HomeMy WebLinkAbout10.6 Engineer's Cost Estimate V CITY OF FONTANA V
PROPOSAL BID SHEET
FOR CONSTRUCTION OF
LOCUST AVENUE SEWER EXTENSION PROJEC1F
FROM 110' SOUTH OF FOOTHILL BLVD. to 170' NORTH OF FOOTHILL BLVD.
BID NO. SB-72-94
ITEM DESCRIPTION ESTIMATED UNIT UNIT TOTAL
NO. QUANTITY PRICE AMOUNT
1. INSTALL 10" EXTRA STRENGTH V.C.P. 96 LF ~f~:2 ~' '~)
PER TRENCH DETAIL "A", SHEET 2 of 3.
2. INSTALL JACKED 20" STEEL PIPE 180 LF ''~'
ENCASEMENT, INCLUDING 10" EXTRA
STRENGTH V,C.P PER TRENCH DETAIL
"B", SHEET 2 of 3.
3. INSTALL 6" DIAMETER EXTRA 2 EA
STRENGTH V.C.P. STUB (2' long).
4. INSTALL 60" DIAMETER CONCRETE PRE- 1 EA ,~l
CAST ECCENTRIC MANHOLE PER L.A.
COUNTY STD. S-a-206, CASE III.
5. TIE PROPOSED V.C.P. SEWER INTO 1 EA
EXISTING STUB AND REMOVE ALL
EXISTING SEALS, PLUGS, AND
MORTAR.
6. SAWCUT AND REMOVE EXISTING A.C. 1050 SF
PAVEMENT AS SHOWN ON TRENCH
DETAIL "A",SHEET 2 of 3.
7. INSTALL A.C. PAVEMENT AS SHOWN 40 TON ~e~ ~)~:::~
ON TRENCH DETAIL "A", SHEET 2 of 3.
8. REMOVE AND REPLACE EXISTING LOOP 2 ~ ~ 'i'2'L'~'~"" I! I~::~
DETECTORS PER CAL-TRANS STD. ES-
5A, TYPE 2A.
9. POTHOLE EXISTING GAS MAIN AND 4 EA
WATER MAIN.
10. PROVIDE TRAFFIC CONTROL, LANE LUMP SUM LS
CLOSURES, AND ALL RELATED WORK,
AS SHOWN ON TRAFFIC CONTROL
PLAN, SHEET 3 of 3, TO INCLUDE THE
PROVISIONS OF ARTICLE 7-10.3 OF
SPECIAL PROVISIONS.
P-16
,11. SUSPEND AND PROTECim~LL AFFECTED LUMP SUM
UTILITIES, (PARTICULAR ATTENTION
SHALL BE TAKEN TO THE PROTECTION
OF THE EXISTING GAS AND WATER
MAIN. SEE SPECIAL PROVISIONS,
APPENDIX III).
12. PROVIDE TRENCH SHEETING, SHORING, LUMP SUM LS
BRACING, TEMPORARY FENCING, AND
ALL APPURTENANT RELATED WORK.
14~ CONSTRUCTION STAKING AND LUMP SUM LS
SURVEYING (PERFORMED UNDER THE
SUPERVISION OF A STATE OF
CALIFORNIA LICENSED LAND
SURVEYOR OR AUTHORIZED
REGISTERED CIVIL ENGINEER).
P-17