DUCT TYPE (Supply Return, de.? �✓.ii 4 ...41k. 4 -.Qc- PUT LOCATION row, Plenum, els.) I ell— t 1 Gni 011 T TATE ALLO WD11 OUT INSULATION _.._ A-VALM e WTI TQ ........... SYSTEM NAME PIPE TYPE (Supply, Return, els.) • IN$U1 ATION REQUIRED? ❑❑ El ❑ Cl ❑ ❑ Q ❑ CI D CI ❑ Q❑ •1' TETO ....FIR�•P ... hQTFS or ullclIn s Do id 1110 1 0 On ................. 1 ............... Nonresidential Compliance Fern ,. ••- ., .1 .►105 AIR.. CONDITIONING LEGEND S Y M 8 0 L DESCRIPTION - CEILING DIFFUSER, NECK SIZE, IN. 0 AIR QUANTITY CFM SOLID UNE DENOTES NEW DUCTWORK •0- - - DASHED UNE DENOTES EXISTING DUCTWORi( TO REMAIN. 4/7"/-1174144.744CROSS-HATCHED UNE DENOTES EXISTING DUCTWORK TO BE REMOVED. D1 C < ` SUPPLY AIR DUCT. .-1 L -" RETURN MR DUCT. (>1.-' C > r EXHAUST AR DUCT. 12 X 6 4 DUCT (FIRST DIMENSION IS SIDE I SHOWN). 12 X 6 (L) 4 UNEO DUCT (SHEET METAL SIZE SHOWN). 4. 4. AUTOMATIC FIRE DAMPER M.V.D. i 1 VOLUME LUME DAMPER 1 1 M.D. MOTORIZED DAMPER MgDOUBLE MI THICKNESS TURNING VANES CEILING DIFFUSER 1112 RETURN AIR GRILLE, RELIEF GRILLE EXHAUST GRILLE , • S.D. SMOKE DETECTOR FRE DAMPER MOTORIZED COMBINATION/SMOKE � I SA SUPPLY A R R.A. RETURN MR I EXHIAUST AlE.A. , O.SA. OUTSIDE AIR U.T.R. UP THRU ROOF C.D. CEILING DIFFUSER R.A.G. R.G. RETURN AIR GRILLE, RELIEF GRILLE • E.G. EXHAUST GRILLE • N.W.S. k R. HOT WATER SUPPLY ARO RETURN C.W.S' k R. CONDENSER WATER SUPPLY AND RETURN O THERMOSTAT (MOUNT AT 42 IN. ABOVE FLOOR). O EQUIPMENT FURNISHED AND INSTALLED BY MECH. CONTRACTOR. V EQUIPMENT FURNISHED AN40 INSTALLED BY ELECTR. CONTRACTOR. EQUIPMENT FURNISHED BY MECN. CONTRACTOR AND INSTALLED BY ELECTR. CONTRACTOR. POINT Of CONNECTION FROM EXISTING DUCTWORK TO TITLE 24 NOTES MANDATORY ' REQUIREMENTS FOR PACKAGED AIR. CONDITIONERS WITH GAS FURNACES OR HEAT PUMPS ALL PACKAGED MR CONDITIONING EQUIPMENT SHALL BE CERTIFIED TO COMPLY WITH THE CURRENT CALIFORNIA BUILDING AND APPLIANCE EFFICIENCY STANDARDS, TITLES 20 & 24. t. OUTSIDE' VENTKATION SHALL -BE PROVIDED TO ALL commotion SPACE AT A RATE OF 0.15 CFM/SF OR 15 CFM/PERSON, NMICHEVER IS GREATER. S, , A THERMOSTAT SHALL 8E OVIDET) TO EACH ZONE TO CONTROL HEATING AND COOLING. HEATING �'R POINT SHALL SETP TBE ADJUSTABLE DOWN TO SSF OR LOWER, AND THE COOLING SETPOINT TO 8SF OR HIGHER. THE THERMOSTAT SHALL. BE MANUALLY SWITCHED BETWEEN HEATING AND COOLING. 1. r VENTILATION AMR SHALL BE PROVIDED AT LEAST 55 MINUTES OUT OF EVERY 60 MINUTES. THE AUTO/ON FAN SWITCH SHALL BE SET IN THE ION POSr110N. . SYSTEM CONTROLS SHALL INCLUDE THE FOLLOEING FEATURES: A) AN AUTOMATIC TIME SWITCH, CERTIFIED BY THE STATE ENERGY COMMISSION SHALL START AND STOP THE AIR CONDITIONING EQUIPMENT. B) AN ACCESSIBLE MANUAL OVERRIDE TIMER WITH 0 TO 4 HOURS SHALL BE PROVIDED. THE CONTFVL5 MUST , START THE SYSTEM ONE HOUR AHEAD OF OCCUPANCY tN ORDER ID' PURGE THE 13UILDIKG. THE CONTROLS MUST RESTART THE SYSTEM DURING UNOCCUPIED TIMES TO MA NTAIN HEATING SETBACK/COOUNG SETPOINTS. SETBACK CONTROLS ARE NOT REQUIRED FOR OUTSIDE DESIGNS ABOVE 37F (WINTER) AND BELOW 100'F (SUMMER). 1. : Ol1TS1OE ASRSUPPLY AND EXHAUST EQUIPMENT SHALL HAVE DAMPERS THAT AUTOMATICALLY CLOSE DURING PERIODS OF EQUIPMENT SHUT DOWN. . NEAT PUMP CONTROLS SHALL PREVENT SUPPLEMENTARY HEATERS FROM OPERATING WHEN THE HEATING LOAD CAN BE MET BY THE HEAT PUMP ALONE ANO SHALL HAVE 'CUT -ON AND CUT-OFF TEMPERATURES FOit THE COMPRESSION HEATING ARE HIGHER THAN THE TEMPERATURES FOR SUPPUMENTARY HEATING. D UCTS SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE TRH CHAPTER 10 OF THE STATE MECHANICAL CODE. DUCTS SHALL BE SEALED IN ACCORDANCE WiTH SMACNA HVAC DUCT CONSTRUCTION , STANDARDS METAL AND FLEXIBLE, 1985. PRESSURE SENSITIVE TAPE MAY BE 'USED FOR SEALING DUCTS OPERATING AT LESS THAN 1 INCH WATER COLUMN PRESSURES. 9. DUCTS SHALL BE INSULATED 114 COMPLIANCE WITH UMC SEC. 1005. 10. THE MR DISTRiBUTION SYSTEM SHALL BE BALANCED NI ACCORDANCE %VIM THE ASSOCIATED NR BALANCE COUNCIL NATIONAL STANDARDS 111I16. A WRfT'TEN COPY OF THE BALANCE REPORT SHALL BE SIGNED BY THE TESTING PERSONNEL AND BE GIVEN TO THE OWNER AND BUILDING INSPECTOR. VARADI ENGINEERINO . N Wail Yin tietdws mt MB 7, La AIME CA MX (310) Vii" ' Par CM 11118'-12 Q) 0 a O albu r .0 0 • sie Architects A U r k"' U < IN 4 Drawn by Checked by Date Print Dates Job Number 9450113, Sheet DWG, NO. 2453 SHEET 67 of 80