Loading...
HomeMy WebLinkAbout17.2 Utility Responses City of Fontana CALIFORNIA June 29, 1994 Mr. Luis Montenegro, Project Engineer San Gabriel Valley Water Company 11142 Garvey Avenue E1 Monte, CA 91734 RE: Washington Drive Sewer Project From Cypress Avenue to Approximately 803 Feet East Request to Abandon Water Main Dear Mr. Montenegro: For the project in reference, and as the enclosed project plans indicate, the optimum alignment proposed for the sewer main is centered approximately 4 feet north of, and parallel to, an existing 2" diameter steel water main that has four residences hooked to it. There is also an existing 12 3/4" diameter water main centered 12 feet to the north of, and parallel to, the proposed sewer main. The proposed sewer alignment complies with the Sta~e of California Department of Health Services criteria for separation of water mains and sanitary sewer, with respect to the 12 3/4" diameter water main. It does not comply with respect to the 2" 'water main. To comply with the criteria for the 2" water main will make the sewer main deviate from the optimum alignment, incur extra costs, and also reduce the separation with the 12 3/4" water main installed just a few years ago. This office requests that you reconnect the existing four residential services from the 2" main to the 12 3/4" main and abandon the 2" main, prior to the start of the sewer project currently estimated to be advertised for bids in September, 1994. 8353 SIERRAAVENUE(P.O, BOX518) · FONTANA CALIFORNIA92334-0518 · (714)350-7600 SISTER CI'1'Y- KAMLOOPS, B.C. CANADA ~ recycled paper "Mr. Luis Montenegro June 29, 1994 Page Two Please respond to this office in writing. If you have any questions on the above, please call the undersigned at 909-350-6641. Thank you for your attention to this matter. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Department Felipe Molinos, P.E. Principal Civil Engineer/Capital Improvements FM:sh Enclosure cc: City Engineer City of Fontana CALIFORNIA May 22, 1995 Frank LoGuidice Vice President - Engineering and Operations San Gabriel Valley Water Company P.O. Box 6010 E1 Monte, CA. 91734 RE: WASHINGTON DRIVE SEWER PROJECT COMPENSATION FOR THE WATER'S COMPANY ABANDONMENT OF THE EXISTING MAIN Dear Mr. LoGuidice: Enclosed is the City of Fontana Check No. 28473 in the amount of $12,650.00 (Twelve Thousand Six Hundred and Fifty Dollars). This check is per the amount agreed in the letter dated January 3, 1995 (Copy Attached). The City of Fontana appreciates the San Gabriel Valley Water Company's co-operation in this regard and timely abandonment of the existing 2 inch water main. Please call me at (909)350--7613, if you have any questions. Sincerely, COMMUNITY DEVELOPMENT DEP~TMENT Engineering Division Robert W. Weddle, P.E. City Engineer cc: City Manager Community Development Director Principal Civil Engineer/Special Projects 8353 SIERRA AVENUE(RO. BOX518) · FONTANA, CALIFORNIA92334-0518 · (714)3504600 SISTER CITY-- KAMLOOPS, B.C. CANADA ~i,~ recycled paper T~ A N_l A R C 0 M P A N 'Y A DIVISION OF SAN GABRIEL VALLEY WATER COMPANY 8440 NUEVO AVENUE · P.O. BOX 987, FONTANA. CALIFORNIA 92334 · (90g) 822-2201 May 18, 1995 City of Fontana 8353 Sierra Avenue Fontaria, CA 92335 Attention: Mr'. Yousuf Patanwala Subject: Washington Drive Sewer Project Gentlemen: You are hereby advised that Fontana Water Company has completed the abandonment of the 2-inch water main on Washington Drive. We have enclosed herewith one copy of our con:struction plan which shows the completed work and the approximate locations of our facilities within the project area. Our facilities will require protection in accordance with Section 5.1 and 5.2 of the Standard Specifications for' Public Work Construction, and we wish to cooperate with you to prevent damage to our facilities and interruption of your work. If you should need addi!~ional information, please do not hesitate to contact me at (818) 448-6183, Ext. 252. Very truly yours, r e LFM:dz City of Fontana CALIFORNIA January 3, 1995 Mr. Frank A. LoGuidice Vice President - Engineering and Operations San Gabriel Valley Water Company P.O. Box 6010 El Monte, CA 91734 RE: Abandonment of Water Facilities;, Washington Drive Sewer Project; Fontana, California Mr. LoGuidice: The City of Fontana ("City") requests that the San Gabriel Valley Water Company ("Water Company ") abandon certain of its water distribution facilities located in Washington Drive. This abandonment is necessary to accommodate the City's construction of the Washington Drive Sewer Project. This Project is an important one benefitting the general public and is part of the City's program to enhance its sewer collection system. If the Water Company is unwilling to voluntarily abandon its existing water facilities, the City would be forced to consider the use of its eminent domain powers to acquire that portion of the existing facilities necessary to accommodate the City's construction of its Project. We would prefer to resolve this matter by agreement rather than by the possible initiation of condemnation proceedings. According, this letter requests that the Water Company abandon that portion of its Washington Drive existing water main identified in the attached map. In addition, the Water Company will need to transfer service for those customers which currently receive service from the existing main to an adjacent Water Company main already in place under Washington Drive. The City will pay the Water Company the sum of $12,650.00 as full compensation for the Water Company's abandonment of the existinl; main and transfer service to the adjacent main. The City will notify the Water Company when it needs the Water Company to abandon the existing main and transfer service. We have al;reed that the Water Company will complete its work within thirty (30) days following the City's request. The City will pay $12,650.00 to the Water Company within thirty (30) days following the Water Company's completion of its work. 8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA, CALIFORNIA 92334-0518 · (714) 350-7600 SISTER CITY -- KAMLOOPS, B.C, CANADA Mr. Frank LoGuidice January 3, 1995 Page Two In addition, by accepting the foregoing compensation, the Water Company will forego all other claims against the City which the Water Company could have asserted in a condemnation action if the City had proceeded to file such an action. Furthermore, the City and the Water Company acknowledge and agree that their agreernent with respect to this Project shall not affect or impair any other rights, remedies or obligations of them with respect to other City projects or Water Company lines, equipment or facilities. Please acknowledge your agreement on behalf of the Water Company by signing this letter where noted below. Please return a signed copy of the letter to me for my files and keep one for yours. Your professional courtesy and cooperation is appreciated. Please call me if you have any questions. Sincerely, Gregory C. Devereaux City Manager GCD:RWW:km cc: Community Development Director City Engineer l?rincipal Civil Engineer/CIP AGREED AND ACCEPTED: By: Frank LoGuidice for the San Gabriel Valley Water Company , 0 5000' ~ ~ ~ RIALTO RANC-IO ~ HIGHLAND AV~ CUCA~ONGA > ~ FONTANA WALNUT S1 ~ ~ ~ ~ PROJECT ~ ,,. ,~,,.,..o ?o;"4 LOCATION L E G E N D CITY OF FONTANA CiP~' OF FONTANA'S SPHERE OF INFLUENCE INCORPORAEO CITY WASHINGTON DRIVE SEWER PROJECT