Loading...
HomeMy WebLinkAbout29.3 Reports of Inspection(~ITY OF FONTANA V . ,.t,,,/ ~..~r""- REPORT NO. WEEKLY STATEMENT OF WORKIN(3 DAYS To: //,_~ The following statement shows the numt~er of working days Charged to your tontract for the week enctlng Non-Working Working Days Daya No Work Date Day Weather, Weaz~er Conditions or O~er Conditions WorKing C~used Dy Done on Day Weather Controlling Operation (Note 2- g Wed. / Days this week ...................................................................................................... D~rS previousty rsportecl ...................................................................................... Total days to date .............................................................................................. ................................................................................................ CCO Other Day~ previously reported ................. ~ ............................................................................................. ToM dayl to d~te .......................................................................................................................... CO~PUTAT1C)N O~ ~XTEN~ED DAT~ ~R ~GMPLET1CN Nurnl~er N~mbered D~e 1, Date Contract 8DDroved DyA~omey Qenere~ ................................................:,..-..,:,..:,:::.. Z Working daV~ specified in correct. ................................................................. 3, COMPUTE DAT~ FOR COMPLETION (il ~11 d~y~ ~pe~ified are worKe. t~la).., iE .... 4. Total time extension d~/~ ~proved to date (COO plus orner) ...................... 5 Total non-worKing days to date (Note 4) ......................................................... 6. 9ub Total (Line 4 ~lus line 5) ........................................................................... :.i ::i ' i:': I EXTENDED DATE FOR COMPLETION ~ne ~ plue line 6) ......................... """"" 8. Revised working d~l~ for oont~ct ~ne 2 plu~ Line 4) .................................. 10. WORKINQ DAY8 ~EMAININQ (Ljna 8 minue Line g) .................................... ContTofi~ng ~er~lon~s~ Rem~'ul<s: (Note 6") (ContJnue on reverse) The Contractor will De a~lowed fifteen (153 deys In ',¢nkih to prote~t In writing We correcthess of the statement; othenvise the statement sr~aJl be deemed to ~ave ResiQent Engineer been ~ccepted by the Contr,=ctor as correct. NOTE: All footnotes are on 12/92 JT/ab reverse side, INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for'time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CiTY Of FONTANA REPORTNO, WEEKLY STATEMENT OF WORKING DAYS The following statement shows the number of ~'orking days charged to your contract for the week ending Non-Working Working Days Days No Work Date Day Weather, Wemer Conditions or O~er Oond~ion8 Working Caused by Done on Day Weather Controlling Operation (Note ~- / Thur. DayB thi9 week ...................................................................................................... Days previous~ reposed ...................................................................................... Total days to date .................................................................................................. T~a~:~:r~2~7~ ................................................................................................CCO NumberD~s ADDroved COO Other Days prevlou9~ reposed ............................................................................................................... Total d~ to d~e ........................................................................................................................... COMPUTATION OF E~NDED DATE FOR COMPLETION Number Numbe~d D~e of D~ D~ (Note 1. Date Contract ~roved by A~orney Gener~ ................................................. 2. Working days specified in con~c~ ................................................................. :~:~:~:~:~:~:~:E:~:~:E:~?~:E:~:~:~:~:~:~:E:~:~:~:~. 3. COMPUTE DATE FORGOMPL~ON (if all da~ specified are workable),.. ~]~ ' ....... ' J ........ 4. Tot8l time e~ension days approved to d~e (COO plus other) ...................... ::::::::::::::::::::::::::::::::::::::::::::::::::::: 6. Sub Total (Line 4 plus Line ~ ........................................................................... 7. E~ENDED DATE FOR COMPLE~ON (Une 8 plus Une 9. Total working days to date ............................................................................... 10. WORKING DAYS REINING (Une 8 minus Line 9) .................................... Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest In writing the correcthess of the statement; otherwise the statement shall be deemed to have Resident Engineer been acceDted bythe Contractor as correct. NOTE: All footnotes are on 12/92JT/ab reverse side. Z~B~RU~ZO~B TO R3BZDB)r~ ~GZ3i~, l. When recording nonworking days ~ue to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. DO not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons o~her than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line S). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under RENARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be includedz (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPOR'rNO. WEEKLY STATEMENT OF WORKING DAYS ~ fo~lo~n~ s~eme~ s~o~ ~e numbe~ of wo~n~ d~ ch~ged ~o ~our con~s~ for ~e wee~ en~in~ ~ ~ ~ Non-Wo~ng Wo~ng O~ D~ No Wo~ Da D~ Weber, Weber Con~ffions or ~er Con~ffions Wo~ng C~se~ ~ Done on D~ Weber Cobolring ODe~On (No~ ~ / on, / D~ ~is ~e~ ..................................................................................................... D~ pre~ous~ ~po~.......; .............................................................................. To~ d~ to dB .................................................................................................. ~ME ~NSION8 CCO N~ D~ ~pro~ CCO O~ ~ls repo~ .................................................................................................... D~ p~ous~ ~po~d ............................................................................................................... To~ ~ to d~ ........................................................................................................................... COMP~A~ON OF ~NDED DA~ FOR COMP~ON NumUer Numbered D~ 1. D~ Co~ ~pro~ ~ ~om~ Gene~ ................................................. ~E~ · Wo~g d~ Ipecffied In ~o~ ................................................................. ::::::::::::::::::::::::::::::::::::::::::::::::::: · CO~ DA~ FOR COMP~ON ff / d~ spe~ed B ~le)... E~::~E~E~E~E~""""""":':"' ""'j """":':':':"+" 5 To~ non-wo~ng d~ to dB ~o~ ~ ......................................................... S S~ Tol ~ne 4 plu~ Une ~ ........................................................................... 7. ~NDED ~ FOR CO~ ~ne 3 p~l Une ~ .......................... ::::::::::::::::::::::::: I 1 O. WORffiNG DA~ RE~ ~ne 8 min~ Une ~ .................................... Co~olllng Ope~on(I) Remarks: (Nots 6) (Corffinue on reverse) The Contractor wtll be ~llowed fifteen (1 !5) deyl In wt'll~h to protest In wri~ng ~e correctneeeof~estmement;omer~se~estal~ementslqedlbedeemedtol~sve Resident Engineer been sc, cepted by t~e ContrLL, tor is corre~ NOTE: Atl footnotes. ire on 12/92 JT/eD reverse side. CITY OF FONTANA REPORTNO. 32 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contrast for the week ending 6/18 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 6/14/93 Mon. 1 6/15/93 Tue. 1 6/16/93 Wed. 1 6/17/93 Thur. 1 6/18/93 Fri. 1 Days this week ................................................................................................50 Days previously reported ................................................................................12915 Total days to date ............................................................................................13415 CCO Other . 10 Days previously reposed .........................................................................................................20 Total days to date ....................................................................................................................30 of Days ~ Ca% Cor'l%::; accrcvod b! ~; :~ C ;~:nEi .... j ."'~7 ..... ~ ................................. 1' ! S 92 2 Wark,n~; days ~::~:: f ~d rl ::c',:rdc: ..................... L .......1.' 9. ~ 3. CC .~ '~'L .~T~ FO~ CC:~.',. ~T~C'~ ,,'., d.,~'- ,,:,~,:,',~d ,'o ,~,~,,~ d .... ~ ]]_.]_2].1].].. ]~].~.]~'.". 4. TC.~. ~ me cx:ev:,i~'~ da)r. nn:~ :~ved ta <.l~;:e :CCC ::1.~. c;t'e': ...... ' "bS .......... 5 :;,~aln~n-wc'~i'-gc~.~yzl~cla":~N~.le.l: ................... ~L~ 6 Sub 'o:a ;l.i'~e .I p,us L ne ~ ........................ , .I 5 7. EXIENDE3 ;r,l 2 rt)q CCr.'-'LLImO~ ~ :a,- ;Z :.,I,~ L r=c ~; ......... Z ........'1.'. L "' 10. wo;'~K ~G DAYS F;EMAININS ,L r'~ ~ m r~.n; ine 9, ............... 6 : Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have t Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT EN3INEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 31 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 6/11 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 6/07/93 Mort. Clear, 70 Degrees 1 6/08/93 Tue. Clear, 80 Degrees 1 6/09/93 Wed. Clear, 83 Degrees 1 6/10/93 Thur. Clear, 93 Degrees 1 6/11/93 Fri. Clear, 91 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................12415 Total days to date ............................................................................................12915 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ...............................................................................................220 Days previously reported .........................................................................................................0 Total days to date ....................................................................................................................20 coMPuTAT,oNoFE ENDEDDATEFoRcoMpLETioNDa, e 1. Date Contract approved by City Co.=qc~ ........................ I I '0 2. Working days specified in contra;: ....................... ' I '0 ....Z .............................. 3. COMPUTE DATE FOR COMPLETI::.','N 'i' ~1 :j~,y'. ,',p::',',iac.'J r,'o we'<=,:.: u: ...................... ...........2.' .['. '..'.. '.~;..~!'/:'.'_:?~.';_L. 4. Total time extension days approv,'d Io (::~-c 5. Total non-working days to date (l'.c:e 4. . ................ 15 6. Sub Total (Line 4 plus Line 5) ............................... 35 ! ': '% "::L'. ,. XTENDEDDATEpo co. L 'o.,.',.,.,, ....F ........." 8. Revised working days for contract _'4c 2 9. Totalworkingdaystodate .................................. ~. .:2_'~ .... 10. WORKING DAYS REMAINING iL=no 5 !f.i,,,,~ .. r'~ [~ ............. 1 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) 5/31/93 Memorial Day Holiday The Contractor will be allowed fifteen (15) days in which to protest in writing the ,~e,,~g~ correcthess of the statement; otherwise the statement shall be deemed to have as' ineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. IN8TRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REM3~RKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as towhat controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 30 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inn. The following statement shows the number of working days charged to your contract for the week ending 6/4 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 5/31/93 Man. Holiday 0 6/01/93 Tue. Clear, 78 Degrees 1 6/02/93 Wed. Clear, 80 Degrees, Dark, 60 Degrees 1 6/03/93 Thur. Dark, 60 Degrees 1 6/04/93 Fri. Dark, 60 Degrees 1 Days this week ................................................................................................40 Days previously reported ................................................................................12015 Total days to date ............................................................................................12415 TIME EXTENSIONS Number Days Approved Days this report ...............................................................................................CCOCCO Other 2 20 Days previously reported .........................................................................................................0 Total days to date ....................................................................................................................20 COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered _J._ Date of Days Day CNote 5) 1 Ddla Carill~<:l spp'c..;c,n r:y C ::,' C:;.L.r':. I ........................ . ............ '.1.~.._5..~_2 .... 2 Workim~ d,;ys scoc f'sd in can:l.,.': .......................... ' "' :1 2 CO\"'~U'E DATE FOR CO!."~L.FTI,D% .:: ~,i :l~.ys s:x~c;'.er~ c, ~ ':'oi k.~L~l,. ' ............................. ]"'.~ :.:2' .'..::~"" · 1 '['DI~.I timo ax:eqs cn o~,',.~; r~:'~i)l :).;rid to rJs:o .C3=D ;~ .is n'l'f:' . .... ;:?7 .....[ ..................................... 5 Tab. I r~c:n-'.'vo,k :'[1 d,.'.,,~ -c nr, t::: :"<.: :e ,:, ......................... ' 5 ' 6 .~ab 'o',al ~L. ne 4 I~',u': 5no 5,. ............................ 35" 7 EXTENDFD DATE F',)R CCr,:FL=TiO'.; :_i*i.- 3 ::'...,': :..','.,: 8 lie'. isccl wcrl,,ing ~.'~'~ t;.r ccq'r~,::: ,1 r:-' 2' !:ljs L r'c .1: ............ 9 T'>lr.I wc:r.:,i'K! :ll;y:.; k: di~:e .............................. 12.1 10 WORK NG DAY9 RFI.!A~N N,'-'. . r'n Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) 5/31/93 Memorial Day Holiday The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have ineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recordin9 nonworking days due to weather, state the reason why the day was Unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters .with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 29 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, inc. The following statement shows the number of working days charged to your contract for the week ending 5/28 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 5/24/93 Mon. Clear, 73 Degrees 1 5/25/93 Tue. Clear, 73 Degrees 1 5/26/93 Wed. Clear, 81 Degrees 1 5/27/93 Thur. Clear 1 5/28/93 Fri. Clear 1 Days this week ................................................................................................50 Days previously reported ................................................................................11515 Total days to date ............................................................................................12015 CCO Other 20 Days previously reported .........................................................................................................0 Total days to date ....................................................................................................................20 COMPUTATION OF EXTGNDED DATE FOR COMPLETION I Number Numbered . Date of Da)/s Da~/(Note 5~ 1. Date Contract approved by City Cc J'~c,' ....................... [ .... ' ......1.'1.'~.~.... 2. Working days specified in contract ........................ 1 '0 3. COMPUTE DATE FOR COMPL"' CN (I e I r:sy,, t, pe." f':.:d ~,re '.~,'r:'.<su:e __Z'.: .:..::""'~.j.:'...~..":'.:.), ~:?,~";j~.' 4. Total time extension days approv.;ri ~a date :CCC ~:.,s c he,) ....... I 2C., 5. Tote non-working days to date :N~ e ,'-~ .... :5 6. Sub Total (Line 4 plus Line 5) ............................ 35 7. EXTENDED DATE FOR COMPLFTIC)% ,jrls 3. :':l J, L ,'e .";: ....... i ' ' ]22..,' "'.2._'_~ 22'2'9 I ,I .3,.'~..:.:.. 8. Revised working days for contrr.,'.~ :L ,'e P I: t;s L;ne -:; ......... :3,., 9. Total working days to date ........................... 1 '-,',?.,: 10, WORKING DAYS REMAINING ,L,'~ !; m.*.. ~ ,:'r .c, . ......... Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the ~ "- ' ' correctness of the statement; otherwise the statement shail be deemed to have Ras~n~t ~'~gineer been accepted by the Contractor as correct, NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REM3~RKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 28 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors. Inc. The following statement shows the number of working days charged to your contract for the week ending 5/21 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 5/17/93 Mon. Clear, 73 Degrees 1 5/18/93 Tue. Clear, 81 Degrees 1 5/19/93 Wed. Clear, 83 Degrees 1 5/20/93 Thur. Clear, 81 Degrees 1 5/21/93 Fri. Clear, 81 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................11015 Total days to dete ............................................................................................11515 CCO Other . 2 20 Days previously reported .........................................................................................................0 Total days to date ....................................................................................................................20 COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date of.D~ys . Day (Note 5) 1. Date Contrast epproved by City C;~u~',:i ..................... 2. Working days specified in contract ...................... ' 1 3. COMPUTE DATE FOR COMPLET ON ;.r ,..'..' d=,/e ~'1:"';;""':':' .',.e ,.,.:,. k ~blc.TTS':.'7::'::.":T:.............'. '. :.[.::::::.~ '.~.'.~.~::.:. 4. Total time extension days approve,': :c n~'~ .CC,O pIj~ r. tl'c', ........20 5. Total non-working days to date (Nc;c 4.. ....................: 5 6. Sub Total (Line 4 plus Line 5) ..............................1' ."Z.. '~..j,._'. 7. EXTENDED DATE FOR COMPLE'rlO% ._ine 3 :.;IJs ' ;.ie (~ ...........""1'3'j ......i '"'[ """'~";:~. G3 .,,,. ............ ' ............................................ 8. I J..I .n.. 9 .................. r5 10. WORKING DAYS REMAINING (-~ns 8 mi'~js L I'~ 9.. ............ ~. 1 b Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the d~entE correctness of the statement; otherwise the statement shall be deemed to have ngineer been accepted by the Contractor as correct, NOTE: All footnotes are on reverse side, INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORTNO. 27 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 5/14 ,1993 Non-Working Working Days Days No Work Dote Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 5/10/93 Men. 1 5/11/93 Tue. 1 5/12/93 Wed. 1 5/13/93 Thur. 1 5/14/93 FrL 1 Days this week ................................................................................................50 Days previously reported ................................................................................10515 Total days to date ............................................................................................11015 CCO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number JNumbarad Date Day<Note5> 1 Date Contract approved by Attorney General .................. t~i~i~ ~ 11/10/92 2 W~>!k I'L: ddyc ~per:i'ie:: i' :c":r,:lct ........................... ' ......................:~'~'kj ....................~ .... :.~ CO'."'iJIE DA'E =OR C,D'.I,r'. ET,CN :,r el' C:n~ sr:e'-' let: ,,it ';,'o:k.mJo ' ............ i'i":. ":' :':'. ":':": :":'::FZ":~ ;;:;. ~3 '7' /. Tohd ti:"o ex~e't~ on :Ir.~ ~ .,:~[:., :.,vcd Io c~:c ,C:(: 9 p.t.s :>l.t,~n ......:C 3. h:h~'n..'.-,-,;olkn;jd~.ys:ecst:~:No.~--'i ................. 6. S J:; 'lch.I h'.. nc 4 :~1,=!~ i'ta 5; ...................... !5 i ........................... .,.., ..... ,-¥ ......:' ~ FIva i I tur'e:: L. 9. T:~L~.,~ :,'c'.dqg :~,y~ to dora ................... . '1 ' :'.. 1'? WCI KIN,'.-; :'V~YS ~_ '.'A % %',.-', L.nc 8 ^';:t J+, L. "a ~' . ........ : I Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in w, dting the " correctness of the statement; otherwise the statement shall be deemed to have ~ Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditione. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extentl (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 26 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: KenkQ Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 5/07 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 5/03/93 Mon. Cloudy, 72 Degrees 1 5/04/93 Tue. Cloudy, 71 Degrees 1 5/05/93 Wed. Clear, 74 Degrees 1 5/06/93 Thur. Clear, 76 Degrees 1 5/07/93 Fri. Cloudy, 74 Degrees 1 Days this week ................................................................................................50 Days previousry reported ............................................................ ....................10015 Total days to date ............................................................................................10515 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number J Numbered L Date ofDays_. De)/ (No!p 5) '1 ~C.'I~'2 1. Date Contract epproved by A, orney G,~,,'c',,I.....: .............. ,. ....110"' .. ~.....'~.~.":.. 2. Working days specified in contract .......................... . ..............: ..............T ..... 4. Total time extension days approved tl: ~;.~,:s :CCL') F t.a ;)l'lere ..... __ 15 ~' 5. Total non-working days to date (Note -1; ............... i -- 7. PLETI~: ~'~', .~ =':L..~ . .n,'-'(~: .' .' ...' .'. I ' 5 14 93 8. Revised working days for contract {Linc 2 :,ij~ L r'e 4 ......... . ' 10 ~ 9. Total working days to date .................................. Ijb r 10. WORKING DAYS REMAINING (Line ~! iT .~L~, i r~? 9 ............. ~, ~ Controlling Operation(s) Remarks: (Note 6) (Oontinue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the Re~nt~n correcthess of the statement; otherwise the statement shall be deemed to have ginear been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTION8 TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: V CITY OF FONTANA REPORT NO. 25 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inn, The following statement shows the number of working days charged to your contract for the week ending 4/30 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 4/26/93 Men. Cioudy AM, 72 Clear PM Degrees 1 4/27/93 Tue. Clear, Windy 75 Degrees 1 4/28/93 Wed. Clear, 78 Degrees 1 4/29/93 Thur. Cloudy AM, Clear PM 73 Degrees 1 4/30/93 FrL Clear, 80 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................95 15 Total days to date ............................................................................................10015 TIME EXTENSIONS Number Days Approved Days this report ...............................................................................................CCOCOO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... 1. Date Ccq:ra,". enpr~v~::d I.,,/Attr: 'qc.~, G;~:'tor~ ................. ' ' '~'1 10 9,_;"' 2. Working c~,y,, ~,|:ef;i'P',.n r. ccml.~.~.'l ...................... . . . . 1.:::: ....... 3. COMPL,'~' :AT[.: I'G'~ CC;,'~LFTI.~%: ! f a I uz:y ~ s::~c t ~!;: ~.le ¢.'~:~kq::;e ' 4. Total tim.~ cx-c'q9icn ,.'-'a, ~' s:;l>',~>.,'erl In: I~,I,., C,':C :~ijs n.h:y! ......" C .~ ................. I'.'.;.;.:~:~.'~'~ 5. Total nC"l-;VOh< r'~} (l~'./~.~ 'C C510 '%,.L:.;~ ~., ............. 1;~ "'~.-' 6. SUb Tot,'d ;L."c 4 r~lj,.= ._in.:~ ~. .......................... '5 7. EXTENCE. r,':,RO' . '_ r. ...... ' ..... 8. Revised :'/:!rk.n~ tie':,:, ;.::, c;~l'l,~;::' '.L ,": 2 I:':'.~ I iP9 4 ...........I ; IC ~ ......... 9. Total work I:~.I 10. WORKikG ';AYG R.."r.'A"',:'%G 'L ~':! ".' m r'L.~, Li',.:, ,") .......... 1 :: . Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the Re~nnt ~ correctness of the statement; otherwise the statement shall be deemed to have Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 24 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO; Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 4/23 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 4/19/93 Mon. Clear,Windy 78 Degrees 1 4/20/93 Tue. Clear, 80 Degrees 1 4/21/93 Wed. Clear, 81 Degrees 1 4/22/93 Thur. Clear 82 Degrees 1 4/23/93 Fri, Overcast, Cool 75-80 Degrees 1 Days this week ................................................................................................40 Days previously reported ................................................................................91 14 Total days to date ............................................................................................9515 T~,le%sEth~'sEr~lo(:)~~ ..........................................................................................CCO NumberDaysApproved CCO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... 1. Date Contract approved by Attorney Gc:,~;r,.t .'~"~ '. .... . ~ ..... of Days Day (Note 5) i 11C 92 5. Tm~d ron-wcrking c:syn t3 d,'re ~Nl.',=g ,1} .................. = 15 6, SL, I') TC'.Sl ;Liqo 4 plus L. nc ,~ ....................... 15 7. EXILNDE3 .'3A'[.~ } O.'t CCk'=,'.ETION i_i'~c 3 :'~l.~s ! I'e, E.. ..... I ......... i' 5 1~ 8. R-sviso,'l 'A'C';:j"tJ Ca'iS '3r CC'I'I{,',:I ,. ~ne 2 :)!js ' ~'3 4} .............J ' 'i'I';; .......i .................... 10. WO=..(:,%G DAYS REr,%%%O'.I r'-~g n,~'~s,.ino9 ............ ~ 'i Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correcthess of the statement; otherwise the statement shall be deemed to have Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side, INSTRUCTION8 TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 23 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 4/16 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 4/12/93 Men. Cloudy AM, 72 Clear PM Degrees 1 4/13/93 Tue. Clear, Windy 75 Degrees 1 4/14/93 Wed. Clear, 78 Degrees 1 4/15/93 Thur. Cloudy AM, Clear PM 73 Degrees 1 4/16/93 Fri. Clear, 80 Degrees 1 Days this week ................................................................................................50 Days previously repealed ................................................................................86 14 Total days to date ............................................................................................9114 %%2 .......................................................................................... COOOther Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION I Number INurebared Date of Days Day (Note 5) · 11 () 92 ' 1. Date Contract approved by Attorney Ccqerrl: ................. : 2. Working days specified in contract ........................ I ' 0 '1 ................. 3. COMPUTE DATE FOR COMPLETION 'd t.I dgy.~ sFc, c.f.ed .j;e ;vc'Ka,; e: I..'7'.7'.'..' .'.-.'Z7, 4. Total time extension days approved to date (CCO plus ot" 5. Total non-working days to date (Note 4} .............................. 14 6. Sub Total (Line 4 plus Line 5) ....................................................... 1-". ...... 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6 ....... [. """'1""' b 13 '.}3 8. Revised working days for contract (Line 2 plus Line 4) ......... : ' 10 9. Total working days to date ............................................................. 10. WORKING DAYS REMAINING (Line 8 minus Line 9) ............... Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctnasa of the statement; otherwise the statement shall be deemed to have ineer been accepted by the Contractor as correct. NOTE: All footnotes ere on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for~ time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 22 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc, The following statement shows the number of working days charged to your contract for the week ending 4/9 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 4/05/93 Men. Cloudy, 62 Degrees 1 4/06/93 Tue. Clear, 73 Degrees 1 4/07/93 Wed. Clear, 75 Degrees 1 4/08/93 Thur. Clear, 80 Degrees 1 4/09/93 Fri. Clear, 78 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................81 14 Total days to date ............................................................................................8614 TIME EXTENSIONS Days Approved Days this report ...............................................................................................CCO NumberCCOOther Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION I Number Numbered I Date of Days Day (No:Le 5) 1. Date Contract apFrovcd h ~, Ahc~.'n">' C3:!n~..lu'.l ............ ; ............ 1' '~') [};:~.... 2. Working days spec;[i~.~l .,- cent,act ................. I ~0 3. COMPUTE DATE FO, { CO,','-"LETION, ' e I c,<.y ,o '.-=;e:c' :'~ ~.r~: ,'.'cr~u=;;.'.? ....... . .........:4~..'~:,.3. ...... 4. Total time extension :=..qy,~ e;~l:'c ;ed Io rJ=q:o ~CCC :.,i,,r. c'h~'! ....... C 5. Total non-working i!~yf.: T:~ rh~le ,Nc e .;! ......... 6. Sub Total (Line 4 ~: L.~ L I..~ C:: ....................... '4 7. EXTENDED DATE FCH CO'.;P. FTI,')% ,L n~ ? ~:1:~ L r';~ ','j .......... ' ......... 1"'5~,3 93' ' 8. Revised working dais ~t~r c;.,~:r,:~:~ ;Li'm 2 [: ~..~ Li'!c, .;= ............ ' 1C 9. Total working days tc~ :~,.ls ............................ ~'~!'.. 10. WORKING DAYS r~E','A NNG::i'~.r!,~m,'~.~. rle~) ............... 2.1 .... Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correcthess of the statement; otherwise the statement shall be deemed to have Resident Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL R~S: CITY OF FONTANA REPORTNO. 21 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc, The following statement shows the number of working days charged to your contract for the week ending 4/2 ,1993 Non-Working Working Days Days No Work Date Day Weather Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 3/29/93 Men, Clear, 68 Degrees, Cloudy PM 1 3/30/93 Tue. Clear, 71 Degrees 1 3/31/93 Wed, Clear, 73 Degrees 1 4/01/93 Thur, Cloudy, 65 Degrees 1 4/02/93 Fri, Clear, 73 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................76 14 Total days to date ............................................................................................8114 TIME EXTENSIONS Days Approved Days this report ...............................................................................................CCO NumberCCOOther Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date of Days Day (Not.?_.~.__ 1. Date Contract approved b:,' AIIc'qr~y ,~::n,..l~,i ............ , ...: ........ ' 11 ~0:92 2. Working days specified in ,:r:n:r.-'~ct ............. I ' 0 3. coMPuTE DATE fen CC'~':LCT~O~.' ~, ~u~'~ .,::,~: :::~: ,.re ':.',::,,,:,'e". .'.'.': .: .7::'2 ".;.':::'~.'~.:~'." 4. Total time extension days s~:.l:'c. ved I~', deI,j :CCC o...,,, c:hc'. ......7" 'C 5, Total non-working days to J,:=|e 6. Sub Total (Line 4 plus Line 5. . .................... ' -'. ~. EXTENDE~ DATE ~on co~.,=. rT~:'>\ ,~,nc ~ p~.,,', ,~ f~, ........... ............:,::..:..""'..:.1.i:_:~.~.~ ~.'..:. 8. Revised working days for c3rl'&:. :Ls.:s 9, Total working days to date .................................. 10. WORKING DAYS REMAIniNG :[ "e R m r'L3 :.iq.'., Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (~ 5) days in which to protest in writing the correcthess of the statement; otherwise the statement shall be deemed to have ngineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording w6rking and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 20 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenks Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 3/26 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 3/22./93 Mon. Clear, 81 Degrees 1 3/23/93 Tue. Overcast, 75 Degrees 1 3/24/93 Wed. Cloudy, 68 Degrees 1 3/25/93 Thur. Cloudy, 67 Degrees 1 3/26/93 FrL Cloudy, 68 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................71 14 Total days to date ............................................................................................7614 TiME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered I Date of Days_.... Day (Note 5) .. 1, Date Contract epproved by Attorney Gc"nr.q ............ . ................:.. . ~ :1..1.,:~.~..2. ..... 2. Working days specified in contract 113 3. COMPUTE DATE FOR COMPLETION ~ f all i;~,ys ~-~[,'e~.f:~=('J ore wo, kel:)Ic ..... [.... ::i..'~.'.~.:'..:. 4. Total time extension days approves to d,~l.'j (CC'3 I; t,s, otqor.~ .......0 5, Total non-working days to date (Nola ,I = ....................... '4 6. Sub Total (Line 4 plus Line 5) ................................. ' 4 7. EXTENDED DATE FOR COMP ET,ON .., ,.-,, ? L, o 6; ........ 8. Revised working days for contract !Li'~o 2 I: L-3 , ijo .: ~ ................113 9. Total working days to date ........................................ 76 10. WORKING DAYS REMAINING (Lipe 8 m=nbe _jr1.19~ ................. 34 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the Reagent ~g correcthess of the statement; otherwise the statement shall be deemed to have ineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 19 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 3/19 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 3/15/93 Mon. Partly Cloudy, 76 Degrees 1 3/16/93 Tue. Overcast, 74 Degrees 1 3/17/93 Wed. Overcast, 74 Degrees 1 3/18/93 Thur. Clear, 77 Degrees 1 3/19/93 Fri. Clear 1 Days this week ................................................................................................50 Days previously reported ................................................................................66 14 Total days to date ............................................................................................7114 COO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number I Numbered Date of Days Day (Note 5) 1. Ds'o C:or'ha¢:l ~,pl~'o','o:l by )'~l:~',;:"t~), ,qene'al ................. 11 10 92 2. Work rip, d~ys scoc had iq c~:nlr~.~cl ......................... 11C ~ 3. COMPUTE DATE FCR COr~'nL':,ON i r a:l `':!~yi~ spa: ,[,e(J ,j'e workeb -~ .................................. ~, ~,2''';4 ..... 4. Total time ex~o,ts;t,'rt ueiy~' spnrcv3o :~ rl~, ,, ¢CCO F.,us r~l~er~ ....... ]:) ......i ........................] .................~':~ .... 5, Totc, I rl(.;'l-wolk ng clcy~ I~ rt~:e ,Nl:le ,1} ....................... 14 6. Sul'> 'oldl IL nc 4 f~ljs jqe 5: ................................... ' .....:1 t,' ' 7. EXTENDED DA'E FOR (.:O.".'?LI:.'TIO% !Line 3 plus L r.c 6, ......... :""' ..............."....... I" '.' 8. Reviseu work ng de. ys fc' contlud IIne 2 pl...~ L r's 4i ............... 110 9. Tolel working day.'-; Io d~l~.., ..................................... ' 71 10. WORK,NG DAYS REMA:% %G ~Liqe 8 mm~.s, ne 9t .................. ~ 3g Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the R~es~t'~'g correcthess of the statement; otherwise the statement shall be deemed to have ineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORTNO, 18 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenks Contractors, Inc, The following statement shows the number of working days charged to your contract for the week ending 3/12 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlring Operation (Note 2) 3/08/93 Man. Clear, 80 Degrees 1 3/09/93 Tue. Clear, 81 Degrees 1 3/10/93 Wed. Clear, 80 Degrees 1 3/11/93 Thur. Clear, 83 Degrees 1 3/12/93 Fri. Windy-Clear, 81 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................61 14 Total days to date ............................................................................................6614 CCO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number ._LNumbered Date of Days Day (Note 5) . ~'t~rk . ,':~: :~:~;Tj. L'~2.',':.~,Z~. ." .....................· ........~i'6 ................. 3. COr,;PL,TE DA'rL FOR CCMPLET.ON ;~f ell dsy~ :~[:.ecifiud are ;varkshle .... I -' 22 03 4. Tc'.a ~ me exlene,or days appmved Io d~l:e (CCO nlj'z. I;the', ........ ";5 ............i ........... 5. Total non-wo'K Pg ciuy~ to dato 6. SL.b 'to:el ~L,ns 4 plus L~ne . - -~ o r-.,,, .. 0 , '=~:',=.'~' ', .........." ............I"""'::"!~.'~' ;. ~,~o":?...~,~'~ d~..;?:~,.~,~:, ;,"', '2;,u~ .'% ~:'.. ? ............ "'t' :~ ..........i .... 9. Tclal working rlRys :ooot,.'- .................................... ~;6__~. 10. WOR,(ING DAYS HEMAIK %G !Line 8 minds L ne 9, ................. I :4 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be aftowed fifteen (15) days in which to protest in writing the esi~n~in correctnasa of the statement; otherwise the statement shel~ be deemed to have R eer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8}. After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORTNO. 17 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 3/05 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 3/01/93 Mon. Partly Cloudy, 61 Degrees 1 3/02/93 Tue. Clear 1 3/03/93 Wed. Partly Cloudy, 61 Degrees 1 3/04/93 Thur. Clear, 68 Degrees 1 3/05/93 FrL Clear, 71 Degrees 1 Days this week ................................................................................................50 Days previously reporied ................................................................................56 14 Total days to date ..............~ .............................................................................6114 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF F:XTENDED DATE FOR COMPLETION Number J Numbered Date of Days .. Day (Not~5) 1. Date Contract epproved by Attorney Gsner.'.d ................... 11 1C 92 2. Working days specified in contract ...................................... 11 g =. 3. COMPUTEDATEFORCOMPLET,ON',e..~,.,y~:,p~.~,,,~.c'e'owo,keb.s':": ......... :.._..: ::7....'.._';;. ]. .......'..~.~'~j~." 4. Total time extension days approved to dale {C, CO p'G5 o["lor~ .......... 0 5. Total non-working days to date (Note 4', ........................... 6. Sub Total (Line 4 plus Line 5) ............................................. _ '4 ........... 7. EXTENDED DATE FOR COMPLETION ;I.~ne 3 [:.~us I ~re ,5: .......... ' '~.]'" 5"~3 93'" 8. Revised working days for contract (Ling 2 D.L.~, Ling/-~ ................ 110 9. Total working days to date .............................................. 61 10. WORKING DAYS REMAINING (Line ~, rn.~'~.s _ins 9~ ................... . 49 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the .R~.~i~t~'ng correctness of the statement; otherwise the statement shall be deemed to have ineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 17 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenks Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 3/05 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 3/01/93 Mon. Partly Cloudy, 61 Degrees 1 3/02/93 Tue. Clear 1 3/03/93 Wed. Partly Cloudy, 61 Degrees 1 3/04/93 Thur. Clear, 68 Degrees 1 3/05/93 Fri. Clear, 71 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................56 14 Total days to date ............................................................................................6114 TiME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION ~ Number Numbered Date of Days Day (Note 5) 1. DateContractapprovedbyA'131rcyG~nore~; ................ L ...... ~ 11 1092 2. Working days specified in coqt'sc; .............................. i 110 3. COMPUTE DATE FOR COMP, F' CN :if el. d,,,/~ spsc,"~e3 arc work~le! ............... I 4 22 93 4. Total time extension days ~r:nrcvco :c o~tts ICCO plus othcl i ........... O 5. Total non-working days to n,re ,Nots 4~ .......................... lz. ".'~ 6. Sub Total (Line 4 plus Lino 5! .................................... EXTENDED DATE FOR,'L 3r'e ..........:...'.. ' ;""' 8. Revised working days for corl'a;: {Liqo 2 9. Total working days to date, .................................. f ! ,56'L~1 ..j · 10. WORKING DAYS REMAIN,NG 'L ne .............. ;.~ Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the ~ correctnasa of the statement; otherwise the statement shall be deemed to have Resident Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORTNO. 16 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 2/26 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 2/22/93 Men. Partly Cloudy, 61 Degrees 1 2/23/93 Tue. Rain 0 '1 2/24/93 Wed. Cloudy, 58 Degrees 1 2/25/93 Thur. Partly Cloudy, 54 Degrees 1 2/26/93 Fri. Rain, 58 Degrees 0 '1 Days this week ................................................................................................32 Days previously reported ................................................................................53 12 Total days to date ............................................................................................5614 CCO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... ~ Dsl~q Cc.qtra~;; au:.~rcv~.,d by/~;'.~l~.~y G~.~r'~."~l ............... ~ 1 10 92 2. Wc~in..-1 dsys .~pec ~ ed i.q cor;I,!}~;t ............................. ~ 10 3. COMr'JTE DA'E ~OR COV~LETIO% ,' ~= lu~y~ ~l~o~.[.~d ere wo,k~,b;;. .':.':';'~'~ .7. '7.. '~..~. '. ';. ~'.~:~.7~: 4. :o:ellmooxlenson~a~,vs~::provo:Jt~,d8to;~CCl~u~ ot.qou ........ ... . 0. 5 ' otcl r':}r~-wG'~'rg dsys :c oo~¢ ~Note 4; ....................... ;4 6. 5~b 'Fc:a. ;Liqo 4 plu~; ~ ins 5'. .......................... 14 7. EX'~NDE3 :AT: FOR COMP. ETION (L ne 3 pl;,~. L r~c 6, ........ ~:':'::'~7 .......~...:.;..'..'.'.;..'..;.;.;.;.;.J;....;...~.;l~' ~"~ 8 Rev;~sdwcr~iqgda~sfor$or't'8~t~L=~,a2[ u .r'e4} ................. ~. 1:0 9 TCt~.I wc'~i~g d~ys tc {=~=s ......................... 56 1~. W(~RKING 3AY~ REk~A.NINC {..ir~e 8 ,"ir~ds L r'e ~ ............... Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the Re~s~En correctness of the statement; otherwise the statement shall be deemed to have ginear been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. IN2TRUCTION2 TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for' time extensions. 4. Do not include nonworking days which occur after expiration of the Extended. DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working. days numbered for convenience in computation. 6. Time extensions, other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for Which the extension was granted. {d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 2/'19 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 2/15/93 Mon. Holiday 0 2/16/93 Tue. Cloudy, 61 Degrees 1 2/17/93 Wed. Cloudy, 61 Degrees 1 2/18/93 Thur. Rain, 60 Degrees 0 1 2/19/93 Fri. Rain, 57 Degrees 0 1 Days this week ................................................................................................22 Days previously reported ................................................................................51 10 Total days to date ............................................................................................5312 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION ~Number Numbered J Date .gf Days . D~_y (Not_e..5). 1. Date Contract approvcd by A~;umey Gerc'el. L 11 10 92 2. Working days specifiec in contr~ct .................................. : I P, 3. COMPUTE DATE FOR COMP_ETION (i" e': clays .~Decffien ere wcrke:~ler ...................... "' 4 2~'~ ..... 4. Total time extension d,:ys epl:'cved It.'. dn-e ICCO :.~lus crhe') ......... 0 5. Total non-working day~ [o t. Jc:.le (%c:c' 4) ............................ 12 6. Sub Total (Line 4 plus L:Pe 5} ....................... 12 7. EXTENDED DATE FCR CO;,'P~ FTIO% (Lino 3 ol.js I.,nc 6} .............. '* .......... .[.. 5 11.'~3._'..: 8. Revised working days rt.:r cor't's:: ~LiPe .c p L s L. no 4: .............. 1 ' O 9. Total working days to oale ........................................ 53 10. WORKING DAYS REVA'N'%G ~1 ins 8 mr. us I.ine 9~ .................. 57 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the Reagent'~" correctnasa of the statement; otherwise the statement shall be deemed to have Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTION2 TO RB2ID~NT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing forbtime extensions. 4. Do not include nonworking days which occur after expiration of the Extended. DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions. other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or Operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 14 WEEKLY STATEMENT OF WORKING DAYS PROdECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 2/12 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 2/08/93 Mon. Rain, 62 Degrees 0 1 2/09/93 Tue. Rain, 64 Degrees 0 1 2/10/93 Wed, Partly Cloudy, 62 Degrees 1 2/11/93 Thur. Partly Cloudy, 72 Degrees 1 2/12/93 Fri. Cloudy, 70 Degrees 1 Days this week ................................................................................................32 Days previously reported ................................................................................48 8 Total days to date .................................. ..........................................................5110 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION L Number ~ Numbered Date 1 Date Contract approved by Attorney General ............................................, ~ ~, 11/10/92 2, Work "." ... ': . . ' ' 3, COM . '.: ' ' '.' ' .. ', . : · .: ' . . : '. ' · : ' ':; '.':! 4. Total . . .' . . ' ' ' ..... : 5. Total"' .'.' . ..: ..' '.; .: 6. Sub' ' . ' ' ,. 7. EXTE'.' , '... ' : ':.:.'.' :.'. '. ::: .... :. ' :: '~.~ 8. Revi.' '....'.: ' ":' .' . . '. :" .' "' .' 9, Total .'- · .~ ' . : ' 10. WO':.t,~ ......:. .~ .... ...... ..: ...... .. Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the Re~nt ":' correcthess of the statement; otherwise the statement shall be deemed to have Engineer been accepted by the Contractor as correct, NOTE: All footnotes are on reverse side, IN2TRUCTION2 TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for"time extensions. 4. Do not include nonworking days which occur after expiration of the Extended. DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for Which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 13 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contrastors, Inc. The following statement shows the number of working days charged to your contract for the week ending 2/5 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 2/01/93 Men. Clear, 72 Degrees 1 2/02/93 Tue. Clear, 73 Degrees 1 2/03/93 Wed. Padly Cloudy, 75 Degrees 1 2/04/93 Thur. Clear 72 Degrees 1 2/05/93 Fri. Partly Cloudy, 70 Degrees 1 Days this week ................................................................................................'50 Days previously reported ................................................................................43 Total days to data ............................................................................................488 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION l Number Numbered J Date of Days Day (Note 5) 1, Date Contract approved by Attorney Go,'era' ~ : ~'0'~',2 ' ~: ~;~ c~.,~;;~,.d ~;;;';!t,~ .;, ;.. ~:~,:; ;.,'.'.,,i';e=; ~.; ,.;~;k:~i;r ;' 0__ ~:.._:..:::. :~':::_I .....' ~.: ~::..': 4. Total time extension days approved ~. E~ENDED ~ATE ~OR COMPLET, ON ,: .',n ~ ,,,,.= ,.~n ~ .........i'i ...............7 "~ ~'~' 8. Revised working days for contract (Line ;: p'~.i~ Line -': ........ . __1 i~__ _.. 9, Total working days to date .................................. 10. WORKING DAYS REMAINING (Line 8 m I'us I.me :-h ........... 62 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the ~n correcthess of the statement; otherwise the statement shah be deemed to have ginear been accepted by the Contractor as correct. NOTE: All footnotes ere on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a} Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 12 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 1/29 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 1/25/93 Mon. Clear, Windy 75 Degrees 1 1/26/93 Tue. Clear, 76 Degrees 1 1/27/93 Wed. Clear, 78 Degrees 1 1/28/93 Thur. Clear 74 Degrees 1 1/29/93 FrL Partly Cloudy, 68 Degrees 1 Days this week ................................................................................................50 Days previousEy reported ................................................................................38 8 Total days to date ............................................................................................438 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered _~ Date of Days . Day (Note.S).. 1. Date Contract approvgd by A'13rr:y Genera'. ........... . ....... ' 11 2, Workin9 days spe:;ifie'j '~' cc'~'.'ec! ......................... 1: 0 ' ' ....................... 3. coMPuTE DATE .C~ COMrL:',O~, r,;.. ,~,,~.~ ~pe.~i,sd .'e ,vo,k.U,: .............__'.:..'..' ................'j'.l.:'.".::~"~'~.'..': 4. Total time extensi:~n :;r, ys m:provoJ I:> :into :CCO F t.s ol'~on ........0 5. Total non-workin9 c!s,/t~ ::: :~eto :%.::.:0 .~; ................ 6. Sub Total (Line 4 !: us L no 5~ ............................ 8 7. EXTENDED DATE FOR Cot,.' :LETIO'N; ino 3 n ~.s ..ine 6. ...........["' ...................5 '5 93" 8. Revised working days '~.:' corl'a.": =L ne 2 el.if: L Pc ,h ...........1 ~0 .... ~. ' .: :.: ..............................-~3 =.. 8: .............. Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the le~sie~nt '~'En correctnasa of the statement; otherwise the statement shall be deemed to have R ginear been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been perforlned on='~'' the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORTNO. 11 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 1/22 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 1/18/93 Mon. Holiday 0 1/19/93 Tue. Cloudy, 60 Degrees 1 1/20/93 Wed. Clear, 63 Degrees 1 1/21/93 Thur. Clear 65 Degrees 1 1/22/93 Fri. Clear, 70 Degrees 1 Days this week ................................................................................................40 Days previously reported ................................................................................34 8 Total days to date ............................................................................................388 CO0 Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION ~ Number Numbered Date DayINo,e5) 1. Data Contract approved by Attorney Genera ........... ~/~ .............~ 11/10/92 2. Wc..qn~l days apcch.:~ in ca't's:: ......................... 110 a. ccr,,,".J'rE DA":: ~:OF~ CO',~P. FTD~ ,i' e'. dsys ,.':ec '.e,, ,.,,.-. ',,crk,,o'eL ....""' ...............'...':.'7.]:":".:'..L.:'____4. ~.2....S...3__.. · ':.. TC:~ :smo c. xleP&icn dsys app'c,.'cd Io c~'c. iCCO ;.,Ijs clhe'. ......g 5 'Fl:tu 'tcr'-,','olking auy.: to da:o ~Nc'.s ,i~ ....................8 6 SubTolald ns4~.?.l s ."e5 ......................... B 7 LXIENDED DA"" fOR COMP. RTION ,I r:c 3 pI,...* L rs ,r..,. ....... ' "..::.:T;;.LL' '1"' "~"~"' 8 I~evised wc'ki'~g dnys "or con:recl ',Line ? F.:L,~ Li"'o 4! .............. ' ......1"0 9 Tolsi ;','(::'King cry.*. t!.' cote ....................................... 38 . . 10. WCRKINS 3AYS REEMA N NG ;b"e ~ m n,s [no 9! .............. 72 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the es~en~t~'n correctnoes of the statement; otherwise the statement shall be deemed to have R ginear been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTION8 TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORTNO. 10 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 1/15 ,1993 Non-Workin9 Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 1/11/93 Men. Cloudy, 61 Degrees 1 1/12/93 Tue. Cloudy, 62 Degrees Rein at 1:00 PM 0 1 1/13/93 Wed. Rein 0 1 1/14/93 Thur. Cloudy 1 1/15/93 Fri. Cloudy 1 Days this week ................................................................................................32 Days previously reported ................................................................................31 6 Total days to date ............................................................................................348 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... cGMP.TAT,oNopE ENDEDDATE oRcoMpL T,oNDa.a 1. Date Contract appr~v:d l:y A::ornsy Gsnernl ................. . .... 11 10 92 2. Working days sFecifioci 3. COM PUTS OATS re=, CO'.',P..rT~O~ ! f a'~ oey. ,,~:e.-.'f .~ ere wc'~,sL'e .......... ~ ........:1' . '..'..1'..:[:.'4]~.'..~'.2 4. Total time extensic'~ da;,~ epl:'cvod I~) dale :CCC p us (>;qer'. ....... 0 ' ~" 5. Total non-workin;i dsys 6. Sub Total (Line 4 plus ,_ino 5, . ............................ 5 7. EXTENDED DATE FO3 COM~! FTION !_ino 3 c .s . ins 6, .......... ~ .... ............... __ ....... 5 5 93 8. Revised working di~y~ fo~ cart'c:: ,L ~:e ~ :~ljf: L r: -I} ......... 110 9. Total working days Io cJ~l's ......................... 3.'1 10. WORKING DAY8 REMAIk %CI ~L r: ;3 m nus L,-.s 9: ................ 76 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have t Engineer been accepted by the Contractor as correct, NOTE: All footnotes are on reverse side· INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 9 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 1/8 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 1/4/93 Mon. Clear, 63 Degrees 1 1/5/93 Tue. Cloudy, 62 Degrees 1 1/6/93 Wed. Rain 0 1 1/7/93 Thur. Rain 0 1 1/8/93 Fri. Rain 0 1 Days this week ................................................................................................23 Days previously reported ................................................................................29 3 Total days to date ............................................................................................316 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION L Number Numbered Date 1. Dote Contract approved by Attorney General ~:~g..a,..~!~,:~!~. Day (Note 5) 11/10/92 2. Working days specified in contract ........................ ' 110 3. COMPUTE DATE FOR COMPLETION ,' n I aays s;:,oc rod are ,,'c.~,,t: el!"'."..' ."..'. '..'.:...:.:.:.."T 4 ~'..b.~.:'.:. 4. Total time extension days approve,,] t'~ dnle ~CCC c 5. Total non-working days to date (N<>:a · 6. Sub Total (Line 4 plus Line 5) .................................... ~ '~ ........ ] ~393 7. EXTENDED DATE FOR COMPLETION :. ine 3 I: ts Line 6) .......... !- ................... 8. Revised working days for contract, 'ino 2 cl,.s _ino .:, ................. s <L, ne6 m,nus _,he ..................' Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the ~'/"' correctnasa of the statement; otherwise the statement shall be deemed to have Resident Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMAPa{S and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT 8 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 1/1 ,1993 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 12/28/92 Mon. Cloudy, 61 Degrees 1 12/29/92 Tue. Rain, 61 Degrees 0 1 12/30/92 Wed. Cloudy, 63 Degrees 1 12/31/92 Thur. Kenko Holiday 0 1/1/93 FrL Holiday 0 Days this week ................................................................................................21 Days previously reported ................................................................................27 2 Total days to date ............................................................................................293 CCO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF E~ENDED DATE FOR COMPLETION Number Numbered Date ~:nc. ro'.. .: . .""7~ ........ of Days .Day (Note 5) ~' ~'dc~;~ec='~TA~;~;j .............................. · ~ 10 92 2. Wc'<iqg c:~ys spocifiod ~ cor'lrac' . ........................... ____~ ............................ :...~ ............................ 3. COMPJ'rL DA"E FO~ COMP_L I ION n; ~;I cbys sDcci'~c. 5 ar3 wurkeule. 4 22 93 t-. 'c'al I mo oxtonsEoP days apl:.rovo.~ Io da:e ,CCO ::lj~ c:hc', ...... . .... 0 . ~ {~ St,i:. 'c:a'. :L "~ -1 F:us I no 5; ......................... 3 7 EXTENDED DATE FO'~ CO',fP_ET;CN :L ~'e 3 p=u3 L'no 5'. ....... ' ....................... J"."""~'~"~ .... 8 Rovise:J wc'Kiqg cay~! h=r L'<>r't,sc: :Liqo 2 ~ u3 Li'te ~: ........... 1 ' 0 9. Tc:ri W.;.~K rg C'~yS [U t:~,:C ........................... El) ' ~' WOr~KING 3AYS REMAINING ,. rc ~J n:nu~ L -E 9: ............. 8~ Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) 12/31/92 New Year Eve. Holiday The Contractor will be allowed fifteen (15) days in which to protest in writing the correcthess of the statement; otherwise the statement shall be deemed to have Resident Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 7 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 12/25 ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 12/21/92 Mon. Clear, 65 Degrees 1 12/22/92 Tue. Windy, 68 Degrees 1 12/23/92 Wed. Windy, 70 Degrees 1 12/24/92 Thur. Holiday 0 12/25/92 Fri. Holiday 0 Days this week ................................................................................................30 Days previously reported ................................................................................24 2 Total days to date ............................................................................................272 CCO Other Days previously reposed ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF E~ENDED DATE FOR COMPLETION Number Numbered Date of D~ys Day (Note 5) 1. Date Ccqt'e'~: scpreved by Ahcrncy Gcnerol .................. . ........................... ~._ ~ 1 I0 92 2. Work ng days spcc.t od i-t ccn=r.ct ............................ __..... ~ 'q... 3. COMPU'I L DATE ~CR COMi ~L_'.ON ~.[ ~1' days sp:ci'ic.~ oro wcrk~Dlei .............................. J ~ 21 93 4. Total t mo oxteqs on cave ol:nrnvec :c n~:u .CCO ;IJs C~hG'~ .......... , 0 5. Total ncq-work.n~ d~ys to dd'.e (Nct= ~F. ........................ 2 ____~ 6 Sub ToI~:I .L=no 4 ~1~.~ I ~r'e 5~ ............................. 2 7. E~ENOED DATE FQ~ COk'~LE'I ION :t.i~e ~ F u:~ I i.~e ~; ........ ] i 4 23 93 8. Reviso~ work nG clsy:~ Ior <:~;nlracl L.ino 2 !~ ~s Liqo 4~ ............... ' ........l~d ........[ ' ". '" 9. Total ,%'orking d~y;~ Io deto ............................... 10. WO~ %G DAYS R~A % %G =I re9~inusLr:~} ................. ~ ~ Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the e~_ correctness of the statement; otherwise the statement shaft be deemed to have R ant Engineer been accepted by the Contractor as correct, NOTE: All footnotes are on reverse side, INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a} Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 6 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenks Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 12118 ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 12/14/92 Men. Clear, 68 Degrees 1 12/15/92 Tue. Clear, 68 Degrees 1 12/16/92 Wed. Windy, Clear, 70 Degrees 1 12/17/92 Thur. Cloudy, 61 Degrees 1 12/18/92 Fri. Clear, 61 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................19 2 Total days to date ............................................................................................242 EXTENSIONS Number Days Approved TIME report ...............................................................................................CCOCCOOther Days this Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered I Date of Days Day (Note 5) 1. Dam Ccntrsc~ approvod by Aft 3rncy Gore'el ........................ ' 11 1 g g~ 2, Working days speci.rie:~ n :oft'act ................................ ' "' '110 :."' ...... 3. COMFLTE DATE Fen COMPLETION iF ~ I :l~.ys ~coc [;sd ~'e workab;e __ : ...... [.:'..:"' ~.21 ~,3. ..... 4. Total tire oxiorsicn days sppro,.~e:'J to ds'.o (CCC u, L.s ol'~or:. ........ _ 0 ~ 5. Total nc'q-w3rkin~j d~,y~ Io date: ',;c:e .It ........... 2 6. Sbb 'clal !1 re .1 plJs: iqe 5~ ..................................... I 2 7. EX'LND-'3 IJ/,T:E_' =O" COM'LETION ,Line 3 ,~h.s ino 6) ............ [ ............... :2.' .:. L.L...' ......I""'~ .... 8. Ruv sod wor;dqg a,~y= [3r ,*ortlaol :b"e 2 plus [. rs 4! ............... = 110 9. Tolel wcrking ~ays to d~;le ................................. [ 2.1 10. WO:~KNSDAvSREMAN'NSI._rogmr~t.:sI. nog'. ............. I 86 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the Resd~ent E: correcthess of the statement; otherwise the statement shall be deemed to have ineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL R~S: CITY OF FONTANA REPORT NO. 5 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 12/11 ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 12/07/92 Man. Rain, 60 Degrees 0 1 12/08/92 Tue. Clear, 68 Degrees 1 12/09/92 Wed. Clear, 68 Degrees 1 12/10/92 Thur. Clear, 72 Degrees 1 12/11/92 Fri. Light Rain, 60 Degrees Clear P.M. Hours 1 Days this week ................................................................................................41 Days previously reported ................................................................................15 1 Total days to date ............................................................................................192 CCO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date :.,~=,~.=.:.=.=%t.?,,,.~,,~..~<.,..., Day (Note 5) 1. Date Contract approved by Attorney General ............................................~.i~.,'.'.'~i~, 11/10/92 2. Wcr.dng days ;.pet [ed in coPt'ec'. ................... 11 ,S 3. CCMPdTE DA":"; CH. COMnLETION { r all cays ~pecffied ~.'e wark.nblo ...... ~'.~!. ~... 4. Tc'a: I me ,..~xlens on ca~,,.~ enproved '.,'~ ,nt~ls ICCO pluf: ,';Iher) .........0 5. Tc:al r'on-wc',<'^g days :c sate ;Note 4~ ..................... ~2 6. Sut.' Tc'e ;Line 4 plus _ins 5. ....................................~2 7. EX':NDE3 DAT' =OR COMFLETION d ins 3 ,:.,.s. ine 6. ........!...........'''..'. '. '1 '.. '.."~.~;.~A.'..;. 8. Rev secl '.'.'crkiqg clays =or ccnzmc: '.L rs 2 pljs L r:e -!-, ...........'' 10 ,..,.,.. ............................. ,.: ... .Gi. ............... 9, , .... Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be silowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDEI~T ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Donot list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on~'~!!'' the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed.and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 4 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 12/04 ,1992 Non-Working Working Days Days No Work Dote Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 11/30/92 Mon. Clear, 72 Degrees 1 12/01/92 Tue. Clear, 70 Degrees 1 12/02/92 Wed. Cloudy, 67 Degrees 1 12/03/92 Thur. Cloudy, 67 Degrees 1 12/04/92 Fri. Rain, 59 Degrees 0 1 Days this week ................................................................................................41 Days previously reported ................................................................................11 0 Total days to date ............................................................................................151 CCO Other Days previously reposed ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION QF E~ENDED DATE FOR COMPLETION Number Numbered Date of Days Day (Note 5) I . ' '..' ...... . ": .' '. '.'.. 2 ,',:'- ".':..... ."" .' 3 '.. ;.'.' '. . ' . :~ :.; '.' ' :.", .... : .... : ':' '.'.', . ? .' '~.~ 6 :~. ". 7 %. . . ..... :' ', ;+ . 8 ' : '.' .. ."' '.: "' : 9 '... '...,';".. 1'.'.:~ <".;.. '.' :'~".'.' ',',L'. "' ':.. Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the ' correctnasa of the statement; otherwise the statement shall be deemed to have R Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. IN8TRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: ,,, v CITY OF FONTANA REPORT NO. 3 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 11/27 ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 11/23/92 Mort. Heavy Winds, 65 Degrees 1 11/24/92 Tue. Cloudy, 70 Degrees 1 11/25/92 Wed. Winds, 66 Degrees 1 11/26/92 Thur. Holiday 0 11/27/92 Fri. Holiday 0 Days this week ................................................................................................3 Days previously reported ................................................................................8 Total days to date ............................................................................................11 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date of Days Day (Note 5) 1. Date Contract approved by Attornoy Gc'~euj .................. __ 1 · ' 0 '~2 2. Working days specified in contreat .............................. 1 '. 0 3. COMPUTE DATE FOR COMPLETION' [ ~:1 e~ys R!.~oc .er:l F~:'o ;vo,k, ~lc ' ....... : ...........~'.....'..~.[.7.~';.~:'~1' '§3 .... 4. Total time extension days approve:;I Lo d,;la ~C. CO =~l,js ~:.'no~! ........... __ 0 5. Total non-working days to date (N{,~e t.. ....................... 0 6. Sub Total (Line 4 plus Line 5) .................................... 0 7. EXTENDED DATE FOR COMPLFTION ~'L r,s ,? p=dS _ ~'O 6~ ........... 8. Revised working days for confred {Lino 2 c L.s '. ~qo .'-~ ............. 1 ' 9 g. Total working days to date ......................................... : 1 10. WORKING DAYS REMAINING (. ino 8 miqjt~ , "~C ~,~; ................. 99 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) 11/26, 11/27/92 Thanksgiving Holiday The Contractor will be allowed fifteen (15) days in which to protest in writing the .~.~'~7 correctness of the statement; otherwise the statement shall be deemed to have Resilient Engineer been accepted by the Contractor as correct. NOTE: All footnotes am on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO, 2 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 11/20 ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 11/16/92 Mort. Clear, 75 Degrees 1 11/17/92 Tue. Cloudy, 72 Degrees 1 11/18/92 Wed. Cloudy, 76 Degrees 1 ,11/19/92 Thur. Windy, 71 Degrees 1 11/20/92 Fri. Windy, 72 Degrees 1 Days this week ................................................................................................5 Days previously reported ................................................................................3 Total days to date ............................................................................................8 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report .............................................................................................. Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date of Da~/s Day (Note 5) 1. Date Contract approved by Attorney E · '. '...; 2. Working days specified in contract ...... 3. COMPUTE DATE FOR COMPLETION '. : . i ..: . .' .,., ' .. ':: 4. Total time extension days approved tc :: :: :: .... "' 5. Total non-working days to date (Note .' 6. Sub Total (Line 4 plus Line 5) .............. 7. EXTENDED DATE FOR COMPLETIOr. ' ..... ' .. ;; 8. Rov,scd wcfki'tg usys for cor. tra'.,t ,L;Pe 2 plu~ L r'c ,h ............ : 10 9. Total wc'k~Pg c!e),s Io date ........................................ 8 10. WORKING ~AYS '~r_',~A NING ~'ine 8 ,."r~n,Js L ne 9! ............... 102 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the ~,~d~ent~'''' correctnasa of the statement; otherwise the statement shall be deemed to have Engineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due' to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on' the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CiTY OF FONTANA REPORT NO. 1 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 11/13 ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) Mon. 11/10/92 Tue. Windy, 79 Degrees 1 11/11/92 Wed. Kenko Holiday 0 11/12/92 Thur. Windy, 75 Degrees 1 11/13/92 Fri. Clear, 74 Degrees 1 Days this week ................................................................................................3 Days previously reported ................................................................................0 Total days to date ............................................................................................3 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date .................... 0f.D..ays Day (Note 5) 1. D,Y.o Contract ~.~ppr~v-~d by Allc'qoy Go,"em! ................... ' 11 1C ,32 2. W~rking c.~,ys spcci-"e','.' in '.on:rac~ ............................. "' ~:I'C j ..................................................... 3. CCMI ~UTE DA"-' =Crl CO',IPLETIO% i.[ ~ I ~:I~.,/,~ ut-oc hcd e:o wolkabls ........................ L..... ~' ~:'L ~':~... 4. Tc'.e: mo oxten~ on ~sys apF'c','ed t,3 ;;IRIs '.CCC [; us ol.,or: .......... C 5. "c:ol r'~.~r;-wc'.<;"g days :c d/.!l~; ',N;,le 4', ..................... C 6. SUL: Tc:s' (Line J, pIjs ino 5) ................................. '3 7. EX'r'NDED 3ATE "'OR CCM."'I.~T=Of',; ~L na 3 CldS L.r~c. 6. ............ . ...............J ......... 8 Rov.scd wcrki'~g days ;or ."cq:rac: ~1 re 2 [)lJ~' L r'e .1! ............ I ~ 10 ~ 9 I otel wc,,< Pg day~ ~c ¢::,~:e ................................ 3 "'~ 10. WCI-~KING DAYS REMA!NING ILino I~ mi't,,s I ins 9, .......... 107 ' ' [ Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) 11/11/92 Veterans Day Holiday The Contractor will be allowed fifteen (15) days in which to protest in writing the i . correcthess of the statement; otherwise the statement shall be deemed to have ngineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTION8 TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a} Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 1 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. Thef~1~~wingstotementsh~wsthenumber~fw~rkingday~chorgedt~y~urc~ntractf~rtheweekending11/13 ,1992 Non-Working Working Days Days No Work Dote Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weother Contro,,,ng Operation Mort. 11/10/92 ' 79 Degrees 1 11/11/92 0 11/12/92 Thur. Windy, 75 Degrees 1 11/13/92 Fri, Clear, 74 Degrees 1 Days this week ................................................................................................3 Days previously reported ................................................................................0 Total days to date ............................................................................................3 TIME EXTENSIONS COO Number Days Approved COO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Totol days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date of Days Day (Note ~) ..... 9, Tc'.;a .vo'k r'g dc~Vs ts o-c,t.'c ............................ ~ .... Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) 11/11/92 Veterans Day Holiday The Contractor will be allowed fifteen (15) days in which to protest in writing the ~ correctness of the statement; otherwise the statement shall be deemed to have R ginear been accepted by the Controctor os correct, NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 2 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. Thef~~[~wingstatementsh~wsthenumber~fw~rkingd~yschargedt~y~urc~ntractf~rtheweekending11/2~ ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 11/16/92 Mon. Clear, 75 Degrees 1 11/17/92 Tue. Cloudy, 72 Degrees 1 11/18/92 Wed. Cloudy, 76 Degrees 1 11/19/92 Thur. Windy, 71 Degrees 1 11/20/92 Fri. Windy, 72 Degrees 1 Days this week ................................................................................................5 Days previously reported ................................................................................3 Total days to date ............................................................................................8 CCO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXfENDED DATE FOR COMPLETION . Number J Numbered Date 1. Date Contrast epproved by Attorney General ............................................~ ~ 11/10/92 2. Working days specified in contract ................................................ 11 '3 -" 3, COMPUTE DATE FOR COMPLETION (if all days specified are worknblo ' ' ..........[ "'j--~0:G'~" 4. Total time extension days approved to date (CCO plus othe,, ......... C 5. Total non-working days to date (Note 4) ........................................ 6. Sub Total (Line 4 plus Line 5) .......................................................... 7, EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6= ............ ~ ......................' ....... ~" ~'" 8. Revised working days for contract (Line 2 plus Line 4) .............. 1 ~ 0 9. Total working days to date ................................................................ 10, WORKING DAYS REMAINING (Line 8 minus Line 9) .................. ' 1 ~2 Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the ~ng correctness of the statement; otherwise the statement shall be deemed to have ineer been accepted by the Contractor as correct, NOTE: All footnotes are on reverse side, INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORTNO. 3 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. Thef~~~~wingstatementsh~wsthenumber~fw~rkingdayschargedt~y~urc~ntractf~rtheweekending11/27 ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 11/23/92 Mon. Heavy Winds, 65 Degrees 1 11/24/92 Tue. Cloudy, 70 Degrees 1 11/25/92 Wed. Winds, 66 Degrees 1 11/26/92 Thur. Holiday 0 11/27/92 Fri. Holiday 0 Days this week ................................................................................................3 Days previously reported ................................................................................8 Total days to date ............................................................................................11 CCO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date Day<Ncte5> 1. Date Contract epproved by Attorney General ............................................~~ ~, 11/10/92 2. Working days specified in contract .................................................... 1'0 3. COMPUTE DATE FOR COMPLETION (if all days specified are ;¥crkaelo' ' ................ 4. Total time extension days approved ~:~ dirt-'..~ ~CCC p us c:hor. ........ W C 5. Total non-working days to date (Nets .1: ......................... : 6. Sub Total (Line 4 plus Line 5) .................................. ' " 7. EXTENDED DATE FOR COMPLETION ~L r'e 3 p!us L=, e 6: .......... i: ........ ' ..... ...'.: .'..~22:. 8. Revised working days for contract ~.Li,'o 2 I: t.s Li-o 4'= ............. i 10 9. Total working days to date ............................................ 10. WORKING DAYS REMAINING '_in."- 8 m'nus L'Ps ':}: ................ I 9~ Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) 11/26, 11/27/92 Thanksgiving Holiday The Contractor will be allowed fifteen (15) days in which to protest in writing the R~e correctnasa of the statement; otherwise the statement shall be deemed to have er been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 4 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 12/04 ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 11/30/92 Men. Clear, 72 Degrees 1 12/01/92 Tue. Clear, 70 Degrees 1 12/02/92 Wed. Cloudy, 67 Degrees 1 12/03/92 Thur. Cloudy, 67 Degrees 1 12/04/92 Fri. Rain, 59 Degrees .-1 ~ 1 Days this week .................................................................................................6,41 Days previously rapcried ................................................................................11 0 Total days to date ............................................................................................-I'6 /5'1 CCO Other Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTt~NDED DATE FOR COMPLETION Number ]Numbered "i 1Date of Days Day (Note 5) 1. Date Contract approved by Attorney 3one-el ..................... ~ ...... 1C 92 ... g' ~'F t /.~ Working days specified in eon!:a::! ............................ . .... :0 3. coMPuTE DATE FOR COMP ""ON ;., .... 'T:::'..:.':.:' .:' .:.::. .' 4. Total time extension days approvel~ [c '.:'el ."- =:2,0(:) p,L.s (fi'ler= ......... 0 5. Total non-working days to dale :Nule 4; ..................... 1 6. Sub Total (Line 4 plus Line 5) ............................... F 7. EXTENDEDDATEFORCOM'~LLIION!_i'~o3sI,.sLino6) ......... ' ........... I' 42293 ~ I ....Lr, pl.~.L , 1 .............. 10. WORKING DAYS REMAINING :Li.~e ~ Irs..'~.~ _in,., 9 ................ 9.' Controlling Operation(e) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the R~t En correcthess of the statement; otherwise the statement shall be deemed to have gineer been accepted by the Contractor as correct. NOTE: All footnotes are on reverse side. INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b)' Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 5 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc. The following statement shows the number of working days charged to your contract for the week ending 12/11 ,1992 Non-Working Working Days Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 12/07/92 Men. Rain, 60 Degrees ...1 g) 1 12/08/92 Tue. Clear, 68 Degrees 1 12/09/92 Wed. Clear, 68 Degrees 1 12/10/92 Thur. Clear, 72 Degrees 1 12/11/92 Fri. Light Rain, 60 Degrees Clear P.M. Hours 1 Days this week .................................................................................................~ ~'1 Days previously reported .................................................................................,,1.6 15'1 Totaldaystodate .............................................................................................2,'1 I ~2 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date of Day.s ,. Day (Not_e_5) ' B.~'eCo' a ~. r ve,'lnyAl:crneyGone,ial ................. i 1' 1.~2 2. W~...k ~'3 doys scocrcd in canlP~cl ........................ 110 a. coul,a'rE DA'E =Cn CO'.: "LE,O\ ..' :. ~d~:vs ,::,<:.' os er~ ,,'srks,;~ei .....' ............':! ......~ '~:,.~' ~/~.1/~.~ · 1. "c.;sl I me oxls'~s on 5. 'c..li!lr~m-':Ic'..:-gdayslo'J,~;Is:N;>le-'.: ....................... ; 2 · 5. S~.i: TG:.~ i! i'te 4 F u,? I r'.'-' 5.. ........................ 2 7. EXT,/%DED DATE FCR COk""'l.:' ON (_ino 3 c'..s. ins .......... -."_:.'.,,... S. ;.,:-v sac working dilys ~c' cen:r.qct ._ nc 2 9. 'c:~~ working days :c c.e:o .......................... I ' ~, WO;.K:",;G DAYS RTMAINING :Line 8 "inj,: I ~3 ,t.k .................. 89 ~ ~ 'i Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the ~ correctnoes of the statement; otherwise the statement shall be deemed to have ginear been accepted by the Contractor as correct. NOTE: All footnotes ere on reverse side, INSTRUCTIONS TO RESIDENT ENGINEER 1. When recording nonworking days due to weather, state the reason why the day was unworkable when the weather description itself does not adequately descrive conditions. For example, "Clear-wet grade" to describe conditions when the weather is clear, but the grade is too wet to work. Do not list days merely as "Unworkable." 2. Enter days on which no productive work has been performed on the controlling operation(s) for reasons other than weather. 3. List numbers of contract change orders providing for time extensions. 4. Do not include nonworking days which occur after expiration of the Extended DATE OF COMPLETION. On contracts that are overtime, the total under WORKING DAYS shall not be greater than the total of REVISED WORKING DAYS, (Line 8). After approved total of working days has been reached, continue recording working and nonworking days but do not add into the totals. Make statement under REMARKS that WORKING and NONWORKING days are shown for record only since the contract time has elapsed. 5. From calendar issued by Headquarters with working days numbered for convenience in computation. 6. Time extensions other, are to be explained under REMARKS and the following information is to be included: (a) Cause of delay and specification reference \under which approval was granted. (b) Statement as to what controlling operation or operations are being delayed and to what extent. (c) Dates for which the extension was granted. (d) Reference to supporting data. ADDITIONAL REMARKS: CITY OF FONTANA REPORT NO. 6 WEEKLY STATEMENT OF WORKING DAYS PROJECT Cypress Avenue Sewer Project TO: Kenko Contractors, Inc, Thef~~~~Wingstatementsh~Wsthenumber~fw~rkingdeyschargedt~y~urc~ntractf~rtheWeekending12/18 ,1992 Non-Working Working Dsys Days No Work Date Day Weather, Weather Conditions or Other Conditions Working Caused by Done on Day Weather Controlling Operation (Note 2) 12/14/92 Men. Clear, 68 Degrees 1 12/15/92 Tue. Clear, 68 Degrees 1 12/16/92 Wed. Windy, Clear, 70 Degrees 1 12/17/92 Thur. Cloudy, 61 Degrees 1 12/18/92 Fri. Clear, 61 Degrees 1 Days this week ................................................................................................50 Days previously reported ................................................................................~/~ 2 Total days to date .............................................................................................3e ~-42 TIME EXTENSIONS CCO Number Days Approved CCO Other Days this report ............................................................................................... Days previously reported ......................................................................................................... Total days to date .................................................................................................................... COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Date 1. Date Cc'~.'a'j: a.'~pr,cved by A'h>~r-:;'7 ~e"~,rs. _ . ,of Days Day (Note 5) .............. ~ '11,392 2 Work ~. co.v:,u:.'_' DAT~ 4. Total Lin'e ox:eqt on t~y:-.' s:}pr;.~ve'J ~;~ d~=le iC~C L'I.=S C'.her .........'3 5. Tot~l '~:q-;','ork rg clays :c eats ~N:~te -',; ........................2 6. Sub r31;~l d r:s/..'.'.lus. i've 5~ .................................2 ~. E~E.~:,.'D D^TE rC~ C~',~P.ET~ON =~ ~s ~ rk,~ ~.',e ~; ...........': :.'.'7:':: 7~7~:".";.";'~"'~'.";.;.';.";";~' ;""'~;'#~:~"'~ 8. Rev ssc wolk r'g days 'c.- r~:}r'l'~=~: .',1 'r'e ,c p',u,,} I i',e .;.: ..............' 10 9, Total w.~lk ng (Ji-;ys ~t.: d~-.ro .............................~.-3 ?,, i~ . 10. WORK!%G DAvS I-~LMAININC ;Liqo Controlling Operation(s) Remarks: (Note 6) (Continue on reverse) The Contractor will be allowed fifteen (15) days in which to protest in writing the ~ correctness of the statement; otherwise the statement shall be deemed to have ngineer been accepted by the Contractor as correct, NOTE: All footnotes are on reverse side. CITY OF FONTANA R,ponNo, INSPECTOR'S DAILY REPORT M T~)T F S 8 ClrcleD~y Shift Hour~ 8tart PROJECT: ~O~A~ON & DE~C~I~ON OF OPE~ON: HOURS - ~M NO, ~ER EQUIPME~ ~D/OR ~R: ~ RE__K8 EQUIPS, NO. OF DEBCRI~ON ~ ~eaon ~r Idleness or NO. MEN (~ Equipmere or to~ ' _ o~er mm~) I 3~FF t ~ ~ ~. 9 CITY OF FONI'ANA R, ort No. 0-'-. ,I - al - INSPECTOR'S DALLY REPORT M T W T F ~L~ 8 Ciml, Oay 8h~ Hours 8tart o~6~ PROdECT: C..'(PE ~8,,,IE; ~-C~. D~3JC-CT (. e:OP, l~C~ CSI, ILY) T-tO ~--.~F,.:EIdAY LOCATION & DESCRIPTION OF OPERATION: HOUR8 - ~M NO. EQUIPMENT AND/OR LABOR: ~ REMARK8 EQUIPMT. NO. OF DEGCR~PTION (Reaon for t~lleneee or NO. MEN (Of Eclutpmsnt or Labor) ot~er mm~'ks) I E-~ 5 G~ovr~ rp, e~ (5o-rou] 5 Contractor Title Inspector 1 ~g~ ,.if/sb HOUR8 * ITEM NO. WEATHER /.~0' -4G° 0 EQUIPMENT AND/OR LABOR: (~ REMARKS EQUIPMT. NO. OF DEeCRIPTION {~ (Reeeon for Idleness or NO. MEN (Of Equipment or Labor) other ramark=) Cont31ctor Trde inspe~lor 12/9~ Jr/Eb CITY OF FONTANA R,po~ No. 4U D~le ,,~14 I~q~ INSPECTOR'S DAILY REPORT LOCA'RON & DESCRIPTION OF OPERATION: HOUR8 * ITEM NO, WEATHER EQUIPMENT AND/OR LABOR: ~ REMARKS EQUIPMT, NO. OF DEBCRIFTION d~ (ReinmOrt for $dlsnmse or NO. MEN (Of Equipment or Labor) ot~er remarks) I W. P,~_, u'~,. I P,,,. (~.J~h,t(:}oLPN OPP- I ( I ~')~ LL,,'rHf,.~P OPP-. I i CLt' Con~sctor Tltte Inspe,3tor 12/92 j'l'limb CITY OF FONTANA Repo. No. 4~ D=y q ~,8 INSPECTOR'S DAILY REPORT ~ T W ~ ~ $ S C~ O~ HOUR8 - ITEM NO. VFr, ATHER O EQUIPMENT AND/OR LABOR: ~ REMARKS EQUIPMT. NO, OF DEBCRIFTION ~ ~Rlelon for idleness Or NO. MEN (Of Equipment or Labor} o~er rtmark~) I ~N,-rr~z, POE; C/~ Contractor Title Inspe=tor 12/9~ J'rleb CITY OF FONTANA mepo. No. 40 D.y q~ Dale / L -~0 - ~z-- INSPECTOR'S DAILYREPORT M T W{:~F 8 9 CiroleDay 8hilt Houra etare 01C:~ ~top r7oo_ HOUR8 - ITEM NO. WEATHER e.~g_ SOo EQUIPMENT AND/OR LABOR: ~ REMARK8 EQUIPMT, NO. OF DESCRIPTION t~ (fleaon for tclleness or NO, MEN (Of Equipment or Labor) other reinart<s) I L~uTf FO IO C~" ~v~. 14r~4 ~F, I O CITY OF FONTANA ,e,o~No. ?~q D.y q~C~c{~l INSPECTOR'S DALLY REPORT M T~T ,F 8 8 Circle Day 8h~ Hou~ 8t~ ~ ~op t~ LOCA~ON & DESCRIP~ON OF OPE~ON: HOUR8 - ITEM NO. WEATHER 'lt* -, EQUtPMENT AND/OR LABOR: a~ REMARKS EQUIPMT. NO, OF DESCRIPTION (Reason for idleness or NO. MEN (Of Equipment or Labor) other remarks) Corro'actor T~e InsDector 12/92 J'i'/s,b CITY OF FONTANA R.por~No. ~ O.y qG>5 De~, DEC. 26 Ic/q2_, INSPECTOR'S DAILY REPORT ~:>T w T P S S Cir~mO. 8hM:Hour8 8tm'~ ,")'Td~ 8top 1'750 LOCATION & DEI~CRIPTION OF OPERATION: HOUR8 - ITEM NO. WEATHER Pr'. EQUIPMENT AND/OR LABOR: REMARK8 EQUIPMT. NO. OF DEBCRIPTION (Reaon for Idleness or NO. MEN (Of Equipment or Labor) o~$r return) Contractor Tltle Ina!oeblor 12/92 Jl'/mb CITY OF FONTANA Re.o~ No. Day O. ~l li~ INSPECTOR'S DALLY REPORT (~T W 8h~ Hours 8ta~ LOCA~ON&DESORI]~ONOFOPE~ON: 5~t[ ~yPttTS ~% 2o '~- HOURB - rrEM NO, VV~=ATHER , EQUIPMENT AND/OR L~BOR: ~-- REMARK8 EQUIPMT. NO, OF DESCRIPTION ~ (Reason for idleness or NO, MEN (Of Equipment or Labor) other remarks) I 6tab?, s' ~,, Ct~S~ q Con~'actor Titls Ins~/gr-"' r_ . 12/9e JTlab CITY OF FONTANA ReportNo. INSPECTOR'S DALLY REPORT M T W Te8 8 CiroleOay Bh~ Houm ~ O~ ~op . HOURS - iTEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARK8 EQUIPMT. NO. OF DEBCRIFT10N (Ree~on for Idleness or NO. MEN (Of Equipment or Labor) other remaz~s) G~:>,/E .55To. CRAk, T= UT~UTV' P~Cr,aP r~Ty' BO~mC, WV'~CRm.F_ , Contractor Title Inspector 12/92JT/aD CITY OF FONTANA Repo. No. ~2 D=y qSc/ INSPECTOR'S DALLY REPORT M T W ~ S S Circle D~ 8h~ Hou~ 8t~ n~ 8top~_ PROJECT: C.~'PRE.c~3 Axle EFcV, F,_P. ( LOCA RON & DESCRIPTION OF OPERATION: HOURS - FrEM NO. V4FcATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT. NO, OF DEeCRIPTION (Reason for Idleness or NO. MEN (Of Equipment or Labor) other remarks) t R~c.r.A,4or..p,c~c~ fFR.) Ol'tL,ffY ptC, r, OP Contractor Title Innl~ector 12/92 J1'/ab CITY OF FONTANA ~,po~No, ~ O,y qS~ INSPECTOR'S DALLY REPORT M T {i~T F 8 8 Circle Day 8hnl Hours 8t~ ~op . LOCATION & DEGCRIFrrlON OF OPEERATION: HOURS - ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT, NO. OF DESCRIPTION (Reason for Idleness or NO. MEN (Of Equipment or Labor) ob~er remarks) I /~lh'( ~,~r~LP~ ( c~,,o~1 I 'PA~GE. LrdTJ E~, ( ~ ~ Contractor Tit~e inspector 12/92 dT/ab · " V V CITY OF FONTANA ReportNo. ~G Day c/E1 Dm INSPECTOR'S DAILY REPORT M ~w T F s s CircleDay Shift Hours 8tart 0'~b:3 StopiSn't_ LOCATiON & DESCRIPTiON OF OPERATiON: HOURS - FFEM NO. WEATHER r--..~t C~(,.? EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT. NO. OF DESCRIPTION (Reason for idleness or NO. MEN (Of Equipment or L.~bor) o~sr remarks) LTnL.~T~' Contractor 'Ntte Inspector 12/92 Jl'/eb CITY OF FONTANA Repo~No. 2c/ D,y q~o INSPECTOR'S DAILY REPORT ~T W T F 8 8 ClrcleD~ Bh~ Hou~ Bt~ ~ 8top~. HOURS - ITEM NO, WEATHER CLEA~. EQUIPMENT AND/OR !_4,BOR: REMARK8 EQUIPMT. NO. OF DESCRIPTION (Reason for idleness or NO. MEN (Of Equipment or Labor) other remarks) Contractor Title Inspeotor 12/92 J'r/ab CITY OF FONTANA CALIFORNIA MEMORANDUM TO: BOB WEDDLE, CITY ENGINEER, ~ FROM: CA~RLOS NAVARRO, ASSOCIATE ENGINEER/INSPECTION ~ - SUBJECT: REVIEW OF INSPECTION FILES AND SOIL COMPACTION REPORTS WITH RESPECTTO RESENT TRENCH SEI'FLEMENTON CYPRESS AVENUE SEWER PROJECT DATE: JANUARY 11, 1995 A review of the daily field geotechnical reports with assigned inspectors daily reports was conducted and completed by Bob Savant and me. The following was determined: In general, there were locations which failed to pass compaction testing. These areas of concern were, for the most part, addressed but I also found reports that indicated Kenko, Inc. did not respond to GPI's request to rework other said areas. These reports were also received and signed for by the PW Inspector, who appears to have been unresponsive and also failed to respond to or re uest Kenko to react to said reported problems. Thus it appears that some of Ke~o's inactions were never reported to project management and some of these areas went unaddressed. Conclusion: We may have other problem areas in the future with similar failures on Cypress Avenue. Improper compaction around sewer lateral locations may be the potential cause of said failures. When the weather clears and weare able to use the TV camera on the existing system, we will be able to review this situation and assist with timely resolution. Solution: ~)O~t~.._ On future projects involving jor grading/deep excavations/general compaction the project manager and inspection supervisor will establish a weekly review of all geotechnical reports and inspector's daily reports. This general overview on-going construction operations would provide the impetus for appropriate actions to be taken as needed. For example, requesting an on-site contractor to re-work any areas which have failed to meet the required density; questioning inspector actions; requesting clarification items from geo-tec personnel; requesting action from contractor; calling all parties to a conference to resolve field problems, etc. The proposed procedure of establishing a weekly review should alleviate problems in the area of inaccurate reporting and unresponsive actions and provide positive management overview. Bob Weddle January 11, 1995 Page Two Source Fundinq: I now understand that as of 6 AM on January 11, 1995, 24 counties have received a presidential declaration of emergency for major disaster which could provide financial assistance on this project. I have requested that Operations track all time and materials on this project, should we be able to recover the cost from FEMA. CN:sh cc: Sr. Public Works Inspector Associate Engineer/Special Projects PAGE OF ,- DALLY FIELD SUMMARY IN-G..r_L, DATE . SPl PROJ. NO~ PROJ. NAME ~(',~E',. "' ' Jd/4'bjWEATHER · FILL LOCATION/PURPOSE '~L%",,/.C~ REQUIRED COMPACTION :'~'.~ EQUIPMENT USED ~-,,':~C: ~, ~L,~: ,'~:~/ SOURCE OF FILL: ONSITE y' IMPORT SOIL TYPE(S) DEPTH OF FILL/BACKFILL :'~' ' GENERAL SUMMARY OF OBSERVATIONS L( //~'C~b,'. ~, >.dC f ~,~C."',~ A~ , 1.,:.~:4 <,L. "~.%"~ , <2 .~ .~ ,.,, ~ ~ 2.:. J <: .,,.~.,.: ~ -~ ,..~ AREAS OF CONCERN BY "' RECEIVED BY , .-.-"----*- .- --~:': . -~ FOR: GEOTECHNICAL PROFESSIONALS, INC. FOR: FORMS/'F.t(II/e9) · 'r . .f ,~ :f . ' ' ";' '; · · ;: "~". "' ~' :'. % ':i"', , FA EE GPI PROJ. NO. 1}4~ '('' PROJ. NAM ~:~'X~ A E ATH ,,,o,-,o,,,,,,,,o~ %,, .' ~'I¢Yf. (~ ~ ,:,~o,..,,~,:,oo,.,,.,.o-,-,o,., : o'/. f-'t6 eouw~T used~ .~J.' i o ,,,, ,,.; ,.,:::., 9!,-, .~t,j,.,' ,.~.,, p, :,,, . ,...,~.~.~,, ~,, ."m ~''.''',":'~' 'fi,...C. tj ,.-', %t',,~c.~/~,~ ~,./ ~,~ .L- FOR: GEOTECHNICAL PROFESSIONALl], INO. FOR: ...... .. -- ,; ,., ........ .: FA~E'/0 -L " ·"' ':" F ' ' ' DALLY FIELD SUMMARY GPI PROJ.'Nd. P oJ. NAME p ~ ~,~ATE .WEATHER :..:, · ... :- . : ~. I' FILL LOCAlION/PURPOSE' ~[~/' '~ G,[ ~: u ~LiL~/ .... · , , , EQUIPMENT USED ~".r,'.~. SOURCE OF FILL: ONSITE ~/IMPORT SOIL TYPE(S) DEPTH OF FILL/BACKFILL GENERAL SUMMARY OF OBSERVATIONS ,,~/ . ~' ~ F.,"~,~ , % AREAS O.F CONCERN FOR: 6E~ICAL PROFESSIONALS, INC.. FOR: , PAGE MEMO NO. FIELD MEMORANDUM FIELD MEMORANDUM GPIPROJECTNO. 1t4 ,& PROJECTNAME ~/~)y',~,~ ~'~' DATE~h(2/~'S FOR: Geotechnlcal Professionals Inc. The conclultonl ind re~ommendetlonl contithed herein hive been bleed upon cb~ervltJone, I~ noted, end were detive~ uetng generally ecclpte(I engineering Ipproa~hee end pflnolplel MIIli~le It thie time ind the clegtee Of cite Ind Ikllll ordlnltlly exercieecl un~lef limaIll clrcumeton¢es by reputoble geotochnlcel engineere ptl(~tlolng In thll Iree. NO repre~entotIon$ ire made Is to the (ItJIlity or extent of materill not oheerve{I end teetH. NO Other wittartly of repteeentotlon, either expteeeed Or Impitecl, FORM/F-6(8/e9) PAGE"~_. OF7,,,,,- O DALLY FIELD SUMMARY FILL LOCATION/PURPOSE REQUIRED COMPACTION AREAS OF CONCERN FOR: GEOTECHNICAL PROFESSIONALS, INC. FOR: -" RECEIVED April 18, 1994 Sr:.~ 2 I LqcJ4 Wayne Brown Public Works Inspector crn, I:NGiNEER,$OFFiCE Community Development Department 8353 Sierra Ave. Fontana, California Dear Mr. Brown, On February ?, 1993 my son, Joseph D. Germano and a girl friend, Barbara Borjan were shot and killed in a trailer home belonging to Kenko Contractors. At the time my son was a Kenko employee. The person who shot him was/is a Kenko. employee. After this incident occurred I started to receive information from other concerned individuals reflecting other instances of violent/assaultive behavior by other Kenko employees. As a parent who lost a son in a violent act, [ have filed a complaint (law suit) in the Central District of San Bernardino County against Kenko, eta]. Preparing for the case I learued that you witnessed an incident that occurred on a Kenko job site the Thursday (February 4, 1993) before my son was shot to death by a Kenko employee. The incident may have some connection with the death of my son. If you are willing to share the details of the incident [ will appreciate hearing from you. Please keep in mind I am preparing for a court case and any information you share with me may become pan of a public record. You can write and/or send the information to the address below or you can call me collect at (401 )231-2942. This is my home phone and is also equipped to receive a FAX message if you prefer. incerely, J had, RI 02917 JOSEPH ¥- GERMANO 11 E Shadow Brook Lane Smithfield, R] 02917 ' City of Fontana CALIFORNIA CORRECTIVE ACT|ON SOTICE It h~s com~ to our ~nt]on that th~ fo]]owi~ it~ms ~r~ d~fic]~nt abov~ r~r~r~nc~d project job s]t~: t ] 8~rdcadss t~sn Trench [ ] $]~n~n~ t ] Dust t ] M~t~r]~] on 8o~dw~y t I ~n~uffior]z~d 8~r~ C[osur~ [ ] 0thor R~s~ b~ advised that you ~r~ dk~ct~d to tak~ corr~ct]v~ ~ction within th~ fo]]o~n~ t]m~ ~ram~: [ ] Immediately [ ] 2~ Hours [ ] 8y th~ ~nd o~ Curr~nt ~8 Hours All work don~ 8hail b8 ~ccompl]sh~d to th8 aat]s]~act]on o~ th8 n~c~ss~ ~t~pa to correct th~ d~fic]~nc~s and ~nvo]c~ you for r~qujr~d. If you h~v~ any questions r~rd]nO this m~as~ contact ~h~ Engineer or Authorized representative. B~~~ 8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA, CALIFORNIA 92334-0518 · (714) 350-7600 SISTER CITY- KAMLOOP~ B.C. CANADA PUNCH LIST Inspotion was conducted a~ ,~ove projec~ by REPRESENTATION CONTRACTOR.OWNER ENGINEER,ARCNITECT ~...,~,o,:7/~/~° NO. ITEM PUNCH LIST Inspe~ion was conducted at a~ve ~roject by ~g~ ~ ?~Y at o'cl~k th.s date. REPRESENTATION CONTRACTOR-OWNER ENGiNEER-ARCHITECT DISTRIBUTION: 1. Prolee! Minifit 73. 4 CITY OF FONTANA INSPECTOR'9 DAILY REPORT M CQNTRAC:;TQR EQUVsM"r. NO. OIr OEOCSN~E:~ ~ ~ ~nmm ~ ~nttlct~r Title CI'Pf OF FONTANA INSPECTOR'S DALLY REPORT NO. ~ {C~iaUl~ninla~Li:N~ ~C)UR8 - ITEM NC). WE.~T~ER ='.QUIPMENTANO/ORLABOR: '~ ~ ,~) ~ ~ RE~KS NO. MEN (C~ EQJiDmIf~ or LIDca1 .,,,( ~ (l:qellc2n for talehess ~ =.QUIPMENT ANO/OR LABOR: "' ' '~ ~ REMARK8 ;t. jiPMT. NO. OF DEBCRIP'RCN ,,,( ~,j (Rillon for 1011nee,, or NO. MEN (Of Equil:)ment or L~Dor) r.,,~,/Uler rlmarks) Cor~'ictor T~I ~~~ HOUR8 - ITEM NO. WEATHER 3~lP~. NO, OF DEBCR~ON {Re~ for talene~e ~ NO. MEN (~ Equipm~ or ~ Corrc,e. tor ,, T~® ~ ' CITY OF PONTANA V INSPECTOR'$ DALLY REPORT HOUFI8 · C(tM NO. WEATHER ~U&P~. NO. OF DEBG~ON ~ ~ ~ ~ (Rm~ for idlmnm~ NO, MEN ~ E~ipm=~ or ~ o~sr mm~) Corl'Bc:tof ' llt)l ~~ HOUR8 - FFEM NO, WEA'T~ER :UIP~. NO. OF DE~CR~CN (Rea~ for idleness ~r NO. MEN C0t'~'sctof TltJl ~~/~~~ 1 ~Jg~ CITY OF FONTANA INSPECTOR'S DALLY REPORT M T wCT)F s s circ~,s~ HOUR8 · iTEM NO, WEATHER  ~ ~ (ReM~ for idleawes or NO, MEN (~ E~ipm~ or ~ o~er mm~) Cor/rB~tor ° TitJl ~ CITY OF FONTANA V' ~e~,o,~,,~.~,~Z.r INSPECTOR'S DALLY REPORT M T(~)T F S s Circleally HOt JR8 - iTEM NO, WEATHER ;~IP~. NO. OF DESCROON ~ ~ (Reuon f~ Idleness or NQ MEN (~ Equipmere or ~ o~er ~m~) 12/92 HOUR8 · iTEM NO. WEATHER -'.QUIFMENT AND/OR LABOR: ' ~ ~ REMARKB :;LJIPM'T. NO. OF DEeCRIFTION .~ .. ,,,,( ~j (Relaon for toilchess 0r NO. MEN (Of Equipment or Labor) o~mr rimmr.,m) 12/9~ ;UIP~. NO. OF DEBCA~ON ~ ~ ~ ~ ~ ~ (ReM~ for t~lenesl or NO. MEN (~ EquiptaR or ~ offer ~m~) 12/92 HOUR8 - R'EM NIl. WEAT~E{~ ~.QUIPMENT AND/OR LABOR: REMARK8 ;LJIPM"r. NO. OF DE8CRIPTION (.Rellon for I~t~,nea$ of NO, MEN (Of Con~tol' T~Ii Insl:)l~r CITY OF FONTANA V INSPECTOR'S DALLY REPORT Confactor o TKdl 12/~2 Jr/~ GITY' OF FONTANA ~ INSPECTOR'S DALLY REPORT HOt jR8 - ITEM NO. WEATHER ~QUIP~N"I" AND/OR LABOR: ;~JiPM'r. NO. OF DEDCRIIqgON ~ ~ (Rwaonforl~lsnessor NO. MEN (Of E~uipment or m'hO0 ' ''''( ~'j o~er rimtrY, s) Cottractor , Ti~e 1 ~./92 J'l'/tiD , cITY oF FONTANA PUBLIC WORKS SEP, VICF~ CONFINED SPACE WORK pERIvflT HEADING , , ~PLOYEE ~G ~ PRE-E~Y 1. Sar~ ~ and Re~u~ Tai~g Conduc~d om 2. Manda~ P~*En~ B~e~ng Conduc~d on: ~ ~ ' ~ ~a~) 3, Does ~is ~ob gaqui~ Special Tni~ng: 1. Ar~ All Elect~cal Devices Intrinsically S~fo: It'llYES [ ~ ; N/A 2. Hav~ ~I Power Co~s ~d T~ls Been Vi~lly ~ec~d: ~ ~ I J N/A VESSEL PREPARATION 1. Work Az~a Isolated with $1gns/~rdens? $ I N/A 2. All Energy Sources Lo~k~d~aggcd Out? ~ YB I t N/A 3. A~I InpUt Lines Cappcd/Bllnded? s S N/A 5. Vessel Cleaned/Purged? 6. Ventilation Provided 30 Minutes Before Entry? pRE-ENTP, Y ATMOSPHERIC TESTING OXYGEN FLAMMABLE TOXIC TIME I~IT. ~LEL /~,/~ ~) ~LEL t~,t:~.3PPM ~ ~ %LEL ~ __%LEL __. PPM EMERGENCY/RESCUE PROCED~ 1. ~atlonofW~t~nEme~en~y~uePlan 2. T~c of Emc~cncy~c~ue Team Rcqul~d: ~0 * SAFEYY EQUIPMENT Porsonal Proteotive Equipment P~quit~d: ~ Safet~ Equipmen~ Requk~d: 1. Sclf-ContaincdBr~athingApparatusR=quircd? 2. PotUbI~ Atmosphcric Monitor Roquired? s $ YF,~ s I NO TYPE: ir'~ly I J NO TYPE: 3. Tr~p~l and Harncs~ I ~ NO TYPE: , 4. Ventilator [~;:~YES I ~ NO PERMIT AUTHORIZATION ~mr~ Date N/A - No~ Applicable to Present lob. CITY OF FONTANA )mmf INSPECTOR'S DALLY REPORT mm HOUR8 - iTEM NO. WEATHER :~IP~. NO. OF DEBCRI~ON ~ ~ , ~ ~ (Riuon for i~lmniis or NO. MEN 12/92 ,.Fr/a~ HOUFI8 - ITEM NO. =QU~PMENTANDIOR LABOR: ~ ~ ~ ~ NO. MEN (Of Ecluipmen~ or L~c~or) o~er r~m~.~s) Cor'f0'~::tof T~Ii ~J 12J~ JT/aD HOUR8 - ITEM ~QUIPMI~NTAND/ORLABQR: ~'~ {~." '~i ~ REMAFIKB :.!jaPMT. NO. OF DEBCRIPTION ~ ~ ~,~" "i ~J (Reelon for ,Olonos8 or NO. MEN (Of Equipment or Labor) . ob~er remarka) 12Jc~ jT/=h EQUIPMENT ANOIO,q L~: REMNqK3 EQUIPMr. NO. ~ DE~N ~m~ ~ ~et ~ NO. MEN (~ E~m~ ~ ~ ~er ~) ~ Contrlctor Title CITY OF FONTANA INSPECTOR'S DALLY REPORT ~w Contractor Title CITY OF FONTANA INSPECTOR'S DAILY REPORT EQUIPS. ~. OF DE~N Contrlctor Tithe ~nl~ "' ,.,.___.,__- CITY OF FONTANA INSPECTOR'S DAILY REPORT ks T W T(~)S S Crd. D~/ PROJECT ~//~,Y4C~-,~S/~_Z~.~O~ CTOR CONTRA EQUIPMENT ANOIOR LABOR: REMARKS EQUIPMr. NO. OF DEBCRIFrlON 0Relsof~ for ~leneml or NO MEN (Of EQu~ment or Contrlctor Title ~~ln$~~/ tste,,,,__el - CITY OF FONTANA INSPECTOR'S DAILY REPORT EQUIPMENrT AND/OR LABOIq: IqEMA, qKS EQUIPM'T. NO. OF DEBCRFrlON {l=let~on ~r Idetlmm ~ Contrlctor Title MEMO ,an, 3 ,5'.'3oA ,,,,, /1,9' C:)IITRIIUTIOIkI: I. Rilllit ~ 3. IReliMe! P,ol4~ Rllll~tet~l Cantrector Title Inlplt~f Z. ' o o /~ r~l ~l , Er'0 00,7 ,g . ~oo l~ , xI ~, ~o ~ o. zl 3 %30 ~ .~x? %a O DO, ,4 CITY OF FONTANA INSPECTOR'S DAILY REPORT · EQUIP~ ~Ol~ ~: EQ~P~. ~. ~ DE~N NO. MEN (~ E~ ~ ~ Contractor Title t~ CITY OF FONTANA INSPECTOR'S DAILY REPORT PROJECT ~~ ~~ CONTRACTOR ~~ EQUIPMENT AND/OR LABOr: REMARKS EQUIPMr. NO, OF DESCRIftT1ON 0:leeeoft for losenets or NO. MEN (Of E~UC~ment or LeI:K>r) o~her rtmette) Contrlctor Title InlplCtOt CITY OF FONTANA INSPECTOR'S DALLY REPORT PROJECT ~ / EQUIPMENT AND/C),q LABOR: BEMN:IKG EQUIPMr. NO. OF DEGCRF'RON tReeson for lalef'~$, or NO. MEN (Of EQuCme~t or 1,13or) outer rimIbm) ContrlCtor Title Inlpl~tor hee__._er INSPECTOR'S DALLY REPORT u T W(~F S S CircleDre/ 8h~ Hours 8tar~ ~o1~ LOCATION & DESCRI~N OF OPE~ON: -'.QUiPMENT AND/OR LABOR: '~ ~,, ~ ,' ~, REMARKS ':!JIPMT. NO. OF DESCRIPTION (Reason for idleness or NO. MEN (Of Equipment or Labor) ot~er remarks) Cor~actot T~$ ~ 12/9~ jT/ai:} ' HOUR8 - FFEM NO. WEATHER -'-QUIPMENTAND/ORLABOR: "~[x~ ~ '~ ~'~ REMARKS NO. MEN (Of Equipment or Labor) ~,j (Resson for i~leness or o~er rsmanXs) Title InspectorS-/ 12/92 jT/~h CITY OF FONTANA V INSPECTOR'S DALLY REPORT , CiTY OF FONTANA INSPECTOR'S DALLY REPORT ~ T W T ~ a S ci~cl.o,w HOUR8 - FFEM NO. WEATHER -',QUIPMENT AND/OR LABOR: ~ , ~ R~MARKB ';UiPMT. NO, OF DESCRIPTION ~;~ t~!ason for Iciltneas or NO. MEN / (~ or Labor) omer r~ CoF~'Bctor 'RtJl ~~' ~ 1 ~J~2 J'r/aD CITY OF FONTANA V INSPECTOR'S DALLY REPORT HOLjR8 - (TEM NO. ;!JIPMT. NO. OF DESCRIFTION .~, ~)~ ~;~,~,~'~ ,,,( ~j (Reamon for ~dlsness or 12./~ HOUR8 - rT'EM NO. '~a~T~ER · ~ ~ ~ ~ RE~KS ~QUIPME~ ~O/OR ;~lP~. NO. OF DESCRI~ON ~ ~ (Reaon for idleness or NO. MEN (~ Equipmere or ~o~ ' ~ ~ o~er mm~s) Corl'actor lltl$ 12/92 JT/m CiTY OF FONTANA V INSPECTOR'8 DALLY REPORT L A~ON & OE~CRI~ON OF OPE~ON' HOUIR8 - ITEM NO. -',QUIPM~NT AND/OR ~R: ' ~O, MEN _ CITY OF FONTANA -- INSPECTOR'S DAILY REPORT HOUR8 - FT'EM NO. ~,~/ l~PMl'. NO. OF DEBCRIFTIC)N ~ ,, ~j (Resmon for Ic~teness or NO. MEN (Of Equipment or tabor) offier rsms~a) Con~'acZof T~e e~'''''''''~ f 12/92 ,,rT/a~ INSPECTOR'S DAILY REPORT Repo J..3 Z- Day . Date ......,- - / ? __?'-3 @ T W T F S S Cirel, Day Shift Hours Start - Sto!''''- /,. f CITY OF FONTANA PROJECT: C., Y Pr~~ S 4p.e.... ,S-elVe rHQ / e c.:-J. LOCATlON & DESCRIPTION OF OPERAT10N~ " S' y ~;;~ ~~ t:~' , p p n.; / t') F-/ll vi ,<\ 4-) c? .19~ 0 4 ' r 4Y\d HOURS . ITEM NO. ER ~ /,YVt? AI... ~ .... ~7 "< .JIC .~ <l . . I ~ -~ ~ . ~ ~ " ') ~ J I~ l~ ~ ~ ~ , "I ~ ~ I"";: ~ ~ ..., ~ Q ~ f~ ~ =aUIPMeNT AND/OR LABOR: .~ \~ ~ REMARKS :UIPMT. NO. OF OeSCRIPTION ~ ~ ~ ..~ j'..; I~ '-: (R...on for Idl.n... or NO. MEN (Of Equi!'ment or Labor) oth.r remarks) /1,)~ rMJ~")/.L~ .....,.~ ~\. ..... V"J \ . .JI-"" / <...-0'" Contractor T1tII ~~ - 12/92JT/ab CITY OF FONTANA V INSPECTOR'8 DAILY REPORT ;~IP~. NO. OF OERCRI~CN ~ ~ ~ ' ~ (Reaon for idlenell Or NO. MEN Car~'actof T~e e~ 12/92 ~T/a~ HOUR8 - FrOM NO, =QUIPM~NT AND/OR t. ABORT ~,~ ~ -~ ~LjIPM'r. NO. OF DESCRIPTION ~ ,,< ~.) (R®UO~ for t~lsntll or NO. MEN (Of E~ljipment or Llbo~ ot~er r~marks) CITY OF FONTANA V INSPECTOR'S DALLY REPORT Conlr~ctot lltNm 12/9~ HOUFI8 - ITEM NO. ~ ~U~PMI'. NO. OF OESCRIFT1ON ,~ ~ ',,( T,J (R$11on for Idtwnwe$ or NO. MEN (Of Equipment or L~or} ommr rimre'ks) CITY OF FONTANA V INSPECTOR'S DALLY REPORT HOUR8 - FFEM NO. WEATHER · ~QUlPMENT AND/OR I.ABORT '.~ ~', ~ ~,~ REMARKS ';gIPMT. NO. OF DESCRIFRON ~ ~ ~) (RIMon for tcllen®18 or NQ MEN (Of E~ulpmsnt or Libor) olfisr minstrel) ['i°' . ........... ,,-,- ..... 7.J..+ 2~, I t - ~,7_:_--.L-----~~ ..... ' ' _ ~ (.o.~G) - _ ........ 87+00 L~' : -!' ~ ....... = ..... u-' ~S4 ~o ':6 .....X~ ' '~ o ~' C of Fontana .LIFORNIA FAX COMMUNICATIONS FHOM FAX NUMB~ (909) 350-66~ 8 PLEASE D~UVER THE FOLLOWING PAGES TO; From: ~yA P~~CO ~ ~ (Includ~nO cover 8he~) Message: FAX CHARGE ~':C' ~3.00 1ST PAGE (EXCLUDING COVER SHEEll ~1.50 THEREAFTER. ,%~.... . PLEASE MAKE CHECK PAYABLE TO THE CITY OF FONTANA IN THE AMOUNT OF $ .. PLEASE MAIL TO: CITY OF FONTANA. P.O. BOX 518, FONTANA, CA 92334 FROM: Name CompanylRrm Address Phone No. NOTE: Please return this cover sheet wi~h Payment (Account No. 010-031 6-2300) 8383 :SlERRA AVENUE(P,O, 80X818) ,$ FONTANA, CALIFORNIAg2834-061S · (/14)350,7600 SISTER CITY -- KAMLOOPS, B,C. CANADA CITY Of fONTANA V ~.0;~o./.~:~ ~., INSPECTOR'S DAILY REPORT M T W T4~8 8 CirqlmD~ 1 ~J~ JT/aim CITY OF FONTANA INSPECTOR'S DAILY REPORT C)rcle ~QUIPME~ ~D/OR ~R: ' ~ ~ ~ RE~KS ;UiP~. NO, OF DE~CRI~ON ~ ~ ~ (Resort for idleness or NO. MEN (~ Equipme~ or )oQ o~mr mm~s) Con13'actor T~i ~~ 12/92 JT/=h HOUR8 - ITEM NO. WEATHER %UlPMT, NO. OF DESCRIFTION ~ ~ ";~ -,~ ~ ~, (Reason for Idteness or NO. MEN (Of Ec~uiDment or Lal~or) ot~er remarks) 1 ~Jg~ Contractor T'~ 12/~ JT/=h Contactor 12.Jg~ JTIal;) Corfractor "T"itte Inspector ~ 12/92 J'TIs~D CiTY OF FONTANA INBPECTOR'S DALLY REPORT HOURI~ - iTEM NO. WEATHER qQUIPMENT AND/OR LABOR: REMARK8 ;UIPMT. NO, OF DEeCRIFT1ON .~, \ ~, ~ ~j (Reaon for I~teness or NO. MEN (Of Equipment or Labor) other ~marks) / ~/,,~- g' ,e ~ Corfo'actor '~tle ~nal:~ "" 1 ~2 J"r/aD CITY OF FONTANA V INSPECTOR'S DALLY REPORT Coreactor T~i EQt. JtPMENT AND/Gq ~: REMARKS EQUIPMT. NO. OF DE~,RIFTION (Rilloff tot ~ef',ell or NO. MEN (Of E~,v, pr~nt or Lalx~ ofmr rtma'~) (~ontrlclor Title IMIIICIOf INSPECTOR'S DAILY REPORT 8h~ Houm ~ ~ ~op.__ HOUR8 - ~M NO. ~ER NO. MEN (~ Equipmira or ~o~ ' ~ ~ (Reaon for idleness or o~mr /.~ Co~tor ~e o~ 1 ~ ~/~ HOUR8 - ITEM NO. WEATHER ,.;. ~QUIPMENT AND/OR LABOR: ~ REMARKS ';L,,IIPM'T. NO. OF DESCRIFTION ' "'~, ~ NO. MEN (Of Equipment or Labor) "''~ ~ (Reeon for I~tenes,~ or o~,r r~marke~) 12/92 CITY OF FONTANA V INSPECTOR'S DAILY REPORT ~.~.~: c~ y~ ~,~. ,5"e~er~~ 2/92 lad - HOUR8 - ~M NO, ~ER NO. MEN ~ ~ ~ iReMort for idleness or 7/ ~ Z~6o ~~ ~oo~ e,~ ir~ Coln'o'actor · T~$ I~ ~-- 9 2/~ JTI~h Cot-to'actor · "lltll f Contractor · TttJe Inspe~-'''''~ 12/~2 ~1"/~h CITY OF FONTANA ~ ~e~lW,~o.,./.,"'/" INSPECTOR'S DALLY REPORT ~__]_,)w 'r ~ s ~' ~,-,~-~,~ ,~,,:e ,z '- , q',=,2 ),.2 0-,- ~',..D 0.2 -/YO 7 HOUR8 - ITEM NO, WEATHER =.QUIPMENT AND/OR LABOR: DESCRIPTION '~ ~,..~,.~ ' ~ ~,~ REMARK8 · ;LJLPMT. NO. OF (Reason for itJleness or NO. MEN (Of Equipment or Labor) /,}4' Z-'-d4/E~ ./u~a ;za~q //l/ ~'~',j',C-~a /,-,,~,,,,,/a~ q -, . , . 12/92 Zrla~ CITY OFFONTANA ~ ~11~. o.~_/2~ ~',_7 INSPECTOR'S DAILY REPORT sh.~Hou. smrt.p,q/~ HOUR8 -~M NO, NO. MEN (~ EGulDml~ or ~o~ //¢ Z~4~oo ~/ ~ /.~ C~/ Contractor · T~e Insl~e~'''~ ~ ~ 12/92 j'T/aD · ,j",,g~20- ,.d,~-o2 /~'6 7 HOUR8 - ~M NO. ~ER ~QUIPME~ ~D/OR ~R: ~ '~ ~ (Reaon for idleness 0r NO. MEN ' o~er Contractor Title Inspector 12/92 Jl'/ab CITY OF FONTANA V INSPECTOR'S DALLY REPORT CITY OF FONTANA INSPECTOR'S DALLY REPORT M T w T F S S CircleO~/ Cor~'actor · 1~l InS r 12/92 JT/~ CITY OF FONTANA ~w INSPECTOR'S DAILY REPORT : . HOURS -~.M NO, /,~3/~,~L~' * ~UIP~. NO, OF DESCRI~ON ~ ~ (Relon for idleness or NO, MEN (~ Equipme~ or ~o~ ~ ~ ~ ~ offier ~m~s) ,4',? o - 5' o z HOUR8 - ITEM NO. WEATHER ~.QUIPMENT AND/OR LABOR: ~ ; ~,~ REMARK8 ;LJIPNrT. NO. OF DESCRIPTION (Reason for Idlenes8 or NO. MEN (Of Equipment or Labor) o~$r rmmart<s) Corl'e'Bctor · l'~e ~iD$'~~ 12/92 Jl'/ab CITY OF FONTANA V Reoo/~,{. <~ .g Day INSPECTOR'S DAILY REPORT ~w T ~/~,. -~" ~/0 Con~"aclof · TItle Inspe~lof 1 ~9~ CITY OF FONTANA V INSPECTOR'S DALLY REPORT ud~w T CorYo'8.ctor · Tltll ~ ~ 12/~2 JT/=h CITY OF FONTANA V ..oo&,,~./~,6""ow ~ / INSPECTOR'S DALLY REPORT (~T W T ~ 8 S ' /-~--~, CITY OF FONTANA ~,,~' R.=o~.,,.,~./~J'~a~, O~, Y--Z- ~ INSPECTOR'S DALLY REPORT ~T W T F S s Circ~.O~ CoFfo'ac~or · "~tJt ~~ 12,/9~ JT/ab OlTY OF FONTANA V INSPECTOR'S DAILY REPORT HOUR8 - ~M NO. ,~~ , ;UIP~. NO, OF DESCRI~ON ~ (Reaon for I~tmneso or Col-ca'actor · 'Title II'llpl~ 12.J9~ JTIII:} /.-, CITY OF FONTANA a.,- '12jLTT:'-,92 INSPECTOR'S DAILY REPORT ~_,~,y~ v HOUR8 - ~M NO. . 'X ~ RE__K8 NO. MEN f CITY OF FONTANA V INSPECTOR'S DALLY REPORT Cort0'a~tor · Title ~/~~ 12/92 jTlt3 CITY OF FONTANA V ~4o.oL,~./~ oa ,_~,.~/- ?,..3 INSPECTOR'S DALLY REPORT u T(~T F 9 S CircteOsy Shift: HOurs ~tart /',,~,,~ r_..-- CITY OF FONTANA ~ mepok,,~./o Z- D~y aa . r-J/-~ 7 INSPECTOR'S DALLY REPORT HOLIR8 - ~M NO. ~ER . ; ~lP~. NO. OF DEGGRI~ON ~ ~ (RGaon for tdllnGas or NO. MEN (~ Equipmere or ~o~ ~ ~ ~ o~er ~m~s) Corm'actor · Title Inspector CITY OF FONTANA V INSPECTOR'S DALLY REPORT HOUR8 - rT'EM NO, WEATHER · ~UlP~. NO, OF DEBCRI~CN ~ ~ ~ (Reason for Idlenice or NO. MEN Contactor m l'~e Insl:)~ 12/g2 12../9~ CITY OF FONTANA V INSPECTOR'S DAILY REPORT M T W T['~7 8 s CircleOiy 8hi~ Hours Star 8top LOCATION & DESCRIPTION OF OPERATION'. ' HOUR8 - FFEM NO. WEATHER I~QUIPMENT AND/OR LABOR: REMARK8 EQUiPM'I', NO. OF DESCRIPTION (Relson for Idleness or NO. MEN (Of Equipment or L.~bor) o~er remade) Cor~rsctor Title ~""lnsl:ilet~ ' 12/92 J'rf.h HOUR8 - iTEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT. NO. OF DESCRIPTION (ReelOn for idleness or NO. MEN (Of Equipment or Labor) o~er remarks) Contractor Title Insl~ector 12/92 CITY OF FONTANA V INSPECTOR'S DALLY REPORT HOURB - iTEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT. NQ OF DESCRIPTION (Reeeon for lateness or NQ MEN (Of Equipment or Labor) offer remarl<a) CITY OF FONTANA V RC~<~f~o.~D_~/j' INSPECTOR'S DALLY REPORT M TL/~//'T F S 8 CircllD~ HOURS - r'r'EM NO. E~QUIPMENT AND/OR LABOR: , REMARK8 EQUIPMT. NQ OF DESCRIFRON ~ (Rillon for i¢lleness or NO. MEN IOf Equipment or Labor) other r~p'~m_), Comlz~c~or T~de '~ ~ CITY OF FONTANA ~,~ m,o~,,~, .~:>~ Day INSPECTOR'S DAILY REPORT LOCA~ON & DESCRI~ OF OPE~ON: ~C_ 12/92 aT/aD · CITY OF FONTANA ~ INSPECTOR'S DALLY REPORT HOUR8 - ITEM NO, ~THER ,1' 't EQUIPMENT AND/OR LABOR: REMARK8 EQUIPMT. NO, OF DESCRIPTION (R®=won for idleness or NO. MEN Cor~'actor '1'~I ~~ ~ ,CITY OF FONTANA INSPECTOR'S DALLY REPORT M T w T~/B S CimleO~ lJ HOUR8 - ITEM NO, WF. ATHER EQUIPMENT AND/OR LABOR: ~ REMARK8 EQUIPMT. NO. OF DEBCRIPllON (Re-mort for fdleness or NO. MEN (Of Equipment or t.lbo,) o~mr nmmatlm) / ..~,~ 7 ~ /o /3~ ~, ~ /O /, r~n. k' . .~_r? f ~ Con'olctor Tltle Insp, lm~r'''' 12J92 d'l'/ab CITY OF FONTANA INSPECTOR'S DAILY REPORT M Circle (, ,,~' ~ ?DO~- ~,5~d~2 /~/t~ HOUR8 ~ ITEM NO, WEATHER · EQUIPMENT ANC)/OR LABOR: ',~ REM~qK8 NO. MEN Col'~'lctor Title 12/92 HOUR8 - iTEM NO, WEATHER EQUIPMENT ANOIOR LABOR: ~/' ~, ~,.y~, REMARK8 ~ ~ ~ ~ (RiISOfi for Kllensss or E"-"QUIPMT. NO. OP OI=SCRIPT1ON NO. MEN (Of Equipmerit or Cottractor 'n~e //~'/~/~ HOUR8 - iTEM NO. / EQUIPMENT ANO/OR LABOR: ~ ~ REMA~K~ NO. MEN (~ E~m~ or t~ o~ ~m~) Tide Inspe~"lof l~jl~dT/sb · -f',-? 2.-2m - .,~",~2o2/z/,~ ../ HOUR8 - toTEM NO. · EQUIPMENT AND/OR LABOR: I ,~ '~ REM~qK8 NO. MEN (Of Equipment or L~or) / Coffo'~1ot T~I ~~~/x"~,~~/ _-----',__ _ ~ 12/~JTlal:~ 13 R]~OYBRpAYM~CFS STRAIGHT-TIIV~ OVI~[TIIVI~HOURLyRATB CLAS,~i~ICATION ~ lbeh Nasim V~em~ Timtel ~ To~[ Daily Sesntay Sunday OOURNB~rltlI,SON) 1t~ and !bliday Haul,/ and ~ Welfa~ Rse I l/IX I 1/23( Holiday Cm~erDfivet-lfilhway $19.17 !I3AS 34.39 ,~!'~._m_ ~32 8 ~936 $38.90 338.945 Fu~ Ttock Ddvet. Wmof Track (2 .,be) 18J~ 3.43 439 2.0~ 3332 $ 28.M 3[1~ 38.16~ 47.49 DfivetdG~Slse~detTmdt 18.90 3.4~ 4.39 2.03 32 8 29.09 3834 38~4 47.99 Dfivof d Tmua-l~ax Track-Under 3 Yds.. DmnpaemTmd~kulhn61~2Yd~ wate~ Ime. l 18.71 3.43 4.39 2.0~ .32 8 28.90 38,253 38253 47.61 DdvofdTm~t-~Tmck3Yd& of morn, l~Tm&.,6 lf2Yds. w~et level end ovff 18.85 3.4S 4.39 2.03 32 8 29.04 33.465 38.46~ 47.89 Low I~t Ofiw~ (9 exlu of o~et) 19.62 3.4~ 4.3] 2.03 .32 ! 29.81 39.62 39.62 49.43 PB and Sb~n,, 'Prpe Tmda, F~e-ljm inclnd~l W'n~ Tmdr, bet l~niled coTmdmal~acablemPlpe]inema Uti~Wod~whema~ceew ° and'finmm~($_~0Fetboutaddltimal foe Tlnxnan) woeking Track Ddve~ 1 11.80 ~.45 43339 2.03 .32 8 28.99 38.39 ~8.39 47.79 Eraeke C~,,~ Drlv~ 18~7 3.45 4.39 2.03 ..t2 S 28.86 38.19~ 3~,19~ 47.53 hea~/~tpennhioed 18.47 3.45 43339 2.03 .32 8 M.~' 37.89~ 37.89~ 47.13 Tin& lvlmuled Pov~et Bt~e 18.33 3.43 4.39 2.03 .32 8 28.72 37.985 37.985 479~ Tmek P41tme. Wme~ Pea (Sinlie Eelhe), Welder 19.42 3.43 4.39 2.(D 3332 8 29.61 393332 39.32 49.135 Truck Re~ Helper 18.72 3.4~ 4.39 ~ .32 8 28.91 38.27 38.27 47.6~ Tmdc ge~hmsa-Weldet 19.52 3.43 4.39 ~ID .32 8 29.71 39.47 39.47 49.2~ Wateheosemm 18.~9 3.45 4.39 2.03 .32 8 283338 37.1'/5 37.'r7~ 4&9~7 W~ ~ 18.78 3.4.5 4.39 2.0~ .32 8 28.97 3836 38.36 47.7~ WmetPu~TwinEn~ne(wi,Nof wilhout mm:hmem~) 20.42 3.43 4.39 2.03 .32 a 30.61 40.82 40.82 ~1.03 Wmet ~ $~n.eb~ I~? (wllh atmdmaems) 19.92 3.4~ 4.39 2AD .32 8 30. 11 40.07 40.07 -Wam'TmckOofmomaxbs) 18.77 3.4~ 4.39 2.03 .32 8 2[96 38.34Z 38.34~ 47.73 Ddve~dVeh~s. of~d Vehidu: Cmc~_d~ dlve~de, leu thm 6mm) 2A~d~ 18.47 3.45 4.39 2.03 .32 8 28.~6 37.89S 37.89~ 47.13 3 Axle~ ![62 3.4~ 43339 2.03 3332 8. 7.8.81 38.12 38.12 47.43 4 of morn Axles 18.87 3.4~ 4.39 2.1D .32 8 29.06 38.49~ :B.495 47.9:.1 All oa-hilbway equ~eem wt~mulllplspowofso~n~$1.OOpof Im~ s~li~i~zal) 19,4~ 3.4~ 43339 2.0~ 31 $ 2~.~1 ~9.31 :~9.32 4~.0~. I~Yds. w~k~l 1167 3.4~ 4.3~ 2.0:} .~2 s 28.8~ 3[1~ 33.1~j 47.~3 16Yds. ls~lsssd~n2~Yds~wss~le~l lll.~ 3.45 4.,~ 2.~ .32 9 2~.11 35..~ :B.~ 25 Yds. et morn wslof level 19.42 3.45 4.39 2.03 3332 II 29.61 :~9.32 3932 49.03 REC~43NIZED HOLIDAYSt Holidaysq~mv4~h~hegmenlpeev~!hoedysml~mmforHo~ia~r~d~dilbepm~d, dallbedl~~l~ ~ IT~3.[ -~. Cor~'actor Title Ir~l~M'~or ~'~-- 12/92 JT/BJ) Corm*actor T}tle InspeGl~ 12/'9~ JT/ab O rc INSPECTOR'S DALLY REPORT d~TW T ~ 8 8 CirclsO~y ~o~ ~ -,~ LOCA~ON & ~ HOURB - ~ NO. EQUIPS. NO. OF DEBCRI~ON ~ ~ ~ ~ (Re,on for t~lenen or NO. MEN (~ Equipme~ or ~od . Con=~tor T~e ~/~ ~ 2/92 JT/~h CiTY OF FONTANA INSPECTOR'S DALLY REPORT ~ t w T~">s s Circ~.D=~ 8hh~HOuil LOGA~ON & DES OPE~ON: Con~'actor T~I InspeQ~ 12/92 JT/aD CITY OF FONTANA INSPECTOR'S DALLY REPORT PRQECT: ~ P C ~ON' ~ Corm'actor Title Ins~ 1 ~92 J'r/ab CITY OF FONTANA V ,eo~. ~'2 =,~ =.. ~.~'__~' INSPECTOR'S DALLY REPORT M T(~T F 8 S CircllD~ LOC ~ON ~ DESC~F OPE~O HOUR8 - iTEM NO. ./~,~,,~,~EFI ~ ~ EQUIPME~ ~D/OR ~R: ' ~ (Rea~ for ,diehess or s~u~P~. NO. OF OSSC.~ON ~ ~ ~ NO. MEN (~ Equi~me~ or ~o~ o~er ~m~) / ~ ~ ~ CITY OF FONTANA rr, m/ INSPECTOR'S DAILY REPORT HOUR8 - ~M NO, EQUIPS, NO. OF DEBCRI~ON ~ ~ ~ (Rta~for I~)mnese or NO. MEN (~ Equipme~ or )o~ o~mr (~ 2/- ~...~ J"/-//O o HOUR8 - iTEM NO, WEATHER NO. MEN / Corrffactor CITY OF FONTANA V INSPECTOR'S DAILY REPORT · sh.t Hours HOLIR8 - ITEM NO, WEATHER EQUIPME~ ~D/OR ~R: ~ ~ (Rea~ for t~leness or EQUIPS. NO, OF DEBCRI~ON NO, MEN CITY OF FONTANA V INSPECTOR'S DALLY REPORT LOCA~ON & DEBC~6F Contractor iltll CITY OF FONTANA IN~PECTOFI'~ DAILYREPOFIT M T(:~:~T //'2_ Cona'sctor 'hum C~mnspm~f" CITY OF FONTANA ~ INSPECTOR'S DAILY REPORT PR~ECT: OESC~F OPE~ON: Conffactor 12/~ JTIaD CITY OF FONTANA ~ INSPECTOR'S DAILY REPORT 8h~Hou~ LOCA~ON & OESC~F OPE~ON: Corm'actor 'r~tlt ~lnspe':tol''/ "" CITY OF FONTANA INSPECTOR'S DALLY REPORT M T W TC~8 8 CircleD~ HOUR8 - FTEM NO. 'WEATHER '-f, \ EQUIPMENT AND/OR LABOR: ~ ~ :~ REMARKB NO, MEN / ~+ ~ Conl3'~ctor Tl~., · Inspector 12/92 CITY OF FONTANA INSPECTOR'S DAILY REPORT Circle Day 8hift ~:2 21- 2,,~ ,Z")- / / O o HOUR8 - iTEM NO, .W.W.W.W.W.W.W.W.W~THER ~Qu,F~. no. oF Dssc.,rnonD".~ ~: NO. MEN (Of Equipment or Labor) o~er remarks) oo ,,~-/z ~;,-,~,,~_ -~ E~,.k CITY OF FONTANA V ~.,o~ ,o. 7,2` INSPECTOR'S DAILY REPORT M T~T F HOUR8 - FFEM NO. WEATHER EQUIPMENT AND/OR I,A~OR: ~ ~', REMARKS Cobb:or ~e ~ Inspe~ 1 ~ ~/~ INSPECTOR'S DAILY REPORT ~w T ~ t 8 CircSeD~ LOCA~ON & DESC~F OPE~ON; / HOUR8 - ~M NO. _ EQUIPS. NO. OF DEBCRI~ON NO, MEN / / ~,, INSPECTOR'S DALLY REPORT sh~o~. sw~ stop.__ Corro. aclot Title In~~ 1 CITY OF FONTANA INSPECTOR'S DAILY REPORT ~ w T P e s Cira,,O~ LOCA~ON & DESC~F OPE~ON: Corm'actor Title InaDac~r 1 Z/92 CITY OF FONTANA INSPECTOR'S DAILY REPORT u T~T F e S CircleO~ 8h~ Hou~ LOCA~ON DE OPE~ON: & S HOUR8 - ITEM NO, WEATHER EQUIPMT, NO. OF DESCRIPTION t~.~ ~ '~ (Ree. son for t~tlness or NO. MEN (Of Equipment or Lal)or) obher ~lmarl~s) Con'o'actor Title Inspector 12/92 CITY OF FONTANA INSPECTOR'S DAILY REPORT u T~T F S S CircleD~ 8h~ Hou~ ~ ~op . LOC ~ON & DESC~ F OPiniON: HOUR8 - iTEM NO. ',NEATHER EQUtP~. NO. OF DEBCRI~ON ~ ~ ~ (Re,on for I,lenele or NO. MEN Cer~'sctor Title tns0ector 12/92 J'rlaD HOUR8 - iTEM NO, WEATHER ,_, NO. MEN Con~'actor T~$ 12/92 CITY OF FONTANA V ..po~o. do/D~, INSPECTOR'S DALLY REPORT ~T W T ~ s s C~r~,O~ 8h~ Hou~ ~ . LOCA~ON & DEBC~6F OPE~ON: HOLIR8 - ri'EM NO. WEATHER EQUIPMENT AND/OR LABOR: ~ ~ ~ REMARK8 NO, MEN (Of Equipment or I,i)or) ~ ' othmr rmmaf,~) /q/o ~ 7/-F~,;(/' , Contractor T~e Inspe,3tor 12J~ CITY OF FONTANA y INSPECTOR'S DALLY REPORT S~ ~QUIP~D/O~: ~ ~ ~ RE~ EQUIPS. ~. OF DE~ON ~" NO. MEN (~ E~lgm~ or t~ ~,r mm~) Corm'actor 'Rtle ~ ' ~I~/9~JT/e~B ' ' CITY OF FONTANA INSPECTOR'S DAILY REPORT NO. MEN (~ E~Om~ or ~ / HOUR8 - iTEM NO. WEATHER E~UIP~. NO. OF ~ o~er ~m~s) NO. MEN (~ Equt.m,~ or ~oQ ~ ~ ~ ~ ~ (mmaon for t~lmnems or Conr~ctor Ti~s Insp$ctor 12/9~ d'1'/~h CITY OF FONTANA INSPECTOR'S DAILY REPORT LOCA~ ~l D BCR E CITY OF FONTANA ~ ~ ~/3 RoDoft No. Day INSPECTOR'S DAILY REPORT u T~T F 8 8 CircllOsy Con~'actor T]tlt InsDt~lor 12/92 JT/=h CITY OF FONTANA V INSPECTOR'S DAILY REPORT ~w T LOCA~ON & DESC~F OPE~ON: . CITY OF FONTANA Report No. INSPECTOR'S DAILY REPORT M T W T F 8 8 CirclmOmy 81ffiiff Hours 8tlm.',t 8top PFIOdECT: 8CRI~N6F OPERATION: Con'factor l'~mm Inspector 12/92 jl'/=h CITY OF FONTANA v o, .:-/-?_~ INSPECTOR'S DALLY REPORT ~ 27- .,?..~ ,-<"')-//<~ 0 HOUR8 - ITEM NO, · ~,, ~,'~ .~'!'~ ~ ~.~ EQUIPS. NO. OF DESCR~ON ~ ~ ~ ~ (Rla~ ~ I~l.nele of NO. MEN o~er CITY OF FONTANAv ReDor~No. ~ / Day INSPECTOR'S DAILY REPORT PR~ECT: ESC~F OPE~ON: Hours - ~ NO. ~,~ ~ ~b ~J Corm'actor 'T~tle Inspector CITY OF FONTANA ReponNo. DW _ _ D~ce .,,%z~t 31 V"~q_~ INSPECTOR'S DAILY REPORT M T W 8h~ Hou~ LOCA~O~ & DESCRI~ON OF OPE~ON: .. J LL EQUIPMENT AND/OR LABOR: u, REMARK8 EQUIPMT, NO. OF DESCRIFRON ""' ~ ~e~on for Idleness or NO. MEN (Of Equipment or Libor) other reinerie) Corm'actor 'Rtl$ Inspector 12/9~ Jr/ab CITY OF FONTANA ~ ,,o~o. d:~) D,y O~x~ 1-9 ~-~ ~ INSPECTOR'S DALLY REPORT ~ ~ w T ~s e c~o~ ~ . ~ LOCA~ON & DESC~F OF~ ON: ~ ~~ ~,- _~.,_,.~ , J~~,~ ~,~, Con~'8~or "title CITY OF FONTANA V INSPECTOR'S DAILY REPORT Coreractor T~I In~e~l~f CITY OF FONTANA V INSPECTOR'S DAILY REPORT MOU~8 - rrEM NO, WEATHER EQUIPMT. NO, OF DEBCRIFI1ON ~,,~,,~,~, ~j ,,,,,q (ReUon for lateness or NO, MEN (Of EQuipment or tabor) Conlzactor Tl~$ inspeulof 1 ~ j'T/~h CITY OF FONTANA D~e INSPECTOR'S DALLY REPORT 8hift Hour~ Start 8to~ PROJECT: Con'o'~tor Title 12/9~ JT/S]D CITY OF FONTANA D~ INSPECTOR'S DALLY REPORT w T F e 8 CircleO~ ~o~ .' Co~tor CITY OF FONTANA INSPECTOR'B DALLY REPORT ~T W T F e e ClrcleD~ 8h~ Hou~ ~ ~og LOCA~ON & DES F OPE~ON: [,~,/,,/(~/.//~,~'E/'~ HOURS- n'EM NO. WEATHER t' EQUIPMT. NO. OF DEBCRI~ON ~ ~ ~ (ReMon for fdteness or NO. MEN Cor~'actor Tit~e Inspector 12/~2 ,Jg'/ab ~.2 ,"'>"v ',/ ,J~ -:'-'V.'C DATE !. SUBJECT '~',/.' '/,,. -,--,,,,- ,' ,.- _..~.~, ~., :r.,',,ojL.... !., ,,;, ~;,~ .~ ~,~,' ,;,-, -t~j,, · -,:.~,,--._.. ]/~M :" SIGNED REPLY ': "- SIGNED · ~ 45 475 SEND PARTS I AND 2 INTACT - POLY PAK (,50 S~TS) 4P475 CITY OF FONTANA V R, o~No. J'j'/-xX~--~ / P INSPECTOR'S DALLY REPORT ~ T W ~ S C~,D~ NO. MEN - i Corm'actor Tltll Insp~m~lor 12/92 d'l'lab CITY OF FONTANA V INSPECTOR'S DALLY REPORT ~ ,~,/- ?..l J")-//~ o HOUR8 - ITEM NO, WEATHER EQUIPMENT AND/OR LABOR: ~,~, ~ '~ REMARK8 NO. MEN (Of Equipment or Labor) o $r r~marka) / ./,~ L~ ~ r /d' / c/ ~,~.~,.~ /~-~ ~" - Contractor 'RtJe ~~ ~ 12/9~ JT/ab CITY OF FONTANA V INSPECTOR'S DAILY REPORT 8hilt Hour~ 8tare 8top LOCATION& DEISCRI~N C~F OPERATION: (_9 ,-~2- 2,=- j",/--//~:9 ~ HOUR8 - rTEM NO. WEATHER EQUIPMENT AND/OR LABOR: ~ ~, ~ ~ '~ REMARK8 EQUIPMr. NO. OF DEBCRIPTION ¢ m ~,~ "'q (Rillon for I(llenes8 or NO. MEN (Of Equipment or Labor) ot~or reread<s) Corm'actor T~i In~ CITY OF FONTANA v INSPECTOR'S DALLY REPORT u T w(::~ ~ · e C~D~ ~ ~/' ' HOURS - ~M NO, EQUIPS. NO. OF DE8 RIm~UN ~/~ /~ ~2~ ~o~ ~ /,J~ ~/ ~ ~ / Co~tor 1 ~ ;Ira CITY OF FONTANA V no o~'~No. p Day Dm /-,,Z/- INSPECTOR'S DALLY REPORT M T W(2P ~ s s Circ~eOay 8hift Hour~ 8tm't, ~top LOCATION & DESCRI~N(~F OPERATION: Cot'f factor Title In~pe,~or 12/9~ dT/aiD CITY OF FONTANA V .. o~VNNo. ~,~z"y'/"~'/r'~"' ~ INSPECTOR'~ DALLY REPORT ~ T W~P s s ci~,a~ 8h~ Houm ~ ~p PR~ECT: E C~F OPE~ON: Contractor Title Inspector 12/92 J'r/lib CITY OF FONTANA V INSPECTOR'S DALLY REPORT CITY OF FONTANA V INSPECTOR'S DALLY REPORT O ~ ON & DESC~F OPE~QN: Contractor T~$ Inspector 12J92 j'Tlab CITY OF FONTANA v ~=/~,S',~ c~--~ / Report No. D~ INSPECTOR'S DAILY REPORT 8h~Hou~ ~ ~ ~og ~QUIP~ ~DIOR ~R: , RE__K8 EQUIPS. NO. OF DESCROON ~'~ ~ ~ ~ or NO. MEN (~ EqulDme~ or ~o~ Co~tor ~l ~r~ ' CITY OF FONTANA ~ p Day INSPECTOR'S DALLY REPORT 8h~ Hou~ LOCA~ON & DESC~F OPE~ON: Cordfactor Title Inspea'tot 12/92 CITY OF FONTANA ~'~ p O~y INSPECTOR'S DAILY REPORT ~T w · ~ e a c~,o~ CorrffB~tor Ti~$ ~~~ CITY OF FONTANA ~J INSPECTOR'S DAILY REPORT 8h~ Hou~ ~ ~o~ PR~ECT: DESC~F OPE~ON: () 27- ,~.,~ J"'/--//~ o HOUR8 - ITEM NO. WEATHER EQUIPMENT ANOIOR I..A~3R: ~ ~, REMAqK8 EQUIPMr. NO. OF OERCRIFTION ~.~ ~ ~ (Rea~l~leneslor NO. M~ ~ E~lpmem or ~ ~er ~~ Cor~actor Title Insl~e~lor 12/'92 CITY OF FONTANA INSPECTOR'S DALLY REPORT M T W ~F S S C.WD.y Shift Houm 8tert 0700 etop I1C0 LOCATION & DESCRIFTION OF OPERATION: HOUR9 - ~M ~. ~ER EQUIP~ ~D/OR ~R: ~ RE.K8 EQUIPS. NO. OF DESCRI~ON ~ ~ea~ ~ idleness or NO. MEN (~ Equipmere or t~ - ~er mm~) Con'factor Titie Inspector 12/92 ,.R'/Ib v CITY OF FONTANA ReportNo. /'/f' Day INSPECTOR'S DAILYREPORT u T W(~F S S CircleDay Sh~tHourm Stertr~,,~-k~ Stop /,~.~OUR8 FREM NO WEATHER EQUIPMT. hi0. OF DEBGFtlPTION ~ ~ (Fleeson for )cllenes8 or NO. MEN (Of Equipment or Labor) ',-~, r,j ot~er remarks) /,~,~,~,- :,,~' ,')'e¢i:: Cn~J,f / .,~,~,,-,~--- Y;,F' ' / ,'D-'F-~/t'>-'~'-"' 'P' :')'~L/'~,,,~,,u, _, Con~'actor Title Insp, eetl~ 12/92 ,JT/ab CITY OF FONTANA ReportNo./?/06/ Day D.,, T- /j . INSPECTOR'S DAILYREPORT M T(~.T F B e CircleDay 8hiftHoura Start ~Aj~/m4 8top PROJECT: /~e,.<,..C y~7/~ ~ LOCATION & DES~I~ON OF OPERA'RON: ~ ' J ' Contractor Title 12/92JTta~ CITY OF FONTANA ~e.o~No./7/2 Day INSPECTOR'S DALLY REPORT 8hilt HoU~ HOU~ ~0. W~ER EQUIPME~ AND/OR ~OR: ~ ~ RE~K8 EQUIPS, NO, OF DEeCRI~ON ~ ~ NO, MEN (~ Equipme~ or ~o~ o~er remus) CITY OF FONTANA Repo~ No,/-7/7 D~ D=e /,/z - INSPECTOR'S DAILY REPORT M(~)w T F 8 8 Circle Day Shift Hours Start Stop _ ~p/-l~,~ ~W hP~N/~e, HOURS- rnsM NO, W~ATHER EQU{PME~ AND/OR ~OR: RE~KS EQUIPS. NO. OF DEetRItON (Re,on ~or idleness or NO. MEN (~ E~u~pme~ or ~o~ ~ o~er remus) Cor~actor Tr~e Inspeotor 12/92,.J'r/aJ:) F~-,/ CITY OF FONTANA INSPECTOR'S DALLY REPORT 8h~ Hou~ 8ta~ ~.~ ~top.__ CITY OF FONTANA INSPECTOR'S DAILY REPORT 8h~ Hou~ 8t~ Stop . LOCA~ON & DESC~PE~ON: HOURS - iTEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT. NO, OF DESCRIPTION (Reason for talehess or NO. MEN (Of Ec~uipment or Labor) ot~er remarks) Contractor TH:Ie ~ CITY OF FONTANA Repo~No. 9'Y' DW INSPECTOR'S DAILY REPORT u T W{~F 8 8 Circle Day 8h~ Houm 8t~ Stop ~ F LOCA~ON & D E HOUR~ - ITEM NO, WEATHER EQUIPMENT AND/OR LABOR: ~ REMARK8 EQUIPMT, NO. OF DEBCRIPTION 'L~ (Reason for Idleness or NO, MEN (Of Equipment or Labor) other remarks)_ Cor~'actor T]tte InspeCtor 12/92 J'r/ab CITY OF FONTANA Repo~No, ~'-_7 Og.e /- ~ - ,q",_.~ INSPECTOR'S DALLY REPORT M t(~ T F 8 S CircieDiy Shift Hours Start Stop , _ LOCATION & DES~RI~'rlON OF OPERATION: HOUR8 - ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: ~ REMARKS EQUIPMT. NO. OF DESCRIPTION (Re,on for idleness or NO. MEN (Of Equipment or L~bor) other remarks) ~/~ ,~,,,~,- ~ ~ Contractor Title Inspector 12/~2 JT/ab CITY OF FONTANA .eoo~No. Z/,-<7 INSPECTOR'S DAILY REPORT Md~w T F S 8 Circle Day 8hi~HOur8 Start 2/~IWl Contractor ~Tde Inspet~or """2' CITY OF FONTANA .epo~ No, 7-7~- Day INSPECTOR'S DALLY REPORT M~T~W · ~ S S Circ~eD~y Bh~ Hou~ 8t~ Stop , LOCA~ON & DES t HOUR8 - FrEM NO. WEATHER _~ - EQUIPMENTAND/OR LABOR: ~ ~) REMARKS EQUIPMT. NO. OF DESCRIPTION "~ ~'~.~ (Reason for )~leness or NQ MEN (Of Equipment or Libor) "~ ot~er remarks) Con~'actor Titis Inspector 12/92 ,JT/SD '/'~,,~-~.e... / CITY OF FONTANA m.portno. V/ Day INSPECTOR'S DAILYREPORT ~T W T F 8 8 CiraleD~ NO. MEN 1 ~ ~l~ HOURS - ITEM NO, WEATHER ~J _ O EQUIPS, NO, OF DEeCRI~ON ~ ~ ~ ~ ~ ~ (Re,on for Idleness or NO, MEN (~ Equipme~ or ~bo~ o~er remus) Con~'acmr 'F~Io Insl~ector 12/'92 ,J'F/Ed;) ~. HOURS - FFEM NO. WEATHER NO, MEN (~ Equipme~ or )o~ o~er remus) 003 ~,~ Co~tor CITY OF FONTANA Repo~No.//~ Day ~/~ INSPECTOR'S DAILYREPORT M T~T F 8 8 Circle Day 8h~ Hou~ 8t~ 8top__ ,,~ HOURS - ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT. NO. OF DESCRIFTION ~ (Re=won for idleness or NO. MEN (Of Equipment or Labor) L~ ot~er remarks) CITY OF FONTANA INSPECTOR'S DAILY REPORT M~ T F S 8 Circle O~ CorYo'a, ctor Title ~i~ 12/9~ JT/ab CITY OF FONTANA INSPECTOR'S DAILY REPORT ~T W T F S $ CircleO~ 8h~HOu~ 8t~ HOURS - ~M NO. EQUIP~. NO, OF DESCRI~ON ~ ~ ~ ~ RE~KB ~ ~ ' , ~ (Re~onforfdenes8 or NO. MEN ' o~er mm~s) ~/ / l 2 1P,/9~ dT/ab V ~,/P"~;~'~'~ ?''' CITY OF FONTANA Repo, No.--?~F INSPECTOR'S DAILY REPORT ~T W T F S e Cir,~eD,~ 8hilt Hours 8tart HOURS - FFEM NO, WEATHER EQUIPMENT AND/OR LABOR: "~ REMARKS EQUIPMr, NO, OF DESCRIPTION i (Reason for Idleness or Confactor Tltle Inspector 12/92 Jl'/Bb CITY OF FONTANA Repo. No.~27 D.y ~/x__/' INSPECTOR'S DALLY REPORT u T W~F 8 8 CircleD, 8h~ Hou~ ~ 8top _ LOCA~ON & DE~~PE~ON: ' HOUR~ - FFEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPhAT. NO. OF DESCRIPTION (Reason for Idleness or NO. MEN (Of Equipment or Labor) other remarks) Contractor Title Inspector 12/92JT/ab CITY OF FONTANA Re~o~tNo. ~,7~; D~y ~-,,,7 D~= /.2 INSPECTOR'S DAILYREPORT M T~ HOUR8 - I~M~O. W~ER ~ ~ ~ ~ ~ ~ RE__K8 NO. MEN '(~ Equipme~ or ~o~ o~er remus) Co~actor ~e ~ ~ ~ 1 ~ ~/~ CITY OF FONTANA ReOo~No.~D~y INSPECTOR'S DAILY REPORT 8h~ Hou~ 8t~ Btop LOCA~ON & DE CorttTBcicor Tltle ~""'- 12/92 CITY OF FONTANA D,.~. /2 -,2 2?- - ~,2_-,. INSPECTOR'S DALLY REPORT ME~:)W T F S S CircleD. 8hilt Hours =gt'ml~/'-~,~*fi NOU~8 - ~M NO. ~E~ EQUIPS. NO. OF DEBCRI~ON NO. MEN (~ E~ulpme~ or ~ o~er ~m~s) Contractor Tltle fnsp~ ~ 2/9~ ,rl'/~ C City of Fontana CALIFORNIA CORRECTIVE ACTION NOTICE REGARDING: 77F~' ,-d' ,1~, ,.'c~ DATE: It has come to our a~ention that the following items are deficient in the area of the above referenced project job site: [ 1 Barricades [~en Trench [ I Delineators [ I Trench SeRling in Right-of-Way [ 1 Signing [ ] Dust Control [ I Material on Roadway [ I Unauthorized Street Closure [ ] Other Please be advised that you are directed to take corrective action within the following time frame: [ ] Immediately [ ] 24 Hours [ ] By the End. of Current f~48 Hours Work Day. All work done shall be accomplished to the satisifaction of the CiW Engineer. Failure to take corrective action within the specified time will result in the CiW taking the necessa~ steps to correct the deficiencies and invoice you for materials and labor as required. If you have any questions regarding this ~er ~ease contact the Engineer or Authorized representative. 8353 SIERRA AVENUE (P.O, BOX 518) · FONTANA CALIFORNIA 92334-0618 · (714) 3~0-7600 SISTER CITY -- YAMLOOPS, B.C, CANADA CITY OF FONTANA INSPECTOR'S DALLY REPORT M~w T F 8 8 ClrclID~ 8h~ Hou~ ~ , ~p.__ LOCA~ON & DESC~F OPE~ON: HOUR8 - FTEM NO. WEATHER NO. MEN (~ Equipmere or ~o~ offer Corm'sctor Tttle Inspector 12/9~JT/aD CITY O~ FONTANA De~ /Z-,Z/-~ INSPECTOR'S DAILY REPORT ~ T W T F S S C~rcleO~y 0 ~/- ~, NO. MEN (~ Equipmere or ~od o~er remus) Co~tor CITY OF FONTANA Repo~ No, INSPECTOR'S DALLY REPORT LOCA~ON & DE R~E~ON: HOUR8 - ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: ~, , ~, REMARKS EQUIPMT. NO. OF DE8ORIFTlON ~ (Reuon for idleness or NO, MEN (Of Equipment or Labor) ~ ~'~ ~ ~L~ ~ "~ o~er remarks) / J',~,~, T,~-/-, c/ ,- Corm'actor Title Inspector 12/92 City of Fontana CALIFORNIA CORRECTIVE ACTION NOTICE REGARDING: ~'~',,~'/'~, ~ DATE:/,~-,2 2- -c2'7---- TIME: J .' ~/~ It has come to our a~ention that the following items are deficient in the area of the above rebrenced project job site: [ ] Barricades [~en Trench [ ] Delineators [ ] Trench Settling in Right-of-Way [ ] Signing [ ] Dust Control [ ] Material on Roadway [ ] Unauthorized Street Closure [ ] Other Please be advised that you are directed to take corrective action within the following time frame: [ ] Immediately [ ] 24 Hours [ ] By the End of Current F~48 Hours Work Day All work done shall be accomplished to the satisibction of the City Engineer. Failure to take corrective action within the specified time will result in the City taking the necessary steps to correct the deficiencies and invoice you for materials and labor as required. If you have any questions regarding this mawr ease contact the City Engineer or Authorized representative. B ' ~ 8353 StERRAAVENUE(P.O. BOX818) · FONTANA CALIFORNIA 92334.-0818 · (714)350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA CITY OF FONTANA INSPECTOB'S DAILY BEPOBT M T W T~B 8 CirclaDay ~ OUR8 - ~7~O. ~ER ~ ~/~ ~Z/~ EQUIPME~ AND/OR ~OR: ~ , ~ ~ ~ RE~KS NO. M~N (~ ~qui~msm or ~o0 o~sr mmaa) 22 ? nee CITY OF FONTANA R,po~No.--/~2 D.~ 9%/~ o=. INSPECTOR'S DAILY REPORT M T w TdPs s CircleD~y Shift Hours 8tire . Stop Contractor 'ntis ~ 12/92 ,.R"/a~ CITY OF FONTANA Report No, '-~'~ Day c~'u'Z" INSPECTOR'S DALLY REPORT M T W~_)F S S Circle Day 8hiftHours 8tart ~)~Yfl LOCATION & DESCRIPTION OF OPERATION: /A//-* 2,_7,_< Z,F, ~ 2 /- 22 J~/- HOURS - ITEM NO. WEATHER EQUIPMENTAND/OR LABOR: ~ {' ~-"-~ ~ tj REMARKS EQUIPMT. NO. OF DESCRIPTION ~.j~ r,~: '~ (Reason for Idleness or NO, MEN (Of Equipment or Labor) /,~ ? /?~ ~ .~,~oY / Z~ ::~ ~ :~ ~:- ~< ~-,..~7 ~ ~, ~ ~ ,- ~ ,. ,~ .~z 1 ~92 dT/ab CITY OF FONTANA nepo~ No, ~22 Day Date /~ -/2- ~ ~ INSPECTOR'S DAILY REPORT u T W~F 8 8 CircleD~y 8hi~ Hours 8t~ Stop PR~BCT: ~ LOCATION & D~~OPE~ON: HOURS-ITEM NO. WEATHER EQUIPMR NO. OF DEeCRIPTION ~ ~'Z \ ~ (Besson for idleness or NO. MEN (Of Equipment or Labor) other rem~ks) / ~~ ~ / /F ' Contractor Title ~ 12/92 J'F/ab "": 'CITYOFFONTANA · INSPECTORs8 D~LY REPORT HOUR8 - ~M NO. .~.~ - EQUIPME~ ~D/OR ~OR: ~ RE__K8 EQUIPS. NO. OF DEBCRI~ON (Reaon for i~leness or NO. MEN .~ gY~E '~ : "' V V CITY OF FONTANA Repo. No.-~/ Day ?'J'oc>' Dat~ /2.. -/~-~ ~ INSPECTOR'S DAILY REPORT u T~T F S S Circle Day 8h~ Hours 8ta~ 8top.__ LOCATION & D HOURS - ITEM NO. WEATHER ,l. ~ '~ --~-~.~j o~er rem~ks) ConVac~or ~e ~ 1 ~92 · CITY OF FONTANA V .sO~'~No. ,3(::) nay n~ /Z-- INSPECTOR'S DALLY REPORT M ~w T ~ s s LOCA~ON & DESC~ON OF OPE~ON: HOUR8 - ~M NO. ~ /~ '--- EQUIP~ ~D/OR ~R: , ~ ~ RE~K8 EQUIPS. NO. OF DESCROON ~ ~ ~ ~ee~ ~r Idleness or NO. MEN (~ Equipm,m or t~ ~ ~er mm~ Color ~e 1 ~ ~/~ GITYOFFONTANA~'d Rep:.~e~NNo.__~O Day INSPECTOR'S DALLY REPORT u~w m ~ S ,S C~r~O~ .n~CT: ~~ ~~ ~~ I~ON O OPE~ON: LOCA~ON & D F HOUR8 - ITEM NO, WEATHER EQUIPS. NO, OF DE8CRI~ON ~ ~ ' (Reaon for t~lmnesa or / CITY OF FONTANA V INSPECTOR'S DALLY REPORT LOCA~ON & D~I~ON OF OPE)~ON: HOUR8 - ~M NO. ~ER EQUIP~ ~D/OR ~R: ~ ~ ~ RE~K8 EQUIPS. NO. OF DEBCRI~ON ~ ~ ~ (R~a~ ~r Idl~mss or NO, MEN (~ E~ipe~ or )o~ ~ I , ~.r mm~) Co~tor ~e In~ CITY OF FONTANA V .em,o~o...2 ?Day_ fL(~ INSPECTOR'S DALLY REPORT C~ T w T F S S Clr~eD~y 8h~ Houm ~ __ LOCA~ON & D~I~ON OF OPE)~ON: HOUR8 * rTIEM NO. WEATHER EQUIPMENI' AND/OR tABOR: k~ ~ REMARK8 sou,Pvr..o. o, DEsc.,rnoN ~. (i ~ ~ ~ NO, MEN (Of Equipment or Labor) ~ (:)~'' ~j (Reason for Idleness or omer r~marle) Contractor Title ~ '------_,_,_ 12/9~J'r/~ INSPECTOR'S DALLY REPORT M T W T([~) S S CircleDay Shift Hours Staff 2 Y~ Stop HOURS - ~M NO, W~ER ~ ~ ~ ~ RE~KS EQUIPME~ AND/OR ~OR: ~ ' ~ (Re,on for idleness or NO. MEN Co~sctor "CI'PI OF FONTANA V ...~o. 2oc' Day =,?J'J' INSPECTOR'S DAILY REPORT M T W ~CiP S S C~r~ Day HOUR8 - ITEM NO, WEATHER EQUIPMENT AND/OR LABOR: REMARK8 EQUIPMT. NO. OF DESCRIPTION (RillOn for Idleness or NO. MEN Of Equipment or Labor} ~ offer r~mlrle) 2 ~,Q ~ ,c'vZ¢ ~n~e Cord31~for T~e t2/9~jT1813 EQUIPMENTAND/OR ~R: ~ ~' ~ ~, q "'q, 'i REMARK8 EQUIPIVlT, NO. OF DESCRIFTION % ~7. % ~ (Reaon for Ktlsness or NO. MEN (Of Equipment or labor) o~er rimarks) /2? I?~O~ ""~,o,~ .~1,~..- ~ ~ 12/92 dl'lab CITY OF FONTANA ~ ...o~t"do..2 2 Day INSPECTOR'S DALLY REPORT M T W(~F S e 8hi~ Hou~ ~ LOCA~ON S D~I~ON OF OPE~ON: HOUR8 - ITEM NO, WEATHER Cor~actor Title Insl3eJ;let"' 12/92 JT/ab O 2/' ),2,5'/~//a o HOUR8 - ITEM NO. WEATHER · EQUIPMENT AND/OR LABOR: t REMARK8 EQUIPMT. NO. OF DEBCRIFTION ~ : .~ ~,~ (Re,mort for Idleness Or NO. MEN (Of Equipment or L/)or) ot~er mingle) b d ~~ o Co~ctor ~s 1 ~ ~/~ HOUR8 - FFEM NO. WEATHER Con'rector Title Insl}~'/ 12/92 J'r/at} CITY OF FONTANA INSPECTOR'S DALLY REPORT COl TRIG ~/ 12,~brr/l12 CITY OF FONTANA tNSPECTOR'S DALLY REPORT ~T W T ~ S S C~SeD~ Sh~ Hou~ LOCA~ON & DE~ON OF OPE ~ON: Corm'actor T~I 1 'CITY OF FONTANA V INSPECTOR'S DAILY REPORT HOUR8 - ITEM NO. WF, ATHER EQUIPMENT AND/OR LABOR: _ -- ~ REMARK8 EQUIPMT. NO. OF DEBCH~I- ~ iON 04s$1on for Idleness or NO. MEN (Of Equipment or Labor) ~ obhsr r$marle) Cor~'~tor Title Inspmetdir 12/92 j'r/sb Con~'actor Tltle In~" 12/92 JTfab CITY OF FON~TANA ~eport No..2 ! D~y ? '/~ INSPECTOR'S DALLY REPORT MT(~T F 8 8 ci~ao o,y Shh~ Hours 8tart 2 ~ ~ 8top///I:~,/~] LOCA"RON & ~.S'~R'IF']qON OF OPERATi N: ~ Con~'actor T~le Insp~'"' 12/9~ JT/=h HOUR8 - ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARK8 EQUIPMT. NO. OF DESCRIPTION {Pleaon for idleness or NO. MEN (Of Equipment or Labor) older remarks) Con=actor Title Inspector 12/92 ,J'r/liD CITY OF FONTANA Report No. Dm /2---/-~' INSPECTOR'S DALLY REPORT Sh~ Hours Start HOUR8 - rTEM NO. WEATHER EQUIPMENT AND/OR LABOR: ¢ ~,, REMARKS EQUIPMT. NO. OF DESCFIIFTION ~ (Reagon for idleness or NO. MEN (Of Equipment or Labor) t'-7' otfier remarke) JS"/~ /~y//,, ~a~-e 13.4 ,. Contractor Title Inspeotor 12/92 JT/ab CITY OF FONTANAv ~.po'~r/~o. ~ DW T~-/ 8h~Hou~ ~ ~ LOCA~ON & DESC~N OF OPE~ON: ........ Contrlctor Tltle Inspector 12/9~ ,aT/at} CITY OF FONTANA V INSPECTOR'S DALLY REPORT r') ~ /- 2 7- HOUR8 - iTEM NO. VVEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMr. NO. OF DEGCRIPTION (Reason for Icllenc~s8 or NO. MEN (Of Equipment or Labor) other irmains) Contractor 'lqtle I~r 12/92 JT'IEB Ref~or~ NO.~ nay .... O~, //-~6- ~ ~ INSPECTOR'S DALLY REPORT ~ T W~ S ~ C~D~ HOUR8 - iTEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMr. NO, OF DESCRIPTION (Relson for Idleness or NO. MEN (Of Equipment or Libor) other mmarl~) /~/'Tj[~J~-,~ ,/ Contractor T~e Inspector 12/9~ J'i'/ab 'CITY OF FONTANA ReportNo./) Day Date //.2,,C~ INSPECTOR'S DAILY REPORT u T(:~)T F S S Circle Day 8hilt Hours 8tart;::~,.g-//4 8tOp~//Z:22~, HOLIRS - ITEM NO. WEATHER EQUIPMENTAND/OR~BOR: ~ ~ RE~RK8 EQUIPMT. NO, OF DESCRIPTION ~ ~ ~ (Reason for Idlene9s Or NO. MEN (Qf Equipment or Labor) other remarks) ..... Contractor Tfi:le InspectT'/' 12/92 dT/ab 'CITY OF FONTANA Report No/g Day ~> ~ Date INSPECTOR'S DAILY REPORT M ~,/w T F S S Circle Day 8hilt Hours Star~ ,,~)~--7-yt Stop ~ ~') 2/- 2 2 HOURS - ITEM NO, WEATHER EQUIPMENT AND/OR LABOR: ,,~ REMARKS EQUIPMT. NO. OF DESCRIPTION (Reason for idleness or NO, MEN (Of Equipment or Labor) ~ other remarks) },~ /200,e jE~o-~hz,~_- ,,~ Contractor Title 12/92 JT/ab · CITY OF FONTANA V Re,o~No._Z_~CT__..DW_ ?Y~--- INSPECTOR'S DAILY REPORT 8h~Hou~ ~ ~ ~ ~, HOUR8 - iTEM NO. WEATHER EQUIPMENT AND/OR ~OR: ~ ~ RE__K8 NO. MEN Cor~'actor Title ~ 12/92 ,JT/.h CITY OF FONTANA ReportNo.//_/,t Day D ate //-.,2 O -/~ INSPECTOR'S DAILY REPORT M T W T~Z~ S s Cirole Day Shift Hours Start t2-4f~z~ Stop, PROJECT' ~ A J/~'J,,/'~ ~ ~ HOUR8 - ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: '~ RE~RKS EQUIPMT. NO. OF DESCRIPTION ~ (Reason for idleness or NO. MEN (Of Equipment or Labod ~ ~er~~ / ~ ~ ~ Contractor Title ~ ~ ' 12/92 dT/ab CITY OF FONTANA nepo~ No. Z_~ Day D ate //--/=2- ~' -' INSPECTOR'S DAILY REPORT M T W~FSS 8hi~ Hours et8~ ~ ~ g:~ 2/' 2,,2 ,,~/- HOURS - ITEM NO. WEATHER \ EQUIPMENT AND/OR ~BOR: '~ RE~RKS EQUIPMT, NO. OF DESCRIPTION ~ (Reason for idleness or NO. MEN (Of Equipment or Labod ~ other remarks) Contractor Title or 12/92 dT/ab CITY OF FONTANA Rapo~No. / ~, Day 7,,7 ~ Datel~ ,/~Z- -/,,~cy_~ ~, INSPECTOR'S DALLY REPORT M T~T F S 8 Circle Day Sh~Hours 8ta~ 8top F~ i~ !OURS - ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: ~-~ ~,~ RE~RKS EQUIPMT. NO, OF DESCRIPTION (Reason for idleness or NO. MEN (Of Equipment or Labor) other remarks) Contractor TItle ~~ 12/92 JT/ab ;' V rmwm CITY OF FONTANA nepor~No, // Day Date //-/7-~ INSPECTOR'S DAILY REPORT u(:~w T F S S Shift Hours 8ta~ 2~ 8topq HOURS - ITEM NO, WEATHER EQUIPMENT AND/OR LABOR: 'i, ~; REMARKS EQUIPMT, NO. OF DESCRIPTION ~ \~ (Reason for idleness or NO, MEN (Of Equipment or Labor) ~ other remerke) Contraotor Title ~~ ' 12./92 JT/ab CITY OF FONTANA nepo~No./O _D.y ~'~TY Date //-/~ '~'g' INSPECTOR'S DALLY REPORT ~T W T F S S CircleDay Shift Hours 8ta~ ~ Stop ~ LOCATION & DE PE HOURS - ITEM NO. WEATHER EQUIPMT, NO. OF DESCRIPTION ~ ~ (Resson for Idleness or NO, MEN (Of Equipment or Labod other ramarks) Contractor Title ~ ' 12/92 JT/ab CITY OF FONTANA ReportNo. ~,~ .Day Date //-/,_.? - ~' ~-- INSPECTOR'S DAILY REPORT M T W 'r~)S 8 Circle Day Shift Hours Start ~ D~/~ Stop L/t HOURS - ITEM NO. WEATHER E~U~P~E~T ~D~OR L~OR~ ~ ~ EQUIPMT. NO. OF DESCRiPTiON ~ (Reason for i~lene~s or NO. MEN (Of Equipment or LaboO ~ other rem~ks) Contractor Title Inspector 12/92 dTlab CITY OF FONTANA nepo No. Day Date //-/2 INSPECTOR'S DAILY REPORT M T W(:~F S S Circle Day Shift Hours Start ~/~ yr't, Stop L/ LOCATION & D~C~IPTION OF OPERATION: ' HOURS - ITEM NO. WEATHER EQUIPMENT ANDtOR LABOR: ~ ! REMARKS EQUIPMT. NO. OF" DESCRIPTION d~ '~ (Reason for idleness or NO MEN (Of Equipment or Labor) other remarks) Contractor TItle 12/92 dTlab CITY OF FONTANA Re~or~ No. Date INSPECTOR'S DAILY REPORT u T~T F S 8 Circle Day 9~i~ Hours 8ta~ Stop,__ LOCATION & DE~ON OF OPERATION: HOURS-ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT. NO, Of DESCRIPTION (Reason for idleness or NO, MEN (Of Equipment or Labor) other remarks) Contractor T~tle ~ 12/92 dT/ab CITY OF FONTANA INSPECTOR'S DALLY REPORT M(~W T F S S ShlftHours Start HOURS - ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: ~ REMARKS EQUIPMT. NO,.OF DESCRIPTION ~ (Reason for idleness or NO. MEN (Of Equipment or Labor) other remarks) ~ ~o ~ ,~ ~ ,~ _ Con~'actor Title ~ 12/92 jTlsh CITY OF FONTANA nepo~No, ~' Day 72,,,~ Date //~- ~'-~'~--~ INSPECTOR'S DAILY REPORT ~ T W T F S S Circle Day 8h~ Hours 8ta~ Stop HOURS - ITEM NO. WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT. NO, OF DESCRIPTION (Reason for Icileness or NO, MEN (Of Equipment or Labor) other remarks) Contractor Title Inspector 12/92 JT/ab CITY OF FONTANA Ro~onNo. ~t' Dr/~/.-~ocy INSPECTOR'S DAILY REPORT ~TW T F 8 8 Circle Day 8h~ Houm Staff/~O~i 8top ~e P~. LOCA~ON & D~ON OF OPE~ON: ~ HOURS - ~M NO. ~ER EQUIPMENT AND/OR LABOR: ,~ REMARK8 EQUIPMT. NO. OF DESCRIPTION "-,~. (Reason for lOtenema or NO. MEN (Of Equipment or Labor) other remarks) / ~",~L,,~"~ \ ~ 4 Conl~'Bctor Title CITY OF FONTANA Re~o. No. INSPECTOR'S DAILY REPORT M T W~F 8 s CircleDay 8top HOUR8 - ITEM NO. WEATHER .l ,,,): ' EQUIPMENT AND/OR LABOR: ~ REMARKS EQUIPMT. NO. OF DESCRIPTION ~ (Reason for idleness or NO. MEN other remarks) Corm'actor Title Inspee~'''''' 12/92 ~:~ ~ /- 2.2. ,.,~w .}/,~ 0 HOUR8 - ITEM NO. WEATHER EQUIPMENT AND/OR ~OR: ~ RE__K8 EQUIPS. NO. OF DESGRI~ON (Re.on for Idlenesa or NO. MEN (~ Equipme~ or ~o~ o~e~ remus) Contractor Titte Ingpwd'~' 12/92 dl'/ab CITY OF FONTANA R..o~No. -2 D.,/ · D-,o INSPECTOR'S DALLY REPORT u(:~w T F S 8 CircleDz~y 8hilt Hours Btart ~to~ HOUR8 - ITEM NO, WEATHER EQUIPMENT AND/OR LABOR: REMARKS EQUIPMR NO, OF DEBCRIF'igON Reason for Kjlenes8 or NO. MEN (Of Equipment or Labor) other remarks) Contractor Title ~ " EQUIPMENT AND/OR LABOR: REMARKS EQUIPMT. NO. OF DESCRIFT1ON (Reason for idleness or NO. MEN (Of Equipment or Labor) other remarks) I , ~ ~ nk'/.,,,G &/,,,,/7~,r~ s ~, ,~ ~'. /,4./~ o Contractor Tide ~"~ PACIFIC CLAY PRODUCTS, ]tiC, 20325 'romeseal Canyon Rr.L, Corona, CA 91719 , p.O.Box1149, Comna, CAg17111.|149 Phone: {714) 735.6020 · FAX: {714) 734-7390 FAX TRANSMITTAL, COVER SHEET We are transmitting trom a Sharp FO-700 facsimile machine, Ths total number of pages, including th s cover sheet.. If you do not receive all of the pages, please call (714)735-6020, ext~ Comments: PAIGIFtC nLAY PRn[~UCTI~IJNQ. March 25, 1993 Mr, Heal Bolanger Kenko, Inc. P.O. Box 831 Celtmesa, CA 92320 Re: Fontana, Cypress Avenue Sewer, Joint Repair Dear Neal: Per our conversation, I understand you have a crack at the spigot end of a piece of 30" VCP, Several methods of repair have beon successfu|ly used. The two concerns ~e have in any repair ts structural integrity and leak resistance. Repairs, on a limited basis, are often better than replacenent because of the disturbance of adjacent pipe and sol1 and the use of couplings and field cut pipe. Ftlltng the Joint void and epoxying with m6terial supplied by Pacific Clay should form a leak proof and structurally sound repair. An air test wilt be required to ~ssure the repair, Should you have any further questions, please Feel Free to call, Sincerely, Vice President Director, Engineering Services JBB/cm 833~ Teme~al Canyon Rood. C~tone. OA 91719 · P.O. Box 11449, Corona, GA 61718-I 148 · ~ [714] 735-6Q~0 Pex: (Tq 4) 73