HomeMy WebLinkAbout5.5 To and From Property Owner City of Fontana
CALIFORNIA
March 12, 1996
Joseph Eisenberg APN NO. 243-123-14
1901 Avenue of the Stars
16th Floor
Los Angeles, CA 90067
SUBJECT: Locust Avenue Sewer Extension Project From
110' South of Foothill Blvd. to 170' North
of Foothill Blvd.
Notice of Construction
Dear Resident/Business Owner:
The Fontana City Council has awarded a construction contract to the
lowest responsible bidder S.J. Burkhardt, Inc. for the above
referenced project. The project consists of the construction of a
10" V.C.P. Sewer Main from 110 feet South of Foothill Boulevard to
170 feet North of Foothill Boulevard located on Locust Avenue. The
construction is expected to start in the first week of April, 1996.
The Contractor as an independent business will choose its own
method of operation. The Contractor's working hours will be
limited from 7:00 a.m. to 6:00 p.m. Monday through Friday. The
Contractor is required to complete all work on this project within
25 working days from the start date.
The Agency's role will be that of providing the necessary
inspection and material testing. The contractor shall be required
to supervise and complete all work as per plans, specifications and
City of Fontana and Caltrans Standards.
It is the Agency's sincere desire to accomplish this construction
with a minimum of inconvenience to the area'a residents and
businesses. The City requests your cooperation in this respect.
The City will work closely with you and the contractor to reduce
both the occurrence and the duration of any unpleasant condition.
Please recognize that construction sites can be dangerous;
particularly keep small children away from the construction site
and activity at all times.
MAILING ADDRESS: P.O.BOX 518
8353 SIERRA AVENUE · FONTANA, CALIFORNIA 92334-0518 · (909) 350-7600
PRINTED ON RECYCLED PAPER
Please contact the City Inspector, Wayne Brown at (909) 350-6636 if
you have any questions with respect to the construction activities
in the field. You may also contact the =undersigned at (909 350-
6645 for any additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
You wala, P.E.
Associate Engineer/Special Projects
cc: City Engineer
Deputy City Engineer/City Traffic Engineer
Principal Civil Engineer/Special Projects
Street and Utilities Manager (C.A.)
Public Works Inspector (W.B.)
City of Fontana
CALIFORNIA
March 12, 1996
Gary Lazar APN NO. 246-231-13
C/O California Target Enter, Inc.
12739 Lakewood Boulevard
Downey, CA 90242
SUBJECT: Locust Avenue Sewer Extension Project From
110' South of Foothill Blvd. to 170' North
of Foothill Blvd. ~
Notice of Construction
Dear Resident/Business Owner:
The Fontana City Council has awarded a construction contract to the
lowest responsible bidder S.J. Burkhardt, Inc. for the above
referenced project. The project consists of the construction of a
10" V.C.P. Sewer Main from 110 feet South of Foothill Boulevard to
170 feet North of Foothill Boulevard located on Locust Avenue. The
construction is expected to start in the first week of April, 1996.
The Contractor as an independent business will choose its own
method of operation. The Contractor's working hours will be
limited from 7:00 a.m. to 6:00 p.m. Monday through Friday. The
Contractor is required to complete all work on tlhis project within
25 working days from the start date.
The Agency's role will be that of providing the necessary
inspection and material testing. The contractor shall be required
to supervise and complete all work as per plans, specifications and
City of Fontana and Caltrans Standards.
It is the Agency's sincere desire to accomplish this construction
with a minimum of inconvenience to the area'a residents and
businesses. The City requests your cooperation in this respect.
The City will work closely with you and the contractor to reduce
both the occurrence and the duration of any unpleasant condition.
Please recognize that construction sites can be dangerous;
particularly keep small children away from the construction site
and activity at all times.
8353 SIERRAAVENUE(P.O. BOX518) · FONTANA CALIFORNIA92334-0518 · (714)350-7600
SISTER CITY -- KAMLOOPS, B.C. CANADA
~i~ recycled paper
Please contact the City Inspector, Wayne Brown at (909) 350-6636 if
you have any questions with respect to the construction activities
in the field. You may also contact the undersigned at (909) 350-
6645 for any additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yousuf Patanwala, P.E.
Associate Engineer/Special Projects
cc: City Engineer
Deputy City Engineer/City Traffic Engineer
Principal Civil Engineer/Special Projects
Street and Utilities Manager (C.A.)
Public Works Inspector (W.Bo)
City of Font, ana
CALIFORNIA
March 12, 1996
Pentecostal Church APN NO. 243-123-15
P.O. Box 888
Fontaria, CA 92334
SUBJECT: Locust Avenue Sewer Extension Project From
110' South of Foothill Blvd. to 170' North
of Foothill Blvd.
Notice of Construction
Dear Resident/Business Owner:
The Fontana City Council has awarded a construction contract to the
lowest responsible bidder S.J. Burkhardt, Inc. for the above
referenced project. The project consists of the construction of a
10" V.C.P. Sewer Main from 110 feet South of Foothill Boulevard to
170 feet North of Foothill Boulevard located on Locust Avenue. The
construction is expected to start in the first week of April, 1996.
The Contractor as an independent business will choose its own
method of operation. The Contractor's working hours will be
limited from 7:00 a.m. to 6:00 p.m. Monday through Friday. The
Contractor is required to complete all work on this project within
25 working days from the start date.
The Agency's role will be that of providing the necessary
inspection and material testing. The contractor shall be required
to supervise and complete all work as per plans, specifications and
City of Fontana and Caltrans Standards.
It is the Agency's sincere desire to accomplish this construction
with a minimum of inconvenience to the area'a residents and
businesses. The City requests your cooperation. in this respect.
The City will work closely with you and the contractor to reduce
both the occurrence and the duration of any unpiLeasant condition.
Please recognize that construction sites can be dangerous;
particularly keep small children away from the construction site
and activity at all times.
MAILING ADDRESS: P.O.BOX 518
8353 SIERRA AVENUE · FONTANA, CALIFORNIA 92334-0518 · (909) 350-7600
PRINTED ON RECYCLED PAPER
Please contact the City Inspector, Wayne Brown at (909) 350-6636 if
you have any questions with respect to the construction activities
in the field. You may also contact the undersigned at (909) 350-
6645 for any additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yousu~a~anwala, P.E.
Associate Engineer/Special Projects
cc: City Engineer
Deputy City Engineer/City Traffic Engineer
Principal Civil Engineer/Special Projects
Streets and Utilities Manager (C.A.
Public Works Inspector (W.B.
City of Fontana
CALIFORNIA
March 12, 1996
Bert H. Hirezi APN NO. 246-051-13
15507 Caufield Avenue
Norwalk, CA 90650
SUBJECT: Locust Avenue Sewer Extension Project From
110' South of Foothill Blvd. to 170' North
of Foothill Blvd.
Notice of Construction
Dear Resident/Business Owner:
The Fontaria City Council has awarded a construction contract to the
lowest responsible bidder S.J. Burkhardt, Inc. for the above
referenced project. The project consists of the construction of a
10" V.C.P. Sewer Main from 110 feet South of Foothill Boulevard to
170 feet North of Foothill Boulevard located on Locust Avenue. The
construction is expected to start in the first week of April, 1996.
The Contractor as an independent business will choose its own
method of operation. The Contractor's working hours will be
limited from 7:00 a.m. to 6:00 p.m. Monday through Friday. The
Contractor is required to complete all work on this project within
25 working days from the start date.
The Agency's role will be that of providing the necessary
inspection and material testing. The contractor shall be required
to supervise and complete all work as'per plans, specifications and
City of Fontana and Caltrans Standards.
It is the Agency's sincere desire to accomplish this construction
with a minimum of inconvenience to the area'a residents and
businesses. The City requests your cooperation. in this respect.
The City will work closely with you and the contractor to reduce
both the occurrence and the duration of any unpleasant condition.
Please recognize that construction sites can be dangerous;
particularly keep small children away from the construction site
and activity at all times.
MAILING ADDRESS: P.O.SOX 518
8353 SIERRA AVENUE · FONTANA, CALIFORNIA 92334-0518 · (909) 380-7800
Please contact the City Inspector, Wayne Brown at (909) 350-6636 if
you have any questions with respect to the construction activities
in the field. You may also contact the undersigned at .(909) 350-
6645 for any additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yousuf Patanwala, P.E.
Associate Engineer/Special Projects
cc: City Engineer
Deputy City Engineer/City Traffic Engineer
Principal Civil Engineer/Special Projects
Street and Utilities Manager (C.A.)
Public Works Inspector (W.B.)
City of Fontana
~'~-~a ~(~0~ C A L I F 0 R N I A
March 12, 1996
Sunrise Management Company APN NO. 243-142-17
18150 Foothill Boulevard 243-142-20
Fontana, CA 92336
SUBJECT: Locust Avenue Sewer Extension Project From
110' South of Foothill Blvd. to 170' North
of Foothill Blvd.
Notice of Construction
Dear Resident/Business Owner:
The Fontana City Council has awarded a construction contract to the
lowest responsible bidder S.J. Burkhardt, Inc. for the above
referenced project. The project consists 6f the construction of a
10" V.C.P. Sewer Main from 110 feet South of Foothill Boulevard to
170 feet North of Foothill Boulevard located on Locust Avenue. The
construction is expected to start in the first week of April, 1996.
The Contractor as an independent business will choose its own
method of operation. The Contractor's working hours will be
limited from 7:00 a.m. to 6:00 p.m. Monday through Friday. The
Contractor is required to complete all work on this project within
25 working days from the start date.
The Agency's role' will be that of providing the necessary
inspection and material testing. The contractor shall be required
to supervise and complete all work as per plans, specifications and
City of Fontana and Caltrans Standards.
It is the Agency's sincere desire to accomplish this construction
with a minimum of inconvenience to the area'a residents and
businesses. The City requests your cooperation in this respect.
The City will work closely with you and the contractor to reduce
both the occurrence and the duration of any unpleasant condition.
Please recognize that construction sites can be dangerous;
particularly keep small children away from the construction site
and activity at all times.
MAILING ADDRESS: P.O,BOX 518
8353 SIERRA AVENUE · FONTANA, CALIFORNIA 92334-0518 · (909) 350-7600
PRtNTED ON RECYCLED PAPER
Please contact the City Inspector, Wayne Brown at (909) 350-6636 if
you have any questions with respect to the construction activities
in the field. You may also contact the undersigned at (909) 350-
6645 for any additional information.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Division
Yo nwala, P.E.
Associate Engineer/Special Projects
cc: City Engineer
Deputy City Engineer/City Traffic Engineer
Principal Civil Engineer/Special Projects
Street and Utilities Manager (C.A.)
Public Works Inspector (W.B.)