HomeMy WebLinkAbout27. Weekly Statement City of Fontana CALIFORNIA May 28,1996 Shannon Stuart, Vice-President S.J. Burkhardt, Inc. 6157 Marlatt Mira Loma, CA 91752 RE: Locust Avenue Sewer Extension Project from 110' South of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94) Weekly Statement of Working Days Report No. 6 (FINAL) Dear Mr. Stuart: Enclosed is the weekly statement of working days for week ending May 24, 1996. This statement will be deemed accepted correct unless protested in writing within (15) days from the date of this letter. Please contact the undersigned at(909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division y wl P.E. atan a a, Associate Civil Engineer/Special Projects cc: Principal Civil Engineer/Special Projects 8353 SIERRAAVENUE(P.O. 8OX518) · FONTANA, CALIFORNIA92334-0518 · (714)350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA ~1~ recycled paper CITY OF FONTANA REPORT NO. 6 (FINAL) WEEKLY STATEMENT OF WORKING DAYS P~:{OJECT: LOCUSTAVENUE SEWER EXTENSION (SB-72-94) TO: S.J. BURKHARDT, INC. Tl'!e following statement shows the number of working days charged to your contrast for the week ending May 24, 1996. Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) ~/:20/96 Men. Clear, 78 Degrees 1 5/21/96 Tue. Clear, 80 Degrees 1 Wed. Thur. FrL ~)ays this week ..........................................................................................................20 1 Days previously reported .........................................................................................23 2 1 Total days to date .....................................................................................................252 1 TiME EXTENSIONS CCO Numbers Days Approved "~)ays this report ........................................................................................................(Note 3)CCOOther Days previously reported ..................................................................................................................... 'Total days to date ................................................................................................................................00 ~'OMPUTATION OF EXTENDED DATE FOR COMPLETION ~ Number Numbered Date of Days Day (Note 4) ';I, First working day design:bed......' · · I __~. ............... 2. Working days spsc fled 'n tonitact .............................................. 25 ::. Day ~ Sub Tolal ILino 4 plus Lir. o 51 .................................... ' ~- .............. ~. s r g I e } . 25 ) T3tel ,'~crk~rg days to sate ............................................... I 13. WORKING DAYS REMAIN!NG :Lno 8 rrinus Line 9) . 0 _Conb-olling Operation{s) Remarks; (Note 5) (Continue on reverse) PROJECT SUBSTANTIALLY COMPLETE. CONTRACTOR TO COMPLETE PUNCH LIST ITEMS. The ConS'actor will be allowed fifteen (15') days in which to protest in writing the c!errectness of the statement; otherwise the statement shall be deemed to have ngineer been accepted by the Conb'actor 6s correct. NOTE'. All footnotes are on reverse side. Revised 3/20/1996 INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for.reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL City of Fontana CALIFORNIA May 20,1996 Shannon Stuart, Vice-President 'S.J. Burkhardt, Inc. 6157 Marlart Mira Loma, CA 91752 RE: Locust Avenue Sewer Extension Project from 110' South of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94) Weekly Statement of Working Days Report No. 5 Dear Mr. Stuart: Enclosed is the weekly statement of working days for week ending May 17, 1996. This statement will be deemed accepted correct unless protested in writing within (15) days from the date of this letter. Please contact the undersigned at(909)350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yousuf Patanwala, P.E. Associate Civil Engineer/Special Projects cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA, CALIFORNIA 92334-0518 · (714) 350-7600 SISTER CITY -- KAMLOOPS, B.C. CANADA CITY OF FONTANA REPORTNO. 5 WEEKLY STATEMENT OF WORKING DAYS F'ROJECT: LOCUSTAVENUE SEWER EXTENSION (SB-72-94) TO: S.J. BURKHARDT, INC. The following statement shows the number of working days charged to your contract for the week ending May 17, 1996. Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) _~713/96 Men. Clear, 91 Degrees 1 5/14/96 Tue. Clear/Overcast, 86 Degrees 1 ~:I15/96 Wed. Overcast A.M., Clear P.M., 81 Degrees 1 ~:I16/96 Thur. OvercastA.M., Clear P.M., 79 Degrees 1 ~717/96 FrL Clear, 86 Degrees I 1 Days this week ..........................................................................................................50 1 Days previously reported .........................................................................................18 2 0 ,:Total days to date .....................................................................................................232 1 ~'jME EXTENSIONS CCO Numbers Days Approved 'Days this report ................................: .......................................................................(Note 3)CCOOther Days previously reported ..................................................................................................................... Total days to data ................................................................................................................................00 E!OMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered I Date of Days Day (Note 4) ~ C~:,MPUTE DATE FOR COI'{PL="I'ICN P e I d~tya s.-..~:i'ied .qre Acrkad~ ......... D~ N;:. =,,~, IM~,v !7. · 9.'.'G' !~, S,,b Total ,L~r~u 4 ~:lus L. r'o ~, . ............................. 2 7. EXT._'~,CEDDATE=ORCCM=LE'rCN:Lne3F'usLPu5! ............ _~,/'N; ~::" 'M~Z' ~.~..-:.5 'C WC~<'NG DAYS r,E.VAIN'NG ,Li-o 8 m Pus L ne 9~ ................. 2 _~?ontrolling Operation(s) ~!temarks: (Note 5) (Continue on reverse) ~l~e Contractor will be allowed fifteen (15) days in which to protest in writing the correctnasa of the statement; otherwise the statement shall be deemed to have ginear been accepted by the Contractor as correct. NOTE: All footnotes are on r averse side. Revised 3/20/1996 t INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is tco wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for.reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference/under which approval was granted. (b~ Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMAI~KS: City of Fontana CALIFORNIA May 13,1996 Shannon Stuart, Vice-President S.J, Burkhardt, Inc. 6157 Marlart Mira Loma, CA 91752 RE: Locust Avenue Sewer Extension Project from 110' South of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94) Weekly Statement of Working Days Report No, 4 Dear Mr. Stuart: Enclosed for review is the weekly statement of working days for week ending May 10, 1996. You will be allowed (15) days in which to protest in writing the correcthess of the statement; otherwise, the statement shall be deemed to have been accepted as correct. Please contact the undersigned at (909) 350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yo~jnwala, P.E. Associate Civil Engineer/Special Projects cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE(P.O. BOX 518) · FONTANA, CALIFORNIA92334-0518 · (714)350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA ~e~ recycled paper CITY OF FONTANA naPere' NO. 4 WEEKLY STATEMENT OF WORKING DAYS PROJECT: LOCUST AVENUE SEWER EXTENSION (SB-72-94) TO: S.J. BURKHARDT, INC. 'Fn~ following statement shows the number of working days charged to your contract for the week ending May 1 O, 1996. Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 5/!3/96 Men. Clear, 83 Degrees 1 5/7/96 Tue. Clear, 85 Degrees 1 5/6/96 Wed. Clear, 86 Degrees 1 5/9/96 Thur. Clear, 86 Degrees 1 5/I 0/96 Fd, Clear, 86 Degrees 1 'i~)ays this week ..........................................................................................................50 [')aye previously reported .........................................................................................13 2 Total days to date .....................................................................................................182 TIME EXTENSIONS CCONumbere Days Approved (Note 3) CCO Other ()ays this report ........................................................................................................ Days previously reported ..................................................................................................................... Total days to date ................................................................................................................................00 coM.uT T,oNoF ENDEDDATEFoRcoM.L ,oN 4) 'LFrst,,:;rk,r. gduy~'!es,~ratc, d ...................... . .........:..Z"'Z ..........' ....2' ......{.;!,~.v_~e__,?..7.2. I~cri115.,'SSe !. ~Vcr~mg dsy.'~ scoclfod in :cntr~'.c~ ............. , cou,~s DATE FO~. CO~.~.L='r'O,~ .,f ~', =.>s s.,..~i~,ed .., ,.~.~..~b!.,.. i I'~:,Y ~=-~"~;' 1~.;~;~.::' 9~9" I TOIe,~ t'l~,O exter'sion ca} s aperoved Ic, ."fate ~CCO I:lus c:hc. ri .................0 i. Total r,or..,~.orking c:ays :c cab, Nc.to 41 .............................. :l 2 I ' .' EXTENDED E~ATE FOR COMF_ET.ON ,Li-o 3 cl;,s bno e~ ........... ~ ~ 3,~y N,: -;~8 ~,;-~v ~1.199~ ~ Rovisod.~,cr~ingclay~fc~rco-b'act~Lme2pusL;ne41 ............... :..:.':""i 2,~ · ) To'~el'^~rkingda~¶~:,dato ..................................................... 16 · 0 WC,':IKING DAYS REMAINING ,Line 8 mnus L no _C!ontrolling Operation (s) ~emerks: (Note 5) (Continue on reverse) l'he Contractor will be ellowed fifteen (15) days in which to protest in writing the %~E~g correcthess of the statement; otherwise the statement shell be deemed to have ineer t~een accepted by the Contractor as correct. NOTE: All footnotes are on r ~veree side. Revi,~ed 3/20/1996 INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for.reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS May 6,1996 Shannon Stuart, Vice-President S.J. Burkhardt, Inc. 6157 Marlatt Mira Loma, CA 91752 RE: Locust Avenue Sewer Extension Project from 110' South of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94) Weekly Statement of Working Days Report No. 3 Dear Mr. Stuart: Enclosed for review is the weekly statement of working days for week ending May 3, 1996. You will be allowed (15) days in which to protest in writing the correctness of the statement; otherwise, the statement shall be deemed to have been accepted as correct. Please contact the undersigned at (909) 350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Yousuf Patanwala, P.E. Associate Civil Engineer/Special Projects cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENt3E(P.O. BOX518) · FONTANA CALIFORNIA92334-0518 · (714)350-7600 SISTER CITY -- KAMLOOPS, B.C. CANADA ~lf~ recycled paper CITY OF FONTANA REPORT NO. 3 WEEKLY STATEMENT OF WORKING DAYS PROJECT: LOCUST AVENUE SEWER EXTENSION (SB-72-94) TO: S.J. BURKHARDT, INC. The following statement shows the number of working days charged to your contract for the week ending May 3, 1996. Non-Working Working Days Deye No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) _~:/29/96 Men. Clear/Windy, 92 Degrees 1 4/30/96 Tue. Clear/~Nindy, 94 Degrees 1 ~/1/96 Wed. Clear, 92 Degrees 1 ~;12/96 Thur. Clear, 94 Degrees 1 _5/3/96 Fri. evemast, 78 Degrees 1 "Days this week ..........................................................................................................50 Days previoushi reported .........................................................................................8 2 ..Total days to date .....................................................................................................132 lIME EXTENSIONS CCO Numbers Days Approved 'Days this report ........................................................................................................(Note 3)CCO Other Days previously reported ..................................................................................................................... ..Total days to date ................................................................................................ .................................00 of Days Day (Note 4) "1. First working day designsled .............................................. i ! Cay No. 572 ~;,!:.r.i 1 ~ 1 ~..-;.,6.. 2. ' 3. . 4, Total time extensicn aav,q Rpcroved t,~ =ate ~CCO t;l~i5 3t-err ....................... 3 5. Total non-working days to clare ,%1c~o 41 ................................ 8. cle'.'is~c .%crk,rg days for c =n~,~ct ~Uno 2 plus L ne 41 ................ ..........................................It.',l · C ;VORK:NG DAYS REMA r~ING !bne 8 fr~rtus Line S.I ...................... _(?ontrolling Operation F~emarks: (Note 5) (Continue on reverse) The Contractor will be ellowed fifteen (15) days in which to protest in writing the ~ correcthess of the statement; otheRvise the statement shell be deemed to have ineer been a~oepted by ~he Contractor as oorrect. NOTE: All footnotes are on reverse side, Revised 3/20/1996 INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather~ state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For-example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation{s) for.reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonwOrking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under RF/~a~RKS and the following information is to be included: (a) Cause of .delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS= .............. " Ci ty of Fontana Ib~ LIFORNIA April 29, 1996 Shannon Stuart, Vice-President S.J. Burkhardt, Inc. 6157 Marlatt Mira Loma, CA 91752 RE: Locust Avenue Sewer Extension Project from 110' South of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94) Weekly Statement of Working Days Report No. 2 Dear Mr. Stuart: Enclosed for the review is the weekly statement of working days for week ending April 26, 1996. You will be allowed (15) days in which to protest in writing the correctness of the statement; otherwise, the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned at (909) 350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division You~ktTnwala, P.E. Associate Engineer/Special Projects cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE(P.O. BOX518) ® FONTANA, CALIFORNIA92334-0518 · (714)350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA ~f~ recyciec~ paper CITY OF FONTANA REPORT NO. WEEKLY STATEMENT OF WORKING DAYS PROJECT: LOCUST AVENUE gEWER EXTENSION (SB-72-94) 'ro: S.J. BURKHARDT, INC. 'l_'he following statement shows the number of working days charged to your eontraat for the week ending Apd126, 1996. Non-Working Working Days , Days No Work Date Day Weather, Weather Conditions or Other CandYone Working Caused by Done on Day Weather Controlling Operation (Note 2) 7/22/96 Man. Clear, 77 Degrees 1 4/23/96 Tue. Clear, 88 Degrees 1 7~/24/96 Wed. Clear, 89 Degrees 1 ~1/25/96 Thur. Clear, 89 Degrees 1 ~/26/96 Fd. Clear, 90 Degrees 1 'Days this week ..........................................................................................................50 Days previously reported .........................................................................................3 2 .,Total days to date .....................................................................................................82 'tIME EXTENSIONS CCO NumbePs Deya Approved (Note 3) CCO Other "Days this report ........................................................................................................ Days previously reported ..........................................................,. ......................................................... .,Total days to data ......................................................................: ......................: ..................................00 COMPUTATION OF EXTENDED DATE FOR COMPLETION ~ Number Numbered ~ Date .. of Days Day (Note 4) 1 = ,.[ '.,,'ork,ng a.y de.,g,'ated .......................... . · P:}Y..~?: ~Z? I;P;" 1'3~i?. Wcrki-g ,'ta'e'S specified in ccntract .... 3 COMP'jTE DATE FC~. COMPLETION ,if al' days sneD.';od oro ,c,kar.'l.~, ........ ""'.. .j,D:~..).' .~: ~j:?.~'~ , May 4. Total t,me exton¶ion days ~nprovod to ds!~ .CCO plus nthe', ........................... O I non-,.orkmg d. ,s to d..e .Note ...................::::: :::::.....: :..... ..................._. 6 Sub Tot~l !L,ne 4 nlut~ L no 5~ ..............2 7. EXTENDED DATE FOR CCMPLETION ,Li~o 3 cl,s Lind e! ..... i ]..D~.~. ~E -=""9 ~ ~a.'..':.~.1..]gP'5 . 8. Revisod .~,orking duys fcr contract ~Lir, e 2 pk,s Uno 41 ....................................t' 25 9 Total ~,orking days to da~e .................................................. 8 10. WORKING DAYg REMAINING .I,ne 8 minus Line 91 ....................................... ~ 17 _Controlling Operation(s) 'Remarks: (Note 5) (Continue on reverse) '['he ContreGtor will be allowed fifteen (15) days in whioh to protest in writing the ~e correcthess of the statement; otherwise the statement shall be deemed to have r been acoepted by the Contractor as correot. NOTE: All footnotes are on reverse side. Revised 3/20/1996 INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather; state the reason why the day wa~ unworkable when the weather description itself does not adequately describe conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for.reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the 'total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference/under which approval was granted. (b) Statement as to what contr611ing operation or operations are being delayed and to what extent. {c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: City of Fontana CALIFORNIA April 22, 1996 Shannon Stuart, Vice-President S.J. Burkhardt, Inc. 6157 Marlatt Mira Loma, CA 91752 RE: Locust Avenue Sewer Extension Project from 110' South of Foothill Blvd. to 170' North of Foothill Blvd.(SB-72-94) Weekly Statement of Working Days Report No. 1 Dear Mr. Stuart: Enclosed for the review is the weekly statement of working days for week ending April 15, 1996. You will be allowed (15) days in which to protest in writing the correctness of the statement; otherwise, the statement shall be deemed to have been accepted by you as correct. Please contact the undersigned at (909) 350-6645, if you need any additional information. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division You wala, P .E. Associate Engineer/Special Projects cc: Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA CALIFORNIA 92334-0518 · (714) 350-7600 SISTER CITY- KAMLOOPS, B,C. CANADA ~ie~ recycled paper CITY OF FONTANA REPORTNO. 1 WEEKLY STATEMENT OF WORKING DAYS PROJECT; LOCUST AVENUE SEWER EXTENSION (SB-72-94) TO: S,J. BURKHARDT, INC. The fc,I ow ng statement shows the number of work ng days charged to your conffact for the week ending April 19, 1996. 0 Non-Working Working Days Days No Work De ~e Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Conffolling Operation (Note 2) 4/15/96 Men. Clear, 76 Degrees 1 4/16/96 Tue. Clear, 79 Degrees 1 4/17/,<36 Wed. Rain, 67 Degrees 0 1 4/18/96 Thur. Cloudy, Rain, 69 Degrees 0 1 4/ . Clear, 70 Degrees 1 0 19/.<'-16 Fd. 0 '~ay~ this week ........................................................................................................32 Day~ previously reported .......................................................................................0 0 Tote! days to date ...................................................................................................32 TiME EXTENSIONS CCO Numbers Days Approved (Note 3) COO Other Day~ this report ...................................................................................................... Day=9 previously reported .................................................................................................................. 'Pote.~ days to date ..............................................................................................................................00 DoM,,,uTAT,oNoF ENDEDDATEFoRcoMPL ,oN r' I Date 4) 1. F ~r ,~=rkir. g doy cosig~'ate¢l ......................................' ........ a~' 2 %'~ Crkihg d~yS specified in c;n'.r.'.tct ............................. 25 ............................ ~; ~:; ~'MnUTE DAT~ FC-n CC',VPLETICN .~f ell d9~s spoc,fied ~,'~; wcrkobloL ., "-)a'./..~...5.~E .._.~:13v '71C:,_6.. 7. E (T-'I~DED DATE FCq C,~MPLETICN ,L:ne 3 p!u~ L'n3.31 ........ Do? I~,c. 5~,a I,~."ay 21. · 9Oe · 9 T '.L~I ,~crkS'~g days Io dnto .................................... 3 ' C ,VORK:NG 3t%vS REM;, NING L no 8 m.nus L no 51 .................. 22 = Conboiling Operation (s) Rem~rks: (Note ~5) (Conlinue on raveroe) The ~:~ntractor will be ellowed fifteen (15) days in which to protest in writing the Gorrecthess of the statement; otherwise the statement shall be deemed to have been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side, INSTRUCTIONS TO RESIDENT ENQINEER 1. When recording nonworking days due to weather; state the reason why the day was unworkable when the weather description itself does not adequately describe conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable". 2. Enter days on which no productive work has been performed on the controlling operation(s) for.reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonWorking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the totalunder WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS the WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference/under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: ' /"* 199F,~NSTRUCTION W(~J:tKING DAYS CAL~V~AR AIR TEST DATA SHEET.. Location.[ ~dM_/ Pipe Identifaction.. FIELD TEST DATA.. Pipe Length MH to MH Spec. Initial Stab. Test Test Total Size Time Pres. Time Pres Pres Time /0" /~o' s~ t~so r~s~lz~to ~/~,~S-r/a/~ 3,~~ 3,~'~ 3~ f~/ 222' ~'~lZ~75 T~/~+~ ~s 6~z/~ 3~5 3,2~.~p/,~ Summary,.