HomeMy WebLinkAbout29.3 Reports of Inspection(~ITY OF FONTANA V . ,.t,,,/ ~..~r""-
REPORT NO.
WEEKLY STATEMENT OF WORKIN(3 DAYS
To: //,_~
The following statement shows the numt~er of working days Charged to your tontract for the week enctlng
Non-Working Working Days
Daya No Work
Date Day Weather, Weaz~er Conditions or O~er Conditions WorKing C~used Dy Done on
Day Weather Controlling
Operation
(Note
2- g Wed. /
Days this week ......................................................................................................
D~rS previousty rsportecl ......................................................................................
Total days to date ..............................................................................................
................................................................................................
CCO Other
Day~ previously reported ................. ~ .............................................................................................
ToM dayl to d~te ..........................................................................................................................
CO~PUTAT1C)N O~ ~XTEN~ED DAT~ ~R ~GMPLET1CN Nurnl~er N~mbered D~e
1, Date Contract 8DDroved DyA~omey Qenere~ ................................................:,..-..,:,..:,:::..
Z Working daV~ specified in correct. .................................................................
3, COMPUTE DAT~ FOR COMPLETION (il ~11 d~y~ ~pe~ified are worKe. t~la).., iE ....
4. Total time extension d~/~ ~proved to date (COO plus orner) ......................
5 Total non-worKing days to date (Note 4) .........................................................
6. 9ub Total (Line 4 ~lus line 5) ........................................................................... :.i ::i ' i:':
I EXTENDED DATE FOR COMPLETION ~ne ~ plue line 6) ......................... """""
8. Revised working d~l~ for oont~ct ~ne 2 plu~ Line 4) ..................................
10. WORKINQ DAY8 ~EMAININQ (Ljna 8 minue Line g) ....................................
ContTofi~ng ~er~lon~s~
Rem~'ul<s: (Note 6") (ContJnue on reverse)
The Contractor will De a~lowed fifteen (153 deys In ',¢nkih to prote~t In writing We
correcthess of the statement; othenvise the statement sr~aJl be deemed to ~ave ResiQent Engineer
been ~ccepted by the Contr,=ctor as correct. NOTE: All footnotes are on 12/92 JT/ab
reverse side,
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for'time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CiTY Of FONTANA REPORTNO,
WEEKLY STATEMENT OF WORKING DAYS
The following statement shows the number of ~'orking days charged to your contract for the week ending
Non-Working Working Days
Days No Work
Date Day Weather, Wemer Conditions or O~er Oond~ion8 Working Caused by Done on
Day Weather Controlling
Operation
(Note
~- / Thur.
DayB thi9 week ......................................................................................................
Days previous~ reposed ......................................................................................
Total days to date ..................................................................................................
T~a~:~:r~2~7~ ................................................................................................CCO NumberD~s ADDroved
COO Other
Days prevlou9~ reposed ...............................................................................................................
Total d~ to d~e ...........................................................................................................................
COMPUTATION OF E~NDED DATE FOR COMPLETION Number Numbe~d D~e
of D~ D~ (Note
1. Date Contract ~roved by A~orney Gener~ .................................................
2. Working days specified in con~c~ ................................................................. :~:~:~:~:~:~:~:E:~:~:E:~?~:E:~:~:~:~:~:~:E:~:~:~:~.
3. COMPUTE DATE FORGOMPL~ON (if all da~ specified are workable),.. ~]~ ' ....... ' J ........
4. Tot8l time e~ension days approved to d~e (COO plus other) ...................... :::::::::::::::::::::::::::::::::::::::::::::::::::::
6. Sub Total (Line 4 plus Line ~ ...........................................................................
7. E~ENDED DATE FOR COMPLE~ON (Une 8 plus Une
9. Total working days to date ...............................................................................
10. WORKING DAYS REINING (Une 8 minus Line 9) ....................................
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest In writing the
correcthess of the statement; otherwise the statement shall be deemed to have Resident Engineer
been acceDted bythe Contractor as correct. NOTE: All footnotes are on 12/92JT/ab
reverse side.
Z~B~RU~ZO~B TO R3BZDB)r~ ~GZ3i~,
l. When recording nonworking days ~ue to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. DO not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons o~her than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line S). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under RENARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be includedz
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPOR'rNO.
WEEKLY STATEMENT OF WORKING DAYS
~ fo~lo~n~ s~eme~ s~o~ ~e numbe~ of wo~n~ d~ ch~ged ~o ~our con~s~ for ~e wee~ en~in~ ~ ~ ~
Non-Wo~ng Wo~ng O~
D~ No Wo~
Da D~ Weber, Weber Con~ffions or ~er Con~ffions Wo~ng C~se~ ~ Done on
D~ Weber Cobolring
ODe~On
(No~ ~
/ on, /
D~ ~is ~e~ .....................................................................................................
D~ pre~ous~ ~po~.......; ..............................................................................
To~ d~ to dB ..................................................................................................
~ME ~NSION8 CCO N~ D~ ~pro~
CCO
O~ ~ls repo~ ....................................................................................................
D~ p~ous~ ~po~d ...............................................................................................................
To~ ~ to d~ ...........................................................................................................................
COMP~A~ON OF ~NDED DA~ FOR COMP~ON NumUer Numbered D~
1. D~ Co~ ~pro~ ~ ~om~ Gene~ ................................................. ~E~
· Wo~g d~ Ipecffied In ~o~ ................................................................. :::::::::::::::::::::::::::::::::::::::::::::::::::
· CO~ DA~ FOR COMP~ON ff / d~ spe~ed B ~le)... E~::~E~E~E~E~""""""":':"' ""'j """":':':':"+"
5 To~ non-wo~ng d~ to dB ~o~ ~ .........................................................
S S~ Tol ~ne 4 plu~ Une ~ ...........................................................................
7. ~NDED ~ FOR CO~ ~ne 3 p~l Une ~ .......................... ::::::::::::::::::::::::: I
1 O. WORffiNG DA~ RE~ ~ne 8 min~ Une ~ ....................................
Co~olllng Ope~on(I)
Remarks: (Nots 6) (Corffinue on reverse)
The Contractor wtll be ~llowed fifteen (1 !5) deyl In wt'll~h to protest In wri~ng ~e
correctneeeof~estmement;omer~se~estal~ementslqedlbedeemedtol~sve Resident Engineer
been sc, cepted by t~e ContrLL, tor is corre~ NOTE: Atl footnotes. ire on 12/92 JT/eD
reverse side.
CITY OF FONTANA REPORTNO. 32
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contrast for the week ending 6/18 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
6/14/93 Mon. 1
6/15/93 Tue. 1
6/16/93 Wed. 1
6/17/93 Thur. 1
6/18/93 Fri. 1
Days this week ................................................................................................50
Days previously reported ................................................................................12915
Total days to date ............................................................................................13415
CCO Other
. 10
Days previously reposed .........................................................................................................20
Total days to date ....................................................................................................................30
of Days
~ Ca% Cor'l%::; accrcvod b! ~; :~ C ;~:nEi .... j ."'~7 ..... ~ ................................. 1' ! S 92
2 Wark,n~; days ~::~:: f ~d rl ::c',:rdc: ..................... L .......1.' 9. ~
3. CC .~ '~'L .~T~ FO~ CC:~.',. ~T~C'~ ,,'., d.,~'- ,,:,~,:,',~d ,'o ,~,~,,~ d .... ~ ]]_.]_2].1].].. ]~].~.]~'.".
4. TC.~. ~ me cx:ev:,i~'~ da)r. nn:~ :~ved ta <.l~;:e :CCC ::1.~. c;t'e': ...... ' "bS ..........
5 :;,~aln~n-wc'~i'-gc~.~yzl~cla":~N~.le.l: ................... ~L~
6 Sub 'o:a ;l.i'~e .I p,us L ne ~ ........................ , .I 5
7. EXIENDE3 ;r,l 2 rt)q CCr.'-'LLImO~ ~ :a,- ;Z :.,I,~ L r=c ~; ......... Z ........'1.'. L "'
10. wo;'~K ~G DAYS F;EMAININS ,L r'~ ~ m r~.n; ine 9, ............... 6 :
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have t Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT EN3INEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 31
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 6/11 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
6/07/93 Mort. Clear, 70 Degrees 1
6/08/93 Tue. Clear, 80 Degrees 1
6/09/93 Wed. Clear, 83 Degrees 1
6/10/93 Thur. Clear, 93 Degrees 1
6/11/93 Fri. Clear, 91 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................12415
Total days to date ............................................................................................12915
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................220
Days previously reported .........................................................................................................0
Total days to date ....................................................................................................................20
coMPuTAT,oNoFE ENDEDDATEFoRcoMpLETioNDa, e
1. Date Contract approved by City Co.=qc~ ........................ I I '0
2. Working days specified in contra;: ....................... ' I '0 ....Z ..............................
3. COMPUTE DATE FOR COMPLETI::.','N 'i' ~1 :j~,y'. ,',p::',',iac.'J r,'o we'<=,:.: u: ...................... ...........2.' .['. '..'.. '.~;..~!'/:'.'_:?~.';_L.
4. Total time extension days approv,'d Io (::~-c
5. Total non-working days to date (l'.c:e 4. . ................ 15
6. Sub Total (Line 4 plus Line 5) ............................... 35
! ': '% "::L'.
,. XTENDEDDATEpo co. L 'o.,.',.,.,, ....F ........."
8. Revised working days for contract _'4c 2
9. Totalworkingdaystodate .................................. ~. .:2_'~ ....
10. WORKING DAYS REMAINING iL=no 5 !f.i,,,,~ .. r'~ [~ ............. 1
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
5/31/93 Memorial Day Holiday
The Contractor will be allowed fifteen (15) days in which to protest in writing the ,~e,,~g~
correcthess of the statement; otherwise the statement shall be deemed to have
as' ineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
IN8TRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REM3~RKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as towhat controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 30
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inn.
The following statement shows the number of working days charged to your contract for the week ending 6/4 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
5/31/93 Man. Holiday 0
6/01/93 Tue. Clear, 78 Degrees 1
6/02/93 Wed. Clear, 80 Degrees, Dark, 60 Degrees 1
6/03/93 Thur. Dark, 60 Degrees 1
6/04/93 Fri. Dark, 60 Degrees 1
Days this week ................................................................................................40
Days previously reported ................................................................................12015
Total days to date ............................................................................................12415
TIME EXTENSIONS Number Days Approved
Days this report ...............................................................................................CCOCCO Other
2 20
Days previously reported .........................................................................................................0
Total days to date ....................................................................................................................20
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered _J._ Date
of Days Day CNote 5)
1 Ddla Carill~<:l spp'c..;c,n r:y C ::,' C:;.L.r':. I ........................ . ............ '.1.~.._5..~_2 ....
2 Workim~ d,;ys scoc f'sd in can:l.,.': .......................... ' "' :1
2 CO\"'~U'E DATE FOR CO!."~L.FTI,D% .:: ~,i :l~.ys s:x~c;'.er~ c, ~ ':'oi k.~L~l,. ' ............................. ]"'.~ :.:2' .'..::~""
· 1 '['DI~.I timo ax:eqs cn o~,',.~; r~:'~i)l :).;rid to rJs:o .C3=D ;~ .is n'l'f:' . .... ;:?7 .....[ .....................................
5 Tab. I r~c:n-'.'vo,k :'[1 d,.'.,,~ -c nr, t::: :"<.: :e ,:, ......................... ' 5 '
6 .~ab 'o',al ~L. ne 4 I~',u': 5no 5,. ............................ 35"
7 EXTENDFD DATE F',)R CCr,:FL=TiO'.; :_i*i.- 3 ::'...,': :..','.,:
8 lie'. isccl wcrl,,ing ~.'~'~ t;.r ccq'r~,::: ,1 r:-' 2' !:ljs L r'c .1: ............
9 T'>lr.I wc:r.:,i'K! :ll;y:.; k: di~:e .............................. 12.1
10 WORK NG DAY9 RFI.!A~N N,'-'. . r'n
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
5/31/93 Memorial Day Holiday
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have ineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recordin9 nonworking days due to weather, state the
reason why the day was Unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters .with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 29
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, inc.
The following statement shows the number of working days charged to your contract for the week ending 5/28 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
5/24/93 Mon. Clear, 73 Degrees 1
5/25/93 Tue. Clear, 73 Degrees 1
5/26/93 Wed. Clear, 81 Degrees 1
5/27/93 Thur. Clear 1
5/28/93 Fri. Clear 1
Days this week ................................................................................................50
Days previously reported ................................................................................11515
Total days to date ............................................................................................12015
CCO Other
20
Days previously reported .........................................................................................................0
Total days to date ....................................................................................................................20
COMPUTATION OF EXTGNDED DATE FOR COMPLETION I Number Numbered . Date
of Da)/s Da~/(Note 5~
1. Date Contract approved by City Cc J'~c,' ....................... [ .... ' ......1.'1.'~.~....
2. Working days specified in contract ........................ 1 '0
3. COMPUTE DATE FOR COMPL"' CN (I e I r:sy,, t, pe." f':.:d ~,re '.~,'r:'.<su:e __Z'.: .:..::""'~.j.:'...~..":'.:.), ~:?,~";j~.'
4. Total time extension days approv.;ri ~a date :CCC ~:.,s c he,) ....... I 2C.,
5. Tote non-working days to date :N~ e ,'-~ .... :5
6. Sub Total (Line 4 plus Line 5) ............................ 35
7. EXTENDED DATE FOR COMPLFTIC)% ,jrls 3. :':l J, L ,'e .";: ....... i ' ' ]22..,' "'.2._'_~ 22'2'9 I ,I .3,.'~..:.:..
8. Revised working days for contrr.,'.~ :L ,'e P I: t;s L;ne -:; ......... :3,.,
9. Total working days to date ........................... 1 '-,',?.,:
10, WORKING DAYS REMAINING ,L,'~ !; m.*.. ~ ,:'r .c, . .........
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the ~ "- ' '
correctness of the statement; otherwise the statement shail be deemed to have Ras~n~t ~'~gineer
been accepted by the Contractor as correct, NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REM3~RKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 28
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors. Inc.
The following statement shows the number of working days charged to your contract for the week ending 5/21 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
5/17/93 Mon. Clear, 73 Degrees 1
5/18/93 Tue. Clear, 81 Degrees 1
5/19/93 Wed. Clear, 83 Degrees 1
5/20/93 Thur. Clear, 81 Degrees 1
5/21/93 Fri. Clear, 81 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................11015
Total days to dete ............................................................................................11515
CCO Other
. 2 20
Days previously reported .........................................................................................................0
Total days to date ....................................................................................................................20
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
of.D~ys . Day (Note 5)
1. Date Contrast epproved by City C;~u~',:i .....................
2. Working days specified in contract ...................... ' 1
3. COMPUTE DATE FOR COMPLET ON ;.r ,..'..' d=,/e ~'1:"';;""':':' .',.e ,.,.:,. k ~blc.TTS':.'7::'::.":T:.............'. '. :.[.::::::.~ '.~.'.~.~::.:.
4. Total time extension days approve,': :c n~'~ .CC,O pIj~ r. tl'c', ........20
5. Total non-working days to date (Nc;c 4.. ....................: 5
6. Sub Total (Line 4 plus Line 5) ..............................1' ."Z.. '~..j,._'.
7. EXTENDED DATE FOR COMPLE'rlO% ._ine 3 :.;IJs ' ;.ie (~ ...........""1'3'j ......i '"'[ """'~";:~. G3
.,,,. ............ ' ............................................
8. I J..I .n..
9 .................. r5
10. WORKING DAYS REMAINING (-~ns 8 mi'~js L I'~ 9.. ............ ~. 1 b
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the d~entE
correctness of the statement; otherwise the statement shall be deemed to have ngineer
been accepted by the Contractor as correct, NOTE: All footnotes are on
reverse side,
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORTNO. 27
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 5/14 ,1993
Non-Working Working Days
Days No Work
Dote Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
5/10/93 Men. 1
5/11/93 Tue. 1
5/12/93 Wed. 1
5/13/93 Thur. 1
5/14/93 FrL 1
Days this week ................................................................................................50
Days previously reported ................................................................................10515
Total days to date ............................................................................................11015
CCO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number JNumbarad Date
Day<Note5>
1 Date Contract approved by Attorney General .................. t~i~i~ ~ 11/10/92
2 W~>!k I'L: ddyc ~per:i'ie:: i' :c":r,:lct ........................... ' ......................:~'~'kj ....................~ ....
:.~ CO'."'iJIE DA'E =OR C,D'.I,r'. ET,CN :,r el' C:n~ sr:e'-' let: ,,it ';,'o:k.mJo ' ............ i'i":. ":' :':'. ":':": :":'::FZ":~ ;;:;. ~3 '7'
/. Tohd ti:"o ex~e't~ on :Ir.~ ~ .,:~[:., :.,vcd Io c~:c ,C:(: 9 p.t.s :>l.t,~n ......:C
3. h:h~'n..'.-,-,;olkn;jd~.ys:ecst:~:No.~--'i .................
6. S J:; 'lch.I h'.. nc 4 :~1,=!~ i'ta 5; ...................... !5 i ...........................
.,.., ..... ,-¥ ......:'
~ FIva i I tur'e:: L.
9. T:~L~.,~ :,'c'.dqg :~,y~ to dora ................... . '1 ' :'..
1'? WCI KIN,'.-; :'V~YS ~_ '.'A % %',.-', L.nc 8 ^';:t J+, L. "a ~' . ........ : I
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in w, dting the "
correctness of the statement; otherwise the statement shall be deemed to have ~ Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditione. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extentl
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 26
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: KenkQ Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 5/07 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
5/03/93 Mon. Cloudy, 72 Degrees 1
5/04/93 Tue. Cloudy, 71 Degrees 1
5/05/93 Wed. Clear, 74 Degrees 1
5/06/93 Thur. Clear, 76 Degrees 1
5/07/93 Fri. Cloudy, 74 Degrees 1
Days this week ................................................................................................50
Days previousry reported ............................................................ ....................10015
Total days to date ............................................................................................10515
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number J Numbered L Date
ofDays_. De)/ (No!p 5) '1 ~C.'I~'2
1. Date Contract epproved by A, orney G,~,,'c',,I.....: .............. ,. ....110"' .. ~.....'~.~.":..
2. Working days specified in contract .......................... . ..............: ..............T .....
4. Total time extension days approved tl: ~;.~,:s :CCL') F t.a ;)l'lere ..... __
15 ~'
5. Total non-working days to date (Note -1; ............... i --
7. PLETI~: ~'~', .~ =':L..~ . .n,'-'(~: .' .' ...' .'. I ' 5 14 93
8. Revised working days for contract {Linc 2 :,ij~ L r'e 4 ......... . ' 10 ~
9. Total working days to date .................................. Ijb r
10. WORKING DAYS REMAINING (Line ~! iT .~L~, i r~? 9 ............. ~, ~
Controlling Operation(s)
Remarks: (Note 6) (Oontinue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the Re~nt~n
correcthess of the statement; otherwise the statement shall be deemed to have ginear
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTION8 TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
V
CITY OF FONTANA REPORT NO. 25
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inn,
The following statement shows the number of working days charged to your contract for the week ending 4/30 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
4/26/93 Men. Cioudy AM, 72 Clear PM Degrees 1
4/27/93 Tue. Clear, Windy 75 Degrees 1
4/28/93 Wed. Clear, 78 Degrees 1
4/29/93 Thur. Cloudy AM, Clear PM 73 Degrees 1
4/30/93 FrL Clear, 80 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................95 15
Total days to date ............................................................................................10015
TIME EXTENSIONS Number Days Approved
Days this report ...............................................................................................CCOCOO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
1. Date Ccq:ra,". enpr~v~::d I.,,/Attr: 'qc.~, G;~:'tor~ ................. ' ' '~'1 10 9,_;"'
2. Working c~,y,, ~,|:ef;i'P',.n r. ccml.~.~.'l ...................... . . . . 1.:::: .......
3. COMPL,'~' :AT[.: I'G'~ CC;,'~LFTI.~%: ! f a I uz:y ~ s::~c t ~!;: ~.le ¢.'~:~kq::;e '
4. Total tim.~ cx-c'q9icn ,.'-'a, ~' s:;l>',~>.,'erl In: I~,I,., C,':C :~ijs n.h:y! ......" C .~ ................. I'.'.;.;.:~:~.'~'~
5. Total nC"l-;VOh< r'~} (l~'./~.~ 'C C510 '%,.L:.;~ ~., ............. 1;~ "'~.-'
6. SUb Tot,'d ;L."c 4 r~lj,.= ._in.:~ ~. .......................... '5
7. EXTENCE. r,':,RO' . '_ r. ...... ' .....
8. Revised :'/:!rk.n~ tie':,:, ;.::, c;~l'l,~;::' '.L ,": 2 I:':'.~ I iP9 4 ...........I ; IC ~ .........
9. Total work I:~.I
10. WORKikG ';AYG R.."r.'A"',:'%G 'L ~':! ".' m r'L.~, Li',.:, ,") .......... 1 :: .
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the Re~nnt ~
correctness of the statement; otherwise the statement shall be deemed to have Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 24
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO; Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 4/23 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
4/19/93 Mon. Clear,Windy 78 Degrees 1
4/20/93 Tue. Clear, 80 Degrees 1
4/21/93 Wed. Clear, 81 Degrees 1
4/22/93 Thur. Clear 82 Degrees 1
4/23/93 Fri, Overcast, Cool 75-80 Degrees 1
Days this week ................................................................................................40
Days previously reported ................................................................................91 14
Total days to date ............................................................................................9515
T~,le%sEth~'sEr~lo(:)~~ ..........................................................................................CCO NumberDaysApproved
CCO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
1. Date Contract approved by Attorney Gc:,~;r,.t .'~"~ '. .... . ~ ..... of Days Day (Note 5) i 11C 92
5. Tm~d ron-wcrking c:syn t3 d,'re ~Nl.',=g ,1} .................. = 15
6, SL, I') TC'.Sl ;Liqo 4 plus L. nc ,~ ....................... 15
7. EXILNDE3 .'3A'[.~ } O.'t CCk'=,'.ETION i_i'~c 3 :'~l.~s ! I'e, E.. ..... I ......... i' 5 1~
8. R-sviso,'l 'A'C';:j"tJ Ca'iS '3r CC'I'I{,',:I ,. ~ne 2 :)!js ' ~'3 4} .............J ' 'i'I';; .......i ....................
10. WO=..(:,%G DAYS REr,%%%O'.I r'-~g n,~'~s,.ino9 ............ ~ 'i
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correcthess of the statement; otherwise the statement shall be deemed to have Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side,
INSTRUCTION8 TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 23
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 4/16 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
4/12/93 Men. Cloudy AM, 72 Clear PM Degrees 1
4/13/93 Tue. Clear, Windy 75 Degrees 1
4/14/93 Wed. Clear, 78 Degrees 1
4/15/93 Thur. Cloudy AM, Clear PM 73 Degrees 1
4/16/93 Fri. Clear, 80 Degrees 1
Days this week ................................................................................................50
Days previously repealed ................................................................................86 14
Total days to date ............................................................................................9114
%%2 ..........................................................................................
COOOther
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION I Number INurebared Date
of Days Day (Note 5) · 11 () 92 '
1. Date Contract approved by Attorney Ccqerrl: ................. :
2. Working days specified in contract ........................ I ' 0 '1 .................
3. COMPUTE DATE FOR COMPLETION 'd t.I dgy.~ sFc, c.f.ed .j;e ;vc'Ka,; e: I..'7'.7'.'..' .'.-.'Z7,
4. Total time extension days approved to date (CCO plus ot"
5. Total non-working days to date (Note 4} .............................. 14
6. Sub Total (Line 4 plus Line 5) ....................................................... 1-". ......
7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6 ....... [. """'1""' b 13 '.}3
8. Revised working days for contract (Line 2 plus Line 4) ......... : ' 10
9. Total working days to date .............................................................
10. WORKING DAYS REMAINING (Line 8 minus Line 9) ...............
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctnasa of the statement; otherwise the statement shall be deemed to have ineer
been accepted by the Contractor as correct. NOTE: All footnotes ere on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for~ time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 22
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc,
The following statement shows the number of working days charged to your contract for the week ending 4/9 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
4/05/93 Men. Cloudy, 62 Degrees 1
4/06/93 Tue. Clear, 73 Degrees 1
4/07/93 Wed. Clear, 75 Degrees 1
4/08/93 Thur. Clear, 80 Degrees 1
4/09/93 Fri. Clear, 78 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................81 14
Total days to date ............................................................................................8614
TIME EXTENSIONS Days Approved
Days this report ...............................................................................................CCO NumberCCOOther
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION I Number Numbered I Date
of Days Day (No:Le 5)
1. Date Contract apFrovcd h ~, Ahc~.'n">' C3:!n~..lu'.l ............ ; ............ 1' '~') [};:~....
2. Working days spec;[i~.~l .,- cent,act ................. I ~0
3. COMPUTE DATE FO, { CO,','-"LETION, ' e I c,<.y ,o '.-=;e:c' :'~ ~.r~: ,'.'cr~u=;;.'.? ....... . .........:4~..'~:,.3. ......
4. Total time extension :=..qy,~ e;~l:'c ;ed Io rJ=q:o ~CCC :.,i,,r. c'h~'! ....... C
5. Total non-working i!~yf.: T:~ rh~le ,Nc e .;! .........
6. Sub Total (Line 4 ~: L.~ L I..~ C:: ....................... '4
7. EXTENDED DATE FCH CO'.;P. FTI,')% ,L n~ ? ~:1:~ L r';~ ','j .......... ' ......... 1"'5~,3 93' '
8. Revised working dais ~t~r c;.,~:r,:~:~ ;Li'm 2 [: ~..~ Li'!c, .;= ............ ' 1C
9. Total working days tc~ :~,.ls ............................ ~'~!'..
10. WORKING DAYS r~E','A NNG::i'~.r!,~m,'~.~. rle~) ............... 2.1 ....
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correcthess of the statement; otherwise the statement shall be deemed to have Resident Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL R~S:
CITY OF FONTANA REPORTNO. 21
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc,
The following statement shows the number of working days charged to your contract for the week ending 4/2 ,1993
Non-Working Working Days
Days No Work
Date Day Weather Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
3/29/93 Men, Clear, 68 Degrees, Cloudy PM 1
3/30/93 Tue. Clear, 71 Degrees 1
3/31/93 Wed, Clear, 73 Degrees 1
4/01/93 Thur, Cloudy, 65 Degrees 1
4/02/93 Fri, Clear, 73 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................76 14
Total days to date ............................................................................................8114
TIME EXTENSIONS Days Approved
Days this report ...............................................................................................CCO NumberCCOOther
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
of Days Day (Not.?_.~.__
1. Date Contract approved b:,' AIIc'qr~y ,~::n,..l~,i ............ , ...: ........ ' 11 ~0:92
2. Working days specified in ,:r:n:r.-'~ct ............. I ' 0
3. coMPuTE DATE fen CC'~':LCT~O~.' ~, ~u~'~ .,::,~: :::~: ,.re ':.',::,,,:,'e". .'.'.': .: .7::'2 ".;.':::'~.'~.:~'."
4. Total time extension days s~:.l:'c. ved I~', deI,j :CCC o...,,, c:hc'. ......7" 'C
5, Total non-working days to J,:=|e
6. Sub Total (Line 4 plus Line 5. . .................... ' -'.
~. EXTENDE~ DATE ~on co~.,=. rT~:'>\ ,~,nc ~ p~.,,', ,~ f~, ........... ............:,::..:..""'..:.1.i:_:~.~.~ ~.'..:.
8. Revised working days for c3rl'&:. :Ls.:s
9, Total working days to date ..................................
10. WORKING DAYS REMAIniNG :[ "e R m r'L3 :.iq.'.,
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (~ 5) days in which to protest in writing the
correcthess of the statement; otherwise the statement shall be deemed to have ngineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording w6rking and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 20
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenks Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 3/26 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
3/22./93 Mon. Clear, 81 Degrees 1
3/23/93 Tue. Overcast, 75 Degrees 1
3/24/93 Wed. Cloudy, 68 Degrees 1
3/25/93 Thur. Cloudy, 67 Degrees 1
3/26/93 FrL Cloudy, 68 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................71 14
Total days to date ............................................................................................7614
TiME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered I Date
of Days_.... Day (Note 5) ..
1, Date Contract epproved by Attorney Gc"nr.q ............ . ................:.. . ~ :1..1.,:~.~..2. .....
2. Working days specified in contract 113
3. COMPUTE DATE FOR COMPLETION ~ f all i;~,ys ~-~[,'e~.f:~=('J ore wo, kel:)Ic ..... [.... ::i..'~.'.~.:'..:.
4. Total time extension days approves to d,~l.'j (CC'3 I; t,s, otqor.~ .......0
5, Total non-working days to date (Nola ,I = ....................... '4
6. Sub Total (Line 4 plus Line 5) ................................. ' 4
7. EXTENDED DATE FOR COMP ET,ON .., ,.-,, ? L, o 6; ........
8. Revised working days for contract !Li'~o 2 I: L-3 , ijo .: ~ ................113
9. Total working days to date ........................................ 76
10. WORKING DAYS REMAINING (Lipe 8 m=nbe _jr1.19~ ................. 34
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the Reagent ~g
correcthess of the statement; otherwise the statement shall be deemed to have ineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 19
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 3/19 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
3/15/93 Mon. Partly Cloudy, 76 Degrees 1
3/16/93 Tue. Overcast, 74 Degrees 1
3/17/93 Wed. Overcast, 74 Degrees 1
3/18/93 Thur. Clear, 77 Degrees 1
3/19/93 Fri. Clear 1
Days this week ................................................................................................50
Days previously reported ................................................................................66 14
Total days to date ............................................................................................7114
COO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number I Numbered Date
of Days Day (Note 5)
1. Ds'o C:or'ha¢:l ~,pl~'o','o:l by )'~l:~',;:"t~), ,qene'al ................. 11 10 92
2. Work rip, d~ys scoc had iq c~:nlr~.~cl ......................... 11C ~
3. COMPUTE DATE FCR COr~'nL':,ON i r a:l `':!~yi~ spa: ,[,e(J ,j'e workeb -~ .................................. ~, ~,2''';4 .....
4. Total time ex~o,ts;t,'rt ueiy~' spnrcv3o :~ rl~, ,, ¢CCO F.,us r~l~er~ ....... ]:) ......i ........................] .................~':~ ....
5, Totc, I rl(.;'l-wolk ng clcy~ I~ rt~:e ,Nl:le ,1} ....................... 14
6. Sul'> 'oldl IL nc 4 f~ljs jqe 5: ................................... ' .....:1 t,' '
7. EXTENDED DA'E FOR (.:O.".'?LI:.'TIO% !Line 3 plus L r.c 6, ......... :""' ..............."....... I" '.'
8. Reviseu work ng de. ys fc' contlud IIne 2 pl...~ L r's 4i ............... 110
9. Tolel working day.'-; Io d~l~.., ..................................... ' 71
10. WORK,NG DAYS REMA:% %G ~Liqe 8 mm~.s, ne 9t .................. ~ 3g
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the R~es~t'~'g
correcthess of the statement; otherwise the statement shall be deemed to have ineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORTNO, 18
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenks Contractors, Inc,
The following statement shows the number of working days charged to your contract for the week ending 3/12 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlring
Operation
(Note 2)
3/08/93 Man. Clear, 80 Degrees 1
3/09/93 Tue. Clear, 81 Degrees 1
3/10/93 Wed. Clear, 80 Degrees 1
3/11/93 Thur. Clear, 83 Degrees 1
3/12/93 Fri. Windy-Clear, 81 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................61 14
Total days to date ............................................................................................6614
CCO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number ._LNumbered Date
of Days Day (Note 5)
. ~'t~rk . ,':~: :~:~;Tj. L'~2.',':.~,Z~. ." .....................· ........~i'6 .................
3. COr,;PL,TE DA'rL FOR CCMPLET.ON ;~f ell dsy~ :~[:.ecifiud are ;varkshle .... I -' 22 03
4. Tc'.a ~ me exlene,or days appmved Io d~l:e (CCO nlj'z. I;the', ........ ";5 ............i ...........
5. Total non-wo'K Pg ciuy~ to dato
6. SL.b 'to:el ~L,ns 4 plus L~ne
. - -~ o r-.,,, .. 0 , '=~:',=.'~' ', .........." ............I"""'::"!~.'~'
;. ~,~o":?...~,~'~ d~..;?:~,.~,~:, ;,"', '2;,u~ .'% ~:'.. ? ............ "'t' :~ ..........i ....
9. Tclal working rlRys :ooot,.'- .................................... ~;6__~.
10. WOR,(ING DAYS HEMAIK %G !Line 8 minds L ne 9, ................. I :4
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be aftowed fifteen (15) days in which to protest in writing the esi~n~in
correctnasa of the statement; otherwise the statement shel~ be deemed to have R eer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8}. After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORTNO. 17
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 3/05 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
3/01/93 Mon. Partly Cloudy, 61 Degrees 1
3/02/93 Tue. Clear 1
3/03/93 Wed. Partly Cloudy, 61 Degrees 1
3/04/93 Thur. Clear, 68 Degrees 1
3/05/93 FrL Clear, 71 Degrees 1
Days this week ................................................................................................50
Days previously reporied ................................................................................56 14
Total days to date ..............~ .............................................................................6114
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF F:XTENDED DATE FOR COMPLETION Number J Numbered Date
of Days .. Day (Not~5)
1. Date Contract epproved by Attorney Gsner.'.d ................... 11 1C 92
2. Working days specified in contract ...................................... 11 g =.
3. COMPUTEDATEFORCOMPLET,ON',e..~,.,y~:,p~.~,,,~.c'e'owo,keb.s':": ......... :.._..: ::7....'.._';;. ]. .......'..~.~'~j~."
4. Total time extension days approved to dale {C, CO p'G5 o["lor~ .......... 0
5. Total non-working days to date (Note 4', ...........................
6. Sub Total (Line 4 plus Line 5) ............................................. _ '4 ...........
7. EXTENDED DATE FOR COMPLETION ;I.~ne 3 [:.~us I ~re ,5: .......... ' '~.]'" 5"~3 93'"
8. Revised working days for contract (Ling 2 D.L.~, Ling/-~ ................ 110
9. Total working days to date .............................................. 61
10. WORKING DAYS REMAINING (Line ~, rn.~'~.s _ins 9~ ................... . 49
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the .R~.~i~t~'ng
correctness of the statement; otherwise the statement shall be deemed to have ineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 17
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenks Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 3/05 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
3/01/93 Mon. Partly Cloudy, 61 Degrees 1
3/02/93 Tue. Clear 1
3/03/93 Wed. Partly Cloudy, 61 Degrees 1
3/04/93 Thur. Clear, 68 Degrees 1
3/05/93 Fri. Clear, 71 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................56 14
Total days to date ............................................................................................6114
TiME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION ~ Number Numbered Date
of Days Day (Note 5)
1. DateContractapprovedbyA'131rcyG~nore~; ................ L ...... ~ 11 1092
2. Working days specified in coqt'sc; .............................. i 110
3. COMPUTE DATE FOR COMP, F' CN :if el. d,,,/~ spsc,"~e3 arc work~le! ............... I 4 22 93
4. Total time extension days ~r:nrcvco :c o~tts ICCO plus othcl i ........... O
5. Total non-working days to n,re ,Nots 4~ .......................... lz. ".'~
6. Sub Total (Line 4 plus Lino 5! ....................................
EXTENDED DATE FOR,'L 3r'e ..........:...'.. ' ;""'
8. Revised working days for corl'a;: {Liqo 2
9. Total working days to date, .................................. f ! ,56'L~1 ..j ·
10. WORKING DAYS REMAIN,NG 'L ne
.............. ;.~
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the ~
correctnasa of the statement; otherwise the statement shall be deemed to have Resident Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORTNO. 16
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 2/26 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
2/22/93 Men. Partly Cloudy, 61 Degrees 1
2/23/93 Tue. Rain 0 '1
2/24/93 Wed. Cloudy, 58 Degrees 1
2/25/93 Thur. Partly Cloudy, 54 Degrees 1
2/26/93 Fri. Rain, 58 Degrees 0 '1
Days this week ................................................................................................32
Days previously reported ................................................................................53 12
Total days to date ............................................................................................5614
CCO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
~ Dsl~q Cc.qtra~;; au:.~rcv~.,d by/~;'.~l~.~y G~.~r'~."~l ............... ~ 1 10 92
2. Wc~in..-1 dsys .~pec ~ ed i.q cor;I,!}~;t ............................. ~ 10
3. COMr'JTE DA'E ~OR COV~LETIO% ,' ~= lu~y~ ~l~o~.[.~d ere wo,k~,b;;. .':.':';'~'~ .7. '7.. '~..~. '. ';. ~'.~:~.7~:
4. :o:ellmooxlenson~a~,vs~::provo:Jt~,d8to;~CCl~u~ ot.qou ........ ... . 0.
5 ' otcl r':}r~-wG'~'rg dsys :c oo~¢ ~Note 4; ....................... ;4
6. 5~b 'Fc:a. ;Liqo 4 plu~; ~ ins 5'. .......................... 14
7. EX'~NDE3 :AT: FOR COMP. ETION (L ne 3 pl;,~. L r~c 6, ........ ~:':'::'~7 .......~...:.;..'..'.'.;..'..;.;.;.;.;.J;....;...~.;l~' ~"~
8 Rev;~sdwcr~iqgda~sfor$or't'8~t~L=~,a2[ u .r'e4} ................. ~. 1:0
9 TCt~.I wc'~i~g d~ys tc {=~=s ......................... 56
1~. W(~RKING 3AY~ REk~A.NINC {..ir~e 8 ,"ir~ds L r'e ~ ...............
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the Re~s~En
correctness of the statement; otherwise the statement shall be deemed to have ginear
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
IN2TRUCTION2 TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for' time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended. DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working. days
numbered for convenience in computation.
6. Time extensions, other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for Which the extension was granted.
{d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO.
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 2/'19 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
2/15/93 Mon. Holiday 0
2/16/93 Tue. Cloudy, 61 Degrees 1
2/17/93 Wed. Cloudy, 61 Degrees 1
2/18/93 Thur. Rain, 60 Degrees 0 1
2/19/93 Fri. Rain, 57 Degrees 0 1
Days this week ................................................................................................22
Days previously reported ................................................................................51 10
Total days to date ............................................................................................5312
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION ~Number Numbered J Date
.gf Days . D~_y (Not_e..5).
1. Date Contract approvcd by A~;umey Gerc'el. L 11 10 92
2. Working days specifiec in contr~ct .................................. : I P,
3. COMPUTE DATE FOR COMP_ETION (i" e': clays .~Decffien ere wcrke:~ler ...................... "' 4 2~'~ .....
4. Total time extension d,:ys epl:'cved It.'. dn-e ICCO :.~lus crhe') ......... 0
5. Total non-working day~ [o t. Jc:.le (%c:c' 4) ............................ 12
6. Sub Total (Line 4 plus L:Pe 5} ....................... 12
7. EXTENDED DATE FCR CO;,'P~ FTIO% (Lino 3 ol.js I.,nc 6} .............. '* .......... .[.. 5 11.'~3._'..:
8. Revised working days rt.:r cor't's:: ~LiPe .c p L s L. no 4: .............. 1 ' O
9. Total working days to oale ........................................ 53
10. WORKING DAYS REVA'N'%G ~1 ins 8 mr. us I.ine 9~ .................. 57
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the Reagent'~"
correctnasa of the statement; otherwise the statement shall be deemed to have Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTION2 TO RB2ID~NT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing forbtime
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended. DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions. other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or Operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 14
WEEKLY STATEMENT OF WORKING DAYS
PROdECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 2/12 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
2/08/93 Mon. Rain, 62 Degrees 0 1
2/09/93 Tue. Rain, 64 Degrees 0 1
2/10/93 Wed, Partly Cloudy, 62 Degrees 1
2/11/93 Thur. Partly Cloudy, 72 Degrees 1
2/12/93 Fri. Cloudy, 70 Degrees 1
Days this week ................................................................................................32
Days previously reported ................................................................................48 8
Total days to date .................................. ..........................................................5110
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION L Number ~ Numbered Date
1 Date Contract approved by Attorney General ............................................, ~ ~, 11/10/92
2, Work "." ... ': . . ' '
3, COM . '.: ' ' '.' ' .. ', . : · .: ' . . : '. ' · : ' ':; '.':!
4. Total . . .' . . ' ' ' ..... :
5. Total"' .'.' . ..: ..' '.; .:
6. Sub' ' . ' ' ,.
7. EXTE'.' , '... ' : ':.:.'.' :.'. '. ::: .... :. ' :: '~.~
8. Revi.' '....'.: ' ":' .' . . '. :" .' "' .'
9, Total .'- · .~ ' . : '
10. WO':.t,~ ......:. .~ .... ...... ..: ...... ..
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the Re~nt ":'
correcthess of the statement; otherwise the statement shall be deemed to have Engineer
been accepted by the Contractor as correct, NOTE: All footnotes are on
reverse side,
IN2TRUCTION2 TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for"time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended. DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for Which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 13
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contrastors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 2/5 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
2/01/93 Men. Clear, 72 Degrees 1
2/02/93 Tue. Clear, 73 Degrees 1
2/03/93 Wed. Padly Cloudy, 75 Degrees 1
2/04/93 Thur. Clear 72 Degrees 1
2/05/93 Fri. Partly Cloudy, 70 Degrees 1
Days this week ................................................................................................'50
Days previously reported ................................................................................43
Total days to data ............................................................................................488
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION l Number Numbered J Date
of Days Day (Note 5)
1, Date Contract approved by Attorney Go,'era' ~ : ~'0'~',2 '
~: ~;~ c~.,~;;~,.d ~;;;';!t,~ .;, ;.. ~:~,:; ;.,'.'.,,i';e=; ~.; ,.;~;k:~i;r ;' 0__ ~:.._:..:::. :~':::_I .....' ~.: ~::..':
4. Total time extension days approved
~. E~ENDED ~ATE ~OR COMPLET, ON ,: .',n ~ ,,,,.= ,.~n ~ .........i'i ...............7 "~ ~'~'
8. Revised working days for contract (Line ;: p'~.i~ Line -': ........ . __1 i~__ _..
9, Total working days to date ..................................
10. WORKING DAYS REMAINING (Line 8 m I'us I.me :-h ........... 62
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the ~n
correcthess of the statement; otherwise the statement shah be deemed to have ginear
been accepted by the Contractor as correct. NOTE: All footnotes ere on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a} Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 12
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 1/29 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
1/25/93 Mon. Clear, Windy 75 Degrees 1
1/26/93 Tue. Clear, 76 Degrees 1
1/27/93 Wed. Clear, 78 Degrees 1
1/28/93 Thur. Clear 74 Degrees 1
1/29/93 FrL Partly Cloudy, 68 Degrees 1
Days this week ................................................................................................50
Days previousEy reported ................................................................................38 8
Total days to date ............................................................................................438
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered _~ Date
of Days . Day (Note.S)..
1. Date Contract approvgd by A'13rr:y Genera'. ........... . ....... ' 11
2, Workin9 days spe:;ifie'j '~' cc'~'.'ec! ......................... 1: 0 ' ' .......................
3. coMPuTE DATE .C~ COMrL:',O~, r,;.. ,~,,~.~ ~pe.~i,sd .'e ,vo,k.U,: .............__'.:..'..' ................'j'.l.:'.".::~"~'~.'..':
4. Total time extensi:~n :;r, ys m:provoJ I:> :into :CCO F t.s ol'~on ........0
5. Total non-workin9 c!s,/t~ ::: :~eto :%.::.:0 .~; ................
6. Sub Total (Line 4 !: us L no 5~ ............................ 8
7. EXTENDED DATE FOR Cot,.' :LETIO'N; ino 3 n ~.s ..ine 6. ...........["' ...................5 '5 93"
8. Revised working days '~.:' corl'a.": =L ne 2 el.if: L Pc ,h ...........1 ~0 ....
~. ' .: :.: ..............................-~3
=.. 8: ..............
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the le~sie~nt '~'En
correctnasa of the statement; otherwise the statement shall be deemed to have R ginear
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been perforlned on='~''
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORTNO. 11
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 1/22 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
1/18/93 Mon. Holiday 0
1/19/93 Tue. Cloudy, 60 Degrees 1
1/20/93 Wed. Clear, 63 Degrees 1
1/21/93 Thur. Clear 65 Degrees 1
1/22/93 Fri. Clear, 70 Degrees 1
Days this week ................................................................................................40
Days previously reported ................................................................................34 8
Total days to date ............................................................................................388
CO0 Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION ~ Number Numbered Date
DayINo,e5)
1. Data Contract approved by Attorney Genera ........... ~/~ .............~ 11/10/92
2. Wc..qn~l days apcch.:~ in ca't's:: ......................... 110
a. ccr,,,".J'rE DA":: ~:OF~ CO',~P. FTD~ ,i' e'. dsys ,.':ec '.e,, ,.,,.-. ',,crk,,o'eL ....""' ...............'...':.'7.]:":".:'..L.:'____4. ~.2....S...3__..
· ':.. TC:~ :smo c. xleP&icn dsys app'c,.'cd Io c~'c. iCCO ;.,Ijs clhe'. ......g
5 'Fl:tu 'tcr'-,','olking auy.: to da:o ~Nc'.s ,i~ ....................8
6 SubTolald ns4~.?.l s ."e5 ......................... B
7 LXIENDED DA"" fOR COMP. RTION ,I r:c 3 pI,...* L rs ,r..,. ....... ' "..::.:T;;.LL' '1"' "~"~"'
8 I~evised wc'ki'~g dnys "or con:recl ',Line ? F.:L,~ Li"'o 4! .............. ' ......1"0
9 Tolsi ;','(::'King cry.*. t!.' cote ....................................... 38 . .
10. WCRKINS 3AYS REEMA N NG ;b"e ~ m n,s [no 9! .............. 72
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the es~en~t~'n
correctnoes of the statement; otherwise the statement shall be deemed to have R ginear
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTION8 TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORTNO. 10
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 1/15 ,1993
Non-Workin9 Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
1/11/93 Men. Cloudy, 61 Degrees 1
1/12/93 Tue. Cloudy, 62 Degrees Rein at 1:00 PM 0 1
1/13/93 Wed. Rein 0 1
1/14/93 Thur. Cloudy 1
1/15/93 Fri. Cloudy 1
Days this week ................................................................................................32
Days previously reported ................................................................................31 6
Total days to date ............................................................................................348
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
cGMP.TAT,oNopE ENDEDDATE oRcoMpL T,oNDa.a
1. Date Contract appr~v:d l:y A::ornsy Gsnernl ................. . .... 11 10 92
2. Working days sFecifioci
3. COM PUTS OATS re=, CO'.',P..rT~O~ ! f a'~ oey. ,,~:e.-.'f .~ ere wc'~,sL'e .......... ~ ........:1' . '..'..1'..:[:.'4]~.'..~'.2
4. Total time extensic'~ da;,~ epl:'cvod I~) dale :CCC p us (>;qer'. ....... 0 ' ~"
5. Total non-workin;i dsys
6. Sub Total (Line 4 plus ,_ino 5, . ............................ 5
7. EXTENDED DATE FO3 COM~! FTION !_ino 3 c .s . ins 6, .......... ~ .... ............... __ ....... 5 5 93
8. Revised working di~y~ fo~ cart'c:: ,L ~:e ~ :~ljf: L r: -I} ......... 110
9. Total working days Io cJ~l's ......................... 3.'1
10. WORKING DAY8 REMAIk %CI ~L r: ;3 m nus L,-.s 9: ................ 76
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have t Engineer
been accepted by the Contractor as correct, NOTE: All footnotes are on
reverse side·
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 9
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 1/8 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
1/4/93 Mon. Clear, 63 Degrees 1
1/5/93 Tue. Cloudy, 62 Degrees 1
1/6/93 Wed. Rain 0 1
1/7/93 Thur. Rain 0 1
1/8/93 Fri. Rain 0 1
Days this week ................................................................................................23
Days previously reported ................................................................................29 3
Total days to date ............................................................................................316
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION L Number Numbered Date
1. Dote Contract approved by Attorney General ~:~g..a,..~!~,:~!~. Day (Note 5) 11/10/92
2. Working days specified in contract ........................ ' 110
3. COMPUTE DATE FOR COMPLETION ,' n I aays s;:,oc rod are ,,'c.~,,t: el!"'."..' ."..'. '..'.:...:.:.:.."T 4 ~'..b.~.:'.:.
4. Total time extension days approve,,] t'~ dnle ~CCC c
5. Total non-working days to date (N<>:a ·
6. Sub Total (Line 4 plus Line 5) ....................................
~ '~ ........ ] ~393
7. EXTENDED DATE FOR COMPLETION :. ine 3 I: ts Line 6) .......... !- ...................
8. Revised working days for contract, 'ino 2 cl,.s _ino .:, .................
s <L, ne6 m,nus _,he ..................'
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the ~'/"'
correctnasa of the statement; otherwise the statement shall be deemed to have Resident Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMAPa{S and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT 8
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 1/1 ,1993
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
12/28/92 Mon. Cloudy, 61 Degrees 1
12/29/92 Tue. Rain, 61 Degrees 0 1
12/30/92 Wed. Cloudy, 63 Degrees 1
12/31/92 Thur. Kenko Holiday 0
1/1/93 FrL Holiday 0
Days this week ................................................................................................21
Days previously reported ................................................................................27 2
Total days to date ............................................................................................293
CCO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF E~ENDED DATE FOR COMPLETION Number Numbered Date
~:nc. ro'.. .: . .""7~ ........ of Days .Day (Note 5)
~' ~'dc~;~ec='~TA~;~;j .............................. · ~ 10 92
2. Wc'<iqg c:~ys spocifiod ~ cor'lrac' . ........................... ____~ ............................ :...~ ............................
3. COMPJ'rL DA"E FO~ COMP_L I ION n; ~;I cbys sDcci'~c. 5 ar3 wurkeule. 4 22 93
t-. 'c'al I mo oxtonsEoP days apl:.rovo.~ Io da:e ,CCO ::lj~ c:hc', ...... . .... 0 . ~
{~ St,i:. 'c:a'. :L "~ -1 F:us I no 5; ......................... 3
7 EXTENDED DATE FO'~ CO',fP_ET;CN :L ~'e 3 p=u3 L'no 5'. ....... ' ....................... J"."""~'~"~ ....
8 Rovise:J wc'Kiqg cay~! h=r L'<>r't,sc: :Liqo 2 ~ u3 Li'te ~: ........... 1 ' 0
9. Tc:ri W.;.~K rg C'~yS [U t:~,:C ........................... El)
' ~' WOr~KING 3AYS REMAINING ,. rc ~J n:nu~ L -E 9: ............. 8~
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
12/31/92 New Year Eve. Holiday
The Contractor will be allowed fifteen (15) days in which to protest in writing the
correcthess of the statement; otherwise the statement shall be deemed to have Resident Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 7
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 12/25 ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
12/21/92 Mon. Clear, 65 Degrees 1
12/22/92 Tue. Windy, 68 Degrees 1
12/23/92 Wed. Windy, 70 Degrees 1
12/24/92 Thur. Holiday 0
12/25/92 Fri. Holiday 0
Days this week ................................................................................................30
Days previously reported ................................................................................24 2
Total days to date ............................................................................................272
CCO Other
Days previously reposed .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF E~ENDED DATE FOR COMPLETION Number Numbered Date
of D~ys Day (Note 5)
1. Date Ccqt'e'~: scpreved by Ahcrncy Gcnerol .................. . ........................... ~._ ~ 1 I0 92
2. Work ng days spcc.t od i-t ccn=r.ct ............................ __..... ~ 'q...
3. COMPU'I L DATE ~CR COMi ~L_'.ON ~.[ ~1' days sp:ci'ic.~ oro wcrk~Dlei .............................. J ~ 21 93
4. Total t mo oxteqs on cave ol:nrnvec :c n~:u .CCO ;IJs C~hG'~ .......... , 0
5. Total ncq-work.n~ d~ys to dd'.e (Nct= ~F. ........................ 2 ____~
6 Sub ToI~:I .L=no 4 ~1~.~ I ~r'e 5~ ............................. 2
7. E~ENOED DATE FQ~ COk'~LE'I ION :t.i~e ~ F u:~ I i.~e ~; ........ ] i 4 23 93
8. Reviso~ work nG clsy:~ Ior <:~;nlracl L.ino 2 !~ ~s Liqo 4~ ............... ' ........l~d ........[ ' ". '"
9. Total ,%'orking d~y;~ Io deto ...............................
10. WO~ %G DAYS R~A % %G =I re9~inusLr:~} ................. ~ ~
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the e~_
correctness of the statement; otherwise the statement shaft be deemed to have R ant Engineer
been accepted by the Contractor as correct, NOTE: All footnotes are on
reverse side,
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a} Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 6
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenks Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 12118 ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
12/14/92 Men. Clear, 68 Degrees 1
12/15/92 Tue. Clear, 68 Degrees 1
12/16/92 Wed. Windy, Clear, 70 Degrees 1
12/17/92 Thur. Cloudy, 61 Degrees 1
12/18/92 Fri. Clear, 61 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................19 2
Total days to date ............................................................................................242
EXTENSIONS Number Days Approved
TIME report ...............................................................................................CCOCCOOther
Days this
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered I Date
of Days Day (Note 5)
1. Dam Ccntrsc~ approvod by Aft 3rncy Gore'el ........................ ' 11 1 g g~
2, Working days speci.rie:~ n :oft'act ................................ ' "' '110 :."' ......
3. COMFLTE DATE Fen COMPLETION iF ~ I :l~.ys ~coc [;sd ~'e workab;e __ : ...... [.:'..:"' ~.21 ~,3. .....
4. Total tire oxiorsicn days sppro,.~e:'J to ds'.o (CCC u, L.s ol'~or:. ........ _ 0 ~
5. Total nc'q-w3rkin~j d~,y~ Io date: ',;c:e .It ........... 2
6. Sbb 'clal !1 re .1 plJs: iqe 5~ ..................................... I 2
7. EX'LND-'3 IJ/,T:E_' =O" COM'LETION ,Line 3 ,~h.s ino 6) ............ [ ............... :2.' .:. L.L...' ......I""'~ ....
8. Ruv sod wor;dqg a,~y= [3r ,*ortlaol :b"e 2 plus [. rs 4! ............... = 110
9. Tolel wcrking ~ays to d~;le ................................. [ 2.1
10. WO:~KNSDAvSREMAN'NSI._rogmr~t.:sI. nog'. ............. I 86
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the Resd~ent E:
correcthess of the statement; otherwise the statement shall be deemed to have ineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL R~S:
CITY OF FONTANA REPORT NO. 5
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 12/11 ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
12/07/92 Man. Rain, 60 Degrees 0 1
12/08/92 Tue. Clear, 68 Degrees 1
12/09/92 Wed. Clear, 68 Degrees 1
12/10/92 Thur. Clear, 72 Degrees 1
12/11/92 Fri. Light Rain, 60 Degrees Clear P.M. Hours 1
Days this week ................................................................................................41
Days previously reported ................................................................................15 1
Total days to date ............................................................................................192
CCO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
:.,~=,~.=.:.=.=%t.?,,,.~,,~..~<.,..., Day (Note 5)
1. Date Contract approved by Attorney General ............................................~.i~.,'.'.'~i~, 11/10/92
2. Wcr.dng days ;.pet [ed in coPt'ec'. ................... 11 ,S
3. CCMPdTE DA":"; CH. COMnLETION { r all cays ~pecffied ~.'e wark.nblo ...... ~'.~!. ~...
4. Tc'a: I me ,..~xlens on ca~,,.~ enproved '.,'~ ,nt~ls ICCO pluf: ,';Iher) .........0
5. Tc:al r'on-wc',<'^g days :c sate ;Note 4~ ..................... ~2
6. Sut.' Tc'e ;Line 4 plus _ins 5. ....................................~2
7. EX':NDE3 DAT' =OR COMFLETION d ins 3 ,:.,.s. ine 6. ........!...........'''..'. '. '1 '.. '.."~.~;.~A.'..;.
8. Rev secl '.'.'crkiqg clays =or ccnzmc: '.L rs 2 pljs L r:e -!-, ...........'' 10
,..,.,.. ............................. ,.:
... .Gi. ............... 9, , ....
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be silowed fifteen (15) days in which to protest in writing the
correctness of the statement; otherwise the statement shall be deemed to have Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDEI~T ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Donot list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on~'~!!''
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed.and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 4
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 12/04 ,1992
Non-Working Working Days
Days No Work
Dote Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
11/30/92 Mon. Clear, 72 Degrees 1
12/01/92 Tue. Clear, 70 Degrees 1
12/02/92 Wed. Cloudy, 67 Degrees 1
12/03/92 Thur. Cloudy, 67 Degrees 1
12/04/92 Fri. Rain, 59 Degrees 0 1
Days this week ................................................................................................41
Days previously reported ................................................................................11 0
Total days to date ............................................................................................151
CCO Other
Days previously reposed .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION QF E~ENDED DATE FOR COMPLETION Number Numbered Date
of Days Day (Note 5)
I . ' '..' ...... . ": .' '. '.'..
2 ,',:'- ".':..... ."" .'
3 '.. ;.'.' '. . ' . :~ :.; '.' ' :.", .... : .... : ':' '.'.', . ? .' '~.~
6 :~. ".
7 %. . . ..... :' ', ;+ .
8 ' : '.' .. ."' '.: "'
:
9 '... '...,';"..
1'.'.:~ <".;.. '.' :'~".'.' ',',L'. "' ':..
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the '
correctnasa of the statement; otherwise the statement shall be deemed to have R Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
IN8TRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
,,, v
CITY OF FONTANA REPORT NO. 3
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 11/27 ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
11/23/92 Mort. Heavy Winds, 65 Degrees 1
11/24/92 Tue. Cloudy, 70 Degrees 1
11/25/92 Wed. Winds, 66 Degrees 1
11/26/92 Thur. Holiday 0
11/27/92 Fri. Holiday 0
Days this week ................................................................................................3
Days previously reported ................................................................................8
Total days to date ............................................................................................11
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
of Days Day (Note 5)
1. Date Contract approved by Attornoy Gc'~euj .................. __ 1 · ' 0 '~2
2. Working days specified in contreat .............................. 1 '. 0
3. COMPUTE DATE FOR COMPLETION' [ ~:1 e~ys R!.~oc .er:l F~:'o ;vo,k, ~lc ' ....... : ...........~'.....'..~.[.7.~';.~:'~1' '§3 ....
4. Total time extension days approve:;I Lo d,;la ~C. CO =~l,js ~:.'no~! ........... __ 0
5. Total non-working days to date (N{,~e t.. ....................... 0
6. Sub Total (Line 4 plus Line 5) .................................... 0
7. EXTENDED DATE FOR COMPLFTION ~'L r,s ,? p=dS _ ~'O 6~ ...........
8. Revised working days for confred {Lino 2 c L.s '. ~qo .'-~ ............. 1 ' 9
g. Total working days to date ......................................... : 1
10. WORKING DAYS REMAINING (. ino 8 miqjt~ , "~C ~,~; ................. 99
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
11/26, 11/27/92 Thanksgiving Holiday
The Contractor will be allowed fifteen (15) days in which to protest in writing the .~.~'~7
correctness of the statement; otherwise the statement shall be deemed to have Resilient Engineer
been accepted by the Contractor as correct. NOTE: All footnotes am on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO, 2
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 11/20 ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
11/16/92 Mort. Clear, 75 Degrees 1
11/17/92 Tue. Cloudy, 72 Degrees 1
11/18/92 Wed. Cloudy, 76 Degrees 1
,11/19/92 Thur. Windy, 71 Degrees 1
11/20/92 Fri. Windy, 72 Degrees 1
Days this week ................................................................................................5
Days previously reported ................................................................................3
Total days to date ............................................................................................8
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ..............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
of Da~/s Day (Note 5)
1. Date Contract approved by Attorney E · '. '...;
2. Working days specified in contract ......
3. COMPUTE DATE FOR COMPLETION '. : . i ..: . .' .,., ' .. '::
4. Total time extension days approved tc :: :: :: .... "'
5. Total non-working days to date (Note .'
6. Sub Total (Line 4 plus Line 5) ..............
7. EXTENDED DATE FOR COMPLETIOr. ' ..... ' .. ;;
8. Rov,scd wcfki'tg usys for cor. tra'.,t ,L;Pe 2 plu~ L r'c ,h ............ : 10
9. Total wc'k~Pg c!e),s Io date ........................................ 8
10. WORKING ~AYS '~r_',~A NING ~'ine 8 ,."r~n,Js L ne 9! ............... 102
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the ~,~d~ent~''''
correctnasa of the statement; otherwise the statement shall be deemed to have Engineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due' to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on'
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CiTY OF FONTANA REPORT NO. 1
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 11/13 ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
Mon.
11/10/92 Tue. Windy, 79 Degrees 1
11/11/92 Wed. Kenko Holiday 0
11/12/92 Thur. Windy, 75 Degrees 1
11/13/92 Fri. Clear, 74 Degrees 1
Days this week ................................................................................................3
Days previously reported ................................................................................0
Total days to date ............................................................................................3
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
.................... 0f.D..ays Day (Note 5)
1. D,Y.o Contract ~.~ppr~v-~d by Allc'qoy Go,"em! ................... ' 11 1C ,32
2. W~rking c.~,ys spcci-"e','.' in '.on:rac~ ............................. "' ~:I'C j .....................................................
3. CCMI ~UTE DA"-' =Crl CO',IPLETIO% i.[ ~ I ~:I~.,/,~ ut-oc hcd e:o wolkabls ........................ L..... ~' ~:'L ~':~...
4. Tc'.e: mo oxten~ on ~sys apF'c','ed t,3 ;;IRIs '.CCC [; us ol.,or: .......... C
5. "c:ol r'~.~r;-wc'.<;"g days :c d/.!l~; ',N;,le 4', ..................... C
6. SUL: Tc:s' (Line J, pIjs ino 5) ................................. '3
7. EX'r'NDED 3ATE "'OR CCM."'I.~T=Of',; ~L na 3 CldS L.r~c. 6. ............ . ...............J .........
8 Rov.scd wcrki'~g days ;or ."cq:rac: ~1 re 2 [)lJ~' L r'e .1! ............ I ~ 10 ~
9 I otel wc,,< Pg day~ ~c ¢::,~:e ................................ 3 "'~
10. WCI-~KING DAYS REMA!NING ILino I~ mi't,,s I ins 9, .......... 107 ' ' [
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
11/11/92 Veterans Day Holiday
The Contractor will be allowed fifteen (15) days in which to protest in writing the i .
correcthess of the statement; otherwise the statement shall be deemed to have ngineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTION8 TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a} Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 1
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
Thef~1~~wingstotementsh~wsthenumber~fw~rkingday~chorgedt~y~urc~ntractf~rtheweekending11/13 ,1992
Non-Working Working Days
Days No Work
Dote Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weother Contro,,,ng
Operation
Mort.
11/10/92 ' 79 Degrees 1
11/11/92 0
11/12/92 Thur. Windy, 75 Degrees 1
11/13/92 Fri, Clear, 74 Degrees 1
Days this week ................................................................................................3
Days previously reported ................................................................................0
Total days to date ............................................................................................3
TIME EXTENSIONS COO Number Days Approved
COO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Totol days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
of Days Day (Note ~) .....
9, Tc'.;a .vo'k r'g dc~Vs ts o-c,t.'c ............................ ~ ....
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
11/11/92 Veterans Day Holiday
The Contractor will be allowed fifteen (15) days in which to protest in writing the ~
correctness of the statement; otherwise the statement shall be deemed to have R ginear
been accepted by the Controctor os correct, NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 2
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
Thef~~[~wingstatementsh~wsthenumber~fw~rkingd~yschargedt~y~urc~ntractf~rtheweekending11/2~ ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
11/16/92 Mon. Clear, 75 Degrees 1
11/17/92 Tue. Cloudy, 72 Degrees 1
11/18/92 Wed. Cloudy, 76 Degrees 1
11/19/92 Thur. Windy, 71 Degrees 1
11/20/92 Fri. Windy, 72 Degrees 1
Days this week ................................................................................................5
Days previously reported ................................................................................3
Total days to date ............................................................................................8
CCO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXfENDED DATE FOR COMPLETION . Number J Numbered Date
1. Date Contrast epproved by Attorney General ............................................~ ~ 11/10/92
2. Working days specified in contract ................................................ 11 '3 -"
3, COMPUTE DATE FOR COMPLETION (if all days specified are worknblo ' ' ..........[ "'j--~0:G'~"
4. Total time extension days approved to date (CCO plus othe,, ......... C
5. Total non-working days to date (Note 4) ........................................
6. Sub Total (Line 4 plus Line 5) ..........................................................
7, EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6= ............ ~ ......................' ....... ~" ~'"
8. Revised working days for contract (Line 2 plus Line 4) .............. 1 ~ 0
9. Total working days to date ................................................................
10, WORKING DAYS REMAINING (Line 8 minus Line 9) .................. ' 1 ~2
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the ~ng
correctness of the statement; otherwise the statement shall be deemed to have ineer
been accepted by the Contractor as correct, NOTE: All footnotes are on
reverse side,
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORTNO. 3
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
Thef~~~~wingstatementsh~wsthenumber~fw~rkingdayschargedt~y~urc~ntractf~rtheweekending11/27 ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
11/23/92 Mon. Heavy Winds, 65 Degrees 1
11/24/92 Tue. Cloudy, 70 Degrees 1
11/25/92 Wed. Winds, 66 Degrees 1
11/26/92 Thur. Holiday 0
11/27/92 Fri. Holiday 0
Days this week ................................................................................................3
Days previously reported ................................................................................8
Total days to date ............................................................................................11
CCO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
Day<Ncte5>
1. Date Contract epproved by Attorney General ............................................~~ ~, 11/10/92
2. Working days specified in contract .................................................... 1'0
3. COMPUTE DATE FOR COMPLETION (if all days specified are ;¥crkaelo' ' ................
4. Total time extension days approved ~:~ dirt-'..~ ~CCC p us c:hor. ........ W C
5. Total non-working days to date (Nets .1: ......................... :
6. Sub Total (Line 4 plus Line 5) .................................. ' "
7. EXTENDED DATE FOR COMPLETION ~L r'e 3 p!us L=, e 6: .......... i: ........ ' ..... ...'.: .'..~22:.
8. Revised working days for contract ~.Li,'o 2 I: t.s Li-o 4'= ............. i 10
9. Total working days to date ............................................
10. WORKING DAYS REMAINING '_in."- 8 m'nus L'Ps ':}: ................ I 9~
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
11/26, 11/27/92 Thanksgiving Holiday
The Contractor will be allowed fifteen (15) days in which to protest in writing the R~e
correctnasa of the statement; otherwise the statement shall be deemed to have er
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 4
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 12/04 ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
11/30/92 Men. Clear, 72 Degrees 1
12/01/92 Tue. Clear, 70 Degrees 1
12/02/92 Wed. Cloudy, 67 Degrees 1
12/03/92 Thur. Cloudy, 67 Degrees 1
12/04/92 Fri. Rain, 59 Degrees .-1 ~ 1
Days this week .................................................................................................6,41
Days previously rapcried ................................................................................11 0
Total days to date ............................................................................................-I'6 /5'1
CCO Other
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTt~NDED DATE FOR COMPLETION Number ]Numbered "i 1Date
of Days Day (Note 5)
1. Date Contract approved by Attorney 3one-el ..................... ~ ...... 1C 92 ...
g' ~'F t /.~
Working days specified in eon!:a::! ............................ . .... :0
3. coMPuTE DATE FOR COMP ""ON ;., .... 'T:::'..:.':.:' .:' .:.::. .'
4. Total time extension days approvel~ [c '.:'el ."- =:2,0(:) p,L.s (fi'ler= ......... 0
5. Total non-working days to dale :Nule 4; ..................... 1
6. Sub Total (Line 4 plus Line 5) ............................... F
7. EXTENDEDDATEFORCOM'~LLIION!_i'~o3sI,.sLino6) ......... ' ........... I' 42293
~ I ....Lr, pl.~.L , 1 ..............
10. WORKING DAYS REMAINING :Li.~e ~ Irs..'~.~ _in,., 9 ................ 9.'
Controlling Operation(e)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the R~t En
correcthess of the statement; otherwise the statement shall be deemed to have gineer
been accepted by the Contractor as correct. NOTE: All footnotes are on
reverse side.
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b)' Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 5
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc.
The following statement shows the number of working days charged to your contract for the week ending 12/11 ,1992
Non-Working Working Days
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
12/07/92 Men. Rain, 60 Degrees ...1 g) 1
12/08/92 Tue. Clear, 68 Degrees 1
12/09/92 Wed. Clear, 68 Degrees 1
12/10/92 Thur. Clear, 72 Degrees 1
12/11/92 Fri. Light Rain, 60 Degrees Clear P.M. Hours 1
Days this week .................................................................................................~ ~'1
Days previously reported .................................................................................,,1.6 15'1
Totaldaystodate .............................................................................................2,'1 I ~2
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
of Day.s ,. Day (Not_e_5)
' B.~'eCo' a ~. r ve,'lnyAl:crneyGone,ial ................. i 1' 1.~2
2. W~...k ~'3 doys scocrcd in canlP~cl ........................ 110
a. coul,a'rE DA'E =Cn CO'.: "LE,O\ ..' :. ~d~:vs ,::,<:.' os er~ ,,'srks,;~ei .....' ............':! ......~ '~:,.~' ~/~.1/~.~
· 1. "c.;sl I me oxls'~s on
5. 'c..li!lr~m-':Ic'..:-gdayslo'J,~;Is:N;>le-'.: ....................... ; 2
· 5. S~.i: TG:.~ i! i'te 4 F u,? I r'.'-' 5.. ........................ 2
7. EXT,/%DED DATE FCR COk""'l.:' ON (_ino 3 c'..s. ins
.......... -."_:.'.,,...
S. ;.,:-v sac working dilys ~c' cen:r.qct ._ nc 2
9. 'c:~~ working days :c c.e:o .......................... I
' ~, WO;.K:",;G DAYS RTMAINING :Line 8 "inj,: I ~3 ,t.k .................. 89 ~ ~ 'i
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the ~
correctnoes of the statement; otherwise the statement shall be deemed to have ginear
been accepted by the Contractor as correct. NOTE: All footnotes ere on
reverse side,
INSTRUCTIONS TO RESIDENT ENGINEER
1. When recording nonworking days due to weather, state the
reason why the day was unworkable when the weather description
itself does not adequately descrive conditions. For example,
"Clear-wet grade" to describe conditions when the weather is
clear, but the grade is too wet to work. Do not list days
merely as "Unworkable."
2. Enter days on which no productive work has been performed on
the controlling operation(s) for reasons other than weather.
3. List numbers of contract change orders providing for time
extensions.
4. Do not include nonworking days which occur after expiration of
the Extended DATE OF COMPLETION. On contracts that are
overtime, the total under WORKING DAYS shall not be greater
than the total of REVISED WORKING DAYS, (Line 8). After
approved total of working days has been reached, continue
recording working and nonworking days but do not add into the
totals. Make statement under REMARKS that WORKING and
NONWORKING days are shown for record only since the contract
time has elapsed.
5. From calendar issued by Headquarters with working days
numbered for convenience in computation.
6. Time extensions other, are to be explained under REMARKS and
the following information is to be included:
(a) Cause of delay and specification reference \under which
approval was granted.
(b) Statement as to what controlling operation or operations
are being delayed and to what extent.
(c) Dates for which the extension was granted.
(d) Reference to supporting data.
ADDITIONAL REMARKS:
CITY OF FONTANA REPORT NO. 6
WEEKLY STATEMENT OF WORKING DAYS
PROJECT Cypress Avenue Sewer Project
TO: Kenko Contractors, Inc,
Thef~~~~Wingstatementsh~Wsthenumber~fw~rkingdeyschargedt~y~urc~ntractf~rtheWeekending12/18 ,1992
Non-Working Working Dsys
Days No Work
Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on
Day Weather Controlling
Operation
(Note 2)
12/14/92 Men. Clear, 68 Degrees 1
12/15/92 Tue. Clear, 68 Degrees 1
12/16/92 Wed. Windy, Clear, 70 Degrees 1
12/17/92 Thur. Cloudy, 61 Degrees 1
12/18/92 Fri. Clear, 61 Degrees 1
Days this week ................................................................................................50
Days previously reported ................................................................................~/~ 2
Total days to date .............................................................................................3e ~-42
TIME EXTENSIONS CCO Number Days Approved
CCO Other
Days this report ...............................................................................................
Days previously reported .........................................................................................................
Total days to date ....................................................................................................................
COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date
1. Date Cc'~.'a'j: a.'~pr,cved by A'h>~r-:;'7 ~e"~,rs. _ . ,of Days Day (Note 5)
.............. ~ '11,392
2 Work
~. co.v:,u:.'_' DAT~
4. Total Lin'e ox:eqt on t~y:-.' s:}pr;.~ve'J ~;~ d~=le iC~C L'I.=S C'.her .........'3
5. Tot~l '~:q-;','ork rg clays :c eats ~N:~te -',; ........................2
6. Sub r31;~l d r:s/..'.'.lus. i've 5~ .................................2
~. E~E.~:,.'D D^TE rC~ C~',~P.ET~ON =~ ~s ~ rk,~ ~.',e ~; ...........': :.'.'7:':: 7~7~:".";.";'~"'~'.";.;.';.";";~' ;""'~;'#~:~"'~
8. Rev ssc wolk r'g days 'c.- r~:}r'l'~=~: .',1 'r'e ,c p',u,,} I i',e .;.: ..............' 10
9, Total w.~lk ng (Ji-;ys ~t.: d~-.ro .............................~.-3 ?,, i~ .
10. WORK!%G DAvS I-~LMAININC ;Liqo
Controlling Operation(s)
Remarks: (Note 6) (Continue on reverse)
The Contractor will be allowed fifteen (15) days in which to protest in writing the ~
correctness of the statement; otherwise the statement shall be deemed to have ngineer
been accepted by the Contractor as correct, NOTE: All footnotes are on
reverse side.
CITY OF FONTANA R,ponNo,
INSPECTOR'S DAILY REPORT M T~)T F S 8 ClrcleD~y
Shift Hour~ 8tart
PROJECT:
~O~A~ON & DE~C~I~ON OF OPE~ON:
HOURS - ~M NO, ~ER
EQUIPME~ ~D/OR ~R: ~ RE__K8
EQUIPS, NO. OF DEBCRI~ON ~ ~eaon ~r Idleness or
NO. MEN (~ Equipmere or to~ ' _ o~er mm~)
I 3~FF
t ~ ~ ~. 9
CITY OF FONI'ANA R, ort No.
0-'-. ,I - al -
INSPECTOR'S DALLY REPORT M T W T F ~L~ 8 Ciml, Oay
8h~ Hours 8tart o~6~
PROdECT: C..'(PE ~8,,,IE; ~-C~. D~3JC-CT (. e:OP, l~C~ CSI, ILY) T-tO ~--.~F,.:EIdAY
LOCATION & DESCRIPTION OF OPERATION:
HOUR8 - ~M NO.
EQUIPMENT AND/OR LABOR: ~ REMARK8
EQUIPMT. NO. OF DEGCR~PTION (Reaon for t~lleneee or
NO. MEN (Of Eclutpmsnt or Labor) ot~er mm~'ks)
I E-~ 5
G~ovr~ rp, e~ (5o-rou] 5
Contractor Title Inspector
1 ~g~ ,.if/sb
HOUR8 * ITEM NO. WEATHER
/.~0' -4G°
0
EQUIPMENT AND/OR LABOR: (~ REMARKS
EQUIPMT. NO. OF DEeCRIPTION {~ (Reeeon for Idleness or
NO. MEN (Of Equipment or Labor) other ramark=)
Cont31ctor Trde inspe~lor
12/9~ Jr/Eb
CITY OF FONTANA R,po~ No. 4U
D~le ,,~14 I~q~
INSPECTOR'S DAILY REPORT
LOCA'RON & DESCRIPTION OF OPERATION:
HOUR8 * ITEM NO, WEATHER
EQUIPMENT AND/OR LABOR: ~ REMARKS
EQUIPMT, NO. OF DEBCRIFTION d~ (ReinmOrt for $dlsnmse or
NO. MEN (Of Equipment or Labor) ot~er remarks)
I W. P,~_, u'~,.
I P,,,. (~.J~h,t(:}oLPN OPP- I (
I ~')~ LL,,'rHf,.~P OPP-. I i
CLt'
Con~sctor Tltte Inspe,3tor
12/92 j'l'limb
CITY OF FONTANA Repo. No. 4~ D=y q ~,8
INSPECTOR'S DAILY REPORT ~ T W ~ ~ $ S C~ O~
HOUR8 - ITEM NO. VFr, ATHER
O
EQUIPMENT AND/OR LABOR: ~ REMARKS
EQUIPMT. NO, OF DEBCRIFTION ~ ~Rlelon for idleness Or
NO. MEN (Of Equipment or Labor} o~er rtmark~)
I ~N,-rr~z, POE; C/~
Contractor Title Inspe=tor
12/9~ J'rleb
CITY OF FONTANA mepo. No. 40 D.y q~
Dale / L -~0 - ~z--
INSPECTOR'S DAILYREPORT M T W{:~F 8 9 CiroleDay
8hilt Houra etare 01C:~ ~top r7oo_
HOUR8 - ITEM NO. WEATHER
e.~g_ SOo
EQUIPMENT AND/OR LABOR: ~ REMARK8
EQUIPMT, NO. OF DESCRIPTION t~ (fleaon for tclleness or
NO, MEN (Of Equipment or Labor) other reinart<s)
I L~uTf FO IO
C~" ~v~. 14r~4 ~F, I O
CITY OF FONTANA ,e,o~No. ?~q D.y q~C~c{~l
INSPECTOR'S DALLY REPORT M T~T ,F 8 8 Circle Day
8h~ Hou~ 8t~ ~ ~op t~
LOCA~ON & DESCRIP~ON OF OPE~ON:
HOUR8 - ITEM NO. WEATHER
'lt* -,
EQUtPMENT AND/OR LABOR: a~ REMARKS
EQUIPMT. NO, OF DESCRIPTION (Reason for idleness or
NO. MEN (Of Equipment or Labor) other remarks)
Corro'actor T~e InsDector
12/92 J'i'/s,b
CITY OF FONTANA R.por~No. ~ O.y qG>5
De~, DEC. 26 Ic/q2_,
INSPECTOR'S DAILY REPORT ~:>T w T P S S Cir~mO.
8hM:Hour8 8tm'~ ,")'Td~ 8top 1'750
LOCATION & DEI~CRIPTION OF OPERATION:
HOUR8 - ITEM NO. WEATHER
Pr'.
EQUIPMENT AND/OR LABOR: REMARK8
EQUIPMT. NO. OF DEBCRIPTION (Reaon for Idleness or
NO. MEN (Of Equipment or Labor) o~$r return)
Contractor Tltle Ina!oeblor
12/92 Jl'/mb
CITY OF FONTANA Re.o~ No. Day
O. ~l li~
INSPECTOR'S DALLY REPORT (~T W
8h~ Hours 8ta~
LOCA~ON&DESORI]~ONOFOPE~ON: 5~t[ ~yPttTS ~% 2o '~-
HOURB - rrEM NO, VV~=ATHER ,
EQUIPMENT AND/OR L~BOR: ~-- REMARK8
EQUIPMT. NO, OF DESCRIPTION ~ (Reason for idleness or
NO, MEN (Of Equipment or Labor) other remarks)
I 6tab?, s' ~,, Ct~S~ q
Con~'actor Titls Ins~/gr-"' r_ .
12/9e JTlab
CITY OF FONTANA ReportNo.
INSPECTOR'S DALLY REPORT M T W Te8 8 CiroleOay
Bh~ Houm ~ O~ ~op .
HOURS - iTEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARK8
EQUIPMT. NO. OF DEBCRIFT10N (Ree~on for Idleness or
NO. MEN (Of Equipment or Labor) other remaz~s)
G~:>,/E .55To. CRAk, T=
UT~UTV' P~Cr,aP
r~Ty' BO~mC, WV'~CRm.F_
, Contractor Title Inspector
12/92JT/aD
CITY OF FONTANA Repo. No. ~2 D=y qSc/
INSPECTOR'S DALLY REPORT M T W ~ S S Circle D~
8h~ Hou~ 8t~ n~ 8top~_
PROJECT: C.~'PRE.c~3 Axle EFcV, F,_P. (
LOCA RON & DESCRIPTION OF OPERATION:
HOURS - FrEM NO. V4FcATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT. NO, OF DEeCRIPTION (Reason for Idleness or
NO. MEN (Of Equipment or Labor) other remarks)
t R~c.r.A,4or..p,c~c~ fFR.)
Ol'tL,ffY ptC, r, OP
Contractor Title Innl~ector
12/92 J1'/ab
CITY OF FONTANA ~,po~No, ~ O,y qS~
INSPECTOR'S DALLY REPORT M T {i~T F 8 8 Circle Day
8hnl Hours 8t~ ~op .
LOCATION & DEGCRIFrrlON OF OPEERATION:
HOURS - ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT, NO. OF DESCRIPTION (Reason for Idleness or
NO. MEN (Of Equipment or Labor) ob~er remarks)
I /~lh'( ~,~r~LP~ ( c~,,o~1
I 'PA~GE. LrdTJ E~, ( ~ ~
Contractor Tit~e inspector
12/92 dT/ab
· " V V
CITY OF FONTANA ReportNo. ~G Day c/E1
Dm
INSPECTOR'S DAILY REPORT M ~w T F s s CircleDay
Shift Hours 8tart 0'~b:3 StopiSn't_
LOCATiON & DESCRIPTiON OF OPERATiON:
HOURS - FFEM NO. WEATHER
r--..~t C~(,.?
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT. NO. OF DESCRIPTION (Reason for idleness or
NO. MEN (Of Equipment or L.~bor) o~sr remarks)
LTnL.~T~'
Contractor 'Ntte Inspector
12/92 Jl'/eb
CITY OF FONTANA Repo~No. 2c/ D,y q~o
INSPECTOR'S DAILY REPORT ~T W T F 8 8 ClrcleD~
Bh~ Hou~ Bt~ ~ 8top~.
HOURS - ITEM NO, WEATHER
CLEA~.
EQUIPMENT AND/OR !_4,BOR: REMARK8
EQUIPMT. NO. OF DESCRIPTION (Reason for idleness or
NO. MEN (Of Equipment or Labor) other remarks)
Contractor Title Inspeotor
12/92 J'r/ab
CITY OF FONTANA
CALIFORNIA
MEMORANDUM
TO: BOB WEDDLE, CITY ENGINEER, ~
FROM: CA~RLOS NAVARRO, ASSOCIATE ENGINEER/INSPECTION ~ -
SUBJECT: REVIEW OF INSPECTION FILES AND SOIL COMPACTION REPORTS
WITH RESPECTTO RESENT TRENCH SEI'FLEMENTON
CYPRESS AVENUE SEWER PROJECT
DATE: JANUARY 11, 1995
A review of the daily field geotechnical reports with assigned inspectors daily
reports was conducted and completed by Bob Savant and me. The following was
determined:
In general, there were locations which failed to pass compaction testing. These
areas of concern were, for the most part, addressed but I also found reports that
indicated Kenko, Inc. did not respond to GPI's request to rework other said
areas.
These reports were also received and signed for by the PW Inspector, who appears
to have been unresponsive and also failed to respond to or re uest Kenko to react
to said reported problems. Thus it appears that some of Ke~o's inactions were
never reported to project management and some of these areas went unaddressed.
Conclusion:
We may have other problem areas in the future with similar failures on Cypress
Avenue. Improper compaction around sewer lateral locations may be the potential
cause of said failures. When the weather clears and weare able to use the TV
camera on the existing system, we will be able to review this situation and
assist with timely resolution.
Solution: ~)O~t~.._
On future projects involving jor grading/deep excavations/general compaction
the project manager and inspection supervisor will establish a weekly review of
all geotechnical reports and inspector's daily reports. This general overview
on-going construction operations would provide the impetus for appropriate
actions to be taken as needed. For example, requesting an on-site contractor to
re-work any areas which have failed to meet the required density; questioning
inspector actions; requesting clarification items from geo-tec personnel;
requesting action from contractor; calling all parties to a conference to resolve
field problems, etc.
The proposed procedure of establishing a weekly review should alleviate problems
in the area of inaccurate reporting and unresponsive actions and provide positive
management overview.
Bob Weddle
January 11, 1995
Page Two
Source Fundinq:
I now understand that as of 6 AM on January 11, 1995, 24 counties have received
a presidential declaration of emergency for major disaster which could provide
financial assistance on this project. I have requested that Operations track all
time and materials on this project, should we be able to recover the cost from
FEMA.
CN:sh
cc: Sr. Public Works Inspector
Associate Engineer/Special Projects
PAGE OF
,- DALLY FIELD SUMMARY
IN-G..r_L,
DATE .
SPl PROJ. NO~ PROJ. NAME ~(',~E',. "' ' Jd/4'bjWEATHER
· FILL LOCATION/PURPOSE '~L%",,/.C~
REQUIRED COMPACTION :'~'.~
EQUIPMENT USED ~-,,':~C: ~, ~L,~: ,'~:~/
SOURCE OF FILL: ONSITE y' IMPORT SOIL TYPE(S)
DEPTH OF FILL/BACKFILL :'~' '
GENERAL SUMMARY OF OBSERVATIONS L(
//~'C~b,'. ~, >.dC f ~,~C."',~ A~ , 1.,:.~:4 <,L. "~.%"~
, <2 .~ .~ ,.,, ~ ~ 2.:. J <: .,,.~.,.: ~ -~ ,..~
AREAS OF CONCERN
BY "' RECEIVED BY , .-.-"----*- .- --~:': . -~
FOR: GEOTECHNICAL PROFESSIONALS, INC. FOR:
FORMS/'F.t(II/e9)
· 'r . .f ,~ :f .
' ' ";' '; ·
· ;: "~". "' ~' :'. % ':i"', , FA EE
GPI PROJ. NO. 1}4~ '('' PROJ. NAM ~:~'X~ A E ATH
,,,o,-,o,,,,,,,,o~ %,, .' ~'I¢Yf. (~ ~
,:,~o,..,,~,:,oo,.,,.,.o-,-,o,., : o'/. f-'t6
eouw~T used~ .~J.'
i o ,,,, ,,.; ,.,:::.,
9!,-, .~t,j,.,' ,.~.,, p, :,,, . ,...,~.~.~,, ~,, ."m ~''.''',":'~'
'fi,...C. tj ,.-', %t',,~c.~/~,~ ~,./ ~,~
.L-
FOR: GEOTECHNICAL PROFESSIONALl], INO. FOR:
...... .. -- ,; ,., ........ .:
FA~E'/0 -L "
·"' ':" F
' ' ' DALLY FIELD SUMMARY
GPI PROJ.'Nd. P oJ. NAME p ~ ~,~ATE .WEATHER
:..:, · ... :- . : ~. I'
FILL LOCAlION/PURPOSE' ~[~/' '~ G,[ ~: u ~LiL~/ ....
· , ,
,
EQUIPMENT USED ~".r,'.~.
SOURCE OF FILL: ONSITE ~/IMPORT SOIL TYPE(S)
DEPTH OF FILL/BACKFILL
GENERAL SUMMARY OF OBSERVATIONS
,,~/
.
~' ~ F.,"~,~ ,
%
AREAS O.F CONCERN
FOR: 6E~ICAL PROFESSIONALS, INC.. FOR: ,
PAGE
MEMO NO.
FIELD MEMORANDUM
FIELD MEMORANDUM
GPIPROJECTNO. 1t4 ,& PROJECTNAME ~/~)y',~,~ ~'~' DATE~h(2/~'S
FOR: Geotechnlcal Professionals Inc.
The conclultonl ind re~ommendetlonl contithed herein hive been bleed upon cb~ervltJone, I~ noted, end were detive~ uetng generally
ecclpte(I engineering Ipproa~hee end pflnolplel MIIli~le It thie time ind the clegtee Of cite Ind Ikllll ordlnltlly exercieecl un~lef limaIll
clrcumeton¢es by reputoble geotochnlcel engineere ptl(~tlolng In thll Iree. NO repre~entotIon$ ire made Is to the (ItJIlity or extent of materill
not oheerve{I end teetH. NO Other wittartly of repteeentotlon, either expteeeed Or Impitecl,
FORM/F-6(8/e9)
PAGE"~_. OF7,,,,,-
O DALLY FIELD SUMMARY
FILL LOCATION/PURPOSE
REQUIRED COMPACTION
AREAS OF CONCERN
FOR: GEOTECHNICAL PROFESSIONALS, INC. FOR: -"
RECEIVED
April 18, 1994 Sr:.~ 2 I LqcJ4
Wayne Brown
Public Works Inspector crn, I:NGiNEER,$OFFiCE
Community Development Department
8353 Sierra Ave.
Fontana, California
Dear Mr. Brown,
On February ?, 1993 my son, Joseph D. Germano and a girl friend, Barbara Borjan were shot and
killed in a trailer home belonging to Kenko Contractors. At the time my son was a Kenko
employee. The person who shot him was/is a Kenko. employee.
After this incident occurred I started to receive information from other concerned individuals
reflecting other instances of violent/assaultive behavior by other Kenko employees.
As a parent who lost a son in a violent act, [ have filed a complaint (law suit) in the Central
District of San Bernardino County against Kenko, eta]. Preparing for the case I learued that you
witnessed an incident that occurred on a Kenko job site the Thursday (February 4, 1993) before
my son was shot to death by a Kenko employee. The incident may have some connection with
the death of my son. If you are willing to share the details of the incident [ will appreciate
hearing from you.
Please keep in mind I am preparing for a court case and any information you share with me may
become pan of a public record.
You can write and/or send the information to the address below or you can call me collect at
(401 )231-2942. This is my home phone and is also equipped to receive a FAX message if you
prefer.
incerely,
J had, RI 02917
JOSEPH ¥- GERMANO
11 E Shadow Brook Lane
Smithfield, R] 02917
'
City of Fontana
CALIFORNIA
CORRECTIVE ACT|ON SOTICE
It h~s com~ to our ~nt]on that th~ fo]]owi~ it~ms ~r~ d~fic]~nt
abov~ r~r~r~nc~d project job s]t~:
t ] 8~rdcadss t~sn Trench
[ ] $]~n~n~ t ] Dust
t ] M~t~r]~] on 8o~dw~y t I ~n~uffior]z~d 8~r~ C[osur~
[ ] 0thor
R~s~ b~ advised that you ~r~ dk~ct~d to tak~ corr~ct]v~ ~ction within th~ fo]]o~n~
t]m~ ~ram~:
[ ] Immediately [ ] 2~ Hours
[ ] 8y th~ ~nd o~ Curr~nt ~8 Hours
All work don~ 8hail b8 ~ccompl]sh~d to th8 aat]s]~act]on o~ th8
n~c~ss~ ~t~pa to correct th~ d~fic]~nc~s and ~nvo]c~ you for
r~qujr~d. If you h~v~ any questions r~rd]nO this m~as~ contact ~h~
Engineer or Authorized representative. B~~~
8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA, CALIFORNIA 92334-0518 · (714) 350-7600
SISTER CITY- KAMLOOP~ B.C. CANADA
PUNCH LIST
Inspotion was conducted a~ ,~ove projec~ by
REPRESENTATION
CONTRACTOR.OWNER ENGINEER,ARCNITECT
~...,~,o,:7/~/~°
NO. ITEM
PUNCH LIST
Inspe~ion was conducted at a~ve ~roject by ~g~ ~ ?~Y at o'cl~k th.s date.
REPRESENTATION
CONTRACTOR-OWNER ENGiNEER-ARCHITECT
DISTRIBUTION: 1. Prolee! Minifit
73. 4
CITY OF FONTANA
INSPECTOR'9 DAILY REPORT M
CQNTRAC:;TQR
EQUVsM"r. NO. OIr OEOCSN~E:~ ~ ~ ~nmm ~
~nttlct~r Title
CI'Pf OF FONTANA
INSPECTOR'S DALLY REPORT
NO. ~ {C~iaUl~ninla~Li:N~
~C)UR8 - ITEM NC). WE.~T~ER
='.QUIPMENTANO/ORLABOR: '~ ~ ,~) ~ ~ RE~KS
NO. MEN (C~ EQJiDmIf~ or LIDca1 .,,,( ~ (l:qellc2n for talehess ~
=.QUIPMENT ANO/OR LABOR: "' ' '~ ~ REMARK8
;t. jiPMT. NO. OF DEBCRIP'RCN ,,,( ~,j (Rillon for 1011nee,, or
NO. MEN (Of Equil:)ment or L~Dor) r.,,~,/Uler rlmarks)
Cor~'ictor T~I ~~~
HOUR8 - ITEM NO. WEATHER
3~lP~. NO, OF DEBCR~ON {Re~ for talene~e ~
NO. MEN (~ Equipm~ or ~
Corrc,e. tor ,, T~® ~ '
CITY OF PONTANA V
INSPECTOR'$ DALLY REPORT
HOUFI8 · C(tM NO. WEATHER
~U&P~. NO. OF DEBG~ON ~ ~ ~ ~ (Rm~ for idlmnm~
NO, MEN ~ E~ipm=~ or ~ o~sr mm~)
Corl'Bc:tof ' llt)l ~~
HOUR8 - FFEM NO, WEA'T~ER
:UIP~. NO. OF DE~CR~CN (Rea~ for idleness ~r
NO. MEN
C0t'~'sctof TltJl ~~/~~~
1 ~Jg~
CITY OF FONTANA
INSPECTOR'S DALLY REPORT M T wCT)F s s circ~,s~
HOUR8 · iTEM NO, WEATHER
~ ~ (ReM~ for idleawes or
NO, MEN (~ E~ipm~ or ~ o~er mm~)
Cor/rB~tor ° TitJl ~
CITY OF FONTANA V' ~e~,o,~,,~.~,~Z.r
INSPECTOR'S DALLY REPORT M T(~)T F S s Circleally
HOt JR8 - iTEM NO, WEATHER
;~IP~. NO. OF DESCROON ~ ~ (Reuon f~ Idleness or
NQ MEN (~ Equipmere or ~ o~er ~m~)
12/92
HOUR8 · iTEM NO. WEATHER
-'.QUIFMENT AND/OR LABOR: ' ~ ~ REMARKB
:;LJIPM'T. NO. OF DEeCRIFTION .~ .. ,,,,( ~j (Relaon for toilchess 0r
NO. MEN (Of Equipment or Labor) o~mr rimmr.,m)
12/9~
;UIP~. NO. OF DEBCA~ON ~ ~ ~ ~ ~ ~ (ReM~ for t~lenesl or
NO. MEN (~ EquiptaR or ~ offer ~m~)
12/92
HOUR8 - R'EM NIl. WEAT~E{~
~.QUIPMENT AND/OR LABOR: REMARK8
;LJIPM"r. NO. OF DE8CRIPTION (.Rellon for I~t~,nea$ of
NO, MEN (Of
Con~tol' T~Ii Insl:)l~r
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
Confactor o TKdl
12/~2 Jr/~
GITY' OF FONTANA ~
INSPECTOR'S DALLY REPORT
HOt jR8 - ITEM NO. WEATHER
~QUIP~N"I" AND/OR LABOR:
;~JiPM'r. NO. OF DEDCRIIqgON ~ ~ (Rwaonforl~lsnessor
NO. MEN (Of E~uipment or m'hO0 ' ''''( ~'j o~er rimtrY, s)
Cottractor , Ti~e 1 ~./92 J'l'/tiD
,
cITY oF FONTANA
PUBLIC WORKS SEP, VICF~
CONFINED SPACE WORK pERIvflT
HEADING , ,
~PLOYEE ~G ~ PRE-E~Y
1. Sar~ ~ and Re~u~ Tai~g Conduc~d om
2. Manda~ P~*En~ B~e~ng Conduc~d on: ~ ~ ' ~ ~a~)
3, Does ~is ~ob gaqui~ Special Tni~ng:
1. Ar~ All Elect~cal Devices Intrinsically S~fo: It'llYES [ ~ ; N/A
2. Hav~ ~I Power Co~s ~d T~ls Been Vi~lly ~ec~d: ~ ~
I J N/A
VESSEL PREPARATION
1. Work Az~a Isolated with $1gns/~rdens? $ I N/A
2. All Energy Sources Lo~k~d~aggcd Out? ~ YB I t N/A
3. A~I InpUt Lines Cappcd/Bllnded?
s S N/A
5. Vessel Cleaned/Purged?
6. Ventilation Provided 30 Minutes Before Entry?
pRE-ENTP, Y ATMOSPHERIC TESTING OXYGEN FLAMMABLE TOXIC TIME I~IT.
~LEL /~,/~
~) ~LEL t~,t:~.3PPM ~
~ %LEL
~ __%LEL __. PPM
EMERGENCY/RESCUE PROCED~
1. ~atlonofW~t~nEme~en~y~uePlan
2. T~c of Emc~cncy~c~ue Team Rcqul~d: ~0 *
SAFEYY EQUIPMENT
Porsonal Proteotive Equipment P~quit~d: ~ Safet~ Equipmen~ Requk~d:
1. Sclf-ContaincdBr~athingApparatusR=quircd?
2. PotUbI~ Atmosphcric Monitor Roquired? s $ YF,~ s I NO TYPE:
ir'~ly
I J NO TYPE:
3. Tr~p~l and Harncs~
I ~ NO TYPE:
,
4. Ventilator [~;:~YES I ~ NO
PERMIT AUTHORIZATION
~mr~ Date
N/A - No~ Applicable to Present lob.
CITY OF FONTANA )mmf
INSPECTOR'S DALLY REPORT
mm
HOUR8 - iTEM NO. WEATHER
:~IP~. NO. OF DEBCRI~ON ~ ~ , ~ ~ (Riuon for i~lmniis or
NO. MEN
12/92 ,.Fr/a~
HOUFI8 - ITEM NO.
=QU~PMENTANDIOR LABOR: ~ ~ ~ ~
NO. MEN (Of Ecluipmen~ or L~c~or) o~er r~m~.~s)
Cor'f0'~::tof T~Ii ~J
12J~ JT/aD
HOUR8 - ITEM
~QUIPMI~NTAND/ORLABQR: ~'~ {~." '~i ~ REMAFIKB
:.!jaPMT. NO. OF DEBCRIPTION ~ ~ ~,~" "i ~J (Reelon for ,Olonos8 or
NO. MEN (Of Equipment or Labor) . ob~er remarka)
12Jc~ jT/=h
EQUIPMENT ANOIO,q L~: REMNqK3
EQUIPMr. NO. ~ DE~N ~m~ ~ ~et ~
NO. MEN (~ E~m~ ~ ~ ~er ~) ~
Contrlctor Title
CITY OF FONTANA
INSPECTOR'S DALLY REPORT ~w
Contractor Title
CITY OF FONTANA
INSPECTOR'S DAILY REPORT
EQUIPS. ~. OF DE~N
Contrlctor Tithe ~nl~ "'
,.,.___.,__-
CITY OF FONTANA
INSPECTOR'S DAILY REPORT ks T W T(~)S S Crd. D~/
PROJECT ~//~,Y4C~-,~S/~_Z~.~O~
CTOR
CONTRA
EQUIPMENT ANOIOR LABOR: REMARKS
EQUIPMr. NO. OF DEBCRIFrlON 0Relsof~ for ~leneml or
NO MEN (Of EQu~ment or
Contrlctor Title ~~ln$~~/
tste,,,,__el -
CITY OF FONTANA
INSPECTOR'S DAILY REPORT
EQUIPMENrT AND/OR LABOIq: IqEMA, qKS
EQUIPM'T. NO. OF DEBCRFrlON {l=let~on ~r Idetlmm ~
Contrlctor Title
MEMO
,an, 3
,5'.'3oA ,,,,, /1,9'
C:)IITRIIUTIOIkI: I. Rilllit ~
3. IReliMe! P,ol4~ Rllll~tet~l
Cantrector Title Inlplt~f
Z. ' o o /~ r~l ~l , Er'0 00,7
,g . ~oo l~ , xI ~, ~o ~ o. zl
3 %30 ~ .~x? %a O DO, ,4
CITY OF FONTANA
INSPECTOR'S DAILY REPORT
·
EQUIP~ ~Ol~ ~:
EQ~P~. ~. ~ DE~N
NO. MEN (~ E~ ~ ~
Contractor Title t~
CITY OF FONTANA
INSPECTOR'S DAILY REPORT
PROJECT ~~ ~~
CONTRACTOR ~~
EQUIPMENT AND/OR LABOr: REMARKS
EQUIPMr. NO, OF DESCRIftT1ON 0:leeeoft for losenets or
NO. MEN (Of E~UC~ment or LeI:K>r) o~her rtmette)
Contrlctor Title InlplCtOt
CITY OF FONTANA
INSPECTOR'S DALLY REPORT
PROJECT ~
/
EQUIPMENT AND/C),q LABOR: BEMN:IKG
EQUIPMr. NO. OF DEGCRF'RON tReeson for lalef'~$, or
NO. MEN (Of EQuCme~t or 1,13or) outer rimIbm)
ContrlCtor Title Inlpl~tor
hee__._er
INSPECTOR'S DALLY REPORT u T W(~F S S CircleDre/
8h~ Hours 8tar~ ~o1~
LOCATION & DESCRI~N OF OPE~ON:
-'.QUiPMENT AND/OR LABOR: '~ ~,, ~ ,' ~, REMARKS
':!JIPMT. NO. OF DESCRIPTION (Reason for idleness or
NO. MEN (Of Equipment or Labor) ot~er remarks)
Cor~actot T~$ ~ 12/9~ jT/ai:} '
HOUR8 - FFEM NO. WEATHER
-'-QUIPMENTAND/ORLABOR: "~[x~ ~ '~ ~'~ REMARKS
NO. MEN (Of Equipment or Labor) ~,j (Resson for i~leness or
o~er rsmanXs)
Title InspectorS-/
12/92 jT/~h
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
,
CiTY OF FONTANA
INSPECTOR'S DALLY REPORT ~ T W T ~ a S ci~cl.o,w
HOUR8 - FFEM NO. WEATHER
-',QUIPMENT AND/OR LABOR: ~ , ~ R~MARKB
';UiPMT. NO, OF DESCRIPTION ~;~ t~!ason for Iciltneas or
NO. MEN
/ (~ or Labor) omer r~
CoF~'Bctor 'RtJl ~~' ~
1 ~J~2 J'r/aD
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
HOLjR8 - (TEM NO.
;!JIPMT. NO. OF DESCRIFTION .~, ~)~ ~;~,~,~'~ ,,,( ~j (Reamon for ~dlsness or
12./~
HOUR8 - rT'EM NO. '~a~T~ER
· ~
~ ~ ~ RE~KS
~QUIPME~ ~O/OR
;~lP~. NO. OF DESCRI~ON ~ ~ (Reaon for idleness or
NO. MEN (~ Equipmere or ~o~ ' ~ ~ o~er mm~s)
Corl'actor lltl$
12/92 JT/m
CiTY OF FONTANA V
INSPECTOR'8 DALLY REPORT
L A~ON & OE~CRI~ON OF OPE~ON'
HOUIR8 - ITEM NO.
-',QUIPM~NT AND/OR ~R: '
~O, MEN
_
CITY OF FONTANA
--
INSPECTOR'S DAILY REPORT
HOUR8 - FT'EM NO. ~,~/
l~PMl'. NO. OF DEBCRIFTIC)N ~ ,, ~j (Resmon for Ic~teness or
NO. MEN (Of Equipment or tabor) offier rsms~a)
Con~'acZof T~e e~'''''''''~ f
12/92 ,,rT/a~
INSPECTOR'S DAILY REPORT
Repo J..3 Z- Day .
Date ......,- - / ? __?'-3
@ T W T F S S Cirel, Day
Shift Hours Start - Sto!''''-
/,.
f
CITY OF FONTANA
PROJECT: C., Y Pr~~ S 4p.e.... ,S-elVe rHQ / e c.:-J.
LOCATlON & DESCRIPTION OF OPERAT10N~ "
S' y ~;;~ ~~ t:~' , p p n.; / t') F-/ll vi
,<\ 4-) c? .19~ 0 4 ' r
4Y\d
HOURS . ITEM NO. ER
~ /,YVt? AI...
~ .... ~7 "< .JIC
.~ <l .
. I ~ -~
~ . ~ ~
" ') ~ J I~
l~ ~ ~ ~ ,
"I ~ ~
I"";: ~ ~
..., ~ Q ~ f~ ~
=aUIPMeNT AND/OR LABOR: .~ \~ ~ REMARKS
:UIPMT. NO. OF OeSCRIPTION ~ ~ ~ ..~ j'..; I~ '-: (R...on for Idl.n... or
NO. MEN (Of Equi!'ment or Labor) oth.r remarks)
/1,)~ rMJ~")/.L~ .....,.~ ~\. ..... V"J \ . .JI-""
/ <...-0'"
Contractor
T1tII
~~
-
12/92JT/ab
CITY OF FONTANA V
INSPECTOR'8 DAILY REPORT
;~IP~. NO. OF OERCRI~CN ~ ~ ~ ' ~ (Reaon for idlenell Or
NO. MEN
Car~'actof T~e e~
12/92 ~T/a~
HOUR8 - FrOM NO,
=QUIPM~NT AND/OR t. ABORT ~,~ ~ -~
~LjIPM'r. NO. OF DESCRIPTION ~ ,,< ~.) (R®UO~ for t~lsntll or
NO. MEN (Of E~ljipment or Llbo~ ot~er r~marks)
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
Conlr~ctot lltNm
12/9~
HOUFI8 - ITEM NO.
~
~U~PMI'. NO. OF OESCRIFT1ON ,~ ~ ',,( T,J (R$11on for Idtwnwe$ or
NO. MEN (Of Equipment or L~or} ommr rimre'ks)
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
HOUR8 - FFEM NO. WEATHER
·
~QUlPMENT AND/OR I.ABORT '.~ ~', ~ ~,~ REMARKS
';gIPMT. NO. OF DESCRIFRON ~ ~ ~) (RIMon for tcllen®18 or
NQ MEN (Of E~ulpmsnt or Libor) olfisr minstrel)
['i°' . ........... ,,-,- ..... 7.J..+ 2~,
I t - ~,7_:_--.L-----~~ ..... ' '
_ ~ (.o.~G) - _ ........
87+00
L~' : -!' ~ ....... = .....
u-'
~S4 ~o
':6 .....X~ ' '~ o ~'
C of Fontana
.LIFORNIA
FAX
COMMUNICATIONS
FHOM FAX NUMB~ (909) 350-66~ 8
PLEASE D~UVER THE FOLLOWING PAGES TO;
From: ~yA P~~CO ~ ~
(Includ~nO cover 8he~)
Message:
FAX CHARGE ~':C' ~3.00 1ST PAGE (EXCLUDING COVER SHEEll ~1.50 THEREAFTER.
,%~.... .
PLEASE MAKE CHECK PAYABLE TO THE CITY OF FONTANA IN THE AMOUNT OF $ ..
PLEASE MAIL TO: CITY OF FONTANA. P.O. BOX 518, FONTANA, CA 92334
FROM:
Name CompanylRrm
Address Phone No.
NOTE: Please return this cover sheet wi~h Payment
(Account No. 010-031 6-2300)
8383 :SlERRA AVENUE(P,O, 80X818) ,$ FONTANA, CALIFORNIAg2834-061S · (/14)350,7600
SISTER CITY -- KAMLOOPS, B,C. CANADA
CITY Of fONTANA V ~.0;~o./.~:~ ~.,
INSPECTOR'S DAILY REPORT M T W T4~8 8 CirqlmD~
1 ~J~ JT/aim
CITY OF FONTANA
INSPECTOR'S DAILY REPORT
C)rcle
~QUIPME~ ~D/OR ~R: ' ~ ~ ~ RE~KS
;UiP~. NO, OF DE~CRI~ON ~ ~ ~ (Resort for idleness or
NO. MEN (~ Equipme~ or )oQ o~mr mm~s)
Con13'actor T~i ~~
12/92 JT/=h
HOUR8 - ITEM NO. WEATHER
%UlPMT, NO. OF DESCRIFTION ~ ~ ";~ -,~
~ ~, (Reason for Idteness or
NO. MEN (Of Ec~uiDment or Lal~or) ot~er remarks)
1 ~Jg~
Contractor T'~
12/~ JT/=h
Contactor
12.Jg~ JTIal;)
Corfractor "T"itte Inspector ~
12/92 J'TIs~D
CiTY OF FONTANA
INBPECTOR'S DALLY REPORT
HOURI~ - iTEM NO. WEATHER
qQUIPMENT AND/OR LABOR: REMARK8
;UIPMT. NO, OF DEeCRIFT1ON .~, \ ~, ~ ~j (Reaon for I~teness or
NO. MEN (Of Equipment or Labor) other ~marks)
/ ~/,,~- g' ,e ~
Corfo'actor '~tle ~nal:~ ""
1 ~2 J"r/aD
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
Coreactor T~i
EQt. JtPMENT AND/Gq ~: REMARKS
EQUIPMT. NO. OF DE~,RIFTION (Rilloff tot ~ef',ell or
NO. MEN (Of E~,v, pr~nt or Lalx~ ofmr rtma'~)
(~ontrlclor Title IMIIICIOf
INSPECTOR'S DAILY REPORT
8h~ Houm ~ ~ ~op.__
HOUR8 - ~M NO. ~ER
NO. MEN (~ Equipmira or ~o~ ' ~ ~ (Reaon for idleness or
o~mr
/.~
Co~tor ~e o~
1 ~ ~/~
HOUR8 - ITEM NO. WEATHER
,.;.
~QUIPMENT AND/OR LABOR: ~ REMARKS
';L,,IIPM'T. NO. OF DESCRIFTION ' "'~, ~
NO. MEN (Of Equipment or Labor) "''~ ~ (Reeon for I~tenes,~ or
o~,r r~marke~)
12/92
CITY OF FONTANA V
INSPECTOR'S DAILY REPORT
~.~.~: c~ y~ ~,~. ,5"e~er~~
2/92 lad -
HOUR8 - ~M NO, ~ER
NO. MEN ~ ~ ~ iReMort for idleness or
7/ ~ Z~6o ~~
~oo~ e,~ ir~
Coln'o'actor · T~$ I~ ~--
9 2/~ JTI~h
Cot-to'actor · "lltll f
Contractor · TttJe Inspe~-'''''~
12/~2 ~1"/~h
CITY OF FONTANA ~ ~e~lW,~o.,./.,"'/"
INSPECTOR'S DALLY REPORT ~__]_,)w 'r ~ s ~'
~,-,~-~,~ ,~,,:e ,z '-
, q',=,2 ),.2 0-,- ~',..D 0.2 -/YO 7
HOUR8 - ITEM NO, WEATHER
=.QUIPMENT AND/OR LABOR: DESCRIPTION '~ ~,..~,.~ ' ~ ~,~ REMARK8
· ;LJLPMT. NO. OF (Reason for itJleness or
NO. MEN (Of Equipment or Labor)
/,}4' Z-'-d4/E~ ./u~a ;za~q
//l/ ~'~',j',C-~a /,-,,~,,,,,/a~ q
-, . , .
12/92 Zrla~
CITY OFFONTANA ~ ~11~. o.~_/2~ ~',_7
INSPECTOR'S DAILY REPORT
sh.~Hou. smrt.p,q/~
HOUR8 -~M NO,
NO. MEN (~ EGulDml~ or ~o~
//¢ Z~4~oo ~/ ~ /.~ C~/
Contractor · T~e Insl~e~'''~ ~ ~
12/92 j'T/aD
· ,j",,g~20- ,.d,~-o2 /~'6 7
HOUR8 - ~M NO. ~ER
~QUIPME~ ~D/OR ~R: ~ '~ ~ (Reaon for idleness 0r
NO. MEN ' o~er
Contractor Title Inspector
12/92 Jl'/ab
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
CITY OF FONTANA
INSPECTOR'S DALLY REPORT M T w T F S S CircleO~/
Cor~'actor · 1~l InS r
12/92 JT/~
CITY OF FONTANA ~w
INSPECTOR'S DAILY REPORT
: . HOURS -~.M NO, /,~3/~,~L~'
* ~UIP~. NO, OF DESCRI~ON ~ ~ (Relon for idleness or
NO, MEN (~ Equipme~ or ~o~ ~ ~ ~ ~ offier ~m~s)
,4',? o - 5' o z
HOUR8 - ITEM NO. WEATHER
~.QUIPMENT AND/OR LABOR: ~ ; ~,~ REMARK8
;LJIPNrT. NO. OF DESCRIPTION (Reason for Idlenes8 or
NO. MEN (Of Equipment or Labor) o~$r rmmart<s)
Corl'e'Bctor · l'~e ~iD$'~~
12/92 Jl'/ab
CITY OF FONTANA V Reoo/~,{. <~ .g Day
INSPECTOR'S DAILY REPORT ~w T
~/~,. -~"
~/0
Con~"aclof · TItle Inspe~lof
1 ~9~
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT ud~w T
CorYo'8.ctor · Tltll ~ ~
12/~2 JT/=h
CITY OF FONTANA V ..oo&,,~./~,6""ow ~ /
INSPECTOR'S DALLY REPORT (~T W T ~ 8 S '
/-~--~,
CITY OF FONTANA ~,,~' R.=o~.,,.,~./~J'~a~,
O~, Y--Z- ~
INSPECTOR'S DALLY REPORT ~T W T F S s Circ~.O~
CoFfo'ac~or · "~tJt ~~
12,/9~ JT/ab
OlTY OF FONTANA V
INSPECTOR'S DAILY REPORT
HOUR8 - ~M NO.
,~~ ,
;UIP~. NO, OF DESCRI~ON ~ (Reaon for I~tmneso or
Col-ca'actor · 'Title II'llpl~
12.J9~ JTIII:}
/.-,
CITY OF FONTANA
a.,- '12jLTT:'-,92
INSPECTOR'S DAILY REPORT
~_,~,y~ v
HOUR8 - ~M NO.
.
'X ~ RE__K8
NO. MEN
f
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
Cort0'a~tor · Title ~/~~
12/92 jTlt3
CITY OF FONTANA V ~4o.oL,~./~
oa ,_~,.~/- ?,..3
INSPECTOR'S DALLY REPORT u T(~T F 9 S CircteOsy
Shift: HOurs ~tart
/',,~,,~ r_..--
CITY OF FONTANA ~ mepok,,~./o Z- D~y
aa . r-J/-~ 7
INSPECTOR'S DALLY REPORT
HOLIR8 - ~M NO. ~ER
. ;
~lP~. NO. OF DEGGRI~ON ~ ~ (RGaon for tdllnGas or
NO. MEN (~ Equipmere or ~o~ ~ ~ ~ o~er ~m~s)
Corm'actor · Title Inspector
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
HOUR8 - rT'EM NO, WEATHER
·
~UlP~. NO, OF DEBCRI~CN ~ ~ ~ (Reason for Idlenice or
NO. MEN
Contactor m l'~e Insl:)~
12/g2
12../9~
CITY OF FONTANA V
INSPECTOR'S DAILY REPORT M T W T['~7 8 s CircleOiy
8hi~ Hours Star 8top
LOCATION & DESCRIPTION OF OPERATION'. '
HOUR8 - FFEM NO. WEATHER
I~QUIPMENT AND/OR LABOR: REMARK8
EQUiPM'I', NO. OF DESCRIPTION (Relson for Idleness or
NO. MEN (Of Equipment or L.~bor) o~er remade)
Cor~rsctor Title ~""lnsl:ilet~ '
12/92 J'rf.h
HOUR8 - iTEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT. NO. OF DESCRIPTION (ReelOn for idleness or
NO. MEN (Of Equipment or Labor) o~er remarks)
Contractor Title Insl~ector
12/92
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
HOURB - iTEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT. NQ OF DESCRIPTION (Reeeon for lateness or
NQ MEN (Of Equipment or Labor) offer remarl<a)
CITY OF FONTANA V RC~<~f~o.~D_~/j'
INSPECTOR'S DALLY REPORT M TL/~//'T F S 8 CircllD~
HOURS - r'r'EM NO.
E~QUIPMENT AND/OR LABOR: , REMARK8
EQUIPMT. NQ OF DESCRIFRON ~ (Rillon for i¢lleness or
NO. MEN IOf Equipment or Labor) other r~p'~m_),
Comlz~c~or T~de '~ ~
CITY OF FONTANA ~,~ m,o~,,~, .~:>~ Day
INSPECTOR'S DAILY REPORT
LOCA~ON & DESCRI~ OF OPE~ON: ~C_
12/92 aT/aD
· CITY OF FONTANA ~
INSPECTOR'S DALLY REPORT
HOUR8 - ITEM NO, ~THER
,1'
't
EQUIPMENT AND/OR LABOR: REMARK8
EQUIPMT. NO, OF DESCRIPTION (R®=won for idleness or
NO. MEN
Cor~'actor '1'~I ~~ ~
,CITY OF FONTANA
INSPECTOR'S DALLY REPORT M T w T~/B S CimleO~
lJ HOUR8 - ITEM NO, WF. ATHER
EQUIPMENT AND/OR LABOR: ~ REMARK8
EQUIPMT. NO. OF DEBCRIPllON (Re-mort for fdleness or
NO. MEN (Of Equipment or t.lbo,) o~mr nmmatlm)
/ ..~,~ 7 ~
/o /3~ ~, ~ /O /, r~n. k' . .~_r? f ~
Con'olctor Tltle Insp, lm~r''''
12J92 d'l'/ab
CITY OF FONTANA
INSPECTOR'S DAILY REPORT M
Circle
(,
,,~' ~ ?DO~- ~,5~d~2 /~/t~
HOUR8 ~ ITEM NO, WEATHER
·
EQUIPMENT ANC)/OR LABOR: ',~ REM~qK8
NO. MEN
Col'~'lctor Title
12/92
HOUR8 - iTEM NO, WEATHER
EQUIPMENT ANOIOR LABOR: ~/' ~, ~,.y~, REMARK8
~ ~ ~ ~ (RiISOfi for Kllensss or
E"-"QUIPMT. NO. OP OI=SCRIPT1ON
NO. MEN (Of Equipmerit or
Cottractor 'n~e //~'/~/~
HOUR8 - iTEM NO.
/
EQUIPMENT ANO/OR LABOR: ~ ~ REMA~K~
NO. MEN (~ E~m~ or t~ o~ ~m~)
Tide Inspe~"lof
l~jl~dT/sb
· -f',-? 2.-2m - .,~",~2o2/z/,~ ../
HOUR8 - toTEM NO.
·
EQUIPMENT AND/OR LABOR: I ,~ '~ REM~qK8
NO. MEN (Of Equipment or L~or)
/
Coffo'~1ot T~I ~~~/x"~,~~/ _-----',__ _ ~
12/~JTlal:~
13
R]~OYBRpAYM~CFS STRAIGHT-TIIV~ OVI~[TIIVI~HOURLyRATB
CLAS,~i~ICATION ~ lbeh Nasim V~em~ Timtel ~ To~[ Daily Sesntay Sunday
OOURNB~rltlI,SON) 1t~ and !bliday Haul,/ and
~ Welfa~ Rse I l/IX I 1/23( Holiday
Cm~erDfivet-lfilhway $19.17 !I3AS 34.39 ,~!'~._m_ ~32 8 ~936 $38.90 338.945
Fu~ Ttock Ddvet. Wmof Track (2 .,be) 18J~ 3.43 439 2.0~ 3332 $ 28.M 3[1~ 38.16~ 47.49
DfivetdG~Slse~detTmdt 18.90 3.4~ 4.39 2.03 32 8 29.09 3834 38~4 47.99
Dfivof d Tmua-l~ax Track-Under 3 Yds..
DmnpaemTmd~kulhn61~2Yd~
wate~ Ime. l 18.71 3.43 4.39 2.0~ .32 8 28.90 38,253 38253 47.61
DdvofdTm~t-~Tmck3Yd&
of morn, l~Tm&.,6 lf2Yds.
w~et level end ovff 18.85 3.4S 4.39 2.03 32 8 29.04 33.465 38.46~ 47.89
Low I~t Ofiw~ (9 exlu of o~et) 19.62 3.4~ 4.3] 2.03 .32 ! 29.81 39.62 39.62 49.43
PB and Sb~n,, 'Prpe Tmda, F~e-ljm
inclnd~l W'n~ Tmdr, bet l~niled
coTmdmal~acablemPlpe]inema
Uti~Wod~whema~ceew °
and'finmm~($_~0Fetboutaddltimal
foe Tlnxnan) woeking Track Ddve~ 1 11.80 ~.45 43339 2.03 .32 8 28.99 38.39 ~8.39 47.79
Eraeke C~,,~ Drlv~ 18~7 3.45 4.39 2.03 ..t2 S 28.86 38.19~ 3~,19~ 47.53
hea~/~tpennhioed 18.47 3.45 43339 2.03 .32 8 M.~' 37.89~ 37.89~ 47.13
Tin& lvlmuled Pov~et Bt~e 18.33 3.43 4.39 2.03 .32 8 28.72 37.985 37.985 479~
Tmek P41tme. Wme~ Pea (Sinlie
Eelhe), Welder 19.42 3.43 4.39 2.(D 3332 8 29.61 393332 39.32 49.135
Truck Re~ Helper 18.72 3.4~ 4.39 ~ .32 8 28.91 38.27 38.27 47.6~
Tmdc ge~hmsa-Weldet 19.52 3.43 4.39 ~ID .32 8 29.71 39.47 39.47 49.2~
Wateheosemm 18.~9 3.45 4.39 2.03 .32 8 283338 37.1'/5 37.'r7~ 4&9~7
W~ ~ 18.78 3.4.5 4.39 2.0~ .32 8 28.97 3836 38.36 47.7~
WmetPu~TwinEn~ne(wi,Nof
wilhout mm:hmem~) 20.42 3.43 4.39 2.03 .32 a 30.61 40.82 40.82 ~1.03
Wmet ~ $~n.eb~ I~? (wllh atmdmaems) 19.92 3.4~ 4.39 2AD .32 8 30. 11 40.07 40.07
-Wam'TmckOofmomaxbs) 18.77 3.4~ 4.39 2.03 .32 8 2[96 38.34Z 38.34~ 47.73
Ddve~dVeh~s. of~d
Vehidu: Cmc~_d~ dlve~de, leu thm 6mm)
2A~d~ 18.47 3.45 4.39 2.03 .32 8 28.~6 37.89S 37.89~ 47.13
3 Axle~ ![62 3.4~ 43339 2.03 3332 8. 7.8.81 38.12 38.12 47.43
4 of morn Axles 18.87 3.4~ 4.39 2.1D .32 8 29.06 38.49~ :B.495 47.9:.1
All oa-hilbway equ~eem
wt~mulllplspowofso~n~$1.OOpof
Im~ s~li~i~zal) 19,4~ 3.4~ 43339 2.0~ 31 $ 2~.~1 ~9.31 :~9.32 4~.0~.
I~Yds. w~k~l 1167 3.4~ 4.3~ 2.0:} .~2 s 28.8~ 3[1~ 33.1~j 47.~3
16Yds. ls~lsssd~n2~Yds~wss~le~l lll.~ 3.45 4.,~ 2.~ .32 9 2~.11 35..~ :B.~
25 Yds. et morn wslof level 19.42 3.45 4.39 2.03 3332 II 29.61 :~9.32 3932 49.03
REC~43NIZED HOLIDAYSt Holidaysq~mv4~h~hegmenlpeev~!hoedysml~mmforHo~ia~r~d~dilbepm~d, dallbedl~~l~
~ IT~3.[
-~.
Cor~'actor Title Ir~l~M'~or ~'~--
12/92 JT/BJ)
Corm*actor T}tle InspeGl~
12/'9~ JT/ab
O rc
INSPECTOR'S DALLY REPORT d~TW T ~ 8 8 CirclsO~y
~o~ ~ -,~
LOCA~ON & ~
HOURB - ~ NO.
EQUIPS. NO. OF DEBCRI~ON ~ ~ ~ ~ (Re,on for t~lenen or
NO. MEN (~ Equipme~ or ~od .
Con=~tor T~e ~/~
~ 2/92 JT/~h
CiTY OF FONTANA
INSPECTOR'S DALLY REPORT ~ t w T~">s s Circ~.D=~
8hh~HOuil
LOGA~ON & DES OPE~ON:
Con~'actor T~I InspeQ~
12/92 JT/aD
CITY OF FONTANA
INSPECTOR'S DALLY REPORT
PRQECT: ~ P C ~ON' ~
Corm'actor Title Ins~ 1 ~92 J'r/ab
CITY OF FONTANA V ,eo~. ~'2 =,~
=.. ~.~'__~'
INSPECTOR'S DALLY REPORT M T(~T F 8 S CircllD~
LOC ~ON ~ DESC~F OPE~O
HOUR8 - iTEM NO. ./~,~,,~,~EFI ~
~
EQUIPME~ ~D/OR ~R: ' ~ (Rea~ for ,diehess or
s~u~P~. NO. OF OSSC.~ON ~ ~ ~
NO. MEN (~ Equi~me~ or ~o~ o~er ~m~)
/ ~ ~ ~
CITY OF FONTANA rr, m/
INSPECTOR'S DAILY REPORT
HOUR8 - ~M NO,
EQUIPS, NO. OF DEBCRI~ON ~ ~ ~ (Rta~for I~)mnese or
NO. MEN (~ Equipme~ or )o~ o~mr
(~ 2/- ~...~ J"/-//O o
HOUR8 - iTEM NO, WEATHER
NO. MEN
/
Corrffactor
CITY OF FONTANA V
INSPECTOR'S DAILY REPORT
· sh.t Hours
HOLIR8 - ITEM NO, WEATHER
EQUIPME~ ~D/OR ~R: ~ ~ (Rea~ for t~leness or
EQUIPS. NO, OF DEBCRI~ON
NO, MEN
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
LOCA~ON & DEBC~6F
Contractor iltll
CITY OF FONTANA
IN~PECTOFI'~ DAILYREPOFIT M T(:~:~T
//'2_
Cona'sctor 'hum C~mnspm~f"
CITY OF FONTANA ~
INSPECTOR'S DAILY REPORT
PR~ECT: OESC~F OPE~ON:
Conffactor 12/~ JTIaD
CITY OF FONTANA ~
INSPECTOR'S DAILY REPORT
8h~Hou~
LOCA~ON & OESC~F OPE~ON:
Corm'actor 'r~tlt ~lnspe':tol''/ ""
CITY OF FONTANA
INSPECTOR'S DALLY REPORT M T W TC~8 8 CircleD~
HOUR8 - FTEM NO. 'WEATHER
'-f, \
EQUIPMENT AND/OR LABOR: ~ ~ :~ REMARKB
NO, MEN
/ ~+ ~
Conl3'~ctor Tl~., · Inspector
12/92
CITY OF FONTANA
INSPECTOR'S DAILY REPORT
Circle Day
8hift
~:2 21- 2,,~ ,Z")- / / O o
HOUR8 - iTEM NO, .W.W.W.W.W.W.W.W.W~THER
~Qu,F~. no. oF Dssc.,rnonD".~ ~:
NO. MEN (Of Equipment or Labor) o~er remarks)
oo ,,~-/z ~;,-,~,,~_ -~ E~,.k
CITY OF FONTANA V ~.,o~ ,o. 7,2`
INSPECTOR'S DAILY REPORT M T~T F
HOUR8 - FFEM NO. WEATHER
EQUIPMENT AND/OR I,A~OR: ~ ~', REMARKS
Cobb:or ~e ~ Inspe~
1 ~ ~/~
INSPECTOR'S DAILY REPORT ~w T ~ t 8 CircSeD~
LOCA~ON & DESC~F OPE~ON;
/
HOUR8 - ~M NO.
_
EQUIPS. NO. OF DEBCRI~ON
NO, MEN
/
/
~,,
INSPECTOR'S DALLY REPORT
sh~o~. sw~ stop.__
Corro. aclot Title In~~
1
CITY OF FONTANA
INSPECTOR'S DAILY REPORT ~ w T P e s Cira,,O~
LOCA~ON & DESC~F OPE~ON:
Corm'actor Title InaDac~r
1 Z/92
CITY OF FONTANA
INSPECTOR'S DAILY REPORT u T~T F e S CircleO~
8h~ Hou~
LOCA~ON DE OPE~ON:
& S
HOUR8 - ITEM NO, WEATHER
EQUIPMT, NO. OF DESCRIPTION t~.~ ~ '~ (Ree. son for t~tlness or
NO. MEN (Of Equipment or Lal)or) obher ~lmarl~s)
Con'o'actor Title Inspector
12/92
CITY OF FONTANA
INSPECTOR'S DAILY REPORT u T~T F S S CircleD~
8h~ Hou~ ~ ~op .
LOC ~ON & DESC~ F OPiniON:
HOUR8 - iTEM NO. ',NEATHER
EQUtP~. NO. OF DEBCRI~ON ~ ~ ~ (Re,on for I,lenele or
NO. MEN
Cer~'sctor Title tns0ector
12/92 J'rlaD
HOUR8 - iTEM NO, WEATHER
,_,
NO. MEN
Con~'actor T~$
12/92
CITY OF FONTANA V ..po~o. do/D~,
INSPECTOR'S DALLY REPORT ~T W T ~ s s C~r~,O~
8h~ Hou~ ~ .
LOCA~ON & DEBC~6F OPE~ON:
HOLIR8 - ri'EM NO. WEATHER
EQUIPMENT AND/OR LABOR: ~ ~ ~ REMARK8
NO, MEN (Of Equipment or I,i)or) ~ ' othmr rmmaf,~)
/q/o ~ 7/-F~,;(/' ,
Contractor T~e Inspe,3tor
12J~
CITY OF FONTANA y
INSPECTOR'S DALLY REPORT S~
~QUIP~D/O~: ~ ~ ~ RE~
EQUIPS. ~. OF DE~ON ~"
NO. MEN (~ E~lgm~ or t~ ~,r mm~)
Corm'actor 'Rtle ~ ' ~I~/9~JT/e~B '
' CITY OF FONTANA
INSPECTOR'S DAILY REPORT
NO. MEN (~ E~Om~ or ~
/
HOUR8 - iTEM NO. WEATHER
E~UIP~. NO. OF
~ o~er ~m~s)
NO. MEN (~ Equt.m,~ or ~oQ ~ ~ ~ ~ ~ (mmaon for t~lmnems or
Conr~ctor Ti~s Insp$ctor
12/9~ d'1'/~h
CITY OF FONTANA
INSPECTOR'S DAILY REPORT
LOCA~ ~l D BCR E
CITY OF FONTANA ~ ~ ~/3
RoDoft No. Day
INSPECTOR'S DAILY REPORT u T~T F 8 8 CircllOsy
Con~'actor T]tlt InsDt~lor
12/92 JT/=h
CITY OF FONTANA V
INSPECTOR'S DAILY REPORT ~w T
LOCA~ON & DESC~F OPE~ON: .
CITY OF FONTANA
Report No.
INSPECTOR'S DAILY REPORT M T W T F 8 8 CirclmOmy
81ffiiff Hours 8tlm.',t 8top
PFIOdECT: 8CRI~N6F OPERATION:
Con'factor l'~mm Inspector
12/92 jl'/=h
CITY OF FONTANA v
o, .:-/-?_~
INSPECTOR'S DALLY REPORT
~ 27- .,?..~ ,-<"')-//<~ 0
HOUR8 - ITEM NO,
· ~,, ~,'~
.~'!'~ ~ ~.~
EQUIPS. NO. OF DESCR~ON ~ ~ ~ ~ (Rla~ ~ I~l.nele of
NO. MEN o~er
CITY OF FONTANAv ReDor~No. ~ / Day
INSPECTOR'S DAILY REPORT
PR~ECT: ESC~F OPE~ON:
Hours - ~ NO. ~,~ ~ ~b ~J
Corm'actor 'T~tle Inspector
CITY OF FONTANA ReponNo. DW _ _
D~ce .,,%z~t 31 V"~q_~
INSPECTOR'S DAILY REPORT M T W
8h~ Hou~
LOCA~O~ & DESCRI~ON OF OPE~ON: ..
J
LL
EQUIPMENT AND/OR LABOR: u, REMARK8
EQUIPMT, NO. OF DESCRIFRON ""' ~ ~e~on for Idleness or
NO. MEN (Of Equipment or Libor) other reinerie)
Corm'actor 'Rtl$ Inspector
12/9~ Jr/ab
CITY OF FONTANA ~ ,,o~o. d:~) D,y
O~x~ 1-9 ~-~ ~
INSPECTOR'S DALLY REPORT ~ ~ w T ~s e c~o~ ~
. ~
LOCA~ON & DESC~F OF~ ON: ~
~~ ~,- _~.,_,.~ , J~~,~ ~,~,
Con~'8~or "title
CITY OF FONTANA V
INSPECTOR'S DAILY REPORT
Coreractor T~I In~e~l~f
CITY OF FONTANA V
INSPECTOR'S DAILY REPORT
MOU~8 - rrEM NO, WEATHER
EQUIPMT. NO, OF DEBCRIFI1ON ~,,~,,~,~, ~j ,,,,,q (ReUon for lateness or
NO, MEN (Of EQuipment or tabor)
Conlzactor Tl~$ inspeulof
1 ~ j'T/~h
CITY OF FONTANA
D~e
INSPECTOR'S DALLY REPORT
8hift Hour~ Start 8to~
PROJECT:
Con'o'~tor Title
12/9~ JT/S]D
CITY OF FONTANA
D~
INSPECTOR'S DALLY REPORT w T F e 8 CircleO~
~o~ .'
Co~tor
CITY OF FONTANA
INSPECTOR'B DALLY REPORT ~T W T F e e ClrcleD~
8h~ Hou~ ~ ~og
LOCA~ON & DES
F OPE~ON:
[,~,/,,/(~/.//~,~'E/'~ HOURS- n'EM NO. WEATHER
t'
EQUIPMT. NO. OF DEBCRI~ON ~ ~ ~ (ReMon for fdteness or
NO. MEN
Cor~'actor Tit~e Inspector
12/~2 ,Jg'/ab
~.2 ,"'>"v ',/ ,J~ -:'-'V.'C DATE !.
SUBJECT '~',/.' '/,,.
-,--,,,,- ,'
,.- _..~.~, ~., :r.,',,ojL.... !., ,,;, ~;,~ .~ ~,~,' ,;,-, -t~j,, · -,:.~,,--._..
]/~M :"
SIGNED
REPLY ':
"-
SIGNED ·
~ 45 475 SEND PARTS I AND 2 INTACT - POLY PAK (,50 S~TS) 4P475
CITY OF FONTANA V R, o~No. J'j'/-xX~--~ /
P
INSPECTOR'S DALLY REPORT ~ T W ~ S C~,D~
NO. MEN
- i
Corm'actor Tltll Insp~m~lor
12/92 d'l'lab
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
~ ,~,/- ?..l J")-//~ o
HOUR8 - ITEM NO, WEATHER
EQUIPMENT AND/OR LABOR: ~,~, ~ '~ REMARK8
NO. MEN (Of Equipment or Labor)
o $r r~marka)
/ ./,~ L~ ~ r /d' / c/ ~,~.~,.~
/~-~ ~" -
Contractor 'RtJe ~~ ~
12/9~ JT/ab
CITY OF FONTANA V
INSPECTOR'S DAILY REPORT
8hilt Hour~ 8tare 8top
LOCATION& DEISCRI~N C~F OPERATION:
(_9 ,-~2- 2,=- j",/--//~:9 ~
HOUR8 - rTEM NO. WEATHER
EQUIPMENT AND/OR LABOR: ~ ~,
~ ~ '~ REMARK8
EQUIPMr. NO. OF DEBCRIPTION ¢ m ~,~ "'q (Rillon for I(llenes8 or
NO. MEN (Of Equipment or Labor) ot~or reread<s)
Corm'actor T~i In~
CITY OF FONTANA v
INSPECTOR'S DALLY REPORT u T w(::~ ~ · e C~D~
~ ~/' ' HOURS - ~M NO,
EQUIPS. NO. OF DE8 RIm~UN
~/~ /~ ~2~ ~o~ ~ /,J~ ~/
~ ~ /
Co~tor
1 ~ ;Ira
CITY OF FONTANA V no o~'~No.
p Day
Dm /-,,Z/-
INSPECTOR'S DALLY REPORT M T W(2P ~ s s Circ~eOay
8hift Hour~ 8tm't, ~top
LOCATION & DESCRI~N(~F OPERATION:
Cot'f factor Title In~pe,~or
12/9~ dT/aiD
CITY OF FONTANA V .. o~VNNo. ~,~z"y'/"~'/r'~"' ~
INSPECTOR'~ DALLY REPORT ~ T W~P s s ci~,a~
8h~ Houm ~ ~p
PR~ECT: E C~F OPE~ON:
Contractor Title Inspector
12/92 J'r/lib
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
O ~ ON & DESC~F OPE~QN:
Contractor T~$ Inspector
12J92 j'Tlab
CITY OF FONTANA v ~=/~,S',~ c~--~ /
Report No. D~
INSPECTOR'S DAILY REPORT
8h~Hou~ ~ ~ ~og
~QUIP~ ~DIOR ~R: , RE__K8
EQUIPS. NO. OF DESCROON ~'~ ~ ~ ~ or
NO. MEN (~ EqulDme~ or ~o~
Co~tor ~l ~r~ '
CITY OF FONTANA ~
p Day
INSPECTOR'S DALLY REPORT
8h~ Hou~
LOCA~ON & DESC~F OPE~ON:
Cordfactor Title Inspea'tot
12/92
CITY OF FONTANA ~'~
p O~y
INSPECTOR'S DAILY REPORT ~T w · ~ e a c~,o~
CorrffB~tor Ti~$ ~~~
CITY OF FONTANA ~J
INSPECTOR'S DAILY REPORT
8h~ Hou~ ~ ~o~
PR~ECT: DESC~F OPE~ON:
() 27- ,~.,~ J"'/--//~ o
HOUR8 - ITEM NO. WEATHER
EQUIPMENT ANOIOR I..A~3R: ~ ~, REMAqK8
EQUIPMr. NO. OF OERCRIFTION ~.~ ~ ~ (Rea~l~leneslor
NO. M~ ~ E~lpmem or ~ ~er ~~
Cor~actor Title Insl~e~lor
12/'92
CITY OF FONTANA
INSPECTOR'S DALLY REPORT M T W ~F S S C.WD.y
Shift Houm 8tert 0700 etop I1C0
LOCATION & DESCRIFTION OF OPERATION:
HOUR9 - ~M ~. ~ER
EQUIP~ ~D/OR ~R: ~ RE.K8
EQUIPS. NO. OF DESCRI~ON ~ ~ea~ ~ idleness or
NO. MEN (~ Equipmere or t~ - ~er mm~)
Con'factor Titie Inspector
12/92 ,.R'/Ib
v
CITY OF FONTANA ReportNo. /'/f' Day
INSPECTOR'S DAILYREPORT u T W(~F S S CircleDay
Sh~tHourm Stertr~,,~-k~ Stop
/,~.~OUR8 FREM NO WEATHER
EQUIPMT. hi0. OF DEBGFtlPTION ~ ~ (Fleeson for )cllenes8 or
NO. MEN (Of Equipment or Labor) ',-~, r,j ot~er remarks)
/,~,~,~,- :,,~' ,')'e¢i:: Cn~J,f
/ .,~,~,,-,~--- Y;,F' '
/ ,'D-'F-~/t'>-'~'-"' 'P' :')'~L/'~,,,~,,u, _,
Con~'actor Title Insp, eetl~
12/92 ,JT/ab
CITY OF FONTANA ReportNo./?/06/ Day
D.,, T- /j .
INSPECTOR'S DAILYREPORT M T(~.T F B e CircleDay
8hiftHoura Start ~Aj~/m4 8top
PROJECT: /~e,.<,..C y~7/~ ~
LOCATION & DES~I~ON OF OPERA'RON: ~ ' J '
Contractor Title
12/92JTta~
CITY OF FONTANA ~e.o~No./7/2 Day
INSPECTOR'S DALLY REPORT
8hilt HoU~
HOU~ ~0. W~ER
EQUIPME~ AND/OR ~OR: ~ ~ RE~K8
EQUIPS, NO, OF DEeCRI~ON ~ ~
NO, MEN (~ Equipme~ or ~o~ o~er remus)
CITY OF FONTANA Repo~ No,/-7/7 D~
D=e /,/z -
INSPECTOR'S DAILY REPORT M(~)w T F 8 8 Circle Day
Shift Hours Start Stop _
~p/-l~,~ ~W hP~N/~e, HOURS- rnsM NO, W~ATHER
EQU{PME~ AND/OR ~OR: RE~KS
EQUIPS. NO. OF DEetRItON (Re,on ~or idleness or
NO. MEN (~ E~u~pme~ or ~o~ ~ o~er remus)
Cor~actor Tr~e Inspeotor
12/92,.J'r/aJ:)
F~-,/
CITY OF FONTANA
INSPECTOR'S DALLY REPORT
8h~ Hou~ 8ta~ ~.~ ~top.__
CITY OF FONTANA
INSPECTOR'S DAILY REPORT
8h~ Hou~ 8t~ Stop .
LOCA~ON & DESC~PE~ON:
HOURS - iTEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT. NO, OF DESCRIPTION (Reason for talehess or
NO. MEN (Of Ec~uipment or Labor) ot~er remarks)
Contractor TH:Ie ~
CITY OF FONTANA Repo~No. 9'Y' DW
INSPECTOR'S DAILY REPORT u T W{~F 8 8 Circle Day
8h~ Houm 8t~ Stop
~ F
LOCA~ON & D E
HOUR~ - ITEM NO, WEATHER
EQUIPMENT AND/OR LABOR: ~ REMARK8
EQUIPMT, NO. OF DEBCRIPTION 'L~ (Reason for Idleness or
NO, MEN (Of Equipment or Labor) other remarks)_
Cor~'actor T]tte InspeCtor
12/92 J'r/ab
CITY OF FONTANA Repo~No, ~'-_7
Og.e /- ~ - ,q",_.~
INSPECTOR'S DALLY REPORT M t(~ T F 8 S CircieDiy
Shift Hours Start Stop , _
LOCATION & DES~RI~'rlON OF OPERATION:
HOUR8 - ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: ~ REMARKS
EQUIPMT. NO. OF DESCRIPTION (Re,on for idleness or
NO. MEN (Of Equipment or L~bor) other remarks)
~/~ ,~,,,~,- ~ ~
Contractor Title Inspector
12/~2 JT/ab
CITY OF FONTANA .eoo~No. Z/,-<7
INSPECTOR'S DAILY REPORT Md~w T F S 8 Circle Day
8hi~HOur8 Start 2/~IWl
Contractor ~Tde Inspet~or """2'
CITY OF FONTANA .epo~ No, 7-7~- Day
INSPECTOR'S DALLY REPORT M~T~W · ~ S S Circ~eD~y
Bh~ Hou~ 8t~ Stop ,
LOCA~ON & DES
t HOUR8 - FrEM NO. WEATHER
_~ -
EQUIPMENTAND/OR LABOR: ~ ~) REMARKS
EQUIPMT. NO. OF DESCRIPTION "~ ~'~.~ (Reason for )~leness or
NQ MEN (Of Equipment or Libor) "~ ot~er remarks)
Con~'actor Titis Inspector
12/92 ,JT/SD
'/'~,,~-~.e... /
CITY OF FONTANA m.portno. V/ Day
INSPECTOR'S DAILYREPORT ~T W T F 8 8 CiraleD~
NO. MEN
1 ~ ~l~
HOURS - ITEM NO, WEATHER
~J _
O
EQUIPS, NO, OF DEeCRI~ON ~ ~ ~ ~ ~ ~ (Re,on for Idleness or
NO, MEN (~ Equipme~ or ~bo~ o~er remus)
Con~'acmr 'F~Io Insl~ector
12/'92 ,J'F/Ed;)
~. HOURS - FFEM NO. WEATHER
NO, MEN (~ Equipme~ or )o~ o~er remus)
003 ~,~
Co~tor
CITY OF FONTANA Repo~No.//~ Day ~/~
INSPECTOR'S DAILYREPORT M T~T F 8 8 Circle Day
8h~ Hou~ 8t~ 8top__
,,~ HOURS - ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT. NO. OF DESCRIFTION ~ (Re=won for idleness or
NO. MEN (Of Equipment or Labor) L~ ot~er remarks)
CITY OF FONTANA
INSPECTOR'S DAILY REPORT M~ T F S 8 Circle O~
CorYo'a, ctor Title ~i~
12/9~ JT/ab
CITY OF FONTANA
INSPECTOR'S DAILY REPORT ~T W T F S $ CircleO~
8h~HOu~ 8t~
HOURS - ~M NO.
EQUIP~. NO, OF DESCRI~ON ~ ~ ~ ~ RE~KB
~ ~ ' , ~ (Re~onforfdenes8 or
NO. MEN ' o~er mm~s)
~/
/ l 2
1P,/9~ dT/ab
V ~,/P"~;~'~'~ ?'''
CITY OF FONTANA Repo, No.--?~F
INSPECTOR'S DAILY REPORT ~T W T F S e Cir,~eD,~
8hilt Hours 8tart
HOURS - FFEM NO, WEATHER
EQUIPMENT AND/OR LABOR: "~ REMARKS
EQUIPMr, NO, OF DESCRIPTION i (Reason for Idleness or
Confactor Tltle Inspector
12/92 Jl'/Bb
CITY OF FONTANA Repo. No.~27 D.y ~/x__/'
INSPECTOR'S DALLY REPORT u T W~F 8 8 CircleD,
8h~ Hou~ ~ 8top _
LOCA~ON & DE~~PE~ON: '
HOUR~ - FFEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPhAT. NO. OF DESCRIPTION (Reason for Idleness or
NO. MEN (Of Equipment or Labor) other remarks)
Contractor Title Inspector
12/92JT/ab
CITY OF FONTANA Re~o~tNo. ~,7~; D~y ~-,,,7
D~= /.2
INSPECTOR'S DAILYREPORT M T~
HOUR8 - I~M~O. W~ER
~ ~ ~ ~ ~ ~ RE__K8
NO. MEN '(~ Equipme~ or ~o~ o~er remus)
Co~actor ~e ~ ~ ~
1 ~ ~/~
CITY OF FONTANA ReOo~No.~D~y
INSPECTOR'S DAILY REPORT
8h~ Hou~ 8t~ Btop
LOCA~ON & DE
CorttTBcicor Tltle ~""'-
12/92
CITY OF FONTANA
D,.~. /2 -,2 2?- - ~,2_-,.
INSPECTOR'S DALLY REPORT ME~:)W T F S S CircleD.
8hilt Hours =gt'ml~/'-~,~*fi
NOU~8 - ~M NO. ~E~
EQUIPS. NO. OF DEBCRI~ON
NO. MEN (~ E~ulpme~ or ~ o~er ~m~s)
Contractor Tltle fnsp~
~ 2/9~ ,rl'/~
C City of Fontana
CALIFORNIA
CORRECTIVE ACTION NOTICE
REGARDING: 77F~' ,-d' ,1~, ,.'c~ DATE:
It has come to our a~ention that the following items are deficient in the area of the
above referenced project job site:
[ 1 Barricades [~en Trench
[ I Delineators [ I Trench SeRling in Right-of-Way
[ 1 Signing [ ] Dust Control
[ I Material on Roadway [ I Unauthorized Street Closure
[ ] Other
Please be advised that you are directed to take corrective action within the following
time frame:
[ ] Immediately [ ] 24 Hours
[ ] By the End. of Current f~48 Hours
Work Day.
All work done shall be accomplished to the satisifaction of the CiW Engineer. Failure
to take corrective action within the specified time will result in the CiW taking the
necessa~ steps to correct the deficiencies and invoice you for materials and labor as
required. If you have any questions regarding this ~er ~ease contact the
Engineer or Authorized representative.
8353 SIERRA AVENUE (P.O, BOX 518) · FONTANA CALIFORNIA 92334-0618 · (714) 3~0-7600
SISTER CITY -- YAMLOOPS, B.C, CANADA
CITY OF FONTANA
INSPECTOR'S DALLY REPORT M~w T F 8 8 ClrclID~
8h~ Hou~ ~ , ~p.__
LOCA~ON & DESC~F OPE~ON:
HOUR8 - FTEM NO. WEATHER
NO. MEN (~ Equipmere or ~o~ offer
Corm'sctor Tttle Inspector
12/9~JT/aD
CITY O~ FONTANA
De~ /Z-,Z/-~
INSPECTOR'S DAILY REPORT ~ T W T F S S C~rcleO~y
0 ~/- ~,
NO. MEN (~ Equipmere or ~od o~er remus)
Co~tor
CITY OF FONTANA Repo~ No,
INSPECTOR'S DALLY REPORT
LOCA~ON & DE R~E~ON:
HOUR8 - ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: ~, , ~, REMARKS
EQUIPMT. NO. OF DE8ORIFTlON ~ (Reuon for idleness or
NO, MEN (Of Equipment or Labor) ~ ~'~ ~ ~L~ ~ "~ o~er remarks)
/ J',~,~, T,~-/-, c/ ,-
Corm'actor Title Inspector
12/92
City of Fontana
CALIFORNIA
CORRECTIVE ACTION NOTICE
REGARDING: ~'~',,~'/'~, ~ DATE:/,~-,2 2- -c2'7----
TIME: J .' ~/~
It has come to our a~ention that the following items are deficient in the area of the
above rebrenced project job site:
[ ] Barricades [~en Trench
[ ] Delineators [ ] Trench Settling in Right-of-Way
[ ] Signing [ ] Dust Control
[ ] Material on Roadway [ ] Unauthorized Street Closure
[ ] Other
Please be advised that you are directed to take corrective action within the following
time frame:
[ ] Immediately [ ] 24 Hours
[ ] By the End of Current F~48 Hours
Work Day
All work done shall be accomplished to the satisibction of the City Engineer. Failure
to take corrective action within the specified time will result in the City taking the
necessary steps to correct the deficiencies and invoice you for materials and labor as
required. If you have any questions regarding this mawr ease contact the City
Engineer or Authorized representative. B ' ~
8353 StERRAAVENUE(P.O. BOX818) · FONTANA CALIFORNIA 92334.-0818 · (714)350-7600
SISTER CITY- KAMLOOPS, B.C. CANADA
CITY OF FONTANA
INSPECTOB'S DAILY BEPOBT M T W T~B 8 CirclaDay
~ OUR8 - ~7~O. ~ER
~ ~/~ ~Z/~
EQUIPME~ AND/OR ~OR: ~ , ~ ~ ~ RE~KS
NO. M~N (~ ~qui~msm or ~o0 o~sr mmaa)
22 ? nee
CITY OF FONTANA R,po~No.--/~2 D.~ 9%/~
o=.
INSPECTOR'S DAILY REPORT M T w TdPs s CircleD~y
Shift Hours 8tire . Stop
Contractor 'ntis ~
12/92 ,.R"/a~
CITY OF FONTANA Report No, '-~'~ Day c~'u'Z"
INSPECTOR'S DALLY REPORT M T W~_)F S S Circle Day
8hiftHours 8tart ~)~Yfl
LOCATION & DESCRIPTION OF OPERATION:
/A//-*
2,_7,_< Z,F,
~ 2 /- 22 J~/-
HOURS - ITEM NO. WEATHER
EQUIPMENTAND/OR LABOR: ~ {' ~-"-~ ~ tj REMARKS
EQUIPMT. NO. OF DESCRIPTION ~.j~ r,~: '~ (Reason for Idleness or
NO, MEN (Of Equipment or Labor)
/,~ ? /?~ ~ .~,~oY
/ Z~
::~ ~ :~ ~:- ~< ~-,..~7 ~ ~, ~ ~ ,- ~ ,. ,~ .~z
1 ~92 dT/ab
CITY OF FONTANA nepo~ No, ~22 Day
Date /~ -/2- ~ ~
INSPECTOR'S DAILY REPORT u T W~F 8 8 CircleD~y
8hi~ Hours 8t~ Stop
PR~BCT: ~
LOCATION & D~~OPE~ON:
HOURS-ITEM NO. WEATHER
EQUIPMR NO. OF DEeCRIPTION ~ ~'Z \ ~ (Besson for idleness or
NO. MEN (Of Equipment or Labor) other rem~ks)
/ ~~ ~ / /F '
Contractor Title ~ 12/92 J'F/ab
"": 'CITYOFFONTANA
· INSPECTORs8 D~LY REPORT
HOUR8 - ~M NO.
.~.~ -
EQUIPME~ ~D/OR ~OR: ~ RE__K8
EQUIPS. NO. OF DEBCRI~ON
(Reaon for i~leness or
NO. MEN
.~ gY~E '~
: "' V V
CITY OF FONTANA Repo. No.-~/ Day ?'J'oc>'
Dat~ /2.. -/~-~ ~
INSPECTOR'S DAILY REPORT u T~T F S S Circle Day
8h~ Hours 8ta~ 8top.__
LOCATION & D
HOURS - ITEM NO. WEATHER
,l. ~ '~
--~-~.~j
o~er rem~ks)
ConVac~or ~e ~ 1 ~92
· CITY OF FONTANA V .sO~'~No. ,3(::) nay
n~ /Z--
INSPECTOR'S DALLY REPORT M ~w T ~ s s
LOCA~ON & DESC~ON OF OPE~ON:
HOUR8 - ~M NO.
~ /~ '---
EQUIP~ ~D/OR ~R: , ~ ~ RE~K8
EQUIPS. NO. OF DESCROON
~ ~ ~ ~ee~ ~r Idleness or
NO. MEN (~ Equipm,m or t~ ~ ~er mm~
Color ~e
1 ~ ~/~
GITYOFFONTANA~'d Rep:.~e~NNo.__~O Day
INSPECTOR'S DALLY REPORT u~w m ~ S ,S C~r~O~
.n~CT: ~~ ~~ ~~
I~ON O OPE~ON:
LOCA~ON & D F
HOUR8 - ITEM NO, WEATHER
EQUIPS. NO, OF DE8CRI~ON ~ ~ ' (Reaon for t~lmnesa or
/
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
LOCA~ON & D~I~ON OF OPE)~ON:
HOUR8 - ~M NO. ~ER
EQUIP~ ~D/OR ~R: ~ ~ ~ RE~K8
EQUIPS. NO. OF DEBCRI~ON ~ ~ ~ (R~a~ ~r Idl~mss or
NO, MEN (~ E~ipe~ or )o~ ~ I , ~.r mm~)
Co~tor ~e In~
CITY OF FONTANA V .em,o~o...2 ?Day_ fL(~
INSPECTOR'S DALLY REPORT C~ T w T F S S Clr~eD~y
8h~ Houm ~ __
LOCA~ON & D~I~ON OF OPE)~ON:
HOUR8 * rTIEM NO. WEATHER
EQUIPMENI' AND/OR tABOR: k~ ~ REMARK8
sou,Pvr..o. o, DEsc.,rnoN ~. (i ~ ~ ~
NO, MEN (Of Equipment or Labor) ~ (:)~'' ~j (Reason for Idleness or
omer r~marle)
Contractor Title ~ '------_,_,_
12/9~J'r/~
INSPECTOR'S DALLY REPORT M T W T([~) S S CircleDay
Shift Hours Staff 2 Y~ Stop
HOURS - ~M NO, W~ER
~ ~ ~ ~ RE~KS
EQUIPME~ AND/OR ~OR: ~ ' ~ (Re,on for idleness or
NO. MEN
Co~sctor
"CI'PI OF FONTANA V ...~o. 2oc' Day =,?J'J'
INSPECTOR'S DAILY REPORT M T W ~CiP S S C~r~ Day
HOUR8 - ITEM NO, WEATHER
EQUIPMENT AND/OR LABOR: REMARK8
EQUIPMT. NO. OF DESCRIPTION (RillOn for Idleness or
NO. MEN Of Equipment or Labor} ~ offer r~mlrle)
2 ~,Q ~ ,c'vZ¢ ~n~e
Cord31~for T~e
t2/9~jT1813
EQUIPMENTAND/OR ~R: ~ ~' ~
~, q "'q, 'i REMARK8
EQUIPIVlT, NO. OF DESCRIFTION % ~7. % ~ (Reaon for Ktlsness or
NO. MEN (Of Equipment or labor) o~er rimarks)
/2? I?~O~ ""~,o,~ .~1,~..- ~ ~
12/92 dl'lab
CITY OF FONTANA ~ ...o~t"do..2 2 Day
INSPECTOR'S DALLY REPORT M T W(~F S e
8hi~ Hou~ ~
LOCA~ON S D~I~ON OF OPE~ON:
HOUR8 - ITEM NO, WEATHER
Cor~actor Title Insl3eJ;let"'
12/92 JT/ab
O 2/' ),2,5'/~//a o
HOUR8 - ITEM NO. WEATHER
·
EQUIPMENT AND/OR LABOR: t REMARK8
EQUIPMT. NO. OF DEBCRIFTION ~ : .~ ~,~ (Re,mort for Idleness Or
NO. MEN (Of Equipment or L/)or) ot~er mingle)
b d ~~ o
Co~ctor ~s
1 ~ ~/~
HOUR8 - FFEM NO. WEATHER
Con'rector Title Insl}~'/
12/92 J'r/at}
CITY OF FONTANA
INSPECTOR'S DALLY REPORT
COl TRIG ~/
12,~brr/l12
CITY OF FONTANA
tNSPECTOR'S DALLY REPORT ~T W T ~ S S C~SeD~
Sh~ Hou~
LOCA~ON & DE~ON OF OPE ~ON:
Corm'actor T~I
1
'CITY OF FONTANA V
INSPECTOR'S DAILY REPORT
HOUR8 - ITEM NO. WF, ATHER
EQUIPMENT AND/OR LABOR: _ -- ~ REMARK8
EQUIPMT. NO. OF DEBCH~I- ~ iON 04s$1on for Idleness or
NO. MEN (Of Equipment or Labor) ~ obhsr r$marle)
Cor~'~tor Title Inspmetdir
12/92 j'r/sb
Con~'actor Tltle In~"
12/92 JTfab
CITY OF FON~TANA ~eport No..2 ! D~y ? '/~
INSPECTOR'S DALLY REPORT MT(~T F 8 8
ci~ao o,y
Shh~ Hours 8tart 2 ~ ~ 8top///I:~,/~]
LOCA"RON & ~.S'~R'IF']qON OF OPERATi N: ~
Con~'actor T~le Insp~'"'
12/9~ JT/=h
HOUR8 - ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARK8
EQUIPMT. NO. OF DESCRIPTION {Pleaon for idleness or
NO. MEN (Of Equipment or Labor) older remarks)
Con=actor Title Inspector
12/92 ,J'r/liD
CITY OF FONTANA Report No.
Dm /2---/-~'
INSPECTOR'S DALLY REPORT
Sh~ Hours Start
HOUR8 - rTEM NO. WEATHER
EQUIPMENT AND/OR LABOR: ¢ ~,, REMARKS
EQUIPMT. NO. OF DESCFIIFTION ~ (Reagon for idleness or
NO. MEN (Of Equipment or Labor) t'-7' otfier remarke)
JS"/~ /~y//,, ~a~-e 13.4 ,.
Contractor Title Inspeotor
12/92 JT/ab
CITY OF FONTANAv ~.po'~r/~o. ~ DW T~-/
8h~Hou~ ~ ~
LOCA~ON & DESC~N OF OPE~ON: ........
Contrlctor Tltle Inspector
12/9~ ,aT/at}
CITY OF FONTANA V
INSPECTOR'S DALLY REPORT
r') ~ /- 2 7-
HOUR8 - iTEM NO. VVEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMr. NO. OF DEGCRIPTION (Reason for Icllenc~s8 or
NO. MEN (Of Equipment or Labor) other irmains)
Contractor 'lqtle I~r
12/92 JT'IEB
Ref~or~ NO.~ nay ....
O~, //-~6- ~ ~
INSPECTOR'S DALLY REPORT ~ T W~ S ~ C~D~
HOUR8 - iTEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMr. NO, OF DESCRIPTION (Relson for Idleness or
NO. MEN (Of Equipment or Libor) other mmarl~)
/~/'Tj[~J~-,~ ,/
Contractor T~e Inspector
12/9~ J'i'/ab
'CITY OF FONTANA ReportNo./) Day
Date //.2,,C~
INSPECTOR'S DAILY REPORT u T(:~)T F S S Circle Day
8hilt Hours 8tart;::~,.g-//4 8tOp~//Z:22~,
HOLIRS - ITEM NO. WEATHER
EQUIPMENTAND/OR~BOR: ~ ~ RE~RK8
EQUIPMT. NO, OF DESCRIPTION ~ ~ ~ (Reason for Idlene9s Or
NO. MEN (Qf Equipment or Labor) other remarks)
.....
Contractor Tfi:le InspectT'/' 12/92 dT/ab
'CITY OF FONTANA Report No/g Day ~> ~
Date
INSPECTOR'S DAILY REPORT M ~,/w T F S S Circle Day
8hilt Hours Star~ ,,~)~--7-yt Stop ~
~') 2/- 2 2
HOURS - ITEM NO, WEATHER
EQUIPMENT AND/OR LABOR: ,,~ REMARKS
EQUIPMT. NO. OF DESCRIPTION (Reason for idleness or
NO, MEN (Of Equipment or Labor) ~ other remarks)
},~ /200,e jE~o-~hz,~_- ,,~
Contractor Title
12/92 JT/ab
· CITY OF FONTANA V Re,o~No._Z_~CT__..DW_ ?Y~---
INSPECTOR'S DAILY REPORT
8h~Hou~ ~ ~ ~ ~,
HOUR8 - iTEM NO. WEATHER
EQUIPMENT AND/OR ~OR: ~ ~ RE__K8
NO. MEN
Cor~'actor Title ~ 12/92 ,JT/.h
CITY OF FONTANA ReportNo.//_/,t Day
D ate //-.,2 O -/~
INSPECTOR'S DAILY REPORT M T W T~Z~ S s Cirole Day
Shift Hours Start t2-4f~z~ Stop,
PROJECT' ~ A J/~'J,,/'~ ~ ~
HOUR8 - ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: '~ RE~RKS
EQUIPMT. NO. OF DESCRIPTION ~ (Reason for idleness or
NO. MEN (Of Equipment or Labod ~ ~er~~
/ ~ ~ ~
Contractor Title ~ ~ '
12/92 dT/ab
CITY OF FONTANA nepo~ No. Z_~ Day
D ate //--/=2- ~' -'
INSPECTOR'S DAILY REPORT M T W~FSS
8hi~ Hours et8~ ~ ~
g:~ 2/' 2,,2 ,,~/-
HOURS - ITEM NO. WEATHER
\
EQUIPMENT AND/OR ~BOR: '~ RE~RKS
EQUIPMT, NO. OF DESCRIPTION ~ (Reason for idleness or
NO. MEN (Of Equipment or Labod ~ other remarks)
Contractor Title or
12/92 dT/ab
CITY OF FONTANA Rapo~No. / ~, Day 7,,7 ~
Datel~ ,/~Z- -/,,~cy_~ ~,
INSPECTOR'S DALLY REPORT M T~T F S 8
Circle Day
Sh~Hours 8ta~ 8top F~
i~ !OURS - ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: ~-~ ~,~ RE~RKS
EQUIPMT. NO, OF DESCRIPTION (Reason for idleness or
NO. MEN (Of Equipment or Labor) other remarks)
Contractor TItle ~~
12/92 JT/ab
;' V rmwm
CITY OF FONTANA nepor~No, // Day
Date //-/7-~
INSPECTOR'S DAILY REPORT u(:~w T F S S
Shift Hours 8ta~ 2~ 8topq
HOURS - ITEM NO, WEATHER
EQUIPMENT AND/OR LABOR: 'i, ~; REMARKS
EQUIPMT, NO. OF DESCRIPTION ~ \~ (Reason for idleness or
NO, MEN (Of Equipment or Labor) ~ other remerke)
Contraotor Title ~~ '
12./92 JT/ab
CITY OF FONTANA nepo~No./O _D.y ~'~TY
Date //-/~ '~'g'
INSPECTOR'S DALLY REPORT
~T W T F S S CircleDay
Shift Hours 8ta~ ~ Stop ~
LOCATION & DE PE
HOURS - ITEM NO. WEATHER
EQUIPMT, NO. OF DESCRIPTION ~ ~ (Resson for Idleness or
NO, MEN (Of Equipment or Labod other ramarks)
Contractor Title ~ '
12/92 JT/ab
CITY OF FONTANA ReportNo. ~,~ .Day
Date //-/,_.? - ~' ~--
INSPECTOR'S DAILY REPORT M T W 'r~)S 8 Circle Day
Shift Hours Start ~ D~/~ Stop L/t
HOURS - ITEM NO. WEATHER
E~U~P~E~T ~D~OR L~OR~ ~ ~
EQUIPMT. NO. OF DESCRiPTiON ~ (Reason for i~lene~s or
NO. MEN (Of Equipment or LaboO ~ other rem~ks)
Contractor Title Inspector
12/92 dTlab
CITY OF FONTANA nepo No. Day
Date //-/2
INSPECTOR'S DAILY REPORT M T W(:~F S S Circle Day
Shift Hours Start ~/~ yr't, Stop L/
LOCATION & D~C~IPTION OF OPERATION: '
HOURS - ITEM NO. WEATHER
EQUIPMENT ANDtOR LABOR: ~ ! REMARKS
EQUIPMT. NO. OF" DESCRIPTION d~ '~ (Reason for idleness or
NO MEN (Of Equipment or Labor) other remarks)
Contractor TItle
12/92 dTlab
CITY OF FONTANA Re~or~ No.
Date
INSPECTOR'S DAILY REPORT u T~T F S 8 Circle Day
9~i~ Hours 8ta~ Stop,__
LOCATION & DE~ON OF OPERATION:
HOURS-ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT. NO, Of DESCRIPTION (Reason for idleness or
NO, MEN (Of Equipment or Labor) other remarks)
Contractor T~tle ~ 12/92 dT/ab
CITY OF FONTANA
INSPECTOR'S DALLY REPORT M(~W T F S S
ShlftHours Start
HOURS - ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: ~ REMARKS
EQUIPMT. NO,.OF DESCRIPTION ~ (Reason for idleness or
NO. MEN (Of Equipment or Labor) other remarks)
~ ~o ~ ,~ ~ ,~ _
Con~'actor Title ~
12/92 jTlsh
CITY OF FONTANA nepo~No, ~' Day 72,,,~
Date //~- ~'-~'~--~
INSPECTOR'S DAILY REPORT ~ T W T F S S Circle Day
8h~ Hours 8ta~ Stop
HOURS - ITEM NO. WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT. NO, OF DESCRIPTION (Reason for Icileness or
NO, MEN (Of Equipment or Labor) other remarks)
Contractor Title Inspector
12/92 JT/ab
CITY OF FONTANA Ro~onNo. ~t' Dr/~/.-~ocy
INSPECTOR'S DAILY REPORT ~TW T F 8 8 Circle Day
8h~ Houm Staff/~O~i 8top ~e P~.
LOCA~ON & D~ON OF OPE~ON: ~
HOURS - ~M NO. ~ER
EQUIPMENT AND/OR LABOR: ,~ REMARK8
EQUIPMT. NO. OF DESCRIPTION "-,~. (Reason for lOtenema or
NO. MEN (Of Equipment or Labor) other remarks)
/ ~",~L,,~"~ \ ~ 4
Conl~'Bctor Title
CITY OF FONTANA Re~o. No.
INSPECTOR'S DAILY REPORT M T W~F 8 s CircleDay
8top
HOUR8 - ITEM NO. WEATHER
.l
,,,): '
EQUIPMENT AND/OR LABOR: ~ REMARKS
EQUIPMT. NO. OF DESCRIPTION ~ (Reason for idleness or
NO. MEN other remarks)
Corm'actor Title Inspee~''''''
12/92
~:~ ~ /- 2.2. ,.,~w .}/,~ 0
HOUR8 - ITEM NO. WEATHER
EQUIPMENT AND/OR ~OR: ~ RE__K8
EQUIPS. NO. OF DESGRI~ON (Re.on for Idlenesa or
NO. MEN (~ Equipme~ or ~o~ o~e~ remus)
Contractor Titte Ingpwd'~'
12/92 dl'/ab
CITY OF FONTANA R..o~No. -2 D.,/
· D-,o
INSPECTOR'S DALLY REPORT u(:~w T F S 8 CircleDz~y
8hilt Hours Btart ~to~
HOUR8 - ITEM NO, WEATHER
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMR NO, OF DEBCRIF'igON Reason for Kjlenes8 or
NO. MEN (Of Equipment or Labor) other remarks)
Contractor Title ~ "
EQUIPMENT AND/OR LABOR: REMARKS
EQUIPMT. NO. OF DESCRIFT1ON (Reason for idleness or
NO. MEN (Of Equipment or Labor) other remarks)
I , ~ ~ nk'/.,,,G &/,,,,/7~,r~ s ~,
,~ ~'. /,4./~ o
Contractor Tide
~"~ PACIFIC CLAY PRODUCTS, ]tiC,
20325 'romeseal Canyon Rr.L, Corona, CA 91719
, p.O.Box1149, Comna, CAg17111.|149
Phone: {714) 735.6020 · FAX: {714) 734-7390
FAX TRANSMITTAL, COVER SHEET
We are transmitting trom a Sharp FO-700 facsimile machine, Ths total number of
pages, including th s cover sheet..
If you do not receive all of the pages, please call (714)735-6020, ext~
Comments:
PAIGIFtC nLAY PRn[~UCTI~IJNQ.
March 25, 1993
Mr, Heal Bolanger
Kenko, Inc.
P.O. Box 831
Celtmesa, CA 92320
Re: Fontana, Cypress Avenue Sewer, Joint Repair
Dear Neal:
Per our conversation, I understand you have a crack at the spigot end of a piece
of 30" VCP,
Several methods of repair have beon successfu|ly used. The two concerns ~e have
in any repair ts structural integrity and leak resistance. Repairs, on a limited
basis, are often better than replacenent because of the disturbance of adjacent
pipe and sol1 and the use of couplings and field cut pipe.
Ftlltng the Joint void and epoxying with m6terial supplied by Pacific Clay should
form a leak proof and structurally sound repair. An air test wilt be required to
~ssure the repair,
Should you have any further questions, please Feel Free to call,
Sincerely,
Vice President
Director, Engineering Services
JBB/cm
833~ Teme~al Canyon Rood. C~tone. OA 91719 · P.O. Box 11449, Corona, GA 61718-I 148 · ~ [714] 735-6Q~0 Pex: (Tq 4) 73