Loading...
HomeMy WebLinkAbout12.6 To ContractorREIimm;RD OF:: MEm:'rlNG ~ ********************* ~ *** TX REPORT *** TRANSMISSION OK TX/RX NO 1440 CONNECTION TEL 96857838 SUBADDRESS CONNECTION ID ST, TIME 07/13 08:04 USAGE T 02'03 PGS. 3 RESULT OK CITY OF F 0 FAX COMMUNICATIONS N FROM FAX NUMBER: T (909) 350-6618 A A PLEASE DELIVER TH~ FOLLOvv'I. NG PAGES TO: LOCATtON/ I:MONE: ,'~. "Y. ~'ug.~'- ~-A..e--bT LOe,CION/hONE: ~¢,rt~Etlq~Jcr ~XVtc-tO TcrrALNvsm~.RoFP^css: ~r L DA_~: '~--1%-¢~' Tam: (a~curoa~o cov~ sm~-r) I~ YOU DO NOT l~an ALL PAGT:.S, PLF, A!iE eat 'r , (909) CITY OF F 0 FAX COMMUNICATIONS N FROM FAX NUMBER: T (909) 350-6618 A A PEASE DELIVER TIIE FOLLOWING PAGES TO; FAXNtn~e~: C~09) FROM: "-('~-~¢ ~-t~-~-v~4,- TOTAL NUMBEI~ OF PAGES: %~ L DATE: ']--13-%~ TIME: 7:.4~ (~c~mo cov~ IF YOU DO NOT RECEIV~ ALL PAGES, PLEASE CALL (909) 35b "~& (REMOVE AND REPLACE AC. TO II' SOUIH OF C.L FROM STA. II+00 TO STA 17+35) 5' 11' z°' _'- ;min~. SAWCUTUNE 31/2' _N~4,00~.3/4, MAX. HO.~i/BX.kCi O' I E.p. 3 ~G~V~~ 2 c~ 5' o c~ 1 = 2' EL AIER TO BE ASANDONEO PI~ SHORING (BRACING & JACKS, OR i! . ~, .~,°o° , +' o0.o, °~,; 3/4' MAX. CRUSHED ROCK BEDDING TRENCH AND BEDD)NG DETAgL {~ SCALE No. 40964 REV. ~ ADDED ADDITIONAL PAVEMENT (4') TO EXTEND i FOOT SOUTH OF SOUTHERLY TRENCH WXL[ 'i Exp. ,3/,31/99  APPROVAL: 2~-Y~..,4% l'~2//~',r ,~,'rty~ ,.t/~.~.~- 19+00 "~!'HiLUIS E - ( ) '////I (Z2 EES AND GRD. COVER (PROTECT) " 0 FO STA. 18+ 0 - · :X ....... X sr ~w. To ~2' MAX, (rrp.) .:ALTRAI4S RIGHT OF WAY ,,r}, RT. OF CL TRENCH AND BEDDING DET,~.IL A(~ SCALE I" = 5'-O" (SEE CITf STUDIO TRENCH DETAIL 151, FOR ALE OTHER TRENCH CRITERIA) ~ BLVO rime/ ********************* V *** TX REPORT *** TRANSMISSION OK TX/RX NO 1291 CONNECTION TEL 96857838 SUBADDRESS CONNECTION ID ST, TIME 06/20 14:03 USAGE T 01'52 PGS. 3 RESULT OK CITY OF F 0 FAX COMMUNICATIONS N FROM FAX Nwis~,n: T (909) 350-6618 A A PLIEASE DELIV'ER Ti~ FOLLOWEqG P.~GE$ TO: I (~mo corn s~) MESSAGE: CITY OF F 0 FAX C. OMMUNICATIONS N FROM FAX NUlvm~,R: T (909) 350-6618 A N A PLEASE DELIVER THE FOLLOteVlNG PAGE,~I TO: F,,,x N,.~,: ('lt~q') (-8 5::7 ~ ~ Loc~oN/P. omC~/t> 9') ~ ~9 -6 ~ TOTAL NUMSEIt. OF PAGES: '~ DATE: TIME (~C~uD,~a COw.~ s~) IF YOU DO NOT RECEIVE ALL PAOES, PLEASE C,~T .T (CJ0~) MESSAGE:: ,~] CITY OF FONTANA ENGINEERING DIVISION · 8353 .SIERRA AVENUE, FONTANA, CA 92335 PHONE Ntr~Ea: (909) 350-7610 .City of Fontaria CALIFORNIA June 20, 1995 Shannon L. Stuart, Vice President S.J. Burkhardt, Inc. 6157 Marlatt Street Mira Loma, CA. 91752 RE: Washington Drive Sewer Project From Cypress Avenue to Approx. 803 Feet East (SB-71-94) Compaction Test Dear Mr. Stuart: This letter is in response to your letter dated June 20, 1995. The S.J. Burkhardt, Inc. has the construction contract with the City of Fontana. The City can meet or exceed other Jurisdictions or Agency Permit Requirements. The City requirements exceeds the County's permit requirements. In accordance with the Special Provisions, Section 7-5 PERMITS, "If the permit or license of any agency or public utility iS more restrictive than the standard specifications, standard drawings or special provisions, the requirements of the permit or license shall take precedence of that portion of the work in the agency or public utility right-of-way." The City geotechnical consultants have the responsibility to make reasonable determinations for the frequency of the tests to be made and at what intervals. According to Project Geotechnical ConsUltant, the test frequency will be reduced when the contractor obtains better compaction testing results. The Project Geotechnical Consultant has already been instructed to perform additional maximum density curves as warranted in the field[. They have also informed the City that they will be using nuclear testing method to help reduce the testing time. 8353 SIERRAAVENUE(P.O. BOX518) · FONTANA, CALIFORNIA92334,0518 · (714)3504600 StSTER CITY -- KAMLOOPS, B.C. CANADA ~i4~ recycled paper Please call the undersigned at (909)350-6645 if any additional information is required. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division s~at~n You wala, P.E. Associate Engineer/Special Projects cc: City Engineer Principal Civil Engineer/Special Projects City of Fontana CALIFORNIA June 15, 1995 Shanon Stewart S. J. Burkhardt, Inc. 6157 Marlatt Street Mira Loma, CA, 91752 SUBJECT: Washington Drive Sewer Project From Cypress Avenue to Approx. 803 Feet East (SB-71-94) Caltrans Utilities Dear Mr. Stewart: The Caltrans Permit Inspector Mr. Ruben Guerrero has brought to the City's attention that a Caltrans Electrical Utility Service Line has been damaged during excavation. The STANDARD SPECIFICATIONS FOR PUBLIC WORKS (GREENBOOK) states the following under SECTION 5 --UTILITIES: 5-1 LOCATION "The California Department of Transportation is not required by Section 4216 to become a member of the regional notification center. The Contractor shall contact it for location of its subsurface installations." 5-2 PROTECTION "The Contractor shall bear the costs of repair or replacement of any utility damaged if located as noted in 5-1." Accordingly you are notified to repair the Caltrans Utility Line immediately to the satisfaction of the State Representative, Please call the undersigned at (909)350-6645 if you have any questions. Sincerely, COMICUNITY DEVELOPMENT DEPARTMENT Engineering Division Y0~~P~tanwala, P.E. Associate Engineer/Special Projects cc: Public Works Inspector (RS) 8353 SIERRA AVENUE (RO, BOX 518) ® FONTANA, CALIFORNIA 92334-O518 · (714) 350,7600 SISTER CITY- KAMLOOPS, B.C. CANADA ~4~ recyclect paper  KATHY MONTOYA Av,oR. EsHLEMA. )City f c, cLE.N MAYOR ~ ~~ '~ i~ ~Z-, C DR. CHARLES A. KOEHLER CARL B, COLEMAN, JR. MAYOR ..o TEM ' NANCY HOOPER COUNCIL MEMBER ' ' C A L ~ F O ~ N [ A GREGORY C. DEVEREAUX JOHN B. ROBERTS C~ MANAGER COUNCIL MEMBER BEATRICE WATSON COUNCIL MEMBER June 8, 1995 S.J. Burkhardt, Inc. 6157 Marlatt Street Mira Loma, CA 91752 Dear Sirs: Please find enclosed your Bid Bond submitted on April 6, 1995, for "Construction of Washington Drive Sewer Project from Cypress Avenue to Approximately 803 Feet East" in ~e City of Fontann, in as much as you have submitted the fully executed contract for this project, Insurance Certificate, Faithful Performance Bond in the mount of $85,500 and Payment Bond in the amount of $85,500. The City is most appreciative of your interest in bidding on this project. If you should have any further questions, please contact YouSuf Patanwala, in the Engineering Division of the City of Fontann at (909) 350-6645. incere , Lmda S. Nunn, C Deputy City Clerk lsll enclosure ee: Engineering Division (YP) MAILING ADDRESS: P.O.BOX 518 8353 SIERRA AVENUE · FONTANA, CALIFORNIA 92334-0518 · (909) 350-7600 F'I~INTEO ON RECYCLED PAPER City of Fontana CALIFORNIA June 7, 1995 Mr. Charles P. Burkhardt S. J. Burkhardt, Inc. 6157Marlatt Street Mira Loma, CA. 91752 SUBJECT: Washington Drive Sewer Project From Cypress Avenue to Approx. 803 Feet East (SB-71-94) Notice to Proceed Dear Mr. Burkhardt: This letter will serve as :your "Notice to Proceed" on the above referenced project. As per the construction contract you have thirty-five (35) working days after the "Notice to Proceed" to complete all construction work. A City. of Fontaria Public Works Construction Permit must be obtained prxor to starting any work. Please contact the undersigned at (909)350-6645, if any additional information is required. Sincerely, O21VlVUNITY DEVELOBflqT DEPAR]iVflqT Engineering Division Yous ala, P.E. Associate Engineer/Special Projects co: City Engineer Principal Civil Engineer/Special Projects 8353 SIERRAAVENUE(P.O. BOX518) · FONTANA, CALIFORNIA92334-O518 I (714)350-76OO SISTER CH'Y -- KAMLOOPS, B.C, CANADA ~tt recycled paper City of Fontana CALIFORNIA June 7, 1995 Mr. Charles P. Burkhardt S. J. Burkhardt, Inc. 6157Marlatt Street Mira Loma, CA. 91752 SUBJF_.(Z: Washington Drive Sewer Project From Cypress Avenue to Approx. 803 Feet East (SB-71-94) Executed Original Contract Documents Dear Mr. Burkhardt: Enclosed for your records is one fully executed original set of Contract Documents, Performance, and Labor andMaterials Bonds for the above mentioned project. Please contact the undersigned at (909)350-6645, if any additional information is required. Sincerely, CQX,M~ITYDEVELOttVENTDEPARIIVlENT Engineering Division YousXs~a~aanwala, P.E. Associate Engineer/Special :Projects ce: City Engineer Principal. Civil Engineer/Special Projects 8353 SIERRA AVENUE(P,O. BOX518) ® FONTANA, CALIFORNIA92334-0518 i (714)350-7600 SISTER CITY -- KAMLOOPS, B.C. CANADA ~4~ recycled paper City of Fontana CALIFORNIA May 17, 1995 Mr. Charles P. Burkhardt S. J., Burkhardt, Inc. 6157 Marlatt Street Mira Loma, CA. 91752 SUBJECT: Washington Drive Sewer Project From Cypress Avenue to Approx. 803 Feet East (SB-71-94) Pre-Construction Meeting Dear Mr. Burkhardt: The City of Fontaria Will be conducting a pre-construction meeting for the above referenced project. The pre-construction meeting is scheduled for Wednesday, May 24, 1995 at 9:00 am at the City of Fontana City Hall in the DesicFn Advisor~Board Meeting Room (D.A.B.) located at 8353 Sierra Avenue, Fontana, CA. 92335. The project manager, job superintendent and subcontractors are required[ to attend this meeting. You are required to submit the following items at the ~eeting: 1.) Construction Schedule 2.) Emergency Information Form (Copy Enclosed) 3.) Names and titles of persons entitled to authorize and sign change orders. 4.) Copy of City of Fontaria Business License for contractor and subcontractors as required per Fontana Municipal Code, Sec. 15-36. 5.) Copies of Permits. from other Agencies. "Notice to Proceed" will net be issued until these conditions are met. 8353 SIERRA AVENUE(P.O. BOX518) · FONTANA, CALIFORNIA92334-0818 · (714)350-7800 SISTER CITY- KAMLOOPS, B.C. CANADA ~ recycled paper Please contact the undersigned at (909)350-6645, if any additional informational is required. Sincerely, COM~]NITY DEVELOPMENT DEPARTMENT Engineering Division Yous~~a~wala, P.E. Associate Engineer/Special Projects cc: City Engineer ~ Principal Civil Engineer/Special Projects " V CITY OF FONTANA EMR. RGENCY INFORMATION PRO~IECT NAME: WASHINGTON DRIVE SEWER EXTENSION PRO/ECT LOCATION: CYPRESS AVENIlE TO APPROX. 803 FEET EAST CONTRACTOR: S.L BURKHART, [N'C. ADDRESS:6157 MARLATF STREET MIRA LOMA, CA. 92752 OFFICE PHONE: (909~685-7488 FAX:(909~685-7838 RESIDENCE PHONE: MADa~NANCE SUPERINTENDENT: BEEPER: JOB SUPERINTENDENT: ADDRESS: DAY PHONE: RESIDENCE PHONE: FOREIvIAN: ADDRt~S: DAY PHONE: RESIDENCE PHONE: CITY OF FONTANA - EMERGENCY NUMBERS Police Department General Information ....909-350-7700 Emergencies ......... 911 Public Services ........ 909-350-6760 Curtis Aaron ....... 909-350-6685 Engineering Division ...... 909-350-7610 Yousuf Patenwain.. . Off: 909-350-6645 Home: 909-889-2819 Carlos Navefro .... Off: 909-350-6632 Home: 909-825-4727 Robert Savant asp.). Off: 909-350-6633 Home: 909-350-8463 Emergency Information The names, addresses and telephone numbers of the contractor and sub-contractors or his representatives, shall be filed with the City Engineer and the Police Department prior to beginning work. The contractor shall provide adequate detours to the satisfaction of the City Traffic Engineer. A detailed plan of such detours shall be submitted to the City Traffic Engineer at least five (S) days prior to the time the contractor wishes to close off the street or in any way restrict the traffic flow. In actual street closures, the submitted plan shall indicate the route of the detour, the character of the temporary pavement where required, and a layout of the locations of signs and lighting. In all other cases, the contractor shall provide adequate traffic flow in both directions. If traffic cannot be maintained the contractor shall provide flagmen whose sole duties consist of directing traffic through and around the work. In all cases, the approval of a suitable plan shall be granted to the 'contractor prior to the beginning of construction. Failure or refusal by the contractor to comply with the above mentioned requirements shall be sufficient cause for the City Engineer to order the work done by city forces and the cost therein to be borne by the contractor. cc: PoLice Department, At*n: Dispatch and Traffic Serge~mt Associat6 Engineer/Inspection Public Services Director Contractor.. City of Fontana CALIFORNIA May 3, 1995 Mr. Charles P. Burkhardt S. J. Burkhardt, Inc. 6157 Marlatt Street Mira Loma, CA. 91752 SUBJECT: Washington Drive Sewer Project From Cypress Avenue to Approx. 803 Feet East (SB-71-94) Execution of Contract Documents Dear Mr. Burkhardt: On May 2, 1995, the City Council authorized to award the construction contract to S. J. Burkhardt, Inc., for the above reference project. Enclosed to be executed herewith are three (3) sets of contract documents. All three sets must be executed separately and only City provided forms shall be used. Return executed contracts back to the address below as soon as possible. One fully executed set will be returned to you at a later date for your records. City of Fontana Engineering Division 8353 Sierra Avenue Fontana, CA. 92335 Attn: Mr. Yousuf Patanwala Please contact the undersigned at (909)350-6645, if any additional informational is required. Sincerely, COMMUNITY DEVELOPMENT DEPARTMENT Engineering Division Ycu~Pa~anwala, P.E. Associate Engineer/Special Projects cc: City Engineer Principal Civil Engineer/Special Projects 8353 SIERRAAVENUE(P.O. BOX518) ® FONTANA, CALIFORNIA92334-0518 · (714)350-7600 SISTER CITY -- KAMLOOPS, B.C. CANADA ~ recycled paper