Loading...
HomeMy WebLinkAbout2453-5646 N r O W G.'f N0. 2453 SHEET 56 of ' 8 0 l I 0 \ STAIR STRINGER �� � L4X3X1/4 W/2-3/4"OA.B. —�" FOOTING DOWELS SHALL MATCH' WALL REINFORCING IN GRADE, SIZE HORIZ UP AND NUMBER - SPLICE 6t OR 1 -5' MIN � �`V aj ag Ix1f� � SEE ARCH. ;� �� AND 2-3/4"OM.B. REINFORCING SHALL MATCH!LIQUID DEPRESSION t JOINT TOOL EDGES � � ge��� � g ��x 11 LONGITUDINAL FOOTING BARS = SEALANT��W��e$ll DRY PACK �� � IN SIZE AND NUMBER OPTIONAL � � - 2 d MIN p � �s w. s. �,• �.• s» � I1-11 T I -I I I �L�� • • • PROVIDE 90' HOOK WHERE =L1 -1I 111=1I � FIN GRADE OR t EXCEEDS Y SIM 2 CONT. KEY � e � '' 1:6 MAX PAVING -SEE PLANS KEYED JOINT w� BOND BREAKER SLOPE d rig I�• 2-#4 CONT c 2-#5 �' MIN BAR ' o CONT. COVER = � I '> Of EXTEND THICKENED SLAB _ i i� i i� i� � tc � � ° is FOR STAIR WIDTH PLUS 1'-6" ON EACH SIDE. 3'-d' MIN. -lip b � 1 e i ', -' - SAWED � � 1A HORIZ UP f WHERE SHOWN ON PUN SPLICE INDICATES THE POINT OF ►-� �NdnH z- STEPPED FOOTING 8" MIN +���_ ••• �I' �$ *���t�' I- I IlT =III-�1111� 1 •r �a �` E %r'. � i oe WEAKENED PLANE JOINT LIQUID SEALANT 3/Er �!!�R�y£��� STAIR STRINGER TO SLAB ON GRADE 9 STEPPED FOOTING 6 DEPRESSED SLAB AND SLAB EDGE 3 IST POUR 2ND POUR WALL/COLMIN. 10'-d' MIN 1 � DEPTH /LIQUID CONT.U� HERE HORIZ LAP . � � FOOTING 7 /y HIGH CONT. KEYS AT 15' GROUND LINE r- JOINT SEALANT � TYP SLAB ON GRADE REINFORCING PREMDED FELT OUL_ * 5" MIN #4 NOSING BAR TYP BACKFlLL PER SPECS BOND BREAKING TAPE BOTT ONLY 2 ?BENCH FTG'CAIN `` � ��v 1/8r SAWED JT. �I0 Vis_ FIN GRADE OR SLAB -SEE 'bo `� DETAIL 1A EXTERIOR SLA _ PLAN #4 BAR AT BOTTOM OF TRENCH '�� � ISOLATION JOINT BOTT EA RISER EXCAVATION SHALL NOT ` 2XZ �� b Z `-- #4 AT 18" CUSS C LAP SPLICE SEE DETAIL EXTEND BELOW THIS LINE `rX �\ 2-�'4 CONT �` SECTION COMPACTED FlLL 907. DENSIT`f �� O a TYP. REINF AT CHEEK WALt ' MIN ' HORIZ UP NOTE: WELDED SPLICES REQ'D FOR X14 & URGER BARS. NOTES: 1. FOR LOCATION OF CONTROL JOINTS -SEE PLAN WHERE NOT SHOWN, SPACING OF BLDG WALL (GONG OR MASONRY) OR CHEEK WALL Y; WHERE CONT. FOOTING IS UNDER A WALL, LOCATE 1/4 NOTE: THE CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING, SHEATHING JOINTS SHALL NOT EXCEED 28 Ff. IN EITHER DIRECTION AND THE ASPECT x5jWL CHEEK WAIL CONSTRUCTION JOINT AT OF THE CLEAR OPENING WIDTH ABOVE FROM FACE OF OPENING, OR IN OR OTHERWISE MAINTAINING THE SIDES OF RATIO (LONGER SIDE TO SHORTER SIDE) SHALL NOT EXCEED 2:1 NOTE: WHERE THE EXCAVATION FROM CAVE-INS UNTIL 2. KEYED JOINTS MUST BE USED AT END OF THE DAYS WORK AND' ALSO AT � � �y IS R QUIRED, PROVIDE 8" MIDDLE �/a OF THE DISTANCE BETWEEN COLUMNS. ALL BACKFILL IS COMPLETED PER SPECIFICATIONS0 EVERY 150 Ff. OF WORK. THK CONC WALL WITH BOTT BAR #4 AT 10" E.W. AT . 0 NJ P CONCRETE STAIR ON GRADE 10. CONT. FOOTING CONSTRUCTION JOINT 7 EXCAVATION PARALLEL TO FTG. 4 TYP. EXT. SLAB CONTROL JOINTS 1 � r te_ TYPICAL REINF. BURKE 'KEY KOLDr (OR APPROVED EQUAL) v NO PIPES SHALL O PASS THRU THE OR WOOD CONSTRUCTION JOINT � DEPTH WAY � � W/ 3/47X1/3 CONT. KEY N FOOTING PAD a v W000 POST/GONG FTG � WOOD POST/GONG FTG e�P; POUR JOINT , ,o, ~ 5 FOOTING SHALL BE gr fro go ' WOOD ppm � W000 POST SLAB ON GRADE I SLAB ON GRADE ( ✓- STEPPED SO THAT THIS O DIM. DOES NOT EXCEED5TEEL KEY � SEE PLANS FOR 'SIMPSON' CB SEE PLANS FOR 'SIMPSON' CB REINF } �- FINISH GRADE Z A � b, 3'-0" IN ANY CASE LOCATE PIPE TRENCHES PROVIDE METAL SLEEVE WITH SO THAT FOOTINGS I.D. 2 GREATER THAN THE WILL NOT BE UNDERM- �_REINF SAWCUT CONTROL JOINT • x 1 5' AT tg' Vo & FILL W/ SEALANT SMOOTH BARS. APPLY ►- BOND BREAKER TO ONE � 0 O.D. OF THE PIPE. NO EXCAVATION INED. � SI� _ b i L � 4-#5M� � w/2-#3 TIES BELOW THIS LINE _ - - BACKFILL AS PER SEE SPECS. � iii 411-, ;�T � U.O.N. CONT KEY = Q .SAWING MUST OCCUR AS SOON AS CONCRETE SURFACE IS SEE PLANS FOR FTG FIRM ENOUGH SO CONCRETE WILL NOT BE DAMAGED, BUT BQ POURED. SIZE AND REINF 1�. LATER THAN 12 HOURS AFTER CONCRETE HAS BEEN g — —1� 2 � DPTIONAL-SAWED- CONTROL JOINT SEE LANS FOR FTG = —= • (NOT TO BE USED FOR SLABS OVER 6" CHICK) INTERIOR CONDITION SIZE AND REINF �;:.►,� � by NOTES: � y EXTERIOR CONDITION PUCE CONC. FILL AROUND SLEEVES BEFORE 1. FOR LOCATION OF CONTROL JOINTS; --SEE PUN WHERE NOT SHOWN, SPACING POURING FOOTING PADS. FILL SHAM BE SAME OF JOINTS SHALL NOT EXCEED 28 FT. IN EITHER DIRECTION AND THE ASPECT N» WIDTH AS FTG. AND FULL WIDTH OF PIPE TRENCH. RATIO (LONGER SIDE TO SHORTER SIDE) SHALL NOT EXCEED 2:1. JA low 60 2. KEYED JOINTS MUST BE USED AT END OF THE DAYS WORK AND ALSO AT . EVERY 150 FT. OF WORK. a,,,c Pvt- ism* WOOD POST BASE CONNECTIONS 8 PIPE TRENCHES 5 TYP. INTERIOR, S.O.G. CONTROL JOINTS 2 O W G.'f N0. 2453 SHEET 56 of ' 8 0 l I 0