June 29, 1994
Mr. Luis Montenegro, Project Engineer
San Gabriel Valley Water Company
11142 Garvey Avenue
E1 Monte, CA 91734
RE: Washington Drive Sewer Project
From Cypress Avenue to Approximately 803 Feet East
Request to Abandon Water Main
Dear Mr. Montenegro:
For the project in reference, and as the enclosed project plans indicate, the
optimum alignment proposed for the sewer main is centered approximately 4 feet
north of, and parallel to, an existing 2" diameter steel water main that has four
residences hooked to it. There is also an existing 12 3/4" diameter water main
centered 12 feet to the north of, and parallel to, the proposed sewer main.
The proposed sewer alignment complies with the Sta~e of California Department of
Health Services criteria for separation of water mains and sanitary sewer, with
respect to the 12 3/4" diameter water main. It does not comply with respect to
the 2" 'water main.
To comply with the criteria for the 2" water main will make the sewer main
deviate from the optimum alignment, incur extra costs, and also reduce the
separation with the 12 3/4" water main installed just a few years ago.
This office requests that you reconnect the existing four residential services
from the 2" main to the 12 3/4" main and abandon the 2" main, prior to the start
of the sewer project currently estimated to be advertised for bids in September,
1994.
8353 SIERRAAVENUE(P.O, BOX518) · FONTANA CALIFORNIA92334-0518 · (714)350-7600
SISTER CI'1'Y- KAMLOOPS, B.C. CANADA
~ recycled paper
"Mr. Luis Montenegro
June 29, 1994
Page Two
Please respond to this office in writing. If you have any questions on the
above, please call the undersigned at 909-350-6641. Thank you for your attention
to this matter.
Sincerely,
COMMUNITY DEVELOPMENT DEPARTMENT
Engineering Department
Felipe Molinos, P.E.
Principal Civil Engineer/Capital Improvements
FM:sh
Enclosure
cc: City Engineer
City of Fontana
CALIFORNIA
May 22, 1995
Frank LoGuidice
Vice President - Engineering and Operations
San Gabriel Valley Water Company
P.O. Box 6010
E1 Monte, CA. 91734
RE: WASHINGTON DRIVE SEWER PROJECT
COMPENSATION FOR THE WATER'S COMPANY
ABANDONMENT OF THE EXISTING MAIN
Dear Mr. LoGuidice:
Enclosed is the City of Fontana Check No. 28473 in the amount of
$12,650.00 (Twelve Thousand Six Hundred and Fifty Dollars). This
check is per the amount agreed in the letter dated January 3, 1995
(Copy Attached).
The City of Fontana appreciates the San Gabriel Valley Water
Company's co-operation in this regard and timely abandonment of the
existing 2 inch water main.
Please call me at (909)350--7613, if you have any questions.
Sincerely,
COMMUNITY DEVELOPMENT DEP~TMENT
Engineering Division
Robert W. Weddle, P.E.
City Engineer
cc: City Manager
Community Development Director
Principal Civil Engineer/Special Projects
8353 SIERRA AVENUE(RO. BOX518) · FONTANA, CALIFORNIA92334-0518 · (714)3504600
SISTER CITY-- KAMLOOPS, B.C. CANADA
~i,~ recycled paper
T~ A N_l A R C 0 M P A N 'Y
A DIVISION OF SAN GABRIEL VALLEY WATER COMPANY
8440 NUEVO AVENUE · P.O. BOX 987, FONTANA. CALIFORNIA 92334 · (90g) 822-2201
May 18, 1995
City of Fontana
8353 Sierra Avenue
Fontaria, CA 92335
Attention: Mr'. Yousuf Patanwala
Subject: Washington Drive Sewer Project
Gentlemen:
You are hereby advised that Fontana Water Company has completed the
abandonment of the 2-inch water main on Washington Drive. We have enclosed
herewith one copy of our con:struction plan which shows the completed work and
the approximate locations of our facilities within the project area.
Our facilities will require protection in accordance with Section 5.1 and 5.2 of
the Standard Specifications for' Public Work Construction, and we wish to cooperate
with you to prevent damage to our facilities and interruption of your work.
If you should need addi!~ional information, please do not hesitate to contact me
at (818) 448-6183, Ext. 252.
Very truly yours,
r e
LFM:dz
City of Fontana
CALIFORNIA
January 3, 1995
Mr. Frank A. LoGuidice
Vice President - Engineering and Operations
San Gabriel Valley Water Company
P.O. Box 6010
El Monte, CA 91734
RE: Abandonment of Water Facilities;, Washington Drive Sewer Project; Fontana, California
Mr. LoGuidice:
The City of Fontana ("City") requests that the San Gabriel Valley Water Company ("Water
Company ") abandon certain of its water distribution facilities located in Washington Drive. This
abandonment is necessary to accommodate the City's construction of the Washington Drive
Sewer Project. This Project is an important one benefitting the general public and is part of the
City's program to enhance its sewer collection system. If the Water Company is unwilling to
voluntarily abandon its existing water facilities, the City would be forced to consider the use of
its eminent domain powers to acquire that portion of the existing facilities necessary to
accommodate the City's construction of its Project.
We would prefer to resolve this matter by agreement rather than by the possible initiation of
condemnation proceedings. According, this letter requests that the Water Company abandon that
portion of its Washington Drive existing water main identified in the attached map. In addition,
the Water Company will need to transfer service for those customers which currently receive
service from the existing main to an adjacent Water Company main already in place under
Washington Drive.
The City will pay the Water Company the sum of $12,650.00 as full compensation for the Water
Company's abandonment of the existinl; main and transfer service to the adjacent main. The
City will notify the Water Company when it needs the Water Company to abandon the existing
main and transfer service. We have al;reed that the Water Company will complete its work
within thirty (30) days following the City's request. The City will pay $12,650.00 to the Water
Company within thirty (30) days following the Water Company's completion of its work.
8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA, CALIFORNIA 92334-0518 · (714) 350-7600
SISTER CITY -- KAMLOOPS, B.C, CANADA
Mr. Frank LoGuidice
January 3, 1995
Page Two
In addition, by accepting the foregoing compensation, the Water Company will forego all other
claims against the City which the Water Company could have asserted in a condemnation action
if the City had proceeded to file such an action. Furthermore, the City and the Water Company
acknowledge and agree that their agreernent with respect to this Project shall not affect or impair
any other rights, remedies or obligations of them with respect to other City projects or Water
Company lines, equipment or facilities.
Please acknowledge your agreement on behalf of the Water Company by signing this letter
where noted below. Please return a signed copy of the letter to me for my files and keep one
for yours.
Your professional courtesy and cooperation is appreciated. Please call me if you have any
questions.
Sincerely,
Gregory C. Devereaux
City Manager
GCD:RWW:km
cc: Community Development Director
City Engineer
l?rincipal Civil Engineer/CIP
AGREED AND ACCEPTED:
By:
Frank LoGuidice
for the San Gabriel Valley Water Company
,
0 5000'
~ ~ ~ RIALTO
RANC-IO ~ HIGHLAND AV~
CUCA~ONGA >
~ FONTANA WALNUT S1
~ ~ ~ ~ PROJECT
~ ,,. ,~,,.,..o ?o;"4 LOCATION
L E G E N D CITY OF FONTANA
CiP~' OF FONTANA'S
SPHERE OF INFLUENCE
INCORPORAEO CITY WASHINGTON DRIVE SEWER PROJECT