HomeMy WebLinkAbout2437-1y t 1. GENERAL. NOTES ALL WORK SHALL K DONE IN ACCORDWE WITM THIS PLAN AND THE SAN BERNARDINO RANCHO COUNTY STANDARDS AND SPECIFICATIONS. 2. A PERMIT WILL BE REQUIRED FROM THE COUNTY OF SAN BERNARDINO PRIOR TO ANY ENCROACHMENT OR CONSTRUCTION WITHIN THE COUNTY OF SAN BERNARDINO EASEMENTS OR RIGHT-OF-WAY, MIO A CONSTRUCTION PERtiAT IS ALSO REQUIRED FROM 4TH. STREET THE CITY OF FONTANA, ENGINEERING DIVISION, FOR WORK WITHIN CITY OF FONTANX 3. IF ASPHALT CONCRETE IS TO BE PLACED DIRECTLY ON SUBGRADE OF ROAD OR CITY. OF DRAINAGE FACILITIES. A SOILS STERMLANT REGISTERED BY THE E.P.A. FOR USE UNDER A.C. MID P.C.C. SHALL BE UNIFORMLY APPLIED AT THE MANUFACTURER'S RECOMMENDED RATE FOR THE FULL PAVEMENT WIDTH PRIOR TO PAVING. 4. AT THE COMPLETION OF ROUGH GRADING, A MATERIALS REPORT AND THE PROPOSED STRUCTURAL SECTION SHALL BE SUBMITTED BY A SOILS ENGINEER TO THE SAN BERNARDINO COUNTY TRANSPORTATION DEPARTMENT FOR REVIEW AND EVALUATION. APPROVAL WILL BE GIVEN WHEN ALL STRUCTURAL SECTION REQUIREMENTS HAVE BEEN NET. S• COMPACTION TESTS OF EMBANKMENT CONSTRUCTION, TRENCH BACKFILL, COMPACTING ORIGINAL GROUND *0 ALL SUBGRADES SHALL BE PERFORMED AT NO COST TO SAN BERNARDINO COUNTY. A WRITTEN REPORT WITH THESE COMPACTION TESTS SHALL K SUBMITTED TO THE CONTRACTS ADMINISTRATION DIVISION OF SAN BERNARDINO COUNTY TRANSPORTATION DEPARTMENT FOR APPROVAL, PRIOR TO PLACEMENT OF BASE MATERIAL AND/OR SURFACING. 6. AT THE COMPLETION OF LAVING, A MATERIALS REPORT SHALL BE SUBMITTED TO CONTRACTS ENGINEER OF SAN BERNARDINO COUNTY TRANSPORTATION LISTING ALL TESTS OR DETERMINATION COMPLETED TO VERIFY A. R -VALUE, SIEVE ANALYSIS AND EQUIVALENT OF AGGREGATE BASES. B. STABILITY, OIL CONTENT AND SIEVE ANALYSIS OF ASPHALT SURFACING. 7. ALL LATERAL CUTS IN COUNTY MAINTAWD ROADWAYS SHALL BE TESTED TO VERIFY DENSIFICATION TO 907. RELATIVE COMPACTION (R.C.) AT VARYING DEPTHS TO WITHIN 0.5' OF GRADING PLANE. THE TOP 0.5' SHALL BE DENSIFIED TO 957.. a. ALL LONGITUDINAL CUTS SHALL K TESTED IN ACCORDMACE WITH THE SPECIFIED LIMITS AND FREQUENCY AS OUTLINED IN SECTION 6 OF THE SAN BERNARDINO COUNTY STANDARDS AND SPECIFICATIONS. 9, IMMEDIATELY FOLLOWING REMOVAL OF EXISTING PAVEMENT, DIKE, CURB, AND/OR GUTTER, THE CONTRACTOR SHALL DILIGENTLY PURSUE THIS PORTION OF WORK UNTIL COMPLETION. 10. TRANSPORTATION DEPARTMENT APPROVAL DOES NOT INCLUDE WATER OR SEWER SYSTEM OR ESTIMATE OF QUANTITIES 00 tN 11. A PERMIT SHALL BE OBTAINED FROM THE COUNTY TRANSPORTATION DEPARTMENT Or PRIOR TO ANY CONSTRUCTION ON THIS PROJECT. N 0 12. ALL PIPE LINES OR SUBSTRUCTURES OF ANY KIND, AND TELEPHONE OR POWER POLES, WATER METERS, VALVES, HYDRANTS, ETC., SHOWN OR NOT SHOWN ON THESE PLANS WITHIN THE LIMITS OF THIS DEVELOPMENT OR IN ADJACENT AREAS WHERE IMPROVEMENT WORK IS TO BE DONE SHALL BE REMOVED OR RELOCATED AT DEVELOPER'S EXPENSE, AND AT NO COST TO THE SAN BERNARDINO COUNTY TRANSPORTATION DEPARTMENT. IT SHkL BE THE DEVELOPER'S RESPONSIBILITY TO NOTIFY ALL AGENCIES CONCERNED. 13. EXtSTI NG COUNTY ROADS WHICH REQUIRE RECONSTRUCTION SHALL REMAIN OPEN FOR JRAFFIC AT ALL TIMES WITH ADEQUATE DETOURS DURING ACTUAL CONSTRUCTION. 14. ALL STRIPING AND PAVEMENT JIARKIVGS NOT SHOWN ON PLAN, OBLITERATED DURING THE CONSTRUCTION OR BY AC OVERLAY, SHALL BE REPLACED IN CONFORMANCE WITH THE CURRENT EDITION OF THE TRAFFIC MANUAL PUBLISHED BY THE STATE OF CALIFORNIA, D.O.T. 15. THE PRIVATE ENGINEER IS RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTABILITY OF THE WORK HEREON. IN THE EVENT OF DISCREPANCIES ARISING DURING CONSTRUCTION, THE PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING AN ACCEPTABLE SOLUTION AND REVISE THE PLAN FOR APPROVAL BY THE COUNTY OF SAN BERNARDINO. 16. SHOULD ANY EXISTING STOP SIGN BE LOCATED ON A DEVELOPED CORNER OF AN INTERSECTION IT DUST BE MAINTAINED IN PLACE NEXT TO THE EXISTING PAVEMENT UNTIL SUCH TIME AS THE WIDENED ROADWAY IS OPEN FOR TRAFFIC. AT THAT TIME IT WILL BE RELOCATED THREE (3) FEET BEHIND THE NEW CURB IN THE VICINITY OF THE BEGINNING OF THE CURB RETURN OR AS OTHERWISE DIRECTED BY THE ENGINEER. 17. IT SHALL 19E THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER PRIOR TO ANY STREET REMOVAL OPERATIONS BY THE CONTRACTOR SO THAT THE ENGINEER MAY TIE OUT EXISTING MONUMENTS. 1B. IT SHALL BE THE RESPONSIMITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER AFTER THE BASE COURSE HAS BEEN CONSTRUCTED AND BEFORE THE PAVING HAS BEEN INSTALLED SO THAT THE ENGINEER MAY INSTALL THE STREET CENTERLINE MONUMENTS AS REQUIRED BY THE CITY CODE OF THE CITY OF FONTANA. 19. RECORD DRAWINGS SHALL BE PROVIDED BY THE ENGINEER OF RECORD TO THE CITY OF FONTANA FOR THE WORK SHOWN ON PLANS WITHIN THE CITY LIMITS. THE STREET IMPROVEMENT PLANS I W • CITY OF RANCHO CUCAMON®A i CITY OF RANCHO CUCAMONGA 3 4TH. STREET ._CCS .._. CITY. OF ONITAW INTERNATIONAL AI IRPORT T m' = too. "m OF CN►1� i VICINITY MAP N.T.S. r� It'31-"* CIV t `meq' of COUNTY AVENUE FONTANA NOTICE TO CONTRACTOR THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LPAITED TO NORMAL WORKING HOURS: AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE COUNTY, THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. CONTRACTOR NOTE CONTRACTOR SHALL NOTIFY MWD 48 HOURS PRIOR TO COMMENCEMENT OF ANY WORK WITHIN THE MWD RIGHT-OF-WAY. a ,. ■ Jr UKNIA I 1 I z �,d-i ri FILE I:\94040\don\street\cherry\strpOl.sht _ OWN i DATE: 30 -July -96 1150 oZ 4/L.3 7