HomeMy WebLinkAbout27. Weekly Statement City of Fontana
CALIFORNIA
May 28,1996
Shannon Stuart, Vice-President
S.J. Burkhardt, Inc.
6157 Marlatt
Mira Loma, CA 91752
RE: Locust Avenue Sewer Extension Project from 110' South
of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94)
Weekly Statement of Working Days Report No. 6 (FINAL)
Dear Mr. Stuart:
Enclosed is the weekly statement of working days for week ending
May 24, 1996. This statement will be deemed accepted correct
unless protested in writing within (15) days from the date of this
letter.
Please contact the undersigned at(909)350-6645, if you need any
additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
y wl P.E.
atan a a,
Associate Civil Engineer/Special Projects
cc: Principal Civil Engineer/Special Projects
8353 SIERRAAVENUE(P.O. 8OX518) · FONTANA, CALIFORNIA92334-0518 · (714)350-7600
SISTER CITY- KAMLOOPS, B.C. CANADA
~1~ recycled paper
CITY OF FONTANA REPORT NO. 6
(FINAL)
WEEKLY STATEMENT OF WORKING DAYS
P~:{OJECT: LOCUSTAVENUE SEWER EXTENSION (SB-72-94)
TO: S.J. BURKHARDT, INC.
Tl'!e following statement shows the number of working days charged to your contrast for the week ending May 24, 1996.
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
~/:20/96 Men. Clear, 78 Degrees 1
5/21/96 Tue. Clear, 80 Degrees 1
Wed.
Thur.
FrL
~)ays this week ..........................................................................................................20 1
Days previously reported .........................................................................................23 2 1
Total days to date .....................................................................................................252 1
TiME EXTENSIONS CCO Numbers Days Approved
"~)ays this report ........................................................................................................(Note 3)CCOOther
Days previously reported .....................................................................................................................
'Total days to date ................................................................................................................................00
~'OMPUTATION OF EXTENDED DATE FOR COMPLETION ~ Number Numbered Date
of Days Day (Note 4)
';I, First working day design:bed......' · · I __~. ...............
2. Working days spsc fled 'n tonitact .............................................. 25
::. Day
~ Sub Tolal ILino 4 plus Lir. o 51 .................................... ' ~- ..............
~. s r g I e } . 25
) T3tel ,'~crk~rg days to sate ............................................... I
13. WORKING DAYS REMAIN!NG :Lno 8 rrinus Line 9) . 0
_Conb-olling Operation{s)
Remarks; (Note 5) (Continue on reverse)
PROJECT SUBSTANTIALLY COMPLETE. CONTRACTOR TO COMPLETE
PUNCH LIST ITEMS.
The ConS'actor will be allowed fifteen (15') days in which to protest in writing the
c!errectness of the statement; otherwise the statement shall be deemed to have ngineer
been accepted by the Conb'actor 6s correct. NOTE'. All footnotes are on
reverse side.
Revised 3/20/1996
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather; state the
reason why the day was unworkable when the weather
description itself does not adequately describe
conditions. For example, "Clear-wet grade" to describe
conditions when the weather is clear, but the grade is
too wet to work. Do not list days merely as
"Unworkable".
2. Enter days on which no productive work has been performed
on the controlling operation(s) for.reasons other than
weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after
expiration of the Extended DATE OF COMPLETION. On
contracts that are overtime, the total under WORKING DAYS
shall not be greater than the total of REVISED WORKING
DAYS, (line 8). After approved total of working days
has been reached, continue recording working and
nonworking days but do not add into the totals. Make
statement under REMARKS the WORKING and NONWORKING days
are shown for record only since the contract time has
elapsed.
5. Time extensions other, are to be explained under REMARKS
and the following information is to be included:
(a) Cause of delay and specification reference/under
which approval was granted.
(b) Statement as to what controlling operation or
operations are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL
City of Fontana
CALIFORNIA
May 20,1996
Shannon Stuart, Vice-President
'S.J. Burkhardt, Inc.
6157 Marlart
Mira Loma, CA 91752
RE: Locust Avenue Sewer Extension Project from 110' South
of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94)
Weekly Statement of Working Days Report No. 5
Dear Mr. Stuart:
Enclosed is the weekly statement of working days for week ending
May 17, 1996. This statement will be deemed accepted correct
unless protested in writing within (15) days from the date of this
letter.
Please contact the undersigned at(909)350-6645, if you need any
additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yousuf Patanwala, P.E.
Associate Civil Engineer/Special Projects
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA, CALIFORNIA 92334-0518 · (714) 350-7600
SISTER CITY -- KAMLOOPS, B.C. CANADA
CITY OF FONTANA REPORTNO. 5
WEEKLY STATEMENT OF WORKING DAYS
F'ROJECT: LOCUSTAVENUE SEWER EXTENSION (SB-72-94)
TO: S.J. BURKHARDT, INC.
The following statement shows the number of working days charged to your contract for the week ending May 17, 1996.
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
_~713/96 Men. Clear, 91 Degrees 1
5/14/96 Tue. Clear/Overcast, 86 Degrees 1
~:I15/96 Wed. Overcast A.M., Clear P.M., 81 Degrees 1
~:I16/96 Thur. OvercastA.M., Clear P.M., 79 Degrees 1
~717/96 FrL Clear, 86 Degrees I 1
Days this week ..........................................................................................................50 1
Days previously reported .........................................................................................18 2 0
,:Total days to date .....................................................................................................232 1
~'jME EXTENSIONS CCO Numbers Days Approved
'Days this report ................................: .......................................................................(Note 3)CCOOther
Days previously reported .....................................................................................................................
Total days to data ................................................................................................................................00
E!OMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered I Date
of Days Day (Note 4)
~ C~:,MPUTE DATE FOR COI'{PL="I'ICN P e I d~tya s.-..~:i'ied .qre Acrkad~ ......... D~ N;:. =,,~, IM~,v !7. · 9.'.'G'
!~, S,,b Total ,L~r~u 4 ~:lus L. r'o ~, . ............................. 2
7. EXT._'~,CEDDATE=ORCCM=LE'rCN:Lne3F'usLPu5! ............ _~,/'N; ~::" 'M~Z' ~.~..-:.5
'C WC~<'NG DAYS r,E.VAIN'NG ,Li-o 8 m Pus L ne 9~ ................. 2
_~?ontrolling Operation(s)
~!temarks: (Note 5) (Continue on reverse)
~l~e Contractor will be allowed fifteen (15) days in which to protest in writing the
correctnasa of the statement; otherwise the statement shall be deemed to have ginear
been accepted by the Contractor as correct. NOTE: All footnotes are on
r averse side.
Revised 3/20/1996
t
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather; state the
reason why the day was unworkable when the weather
description itself does not adequately describe
conditions. For example, "Clear-wet grade" to describe
conditions when the weather is clear, but the grade is
tco wet to work. Do not list days merely as
"Unworkable".
2. Enter days on which no productive work has been performed
on the controlling operation(s) for.reasons other than
weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after
expiration of the Extended DATE OF COMPLETION. On
contracts that are overtime, the total under WORKING DAYS
shall not be greater than the total of REVISED WORKING
DAYS, (line 8). After approved total of working days
has been reached, continue recording working and
nonworking days but do not add into the totals. Make
statement under REMARKS the WORKING and NONWORKING days
are shown for record only since the contract time has
elapsed.
5. Time extensions other, are to be explained under REMARKS
and the following information is to be included:
(a) Cause of delay and specification reference/under
which approval was granted.
(b~ Statement as to what controlling operation or
operations are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMAI~KS:
City of Fontana
CALIFORNIA
May 13,1996
Shannon Stuart, Vice-President
S.J, Burkhardt, Inc.
6157 Marlart
Mira Loma, CA 91752
RE: Locust Avenue Sewer Extension Project from 110' South
of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94)
Weekly Statement of Working Days Report No, 4
Dear Mr. Stuart:
Enclosed for review is the weekly statement of working days for
week ending May 10, 1996. You will be allowed (15) days in which to
protest in writing the correcthess of the statement; otherwise, the
statement shall be deemed to have been accepted as correct.
Please contact the undersigned at (909) 350-6645, if you need any
additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yo~jnwala, P.E.
Associate Civil Engineer/Special Projects
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE(P.O. BOX 518) · FONTANA, CALIFORNIA92334-0518 · (714)350-7600
SISTER CITY- KAMLOOPS, B.C. CANADA
~e~ recycled paper
CITY OF FONTANA naPere' NO. 4
WEEKLY STATEMENT OF WORKING DAYS
PROJECT: LOCUST AVENUE SEWER EXTENSION (SB-72-94)
TO: S.J. BURKHARDT, INC.
'Fn~ following statement shows the number of working days charged to your contract for the week ending May 1 O, 1996.
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
5/!3/96 Men. Clear, 83 Degrees 1
5/7/96 Tue. Clear, 85 Degrees 1
5/6/96 Wed. Clear, 86 Degrees 1
5/9/96 Thur. Clear, 86 Degrees 1
5/I 0/96 Fd, Clear, 86 Degrees 1
'i~)ays this week ..........................................................................................................50
[')aye previously reported .........................................................................................13 2
Total days to date .....................................................................................................182
TIME EXTENSIONS CCONumbere Days Approved
(Note 3) CCO Other
()ays this report ........................................................................................................
Days previously reported .....................................................................................................................
Total days to date ................................................................................................................................00
coM.uT T,oNoF ENDEDDATEFoRcoM.L ,oN
4)
'LFrst,,:;rk,r. gduy~'!es,~ratc, d ...................... . .........:..Z"'Z ..........' ....2' ......{.;!,~.v_~e__,?..7.2. I~cri115.,'SSe
!. ~Vcr~mg dsy.'~ scoclfod in :cntr~'.c~ .............
, cou,~s DATE FO~. CO~.~.L='r'O,~ .,f ~', =.>s s.,..~i~,ed .., ,.~.~..~b!.,.. i I'~:,Y ~=-~"~;' 1~.;~;~.::' 9~9"
I TOIe,~ t'l~,O exter'sion ca} s aperoved Ic, ."fate ~CCO I:lus c:hc. ri .................0
i. Total r,or..,~.orking c:ays :c cab, Nc.to 41 .............................. :l 2 I '
.' EXTENDED E~ATE FOR COMF_ET.ON ,Li-o 3 cl;,s bno e~ ........... ~ ~ 3,~y N,: -;~8 ~,;-~v ~1.199~
~ Rovisod.~,cr~ingclay~fc~rco-b'act~Lme2pusL;ne41 ............... :..:.':""i 2,~ ·
) To'~el'^~rkingda~¶~:,dato ..................................................... 16
· 0 WC,':IKING DAYS REMAINING ,Line 8 mnus L no
_C!ontrolling Operation (s)
~emerks: (Note 5) (Continue on reverse)
l'he Contractor will be ellowed fifteen (15) days in which to protest in writing the %~E~g
correcthess of the statement; otherwise the statement shell be deemed to have ineer
t~een accepted by the Contractor as correct. NOTE: All footnotes are on
r ~veree side.
Revi,~ed 3/20/1996
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather; state the
reason why the day was unworkable when the weather
description itself does not adequately describe
conditions. For example, "Clear-wet grade" to describe
conditions when the weather is clear, but the grade is
too wet to work. Do not list days merely as
"Unworkable".
2. Enter days on which no productive work has been performed
on the controlling operation(s) for.reasons other than
weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after
expiration of the Extended DATE OF COMPLETION. On
contracts that are overtime, the total under WORKING DAYS
shall not be greater than the total of REVISED WORKING
DAYS, (line 8). After approved total of working days
has been reached, continue recording working and
nonworking days but do not add into the totals. Make
statement under REMARKS the WORKING and NONWORKING days
are shown for record only since the contract time has
elapsed.
5. Time extensions other, are to be explained under REMARKS
and the following information is to be included:
(a) Cause of delay and specification reference/under
which approval was granted.
(b) Statement as to what controlling operation or
operations are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS
May 6,1996
Shannon Stuart, Vice-President
S.J. Burkhardt, Inc.
6157 Marlatt
Mira Loma, CA 91752
RE: Locust Avenue Sewer Extension Project from 110' South
of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94)
Weekly Statement of Working Days Report No. 3
Dear Mr. Stuart:
Enclosed for review is the weekly statement of working days for
week ending May 3, 1996. You will be allowed (15) days in which to
protest in writing the correctness of the statement; otherwise, the
statement shall be deemed to have been accepted as correct.
Please contact the undersigned at (909) 350-6645, if you need any
additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yousuf Patanwala, P.E.
Associate Civil Engineer/Special Projects
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENt3E(P.O. BOX518) · FONTANA CALIFORNIA92334-0518 · (714)350-7600
SISTER CITY -- KAMLOOPS, B.C. CANADA
~lf~ recycled paper
CITY OF FONTANA REPORT NO. 3
WEEKLY STATEMENT OF WORKING DAYS
PROJECT: LOCUST AVENUE SEWER EXTENSION (SB-72-94)
TO: S.J. BURKHARDT, INC.
The following statement shows the number of working days charged to your contract for the week ending May 3, 1996.
Non-Working Working Days
Deye No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
_~:/29/96 Men. Clear/Windy, 92 Degrees 1
4/30/96 Tue. Clear/~Nindy, 94 Degrees 1
~/1/96 Wed. Clear, 92 Degrees 1
~;12/96 Thur. Clear, 94 Degrees 1
_5/3/96 Fri. evemast, 78 Degrees 1
"Days this week ..........................................................................................................50
Days previoushi reported .........................................................................................8 2
..Total days to date .....................................................................................................132
lIME EXTENSIONS CCO Numbers Days Approved
'Days this report ........................................................................................................(Note 3)CCO Other
Days previously reported .....................................................................................................................
..Total days to date ................................................................................................ .................................00
of Days Day (Note 4)
"1. First working day designsled .............................................. i ! Cay No. 572 ~;,!:.r.i 1 ~ 1 ~..-;.,6..
2. '
3. .
4, Total time extensicn aav,q Rpcroved t,~ =ate ~CCO t;l~i5 3t-err ....................... 3
5. Total non-working days to clare ,%1c~o 41 ................................
8. cle'.'is~c .%crk,rg days for c =n~,~ct ~Uno 2 plus L ne 41 ................
..........................................It.',l
· C ;VORK:NG DAYS REMA r~ING !bne 8 fr~rtus Line S.I ......................
_(?ontrolling Operation
F~emarks: (Note 5) (Continue on reverse)
The Contractor will be ellowed fifteen (15) days in which to protest in writing the ~
correcthess of the statement; otheRvise the statement shell be deemed to have ineer
been a~oepted by ~he Contractor as oorrect. NOTE: All footnotes are on
reverse side,
Revised 3/20/1996
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather~ state the
reason why the day was unworkable when the weather
description itself does not adequately describe
conditions. For-example, "Clear-wet grade" to describe
conditions when the weather is clear, but the grade is
too wet to work. Do not list days merely as
"Unworkable".
2. Enter days on which no productive work has been performed
on the controlling operation{s) for.reasons other than
weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonwOrking days which occur after
expiration of the Extended DATE OF COMPLETION. On
contracts that are overtime, the total under WORKING DAYS
shall not be greater than the total of REVISED WORKING
DAYS, (line 8). After approved total of working days
has been reached, continue recording working and
nonworking days but do not add into the totals. Make
statement under REMARKS the WORKING and NONWORKING days
are shown for record only since the contract time has
elapsed.
5. Time extensions other, are to be explained under RF/~a~RKS
and the following information is to be included:
(a) Cause of .delay and specification reference/under
which approval was granted.
(b) Statement as to what controlling operation or
operations are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS=
.............. " Ci ty of Fontana
Ib~ LIFORNIA
April 29, 1996
Shannon Stuart, Vice-President
S.J. Burkhardt, Inc.
6157 Marlatt
Mira Loma, CA 91752
RE: Locust Avenue Sewer Extension Project from 110' South
of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94)
Weekly Statement of Working Days Report No. 2
Dear Mr. Stuart:
Enclosed for the review is the weekly statement of working days for
week ending April 26, 1996. You will be allowed (15) days in which
to protest in writing the correctness of the statement; otherwise,
the statement shall be deemed to have been accepted by you as
correct.
Please contact the undersigned at (909) 350-6645, if you need any
additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
You~ktTnwala, P.E.
Associate Engineer/Special Projects
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE(P.O. BOX518) ® FONTANA, CALIFORNIA92334-0518 · (714)350-7600
SISTER CITY- KAMLOOPS, B.C. CANADA
~f~ recyciec~ paper
CITY OF FONTANA REPORT NO.
WEEKLY STATEMENT OF WORKING DAYS
PROJECT: LOCUST AVENUE gEWER EXTENSION (SB-72-94)
'ro: S.J. BURKHARDT, INC.
'l_'he following statement shows the number of working days charged to your eontraat for the week ending Apd126, 1996.
Non-Working Working Days
, Days No Work
Date Day Weather, Weather Conditions or Other CandYone Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
7/22/96 Man. Clear, 77 Degrees 1
4/23/96 Tue. Clear, 88 Degrees 1
7~/24/96 Wed. Clear, 89 Degrees 1
~1/25/96 Thur. Clear, 89 Degrees 1
~/26/96 Fd. Clear, 90 Degrees 1
'Days this week ..........................................................................................................50
Days previously reported .........................................................................................3 2
.,Total days to date .....................................................................................................82
'tIME EXTENSIONS CCO NumbePs Deya Approved
(Note 3) CCO Other
"Days this report ........................................................................................................
Days previously reported ..........................................................,. .........................................................
.,Total days to data ......................................................................: ......................: ..................................00
COMPUTATION OF EXTENDED DATE FOR COMPLETION ~ Number Numbered ~ Date
.. of Days Day (Note 4)
1 = ,.[ '.,,'ork,ng a.y de.,g,'ated .......................... . · P:}Y..~?: ~Z? I;P;" 1'3~i?.
Wcrki-g ,'ta'e'S specified in ccntract ....
3 COMP'jTE DATE FC~. COMPLETION ,if al' days sneD.';od oro ,c,kar.'l.~, ........ ""'.. .j,D:~..).' .~: ~j:?.~'~ , May
4. Total t,me exton¶ion days ~nprovod to ds!~ .CCO plus nthe', ........................... O I
non-,.orkmg d. ,s to d..e .Note ...................::::: :::::.....: :..... ..................._.
6 Sub Tot~l !L,ne 4 nlut~ L no 5~ ..............2
7. EXTENDED DATE FOR CCMPLETION ,Li~o 3 cl,s Lind e! ..... i ]..D~.~. ~E -=""9 ~ ~a.'..':.~.1..]gP'5 .
8. Revisod .~,orking duys fcr contract ~Lir, e 2 pk,s Uno 41 ....................................t' 25
9 Total ~,orking days to da~e .................................................. 8
10. WORKING DAYg REMAINING .I,ne 8 minus Line 91 ....................................... ~ 17
_Controlling Operation(s)
'Remarks: (Note 5) (Continue on reverse)
'['he ContreGtor will be allowed fifteen (15) days in whioh to protest in writing the ~e
correcthess of the statement; otherwise the statement shall be deemed to have r
been acoepted by the Contractor as correot. NOTE: All footnotes are on
reverse side.
Revised 3/20/1996
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather; state the
reason why the day wa~ unworkable when the weather
description itself does not adequately describe
conditions. For example, "Clear-wet grade" to describe
conditions when the weather is clear, but the grade is
too wet to work. Do not list days merely as
"Unworkable".
2. Enter days on which no productive work has been performed
on the controlling operation(s) for.reasons other than
weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after
expiration of the Extended DATE OF COMPLETION. On
contracts that are overtime, the total under WORKING DAYS
shall not be greater than the 'total of REVISED WORKING
DAYS, (line 8). After approved total of working days
has been reached, continue recording working and
nonworking days but do not add into the totals. Make
statement under REMARKS the WORKING and NONWORKING days
are shown for record only since the contract time has
elapsed.
5. Time extensions other, are to be explained under REMARKS
and the following information is to be included:
(a) Cause of delay and specification reference/under
which approval was granted.
(b) Statement as to what contr611ing operation or
operations are being delayed and to what extent.
{c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
City of Fontana
CALIFORNIA
April 22, 1996
Shannon Stuart, Vice-President
S.J. Burkhardt, Inc.
6157 Marlatt
Mira Loma, CA 91752
RE: Locust Avenue Sewer Extension Project from 110' South
of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94)
Weekly Statement of Working Days Report No. 1
Dear Mr. Stuart:
Enclosed for the review is the weekly statement of working days for
week ending April 15, 1996. You will be allowed (15) days in which
to protest in writing the correctness of the statement; otherwise,
the statement shall be deemed to have been accepted by you as
correct.
Please contact the undersigned at (909) 350-6645, if you need any
additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
You wala, P .E.
Associate Engineer/Special Projects
cc: Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA CALIFORNIA 92334-0518 · (714) 350-7600
SISTER CITY- KAMLOOPS, B,C. CANADA
~ie~ recycled paper
CITY OF FONTANA REPORTNO. 1
WEEKLY STATEMENT OF WORKING DAYS
PROJECT; LOCUST AVENUE SEWER EXTENSION (SB-72-94)
TO: S,J. BURKHARDT, INC.
The fc,I ow ng statement shows the number of work ng days charged to your conffact for the week ending April 19, 1996.
0 Non-Working Working Days
Days No Work
De ~e Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Conffolling
Operation
(Note 2)
4/15/96 Men. Clear, 76 Degrees 1
4/16/96 Tue. Clear, 79 Degrees 1
4/17/,<36 Wed. Rain, 67 Degrees 0 1
4/18/96 Thur. Cloudy, Rain, 69 Degrees 0 1
4/ . Clear, 70 Degrees 1 0
19/.<'-16 Fd.
0
'~ay~ this week ........................................................................................................32
Day~ previously reported .......................................................................................0 0
Tote! days to date ...................................................................................................32
TiME EXTENSIONS CCO Numbers Days Approved
(Note 3) COO Other
Day~ this report ......................................................................................................
Day=9 previously reported ..................................................................................................................
'Pote.~ days to date ..............................................................................................................................00
DoM,,,uTAT,oNoF ENDEDDATEFoRcoMPL ,oN r' I Date
4)
1. F ~r ,~=rkir. g doy cosig~'ate¢l ......................................' ........ a~'
2 %'~ Crkihg d~yS specified in c;n'.r.'.tct ............................. 25 ............................
~; ~:; ~'MnUTE DAT~ FC-n CC',VPLETICN .~f ell d9~s spoc,fied ~,'~; wcrkobloL ., "-)a'./..~...5.~E .._.~:13v '71C:,_6..
7. E (T-'I~DED DATE FCq C,~MPLETICN ,L:ne 3 p!u~ L'n3.31 ........ Do? I~,c. 5~,a I,~."ay 21. · 9Oe
· 9 T '.L~I ,~crkS'~g days Io dnto .................................... 3
' C ,VORK:NG 3t%vS REM;, NING L no 8 m.nus L no 51 .................. 22 =
Conboiling Operation (s)
Rem~rks: (Note ~5) (Conlinue on raveroe)
The ~:~ntractor will be ellowed fifteen (15) days in which to protest in writing the
Gorrecthess of the statement; otherwise the statement shall be deemed to have
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side,
INSTRUCTIONS TO RESIDENT ENQINEER
1. When recording nonworking days due to weather; state the
reason why the day was unworkable when the weather
description itself does not adequately describe
conditions. For example, "Clear-wet grade" to describe
conditions when the weather is clear, but the grade is
too wet to work. Do not list days merely as
"Unworkable".
2. Enter days on which no productive work has been performed
on the controlling operation(s) for.reasons other than
weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonWorking days which occur after
expiration of the Extended DATE OF COMPLETION. On
contracts that are overtime, the totalunder WORKING DAYS
shall not be greater than the total of REVISED WORKING
DAYS, (line 8). After approved total of working days
has been reached, continue recording working and
nonworking days but do not add into the totals. Make
statement under REMARKS the WORKING and NONWORKING days
are shown for record only since the contract time has
elapsed.
5. Time extensions other, are to be explained under REMARKS
and the following information is to be included:
(a) Cause of delay and specification reference/under
which approval was granted.
(b) Statement as to what controlling operation or
operations are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
' /"* 199F,~NSTRUCTION W(~J:tKING DAYS CAL~V~AR
AIR TEST DATA SHEET..
Location.[ ~dM_/
Pipe Identifaction..
FIELD TEST DATA..
Pipe Length MH to MH Spec. Initial Stab. Test Test Total
Size Time Pres. Time Pres Pres Time
/0" /~o' s~ t~so r~s~lz~to ~/~,~S-r/a/~ 3,~~ 3,~'~ 3~ f~/
222' ~'~lZ~75 T~/~+~ ~s 6~z/~ 3~5 3,2~.~p/,~
Summary,.