HomeMy WebLinkAbout4.4 Geotech Engineer & Report PROJECT NAME C'~y o', "FOt.Tg~r->~'.j.~i~.~(lC".2/T-~.) X.~,.( 5Tb-~L ()(LOlLall- PROJECT NO.
I
DATE ~ ~/fF SAMPLE LOCATION ~?~'~ DEPTH 'tO'/~r TECHNICIAN
TEST' PROCEDURE
50,.,.,,,,
~ $ AST~ DESIGNATION D1557-91 D D698-91 D I METHOD
~ ~ AASHTO T180-86 METHOD C (MODIFIED) D OVERSIZE CORRECTION
: ~ ; MAXIMUM PARTICLE SIZE NO. 4 D
~.....~.,..,.~, vo~u.~ o~ .o~o ,/so ~ ~/,s.ss
TYPE OF RAMME~ MANUAL D MECHANICAL
SOiL + MOLD ~ ~qG~ D~O ~OtO ~ AS
~ i ~ MOLD TARE "ZO~ ~6t~ 20~ 2~ ~0~ REC'D
.... F''''''i''''''j SOIL WET I~ ~ J~]] (~?, I ~ [~?~ MOIST
) : : , WET DENSITY I~1, ( I~,1 IgZ,~ I~/,//z~,~ CONTENT
140): ~ ; : CAN NUMBER ~1 }~ ~ ~ Zt
~ DRY + TARE ~,~ ~,~ ~2~,~ ~7~t~
= ~ i ~ i = LOBS 11,(~ 1~',~.7 ~t,~ ~,~
i.......L.....~.......L.,.~.....i TARE )3.D 3~'~ ~.~ ~H.~
135~'"~""~"'~""~"'~""]' DRY SOIL ~1,~ ~1,~,~ ~
...... )"""'h""")"""'~j"""{" % MOISTURE ~, p ~, ~ ~, ~ /~, ~ 1
....... ~"""'~"""'~"""'~i~ DRY DENSITY IIf,~//~,~i7,~ lt~,~
~ ~ ~ ~ ROCK CONTEN ~,~ ~.~
........ r""'T"""r"""~ ...... j
.... ~ WEIGHT OF TOTAL SAMPLE
~ 3o~..,~....~...~....~...
: ! ~ ~ ~ ~ ~ ~ PLUS 3" WT.
~....j.......~,.....L.....: ......: = " PLUS 3/4" WT ~,
F'"T""T""T"""~ :'""T"'"T"""[ ~ P~us 3/a" ~. ~, f ~,~ ~ s , o
:.......,......,.._...,.......~ ......: = , : P~us.o.~ wT. ?'~rZ~
~25~...j. ~ ~ ,::
[""""""""""""""""" P~US 3/4" WT. __
. i ~ ~ : ~ ~ :. PLUS NO.4 WT
. ...,,.....?-....~.....~.... ~......~.......~.... ~...~.,
~2o~..."...~...~....~...i....~-..;....:,...~...~ .........z~o A~ vo~d~
~"'~"T"'~""7~"':' '~' =:~=~.~o
~ ~ 5~ .......~ ...~,.,.~.. G=2.50
: : : ~ : :~ : ~ ~ OVERSIZE ~CORRECTION
· ,. ~.~ .= .. j, .,......, .,..,~.
' ~ I ~,
:..~......:.. :.... ~......~...; .............,~,~,
.... ,""'r""~""':"i"'~"'~""~""~ :. :~o~,,~..o,~.~ ~-~
,~o,::'~""'S"""'~"""~ r":,"":.""~"~ .........'/""':":', ,
0 5 10 15 20
MOISTURE CONTENT (PERCENT OF DRY WEIGHT)
AGGREGATE
PROJECT NAME
PROJECT NUMBER
SAMPLE ,..r
OVEN DRY WEIGHT A. Z,"7/, "'7
SATURATED, SURFACE DRY B. ~E~s1, f
SATURATED, SUBMERGED C. ~' G
TARE
BULK SPECIFIC GRAVITY _ A _ Z.~,~.
B-C
BULK SPECIFIC GRAVITY _ B _
B-C
(SATURATED SURFACE DRY BASIS)
A
APPARENT SPECIFIC GRAVITY - -
A-C
ABSORPTION _ B-A x 1 O0 = /. I
A
B:GRAVITY.DWG J
'- 'v' O,,,Z_RSIZE
CORRECTION DATA
PROJECT NAME Fc,u-w-~.
PROJECT NUMBER
,.u ~rh ,~ s~ ~,.~ DEPTH 1~ '/~"
SAMPLE
TECHNICIAN ~ DATE
A. % MOISTUTE, FINER FRACTION
B. % MOISTURE, COARSE FRACTION
C. WET WT., FINER FRACTION
D. WET WT., COARSE FRACTION
E. DRY WT., FINER F,RACTION
F. DRY WT., COARSE FRACTION
G. % FINER FRACTION
H. % COARSE FRACTION
I. SPECIFIC GRAVITY
J. MAXIMUM DENSITY
K. OPTIMUM MOISTURE
E = C~ ('i +A--A-
'iO0 ) e --- E.4- (E+F)xlO0
F = D-,'--(1+ B
I"GO') H --- F-~-(E+F)xlO0
'~OOxJxlx62.4 I?___ ,t--f,~'' CORRECTED (KxG~ + (BxH~ ~o'~ % CORRECTED
(jxH)+(ix62.4xO)= pcf MAXIMUI,/{ 1 O0 = MOIS'CURE
DENSITY
FIELD USE ONLY
CORREC'TED
DENSITY
CORRECTED (100xFIELD MOISTURE)-(BxH)
FIELD =
MOISTURE
I~T'e,~,_ MAXIMUM DENSITY TEST DATA
PROJECT NAME ,,~,,,-,,,~i~-~-,~-,~,AJ r~.. ~,.,.~ ~,~ PROjEC~ NO.
DATE~./~ 5AMPLE LOCATION/~/~ DEPTH ~/~ TECHNICTAN
SOIL DESCRIPTION 52' 'S"/c,-~.',r' ~ ~K/C.,~. ~O-L
TEST PROCEDURE
150 ........
: ~ ASTM DESIGNATION D1557-gl ['~ D698-91 [] METHOD ~"
i i AASHTO T180-86 METHOD C (MODIFIED) [] OVERSIZE CORRECTION [~'
MAXIMUM PARTICLE SIZE NO. 4 [] Z~/8" []
TYPE OF RAMMEN MANUAL [] MECHANICAL
i""'~"""'?" METHOD OF SAMPLE PREPARATION DRY I~L MOIST []
~ 45.L..:....~ ~ ~1
~ ~ ~ SOIL + MOLD ~)~ I1~ It~ AS
j : ~ ~ ~OLD TARE ~45~ ~$'~ ~4~ REC'D
140[ [ ~ [ [ CAN NUMBER 1 ~_
~ :~:. .....p....~..-...~..
~ ' ' ' ROCK CONTENT
~ i ~ ~ ~ ~ WEIGHT OF TOTAL SAMPLE ~'/'~
~ ~ ~ ~ ~ j ~ ~ ~ PLUS ~" WT.
..... ~.'.'..~".'..'~"*""~ ...... PLUS 3/4" WT
..... .................... ' =
.... 'i ~ : : ~ PLUS NO,4 WT. Z~ '; S
....... ~......~-.....T....i.I~:~,~
' PLUS 3/4" WT,
~" ': "i"" ] ~" ~"~~ ~ ~ PLUS HO,4 WT
· . ~ : : :
12o~,,,:,,,,~,,,: ........' Zero ATr Vold~ Cu~es TEST :RESULTS
~...~ ..... ~...,~ ..:,. :...: ..... ~,
:...~ ....................... ~ 0=2,80 MAXIMUM DENSflY
~ ....~....~...,,: ........... .......~: .. G=2.6o
: 5 : ~ OVERSIZE: CORRECTION
: .........................:' ~ ...... MAXIMUM DENSliTY
~ ~ OPTIMUM MOISTURE
:..,,,.,: .......~.~. .......,..:....~...: .....~ ~
0 5 10 15 20
MOISTURE CONTENT (PERCENT OF DRY WEIGHT)
-- AGGREGAT E
PROJECT NAME ~rrY o~
PROJECT NUMBER
SAMPLE ~
TECHNICIAN ~' DATE ~//
OVEN DRY WEIGHT A. /~ od::>,: ~
SATURATED, SURFACE DRY B.
SATURATED, SUBMERGED C. /~e b
TARE
BULK SPECIFIC GRAVITY = A =
B-C' ~.,(.,,,t:::p
B
BULK SPECIFIC GRAVITY ' B-C ' ?-,G, 't
(SATURATED SURFACE DRY BASIS)
A
APPARENT SPECIFIC GRAVITY- -
A-C
ABSORPTION ' A x 1 O0 = /, '¢
B:GRAVITY.DWG
.- q ERSIZE
CORRECTION DATA
PROJECT NAME
PROJECT NUMBER
,.., _.k"r,P Io.~
SAMPLE ,'
TECHNICIAN t'z""""' DATE
A. % MOISTUTE, FINER FRACTION
B. % MOISTURE, COARSE FRACTION
C. WET WT., FINER FRACTION
D. WET WT., COARSE FRACTION
E. DRY WT., FINER FRACTION
F. DRY WT., COARSE FRACTION
G. % FINER FRACTION
H. % COARSE FRACTI.ON
I. SPECIFIC GRAVITY
J. MAXIMUM DENSITY
K. OPTIMUM MOISTURE
E = C"'~- (1+l-e--d-O) S = E-;- (E+F)xlO0
F = D~-(1+10--~) H = F,'---(E+F)xlO0
100xJxlx62.4 l t_..k~,,p,upcf CORRECTED (KxG~ + (axH~ 5,~::~ % CORRECTED
(jxH)+(Ix62.4xG)= MAXIMUM 1 O0 = MOISTURE
DENSITY
FIELD USE ONLY
CORREC'TED FIELD DENSITYx Ix62.4xG
FIELD = (lOOxlx62.4)-(FIELD DENSITYxH)
DENSITY
CORRECTED 100xFIELD MOISTURE)-(B×H)
FIELD = G
MOISTURE
b:corrdoto,dwg
MAXIMUM DENSITY TEST DATA
PROJECT NAMEC't1't/bFF"d~PI~ ,JS~,.qfr~rr.,fi,,J t./'L.9~-'Jt"~. ~'- PROJECT NO. Za°~46'O
DATE ~FSAMPLE LOCATION
SOIL DESCRIPTION
TEST PROCEDURE
150 ........
ASTM DESIGNATION D1557-91 [] D698-91 [] METHOD
AASNTO T180-86 METHOD C (MODIFIED) [] OVERSIZE CORRECTION []
MAXIMUM PARTICLE SIZE NO..4 Q 3/8" ED ~/,4"[]
VOLUME OF MOLD 1/30 J~] 1/13,33= []/tH~,L.
TYPE OF RAMMER MANUAL D MECHANICAL Ga
' METHOD OP SAMPLE PREPARATION DRY ~ MOIST D
145~ ........~ ... ~ ~ o
SOIL + .OLD 7~D?l//Za ~tl/eTJ I AS
WET DENSITY j/~. (1139, F113~'. ~
]"'~ ........... T"'~""~ DRY + ~ARE ~)~,~ S2~,~
] :' ~""~ "" ~ TARE /~, f
~ ~""Z ~ ROCK CON~T
~ TOTAL SAMPLE ~ ' ~ ~
~ : WEIGHT OF ' '
~ .... : ......... ]..: PLUS ~'" W~. ~
~..~. ,. ~.us s/~" wT 5'.~.
WEIGHT Or ADJUSTED SAMPLE
~ PLUS 3/4" WT. __
:
: PLUS NO.4 WT .
120~ .......................................... ~ ....... Zero Air Voids Cu~es TEST' RESULTS
s=2.7o ~,~
0=2.60 OPTIMUM
115~ ..................... 0=2.50 ,
OVERSIZE CORRECTION
MAXI~U~ DENSITY
OPTIMUM MOISTURE
110~ .........
0 5 10 15 20
MOISTURE CONTENT (PERCENT OF DRY WEIGHT) I:.,,~,t,,.D~c
---, AGGREGATE
PROJECT NAME
PROJECT NUMBER
/_., /
.~ b"T',~,/'~r'~"0 ~o,D,_._ DEPTH /d2/._C'
SAMPLE ,T
T E C H N ICIA N ,,~,f-~
OVEN DRY WEIGHT A. 1'71~,.~
SATURATED, SURFACE DRY B. I
SATURATED, SUBMERGED C. I ~ ~E, "'2
TARE
A
BULK SPECIFIC GRAVITY ' B-C ' Z ' G~ 0
B
BULK SPECIFIC GRAVITY ' B-C '
(SATURATED SURFACE DRY BASIS)
APPARENT SPECIFIC GRAVITY = A _ A-C
% ABSORPTION_B-A x 100 =/, ~"
A
8:GRAVITY.DWG
C~ERSIZE
CORRECTION DATA
PROJECT NAME ~-.,Ty ~ T=~'',al:'b''l''Jl~
PROJECT NUMBER
,, ~-rf,. ,c,-~c~e ~a'?_..-- DEPTH
SAMPLE ~r
TECHNICIAN ~ DATE e//e/'~"'
A. % MOISTUTE, FINER FRACTION
B. % MOISTURE, COARSE FRACTION )'
C. WET WT., FINER FRACTION
D. WET WT., COARSE FRACTION
E. DRY WT., FINER FRACTION
F. DRY WT., COARSE FRACTION
G. % FINER FRACTION
H. % COARSE FRACTION
I. SPECIFIC .GRAVITY 2_---,
J. MAXIMUM DENSITY I~
K. OPTIMUM MOISTURE ~,,
E = Ce o+re-c) o = E-C-' (E+r)×~oo
OOxJxlx62.4 CORRECTED {KxO~ + (axH) "~¢ MOIS'TURE
(j1xH)+(ix62.4xG)= r'~,q-,fi pcf MAXIMUM 100 = ! % CORRECTED
DENSITY
FIELD USE ONLY
CORREC'TED FIELD DENSITYx 1×62.4xG
FIELD = (lOOxlx62.4)-(FIELD DENSiTYxH)
DENSITY
CORRECTED 100xFIELD MOISTURE)-(BxH)
FIELD = O
MOISTURE
~:corrdoto.dwg
PROJECT NAME ,,,.,x'.C~-!'/-~r'.,,,--.' '."",2. ;~-::".'.,-~-.~' ~:~"~'I PROJECT NO.
DATE ~,,~'/~.F" SAMPLE LOCATION ,'r_~ ~ ~ DEPTH ~.'7~; ' TECHNICIAN
SOIL DESCRIPTION ~ 12 . ~ I -/ r'- i - P,~ ~' ~,P-~ w/~/L
TEST PROCEDURE
150 ........
· : ASTM DESIGNATION D1557-91 [;3 D698-91 i'l METHOD
! ~ AASHTO T180-86 METHOD C (MODIFIED) [::] OVERSIZE CORRECTION [~,
MAXIMUM PARTICLE SIZE NO. 4 C] 3/8' r"l $/A",~,
TYPE OF RAMMER MANUAL ['l MECHANICAL ~
)"""'t"""') METHOD Or $AMPLE PREPARATION DRY J~. MOIST
! i i i ! CAN NUMBER ,.~ '2_
! ] ~ j j LOSS 'eY,//~/.~ 7~,~'
5 DRY DENSITY ,$4,,,.~ IJ~, q
~ ~ ~ ~ ROCK CONTENT
PLUS 3/4" WT
~zs!...i..--:...!....~..~. ~....i!
: : : ~ ~ · ,' : E j WEIGHT OF ADJUSTED SAMPLE
120~. ............ ~ ..................... ........4. ........ Zero Air Voids Curves TEST R;ESULTS
G=2.50
~ ~5.';...-.-.--.~ ........!.
.. ' , : : ~ OVERSIZE CORRECTION
i ...............;. .......i .......: ....."MA×,MUM OENS,
OPTIMUM MOISTURE'
110| ..........
0 lO iS 20
MOISTURE CONTENT (PERCENT OF DRY WEIGHT)
-- : ' Ab' REGATE
PROJECT NAME c,7'V oc ~=,~'tf..-,,j,~
PROJECT NUMBER z-oo~,,~a-ot
SAMPLE ~ ~ ~*~ DEPTH ~-/~
TECHNICIAN ~' DATE ~7/~/~ ~
OVEN DRY WEIGHT A. /& oo, ,~'
SATURATED, SURFACE DRY B.
SATURATED, SUBMERGED C. /aa~,, ~
TARE
BULK SPECIFIC GRAVITY ,_. A _
B-C
B
BULK SPECIFIC GRAVITY - - .z,c, .~-
B-C
(SATURATED SURFACE DRY
A
APPARENT SPECIFIC GRAVITY - -
A-C
B-A
% ABSORPTION ' A x 1 O0 = /, ¢'
~:GRAVITY.DWG
'
CORRECTION DATA
PROJECT NAME
PROJECT NUMBER
,, _..%-r~.
SAMPLE tr
TECHNICIAN ~ DATE e'//-r'J'~ ~''
A. % MOISTUTE, FINER FRACTION
8. % MOISTURE, COARSE FRACTION
C. WET WT., FINER FRACTION
D. WET WT., COARSE FRACTION
E. DRY WT., FINER F~RACTION
F. DRY WT., COARSE FRACTION
G. % FINER FRACTION
H. % COARSE FRACTION
I. SPECIFIC GRAVITY
J. MAXIMUM DENSITY
K. OPTIMUM MOISTURE
E = c~ o+re-d-) o = E~ (E+F)×~OO
F = D~--(1+1--~) H = F,=''' (E+F)xl00
lOOxJxlx62.4 1~.~.3C, cf CORRECTED (KxG~ + (BxH~ 5,~:~,% CORRECTED
(JxH)+(.Ix62.4xG)= MAXIMUM 100 = MOISTURE
DENSITY
FIELD USE ONLY
FIELD = (10 2 YxH)
DENSITY
CORRECTED (IOOxFIELD MOISTURE)-(BxH)
FIELD = G
MOISTURE
::corrdoto.Mwg
PROJECT NAME~FynFFC~--TFNJI~ v-}A,c~nor~r~J ~;rc,~EoJ~"~ ~, PROJECT NO. ZaO~4G-O
DATE ~FSAMPLE LOCATION ~T~ IO~&O DEPTH I~L I~" TECHNICIAN
SOIL DESCRIPTION
TEST PROCEDURE
50 ........
ASTM DESIGNATION D1557-91 ~ "', D698-91 0 ~ETHOD
AASHTO T180-86 METHOD C (MODIFIED) ~ ~ OVERSIZE CORRECTION
MAXIMUM PARTICLE SIZE NO, 4 D 3/8" Q ~/~"~
VOLUME OF MOLD 1/30 D 1/13.3~ ~/~.~
TYPE OF RAMMER MANUAL Q ~ECHANIGAL ~
~ETHOD OF SAMPLE PREPARATION D~Y ~ MOIST ~
SOIL WET 7~ 1~TJ"~i~t~ .OIST
WET DENSITY/~ ~. ~j/3t rj/2J'. ~ CONTENT
j"."""F"'~""r'~~,~ + ,~,~ ~.o s~.~
{ ": ..........~ ........~ LOSS g~,~ Z~,~
~ss~ ........;...: ........]....,: DRY SO~L 4~,~/~,~ ~/~,f
= ~ · , ~ :
~":""~ .......i"' DRY O~.si~ t~-5 ~5/,~ ~,/ J
=~o~..., ........,..-.. w~l~Ht Or TOTAL S~UPLE ~" ~'; Lb~ ·
:: :'7:::7.....:: :.:,~, ~/,-~ f.~, i z.~.
~ PLus 3/8" '~. I~. ,~~ ~
=j..,:,.=====================~ ,0.,.. ~ ~ .3~
WEIGNT OF ADJUSTED
PLUS 3/4" WT.
PLUS NO.4 wT
~2o ..........................................., ....... Zero ~ vo;ds Cu~e. TEST RESULTS
G=2.80 MAXIMUM DENSITY I~
~=z.~o ~
" G=2.60 OPTIMUM MOISTURE
15) .....................: .....................~ ............. G=2.50
~ OVERSIZE CORRECTION
] MAXIMUM DENSITY
~ OPTIMUM
110'
0 5 10 15 20
MOISTUR{ CONTENT (PERCENT OF DRY WEIGHT) m..,:,,~.
.~. -- A~;REGATE:
PROJECT NAME C/5'>/Or/
PROJECT NUMBER
/ /
SAMPLE ~ S~, {~ DEPTH
T E C H N ICIA N ~ [6 DATE
OVEN DRY WEIGHT A. 1'7/'%...~
SATURATED, SURFACE DRY B. /"24'~',~
SATURATED, SUBMERGED C.
TARE
BULK SPECIFIC GRAVITY _ A _
B-C
B
BULK SPECIFIC GRAVITY ' B-C '
(SATURATED SURFACE DRY ,_.'-.SIS)
APPARENT SPECIFIC GRAVITY - A _ A-C
ABSORPTION = B-A x 100 = J,~"
A
~:GRAVITY.DwG
OV~',RSIZE
., ~ CORR~f~TION DATA
PROJECT NAME
PROJECT NUMBER
SAMPLE '~ ~"r-A.
TECHNICIAN ~-z.z___ DATE
A. % MOISTUTE, FINER FRACTION
B. % MOISTURE, COARSE FRACTION
C. WET WT., RNER FRACTION
D. WET WT,, COARSE FRACTION
E. DRY WT., FINER FRACTION
F. DRY WT., COARSE FRACTION
G. % FINER FRACTION
H. % COARSE FRACTION
I. SPECIFIC .GRAVITY
J. MAXIMUM DENSITY
K. OPTIMUM MOISTURE
E = C"~- (l+l-e"O-) G = E'-4- (E+F)xlO0
,,
r = D-f- (',+f-~-~-)H = F+ (E+F),dO0
r 100xJxlx62.4 _ U'~,,~r.~ CORRECTED (KxO~ + (gxh~ "~¢ MOISTURE
,JxH)+(Ix62.4xG)' pcf MAXIMUM 100 = ~% CORRECTED
DENSITY
FIELD USE ONLY
FIELD = ( 0 2 I YxH)
DENSITY
CORRECTED (IO0xFIELD MOISTURE)-(BxH)
FIELD = O
UOISTURE
Please R~mi[ Payments to Ni~o & Moore Corpo~[e Accounting:
10225 ~rnes Canyon Road · Suite A-112 · San Diego, Cali~rnia 92121
Pb~e 1619/457-0400 · Fax 1619) 558-I236 Invoice number 4597
September l, 1995
Page number
Project No. 200646.01 - Waehington Drive Sewer Projec~
Client No. SB-71-94, P.O. No.'B§52~3~'
CITY OF FONTANA
8353 SIERRA AVE. ~L.~.
V NTANA, CA 2ss4-os s
ATTN: MR. YOUSUF PATANWALA
, Invoice through September 1, 1995, for geotechnical consult~ng.~servic%~/
pertaining to the Washington Drive sewer project in Fontand, Californi
= Our services have included project data compil~tion and analysis and
preparation of our report dated August 31, 1995.,
PROFESSIONAL SERVICES Hours, Rate Amount
PRIMC/PA~ ENGINEER/GEOLOGIST
.~ASA5 VAKILI
REPORT pREPARATION
9-0~-95 ~.00 84.00 84.00
PROJECT ENGINEER/GEOLOGIST ..... "-
KURT S. YOSMII
DATA.COMPILATION & ANALYSIS '-
"-. 8-04-95 ~.50 74.00 111.00
"9-01-95 ~.00 74.00 74.00
REPORT PREPARATION
9-01-95 3.50 74.00 259.00
ERICK J. ALDRICH
DATA COMPILATION & ANALYSIS
9-01-95 2.00 62.00 ~24.00
TECHNICAL ILLUSTRATOR
LASZLO ROZGONYI
TECNNICAL ILLUSTRATING
9-0~-95 1.00 39.00 39.00
~RIO O. AQUINO
TECHNICAL iLLUSTRATING
8'04'95 2.50 39 00 97 50
*DATES SHOWN REFLECT END OF BILLING WEEK
PLEASE RETURN WITH PAYMENT
Please Remi~ Payments to Ninyo ~ Moore Corporate Accounting:
10225 Barnes Canyon Road · SuiteA-ll2 · SanDiego, California 92121 Invoice number 45979
Phone ~619) 457-0400, · Fax (619) 558-1236 September 1, 1995
Pa~e number 2
Project No. ~00646.O1 - Washington Drive Sewer Projec~ ~ , ~<-~{
===================== 'v 2T
~ORD PROCESSING/REPRODUCTION
ANNEMIEKE VALKENHOFF
~ORD PROCESSIHG ~: ' ('~> 40. B0 ~Z
9-01-9B .50 27.00 "
MARY ELAINE HEBNER
RE PRODUCT I ON
9-0~-95 .50 27.00 13.50
WANDA G. HAMILTON
WORD PROCESSING
9-0~-95 .50 ~7.00 13.50
· '*THIS( I~OlCl ~TAL,'*~ ,:. ,,sSa~-
PREVIOUS UNPAID INVOICES: Number Date ~ount
· OTAL PRRVIOUS INVOICES: 4,424.00
· *~O~AL BALANC~ DU~***: 5 ~ ~07.00
.
-. ~; :L:4-;, ;,'~ >$~ ~..+, , ~.~'~:'~:;~d,'';>h~r~''''''-
Aged Receivables
Current 31-60 days 61-90 days 91-120 days 121+ days
5~307.00 .00 .00 .00 .00 5,307.00
*DATES SHOWN REFLECT END OF BILLING WEEK
PLEASE RETURN WITH PAYMENT
· San Diego · I~ine · San Berna~dino
Please Remi~ P~ments ~o Ni~o & Moore Cotporte Accounting:
10225 Barnes CaWon Road , Suite A - I M 2 · San Diego, Cali~rnia 92121
Invoice number 45646
Ph°ne16%9}457'O400·Fax(619) BSSLI236 July 28, 1995
Page number
Project No. 200646.01 - Washington Drive Sewer Project'
Client No. SB-71-94, P.O. No. ]9525343
CITY OF FONTANA
8353 SIERRA AVE. ~
FONTANA, CA 92334-0518 CF
ATTN: MR. YOUSUF PATANWALA ~
Progress invoice through July 28, 1995, for geotechnical. consulting
services pertaining to the Washington Drive sewer project in Fontana,'
California. Our services have included project coordination and planning,
laboratory testing of bulk soil samples, in-place density testing of the
compacted fill and sewer trench backfill material.
PROFESSIONAL SERVICES Hours* Rate Amount
PROJECT ENGINEER/GEOLOGIST
KURT S. YOSHII
COORDINATION/PLANNING/LIAISON
6-30-95 10.75 74.00 795.50'
7-07-95 .75 74,00 55.50
7-14-95 .50 74.00 37.00
7-28-95 ~ .25 74.00 18.50
RAI.UNDo L. CSRESO
LABORATOR~ T~STING ~( ~ 13.50 42 00 567 00
?-21-95 ~ · ·
SENIOR T~CHNICIAN
FERNANDO ~UIRO~
FIELD SERVICES
6-30-95 32.00 42.00 ~,344.00
?-0?-95 23.00 42.00 966.00
?-28-95 4.00 42.00 168.00
DATA COHPILATIO~ & ANALYSIS
6-30-95 2.50 42.00 105.00
WORD ~ROCeSSI~G/REPRODOC~I~ 0BIGINAL
C~NTHIA DUENAS YKIUPL~,~;"E
woRD PROCESSING [] COP
6-30-95 AUG 18 L=~+'~ .50 'T7.00 13.50
ACC0UNTSPAYABLE
· DATES SHOWN REFLECT END OF BILLING WEEK
Please Remit Paymen~ co Ni~o & Moore Corporate Accounting:
0225 Barnes Ca~on Road · ~uice A- I 12 · 5an Oiego, Cafi~mia 92 i 21
Invoice number 456~6
P~°ne16rg)~ST'O~OO'Fax(~lg)558"1236 ~Uly 28, 1995
Page number 2
Project No. 200646.0~ - Washington Drive Sewer Project
REIMBURSABLE EXPENSES
VEHICLE/EQUIPMENT CHARGE
6-30-95 FQ 32 Hours @ 6.00 192.00
7-07-95 FQ 23 Hours @ 6.00 138.00
7-28-95 FQ 4 Hours @ 6.00 24.00
· **THis INVOICE TOTAL***:
PREVIOUS UNPAID INVOICES: Number Date Amount
Invoice 45335 6-23-95 2,596.23
TOTAL PREVIOUS INVOICES: 2,596.23~
...........
· **TOTAL BALANCE DUE***: -7,020.25
Aged Receivables
Current 31-60 days 61-90 days 91-120 days 121+ days Total
7,020.23 .00 .00 .00 .00 7,020.23
,DATES SHOWN REFLECT END OF BILLING WEEK
~ °~ ~°"~ PRIORITY
I~EMOi~,,,'4'DUM
TO= Accounts Payable
FROM: Originating Department
SUBJECT: PACKING SLIPS
DATE:
All items on the attached invoice were authorized to be ordered and
have been received. Therefore, payment is hereby authorized to be
made.
P.O. #
F.P.O. #
Invoice #
Account #
ApproVed 'by
Reviewed by
Date
Attachment
ds
Please Remit Payments to Ninyo & Moore Corporate Accounting:
10225 Barnes Canyon Road · SuiteA-112 · San Diego, Cali~rnia 92121
Phone1619) 457-0400 · Fax[61g) SBB-1236 Invoice number 45335
June 23, 1995
Page number 1
Brojeet No. 200646.01 - Washington Drive Sewer Project
C]isnt No. SB-71-94, B.C. No. B9525343
CITY OF FONTANA
8353 SIER~J~ AVE. : ....... :"~]
FONTANA, CA 92334-0518 · JUL 2 01995 j
ATTN: MR YOUSUF PATANWALA
Brogre~8 i~oioe through ~une 23, 1995, ~or geoteehnioal consulting
~erviee8 ~erta~ning to the ~a~hLngton Drive sewer ~rojeet Ln ~ontana,
CalL~ornia. Our ~erviee~ have ~nel~sa ~rojeet eoor~inatio~ a~
Laboratory te~ti~g o~ bul~ ~oil 8a~leB, Ln-~laee ~ensit~ te~ting o~ the
eo~aete~, ~e~er trench bae~11 material, an~ ~r~aratLon o£ our
~ated June 21, 1995.
PROFESSIONAL SERVICES Hours, Rate Amount
PROJECT ENGINEER/GEOLOGIST
KURT S. YOSHII
COORDINATION/PLANNING/LIAISON
6-16-95 2.25 74.00 166.50
6-23-95 6.00 74.00 444.00
MARK A. 8TIER
COORDINATION/PLANNING/LIAISON
6-16-95 .50 74.00 37.00
SENIOR TECHNICIAN
FERNANDO QUIROZ
FIELD SERVICES
6-16-95 13.00 42.00 546.00
6-23-95 15.00 42.00 630.00
DATA COMPILATION & ANALYSIS
6-16-95 ........ 2.00 42.00 84.00
6-23-95 ]'~ '7~!~::q!~t 3.00 42.00 126.00
LABORATORY TESTING '~
'b ;" ~ " 4.00 42.00 168.00
6-16-95
6-23-95 I 2.50 42.00 105.00
3UL 2 0
GUILLERMO MADRIGAL
LABORATORY TESTING ~p~2'i~"~F~'(~''
6-16-95 :j~"~ 'F" 1.50 42.00 63.00
*DATES SHOWN REFLECT END OF BILLING WEEK
Please Remi[ Paymen[~ to N/nyo & Moore Corpora[e Accounting:
10225 Barnes Canyon Road · SuiteA4 12 · San Diego, Cali~rnia 92121
Phone(619) 457-0400 · Fax(619) 558-1236 Invoice number 45335
June 23, 1995
Page number 2
Project No. 200646.01 - Washington Drive Sewer Project
PROFESSIONAL SERVICES Hours, Rate Amount
WORD PROCESSING/REPRODUCTION
JANICE O. HUGH
WORD PROCESSING
6-23-95 .75 27.00 20.25
8ONJA Z. TUTTLE
WORD PROCESSING
6-23-95 .25 27.00 6.75
OFFICE ASSISTANT
MARY ELAINE NEBNER
REPRODUCTION
6-23-95 .25 27.00 6.75
REIMBURSABLE EXPENSES
VEHICLE/EQUIPMENT CHARGE
6-16-95 FQ 13 Hours @ 6.00 78.00
6-23-95 FQ 15 Hours @ 6.00 90.00
OUTSIDE REPRODUCTION
6-01-95 24.98
***THIS INVOICE TOTAL***: 2,596.23
PREVIOUS UNPAID INVOICES: Number Date. Amount
Invoice 44927 5-31-95 584.00
TOTAL PREVIOUS INVOICES: 584.00
***TOTAL BALANCE DUE***: 3,180.23
Aged Receivables
Current 31-60 days 61-90 days 91-120 days 121+ days Total
3,180.23 .00 .00 .00 .00 3,180.23
Please Remit Paymen~ to Ninyo & Moore CorDorate Accounting:
10225 Barnes Canyon Road . Suite A-I12 · San Diego, Caii~rn~a 92121
Phonei619) 45L0400 · Fax(619) 558-1236 Invoice number 44927
May 31, 1995
Page number 1
Project No. 200646.01 - Washington Drive Sewer Project
Client No. SB-71-94, P.O. No~N0~9#525343
attendance at the pre-construction meeting on May 24, 1995, and a visit
to the site.
PROFESSIONAL SERVICES Hours, Rate Amount
PROJECT ENGINEER/GEOLOGIST
KURT S. YOSHII
FIELD SERVICES
5-26-95 1.00 74.00 74.00
CLIENT CONFERENCE
5-26-95 2.00 74.00 148.00
COORDINATION/PLANNING/LIAISON
5-26-95 3.25 74.00: 240.50
SENIOR TECHNICIAN
FERNANDO QUIROZ
CLIENT CONFERENCE
5-26-95 2.00 42.00 84.00
WORD PROCESSING/REPRODUCTION
DONNA LEE MADRIGAL
COORDINATION/PLANNING/LIAISON
5-26-95 .25 36.00 9.00
OFFICE ASSISTANT
MARY ELAINE HEBNER
COORDINATION/PLANNING/LIAISON
5-26-95 .50 27.00 13.50
REIMBURSABLE EXPENSES
VEHICLE/EQUIPMENT CHARGE
5-26-95 KSY 2.5 Hours @ 6.00 15.00
***THIS INVOICE TOTAL***: 584.00
*DATES SHOWN REFLECT END OF BILLING WEEK
~ ' Geot~hnical and Environmental Sciences Consu~n~
Please Remit Payments [o Ninyo & Moore Corporate Accounting:
10225 Barnes CaWon Road · Suite A-112 · San Diego, California 92
Invoice number 45335
Phone(619) 457-O400.Fax[619)558-1236 June 23, 1995
Page number 1
PrOject No; 200646.01 - Washingtom Drive Sewer Project
Client No..SB-71-94, P.O. No. B9525343
CITY OF FONTANA \t~,
8353 SIERRA AVE. ' ~'~
FONTANA, CA 92334-0518 ,~
ATTN: MR. YOUSUF PATANWALA
=======================================================================
Progress invoice through June 23, 1995, for geotechnical consulting
services pertaining to the Washington Drive sewer project in Fontaria,
California. Our services have included project coordination and planning,
laboratory testing of bulk soil samples, in-place density testing of the
compacted, sewer trench backfill material, and preparation of our letter
dated June 21, 1995.
PROFESSIONAL SERVICES Hours, Rate Amount
PROJECT ENGINEER/GEOLOGIST
KURT S. YOSHII
COORDINATION/PLANNING/LIAISON
6-16-95 2.25 74.00 166.50
6-23-95 6.00 74.00 444.00
'-MARK A. STIER
COORDINATION/PLANNING/LIAISON
6-16-95 .50 74.00 37.00
SENIOR TECHNICIAN
FE~NANDO QUIROZ ........ ~' ~ ~'= " ~' '
FIELD SERVICES
6-16-95 13.00 42.00 546.00
6-23-95 15.00 42.00 630.00
DATA COMPILATION & ANALYSIS
6-16-95 2.00 42.00 84.00
6-23-95 3.00 42.00 126.00
LABORATORY TESTING
6-16-95 4.00 42.00 168,00
6-23-95 2.50 42.00 105.00
OUILL~RMO MADRIQA~
LABORATORY TESTING
6-16-95 1.50 42.00 63.00
*DATES SHOWN REFLECT END OF BILLING WEEK
PLEASE RETURN WITH PAYMENT
·
Please Retail Paymen[s [o Ninyo & Moore Corpora[e Accounting:
10225 Barnes Ca~on Road · guile A - I 12 · San Diego, Cali~rnia
Phone(619) 457-0400 · Fax(619) ESB-1236 Invoice number ~5335
June 23, ~995
Page number 2
Project No. 200646.01
PROFESSIONAL SERVICES Hours, Rate Amoum~9~
WORD.PROCESSING/REPRODUCTION
JANICE O. HUGH
WORD PROCESSING
SONJA Z. TUTTLE
WORD PROCESSING
6-23-95 .25 27.00 6.75
OFFICE ASSISTANT
MARY ELAINE REBNER
REPRODUCTION
6-23-95 .25 27.00 6~75
REIMBURSABLE EXPENSES
VEHICLE/EQUIPMENT CHARGE
6-16-95 FQ 13 Hours @ 6.00 78.00
6-23-95 FQ 15 Hours @ 6.00 90.00
~ OUTSIDE REPRODUCTION
'~ 6-01-95 ~ 24.98
· **THIS INVOICE TOTAL***: 2,596.23
PREV OUSU P IDi'NVOiCES:
Invoice 44927 5-31-95 584.00
" TOTAL PREVIOUS INVOICES: 584.00
· **TOTAL BALANCE DUE***: 3,180.23
Aged Receivables
Current 31-60 days 61-90 days 91-120 days 121+ days Total
3,180~23 .00 .00 .00 ~00 3,180.23
*DATES SHOWN REFLECT END OF BILLING WEEK
AINNtlL.'. CERTIFICATE OF INSURANCE
........... ,HIS CE.T..C.,. ,S ,SSU. AS A .A,,,. OF ,NFaMA,. % 'L AND
CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE
DEALEY, RENT~ · AS$~. DOES NOT AMEND, EXTEND QR ALTER THE COVERAGE AFFORDED BY THE
66 Jack London Square POLICIES BELOW.
P.O. Box 12675 C~IES AFF~D~G COVeAGE
Oak l ,nd, CA 94604-267S
510-465-3090
Americtn Automoblle Ins, Co.
LE11B
Ninyo & Moore,
LETTER
102~5 B~rnes C~nyon Rd,SteA112
Sen Diego, CA 92121
LETT~
THIS IS TO CERTIFY THAT THE ~L~ES~F~N~URANCE~TED~EL~HAVEBE~N~SUE~T~THE~NSU~E~NAM~DAB~VEF~T~Ep~L~CYpE~
INDICATED, NOTWITHSTANDtNG ANY REQUIREMENT, TE~ OR CONDITION OF ANY CONTRACT OR OTHER DOC~ENT WITH RESPECT TO WHICH THIS
CERTIRCATE MAY BE ISSUED OR MAY PERT A N, THE N ;URANCE AFFORDED BY TIHE POL C ES DESCRBED HEREIN S SUBJECT TO ALL THE TE~S,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LNITS SHOWNMAY HAVE BEEN REDUCED BY PAID CLAMS.
C~ERCIAL 8~NE~L tlABILITY ALL C~ERAGES SH~ PR00UCTS-C~P/OPA6G.
~CLAIMS ~0i~ OCCUR. ~ PRIOR CERTIFICATES PERS0NAt & AW.
0WN~R'S & CON1~CTOR'S PRQT. R~A I N I N FORCE EACH 0CC~RRENCE
A~ AU~0 AND ARE $TILL VALID tIMIT
.,. $CHEOULED AUTOS THIS IS TO SH~ (Per perso~
__ NQN-0WN~0AU[0S W~KER$ CIPENSATI~ (Per accident)
RENEWAL
"J'l "~RT~ X [ STATUTORY LI"I,TS
A ~ WP8067~401 7/01195 7/01/96 EACH ACCIOENT t 1 ,OOO,OOO
OlSEAS;-POLI~ UM~r t 1,000,00O
EIO~liLffY DiSEASE-EACH EMPL~EE S 1.000 ,OOO
RE: City of FontanD, its elected officials, officers, employees end agents
are named as additional insured~ as respects general and auto Cper CAO001)
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO
MAIL 30 DAYSWRITTENNOTICETOTHECERTIFICATEHOLDERNAMEOTOTHE
C i t y o f Font In a LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL MPOSE NO OBLIGATION OR
Attn: Youluf Pantsnwa I a LIABILITYO~ ANYKINOUPONTHECOMPANY,ITSAGENTSORREPRESENTATIVES.
Fontans, C. 92334-0518 39650000
CONSULTANT SERVICES AGREEMENT
THIS AGREEMENT (hereinafter the "Agreement") is made this
I~r day of D'u~E , 19q%', (the "Effective Date") by and between
the CITY OF FONTANA, a municipal corporation (hereinafter the
"City"), and NinVo & Moore, Inc.
(hereinafter the "Consultant"). The City and the
Consultant are sometimes hereinafter individually referred to as
"Part "
y and hereinafter collectively referred to as the "Parties."
RECITALS
A. The Consultant desires to perform and assume
responsibility and obligations for the services, as hereinafter
described on the terms and conditions set forth herein.
B. The City desires to contract for such services as
hereinafter described on the terms and conditions set forth herein.
NOW, THEREFORE, in consideration of the mutua~ covenants'
and conditions contained herein, the City and the Consultant agree
as follows:
OPERATIVE PROVISIONS
SECTION 1
ENGAGEMENT AND SERVICES OF THE CONSULTANT
1. En~aSement of Consultant. The City hereby engages
the Consultant, subject to the terms and conditions set forth in
this Agreement, to perform the services set forth in Exhibit "A"
(the ,,Services"). The Consultant agrees to perform the Services in
accordance with the terms and conditions of this Agreement.
2. Performance of the Consultant. The Consultant
accepts the relationship of trust and confidence established
between the City and the Consultant by the terms of this Agreement.
The Consultant covenants with the City to furnish its best skill,
judgment and efforts and to cooperate with the City and any other
consultants or contractors engaged by the City in the performance
of th~ Services. The Consultant covenants to use its best efforts
to perform its duties and obligations under this Agreement in an
efficient, expeditious and economical manner, consistent with the
best interests of the City.
3. The Consultant's Personnel. The Consultant shall
provide adequate and experienced administrative and management
personnel to perform the Services.
4. The Consultant's Responsibilities for Costs and
Expenses. The Consultant shall be responsible for all costs and
expenses incurred relative to the Consultant, personnel of the
Consultant and subcontractors of the Consultant, in connection with
the performance of the Services, including, without limitation,
payment of salaries, fringe benefits contributions, payroll taxes,
withholding taxes and other taxes or levies, office overhead
expense, travel expenses, telephone and other telecommunication
expenses, and document reproduction expenses.
SECTION II
RESPONSIBILITIES OF THE CONSULTANT
1. Personnel. The Services shall be performed by
Consultant or under its supervision, The Consultant represents
that it possesses the professional and technical personnel required
to perform the Services. The City retains Consultant on an
independent contractor basis and Consultant is not an employee of
the City. The personnel performing the Services on behalf of the
Consultant shall at all times be under the Consultant's exclusive
direction and control. The Consultant shall pay all expenses
including, without limitation, salaries, fringe benefit
contributions, payroll taxes, withholding taxes and other taxes or
levies and all other amounts due such personnel or due others as a
result of the performance by such personnel of the Services in
connection with their performance of the Services and other amounts
due such personnel in connection with their performance of
Services.
2. Coo~eration/Pro~ect Administrator. Consultant shall
work closely and cooperate fully with the City's designated Project
Administrator, and any other agenci~es which may have jurisdiction
or interest in the Services. This Agreement will be administered
by the Project Administrator. The Project Administrator, or
his/her designee, shall be the principaI officer of the City for
liaison with the Consultant, and shall review and give approval to
the details of the Services as they are performed. The City
designates Robert W. Weddle, P.E., City EnGineer, as its Project
Administrator, but reserves the right to appoint another person as
Project Administrator upon written notice to the Consultant.
3. Pro~ect ManaGer. The Consultant shall designate and
assign a pro~ect manager ("Project Manager"), who shall coordinate
all phases of the Services. The Project Manager shall be available
to the City at'all reasonable times. The Consultant designates _
k to be its Project Manager
Tara S. Si h .
4. T~me of Performance. The Services to be performed
by Consultant under and pursuant to this Agreement shall be
completed as directed by the City's Project Administrator.
5. ReDoft Materials. At the completion of the
Services, the Consultant shall deliver to the City all documents,
data, studies, surveys, drawings, naps, models, photographs, and
2
reports prepared by the Consultant orprepared by others for the
use and/or benefit of the Consultant or otherwise provided to the
Consultant by the City or by others under this Agreement (the
"Report Materials"). The Report Materials shall be considered the
property of the City and shall be delivered to the City upon the
expiration or termination of this Agreement.
6. City Policy. The Consultant shall discuss and
review all matters relating to the Services with the Project
Administrator in advance of all critical decision points in order
to ensure that the Services proceed in a manner consistent with the
goals and policies of the City.
7. Conformance to Applicable Requirements. All aspects
of the provision of the Services by Consultant shall at all times
conform to applicable city, oounty, state, and federal requirements
and be subject to approval of the. Project Administrator and City
Council of the City.
8. Indemnification. -The Consultant shall indemnify,
defend and hold harmless the City, its officers, employees and
agents against, and will hold and save them and each of them,
harmless from any and all actions, claims, damages to persons or
property, penalties, obligations or liabilities that may be
asserted or claimed by any person, firm, entity, corporation,
political subdivision or other organization arising out of alleged
negligent acts, errors or omissions in connection with the
provision of the Services by the Consultant, operations or
activities of the Consultant, its agents, employees or
subcontractors provided for herein, whether or not there is
concurrent negligence on the part of the City, its officers, agents
or employees (but excluding such actions, claims, damages to
persons or property, penalties, obligations, or liabilities arising
from the sole negligence or willful misconduct of the City, its
Council, agents, servants or independent contractors who are
directly responsible to the City) and in connection therewith:
A. The Consultant will defend any action or actions
filed in connection with any of said claims,
damages, penalties, obligations or liabilities and
will pay all costs and expenses, including
attorney's fees incurred in connection therewith.
B. The Consultant will promptly pay any judgment
rendered against the Consultant or the City
covering such claims, damages, penalties,
obligations and liabilities arising out of
negligent acts, errors or omissions in connection
with such Services, operations, or activities of
the Consultant hereunder; and the Consultant agrees
to save and hold the City harmless therefrom.
C. In the event the City is made a party to any action
or proceeding filed or persecuted against the
Consultant for such damages or other claims arising
out of alleged negligance in connection with the
work, operations or activities of the Consultant
hereunder, the Consultant agrees to pay to the City
any and all costs and expenses incurred by City in
such actions or proceedings, together with
reasonable attorneys' fees.
9. Standard of Care; Licenses. The Consultant
represents and warrants that it and all personnel engaged in
performing Services are and shall be fully qualified and are
authorized or permitted under state and local law to perform such
Services. The Consultant shall perform the Services in a skillful
and competent manner. The Consultant shall be responsible to City
for any errors or omissions in the execution of its duties under
this Agreement and in the performance of its duties hereunder. The
Consultant represents and warrants that it and all personnel
engaged in performing the Services have all licenses, permits,
qualifications, and approvals of whatever nature that are legally
required to practice its profession. The Consultant further
represents and warrants that it shall keep in effect all such
licenses, permits, and other approvals during the term of this
Agreement.
10. Insurance. Without limiting the Consultant's
indemnification of the City, the Consultant shall obtain and
provide and maintain at its own expense during the term of this
Agreement a policy or policies of liability insurance of the type
and amounts described below and satisfactory to the City, in its
sole discretion. Such policies shall be signed by a person
authorized by that insurer to bind coverage on its behalf and must
be filed with the City prior to exercising any right or performing
the Services. Said policies, excepting professional liability,
shall add as insureds the City, its elected officials, officers
employees and agents for all liability arising from the
Consultant's Services as described herein but will provide a
Certificate of Insurance.
A. Prior to the commencement of the Services, the
Consultant shall provide to the City certificates of insurance with
original endorsements, and copies of policies, if requested by the
City, of the following insurance, with Best's Class B+VIII or
better carriers:
(1) Workers' compensation insurance covering
all employees and principals of the Consultant, in
a minimum amount of $1 million per accident,
effective per the laws of the State of California;
(2) Commercial general liability insurance
covering third party liability risks, including
without limitation contractual liability, in a
minimum amount of $1 million combined single limit
per occurrence for bodily injury, personal injury,
and property damage. If commercial general
liability insurance or other form with a general
aggregate limit is used, either the general
aggregate shall apply separately to this project,
or the general aggregate limit shall be twice the
occurrence limit;
(3) Commercial auto liability and property
insurance covering any owned and rented vehicles of
Consultant in a minimum amount of $1 million
combined single limit per accident for bodily
injury and property damage.
(4) Professional liability insurance covering
errors and omissions on the part of the Consultant,
in a minimum amount of $1 million each occurrence
and in the aggregate on an a claims made form.
B. Said policy or policies shall be endorsed to
state that coverage shall not be suspended, voided, canceled by
either party, or reduced in coverage or in limits except after
thirty (30) days' prior notice has been given in writing to the
City. The Consultant shall give to the City prompt and timely
notice of claim made or suit instituted arising out of the
Consultant's operation hereunder. The Consultant shall also
procure and maintain, at its own cost and expense, any additional
kinds of insurance, which in its own judgment may be necessary for
its proper protection and performance of the Services.
C. The Consultant shall include subcontracting
consultants, if any, as insureds under its policies or shall
furnish separate certificates and endorsements for each
subcontractor. All coverage for each subcontractor shall be
subject to the requirements stated heroin.
11. Prohibition A~ainst Transfers.
A. The Consultant shall not assign, sublease,
hypothecate, or transfer this Agreement, or any interest therein,
directly or indirectly by operation of law without the prior
written consent of the City. Any attempt to do so without the
prior written consent of the City shall be null and void, and any
assignee, sublessee, hypothecatee or transferee shall acquire no
right or interest by reason of such attempted assignment,
hypothecation, or transfer.
5
B. The sale, a~signment, transfer, or other
disposition of any of the issued and outstanding capital stock of
the Consultant, if the Consultant is a corporation or of the
interest of any general partner or joint venturer or syndicate
member or co-tenant of the Consultant, if the Consultant is a
partnership or a joint venture or a syndicate or a co-tenancy,
which shall result in changing the control of the Consultant, shall
be deemed an assignment of this Agreement. For purposes of this
paragraph, "control" means the ownership of fiftypercent (50%) or
more of the voting power of the corporation or fifty percent (504)
or more of the voting power of a partnership, joint venture,
syndicate or co-tenancy.
12. Progress. The Consultant is responsible to keep the
Project Administrator and/or his/her duly authorized designee
informed on a regular basis regarding the status and progress of
the Services, activities performed and planned, and any meetings
that have been scheduled or are desired relative to the Services or
relative to this Agreement.
13. Confidentialitv. No news releases, including
photographs, public announcements, or confirmations of the same, of
any part of the subject matter of this Agreement or any phase of
the Services shall be made without prior written consent of the
City. The information which results from the Services in this
Agreement is to be kept confidential unless the release of
information is authorized by the City.
14. Scheduling, The Consultant shall generally have no
obligation to work any particular schedule. Provided, the
Consultant will coordinate with the City in achieving the results
sought under the terms of this Agreement.
15. No Set Hours/Right to Contract. The Consultant's
obligation hereunder is to complete the Services and to meet any
deadlines set forth therein. The Consultant has no obligation to
work any particular hours or days or any particular number of hours
or days. In this regard, the Consultant retains the right to
contract for similar Services with any other entity, public or
private.
16. Results. The! City agrees that it will have no right
to control or direct the details, manner or means by which the
Consultant accomplishes the results of the Services performed
hereunder.
SECTION
RESPONSIBILITIES OF CITY
1. Cooperation. The City shall cooperate with the
Consultant relative to the provisions of the Services.
SECTION IV
COMPENSATION
1. Compensation. In consideration of the performance
by the Consultant of the Services, the City shall pay to the
Consultant the fees on a time and material basis as set forth on
Exhibit "B" (the "Hourly Rate Schedule"), in a not to exceed amount
of $20,000.
2 Extra Service. The Consultant shall not receive
additional Compensation for any extra service unless such extra
service has been authorized in writing by the City prior to the
commencement of the extra service. The City shall pay the
Consultant for extra service in accordance with the fee schedule
set forth on Exhibit "B".
3. PaYment of Compensation. The Consultant shall
submit invoices to the City on a monthly or on such other basis as
set forth in Exhibit "B". Each invoice will be itemized. Each
invoice shall show the number of hours worked per person/Consultant
and the nature of the service performed. The City shall make
payments to the Consultant within thirty {30) days following the
date of receipt of the invoice unless the City disputes the amount
of the Compensation the Consultant claims it is owed under this
Agreement.
4. Withholding.
A. Disputed Sums. The City may withhold payment
of any portion of the Compensation if payment is disputed until
resolution of the dispute with the Consultant. Such withholding by
the City shall not be deemed to constitute a failure to pay by the
City. The Consultant shall not discontinue the performance of the
Services for a period of t2~irty (30) days from the date Compen-
sation is withheld hereunder. The Consultant shall have an
immediate right to appeal to the Mayor and the City Council with
respect to withheld amounts. The determination of the Mayor and
the City Council with respect to such matters shall be final. The
Consultant shall be entitled[ to receive interest on any portions of
the Compensation withheld which are thereafter deemed to be
properly payable to the Consultant at the rate of seven percent
(7%) per annum, simple interest.
"B. Retention. The City shall have the right to
re~ain an amount equal to ten percent (10%) of the Compensation
("Retention"). The City shall have the right without further
liability to the Consultant, to utilize the Retention to satisfy
obligations of the City relative to the Services in the event the
Consultant does not complete the Services satisfactory to the City.
7
SECTION V
EXPIPATION AND TERMINATION
1. Events of Default. Each of the following events
shall constitute an "Event of Default":
A. The Consultant shall fail to observe, perform
or comply with any material term, covenant, agreement or condition
of this Agreement which is to be observed, performed or complied
with by the Consultant, if such failure to continue uncured for
three (3) calendar days after the City gives the Consultant notice
of any failure and specified the nature of such failure.
B. The Consultant shall commit any fraud, misrep-
resentation, breach of fiduciary duty, willful misconduct, or
intentional or breach of any provision of this Agreement.
2. Termination Upon Event of Default. In addition to
any other available legal or equitable rights or remedies, upon an
Event of Default by the Consultant, the City shall have the right
to terminate this Agreement upon written notice to the Consultant.
3. Expiration. This Agreement shall expire upon (a)
the Completion Date, (b) full payment of the Compensation, or (c)
one year from the effective date of the contract.
4. Payment Upon Termination. Upon a termination of
this Agreement as provided in paragraph 2 of this Section, the City
shall pay to the Consultant. the part of the Compensation which
would otherwise be payable to the Consultant with respect to the
Services which had been completed as of the date of termination,
less the amount of all previous payments with respect to the
Compensation.
VI
GENERAL PROVISIONS
1. Nondiscrimination by the Consultant. The Consultant
represents and agrees that the Consultant, its affiliates, subsid-
iaries, or holding companies do not and will not discriminate
against any subcontractor, consultant, employee, or applicant for
employment because of race, religion, color, sex, handicap, or
national origin. Such nondiscrimination shall include, but not be
limited to, the following: employment, upgrading, demotion,
transfers, recruitment, recruitment advertising, layoff,
termination, rates of pay or other forms of compensation, and
selection for training, including apprenticeship.
2. Citv's RiQhts to Employ Other Consultants. The City
reserves the right to employ other consultants in connection with
this project.
3. Conflicts of Interest.
A. The Consultant or its employees may be subject
to the provisions of the California Political Reform Act of 1974
(the "Act"), which {1) requires such persons to disclose financial
interests that may foreseeably be materially affected by the
services performed under this Agreement, and (2) prohibits such
persons from making, or participating in making, decisions that
will foreseeably financially affedt such interests.
B. If subject to the Act, the Consultant shall
conform to all requirements of the Act. Failure to do so
constitutes a material breach and is grounds for termination of
this Agreement by the City.
4. Subcontractor.
The Consultant shall not subcontract any portion of
the Services except as expressly stated heroin, without prior
written consent of the City. Subcontracts, if any, shall contain
a provision making them subject to all provisions stipulated in
this Agreement.
5. Waiver.
No waiver of any default shall constitute a waiver
of any other breach or default, whether of the same or any other
covenant or condition. No waiver, benefit, privilege, or service
voluntarily given or performed by other parties shall give the
other any contractual right by custom, estoppel, or otherwise.
6. Notices.
All notices required hereunder shall be given in
writing to the following addresses or such other addresses as the
parties may designate by written notice:
To the City: City of Fontana
8353 Sierra Avenue
Fcntana, CA 92335
Attention: Rober~ W. Weddle, P.E.
City Engineer
To the Consultant: Ninyo & Moore, Inc.
155 West HosDitalitV Lane, Ste 165
San Bernardino, CA 92408
Notice shall be deemed received as follows, depending
upon the method of transmittal: by facsimile, as of the date and
time sent; by messenger, as of the date delivered; and by U.S.
Mail, certified, return receipt requested, as of 72 hours after
deposit in the U.S. Mail.
9
7. Authority to Enter A~reement.
The Consultant is a [corporation/partnership] duly
organized, validly existing in good standing under the laws of the
State of California and will continue to be so during the term of
this Agreement. The Consultant has all requisite power and
authority to conduct its business and to execute and deliver, and
to perform all of its obligations under this Agreement. Each Party
warrants that the individuals who have signed this Agreement have
the legal power, right and authority to enter into this Agreement
so as to bind each respective Party to perform the conditions
contemplated herein.
8. Severability.
If any portion of this Agreement is declared by a
court of competent jurisdiction to be invalid or unenforceable, the
remaining provisions of this Agreement shall continue in full force
and effect.
9. Time is of the Essence.
Time is of the essence in this Agreement, and all
parties agree to execute all documents and to proceed with due
diligence to complete all covenants and conditions set forth
herein.
10. Attorneys' Fees and Costs.
If any legal action or other proceeding is brought
for the enforcement of this Agreement or because of an alleged
dispute, breach, default, or misrepresentation in connection with
any provisions of this Agreement, the successful or prevailing
party shall be entitled to recover reasonable attorneys' fees and
other costs incurred in that: action or proceeding, in addition to
any other relief to which it may be entitled.
11. Governin~ Law and Venue.
ThisAgreement shall be construed in accordance with
and governed by the laws of the State of California. Any lawsuit
brought to enforce this Agreement shall be brought in the
appropriate court in San Bernardino County, State of California.
12. Waiver.
No waiver of any provision of this Agreement shall
be deemed or shall constitute a waiver of any other provision,
whether or not similar, nor shall any waiver constitute a
continuing waiver. No waiver shall be deemed a waiver and no
waiver' shall be binding unless executed in writing by the party
making the waiver.
10
13. Days.
Any term in this Agreement referencing time, days,
or period for performance shall be deemed to be calendar days and
not work days.
14. Entire Aqreement.
This Agreement contains the entire agreement of the
City and the Consultant and supersedes any prior or written
statements or agreements between the City and the Consultant, No
supplement, modification, or amendment of this Agreement shall be
binding unless executed in writing by both parties.
15. Bindin~ on Assigns.
Each and all of the covenants and conditions of this
Agreement shall be binding on and shall inure to the benefit of the
successors and assigns of the respective parties.
16. Invaliditv.
The illegality of any provision of this Agreement
shall not affect the remainder of this Agreement.
17. Counterparts,
This Agreement may be signed in counterparts, each
of which shall constitute an original and which collectively shall
constitute one instrument.
18. Captions.
The captions of the various articles and paragraphs
of this Agreement are for the convenience and ease of reference
only, and do not define,' limit, augment, or describe the scope,
content, or intent of this Agreement or of any part or parts of
this Agreement.
19. Construction.
In all cases, the language in all parts of this
Agreement shall be construed simply, according to its fair meaning
and no~ strictly for or against any party, it being agreed that the
parties or their agents have all participated in the preparation of
this Agreement.
20. Cooperation/Further Acts.
The parties shall fully cooperate with one another
in attaining the purposes of this Agreement and, in connection
therewith, shall take any s~uch additional further acts and steps
11
and sign any such additional documents as may be necessary,
appropriate and convenient as related thereto.
21. Suspension of Work.
Notwithstanding any other provision of this
Agreement to the contrary, the Services performed by the Consultant
may be suspended by the City in whole or in part from time to time,
in any number of times, when determined by the City, in its sole
discretion, that suspension is necessary and in the interest of the
City, to ensure it has received sufficient funds from the Developer
to timely pay the Agreement Costs. The Consultant shall comply
immediately with any written order by the City suspending the
Services. The Services shall be suspended until receipt by the
Consultant of a written Services commencement order from the City.
Further, and notwithstandin~i any other provision of this Agreement
to the contrary, any such suspension shall not relieve the
Consultant of any of its obligations under this Agreement.
Further, and notwithstandin~F any other provision of this Agreement
to the contrary, any such suspension shall be without any liability
to the Consultant on the part of the City, and the Consultant shall
not be entitled to any additional compensation as a result of such
suspension.
22. Incorporation of Recitals and Exhibits.
A. The "Recitals" constitute a material part
hereof, and are hereby incorporated by reference herein as though
fully set forth hereat.
B. The "Exhibits" constitute a material part
hereof, and are hereby incorporated by reference herein as though
fully set forth hereat.
23. References.
All references to the Consultant shall include all
personnel, employees, agents and subcontractors of the Consultant.
[SIGNATURE PROVISION ON FOLLOWING PAGE]
12
IN WITNESS WHEREOF, the parties hereto have accepted and
made and executed this Agreement upon the terms, conditions, and
provisions set forth above as of the Effective Date.
CITY OF FONTANA, CONSULTANT
a municipal corporation
'~~~e~evereaux '
ATTEST: *Notary
*Notarization of signature is
~ 2 division tract, landscape
hyntoya maintenance, and storm drain
Ma
ity C rk ~ fee agreements; all deeds,
certificates of participation
and compliance, and all other
required by state law.
Approved as to legal,form:
or
Stephen P. Deitsch
City Attorney
Frank Schuma
Community Development Director
Risk Management
13
EXHIBIT
SCOPE OF SERVICES
Provision of geotechnical services as required depending on the nature of the project and the
project specifications. The tests will be performed on latest approved standards from recognized
agencies and related to the work. The nature of such geotechnical services as expected but not
limited to may consist of the following:
1. Optimum soil moisture density test
2. In place soil densities test
3. Sand equivalent test
4. Sieve Analysis
5. Soil Analysis
6. R-Value
7. Concrete Mix Design
8. Concrete Compression Test
9. Concrete Slump Test
10. Asphalt Core Density
11. Marshall Maximum Density
12. Field Observation
13. The consultant may be called upon to attend meetings during any phase of work to give
technical advise
The Consultant is expected to provide the lead role in providing the testing services under the
general direction of the inspector and engineer as appropriate. The Consultant will be expected
to provide the services required within twenty four hours of the City Engineer's or his
authorized representative's request. Results of the tests shall be made available immediately in
the field (where applicable) and followed by final reports within 48 hours after performance of
the tests.
EXHIBIT "B"
1998 SCHEDULE OF FEES
HOURLY CHARGES FOR PERSONNEL
Principal/kssociate Engineer/Geologist/Hydrogeologist/Environmental Scientist . ..
Senior Project Engineer/Geologist/FIydrogeologist/Environmental Scientist ....... $77
Project Engineer/Geologist/Hydrogeologist/Environmenml Scientist ............ $74
Senior Staff Engineer/Geologist/Hydrogeologist/Environmental Scientist ........ $69
Staff Engineer/Geologist ............................................. $62
Senior Technician $42
Technician .................................................. $39
Technical Illustrator ................................................ $39
Geotechnical/]Environmental Assistant ................................... $28
Information Specialist ...............................................
Word Processing/Technical Edking~Keproduction .......................... $27
OTHER CHARGES
There will be a minimum charge of two hours for field observation or
Expe~ witness testimony will be charged at $175 per hour, with a minimum charge of four
hours.
Direct project expenses (such as field equipment rental, consultants, permits, insurance,
travel and subsistence) will be charged at cost plus 15 percent.
Field vehicle usage will be charged ~t $6 per hour.
Nuclear densi~ gauge usage will be charged at $9 per hour.
Seismograph usage will be charged at $12 per hour.
IncHnometer usage wilt be charged ar ];20 per hour.
Rates for laboratory testing and use of o~her special equipment will be determined for
e~,ch project, and will be provided upon request.
iNVOiCES,TiiEpAyME~TS
Invoices ' e rendered monthly unless otherwise arranged, and are payable upon
---r~,~i t. A service c f 1.5 percent per month will be charged on accounts not paid
. . . . . .
· ;~i"ecs~Ae"~er~ ercosts incurred in colleccing delinquent accounts
10225 Barnes Canyon ~oac~ · SulceA*l.12 San [):ego. California 92121 · Phone(619) 457-0400 · ~ax [619) ~.58-1236
55 V,/es[ Hospitality Lane · Su:ce 165 ° San BernBrajno, California 92408 · Phone (909138343777 · Fax (90c)) 383-8776
A4 OIIIL CERTIFICATE OF INSURANCE
;-.
P.CD~CEII 'TF;TrCER'/T~'~C'JTE IS ISSUED ~S A MATTE~F'~r~RMATIO~/%~/L~AND
CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE
DEALEY, RENT~ & ASS~IATES DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE
P.O. BOx 12675 POLICIES BELOW.
Oakland, CA 94604-2675 CO~ffilES AFFORD~G COVBAGE
Edi
510-465-3090 co~A~
LETTER
Commerce ~ Industry Ins. Co.
I~ LETTER B Associated Indemnitv Corp.
Ninyo & Moore co~A~
10225 Barnes Canyon Rd,SteA112 Guaranty National ins.
S,n Diego, CA 92121 ~D
American Intn'l Specialty
X C~ERCIAL 6ENE~L LIABILitY GL3406115 10/03/94 10/03/95 PROOUCTS-C~P/OPAGG. $ 2.000
~CLA~MS ~DE ~ OCCUR. PERSO~ & A~. INJU~ t 1.0GO .00O
FiRE ~GE (~ one fire) S 50
X A~ AUTO CA2772810 10/03/94 10/03/95 LIMIT 1.000.000
J ~BRELLA ~O~ A6GREGAIE I 2,000.000
X OTHER T~N ~BR~LLA FO~ ~1005613 10/03/94 10/03/95' ~?:~~I~==~==?=~{=={==~
wPee64~e34 7/01/94 ?/01/95 EACHACCIO~N~ I 1.0OO.OOO
01SEASE-POLI~ LIMIT I 1.0OO .O00
Professional ??35557 10/03/94 10/03/95 $1,000,000 per
& Contractors claim & $1,000,000
Pollution Liab. annual/aareglte
RE: City of Fontone, its elected officials, officers, employees and agents
are named ms additional insgrads as respects general and auto (per CAOO01)
liability. . ............
~:~ EXPIRATION OAT~ THEREOF. THE ISSUING COMPANY WILL ~NDEAVQ~ TO
~j~ MAIL 30 DAYSWRITTENNOTICETOTN~CERTiFICAT~NOLD~NAM~DTOTHE
C i t y o f F o n t a n a ~; L~FT~FAILUR~ TO MAIL SUCH NOTICE SHALL ~POS~ NO OBLIGATION
At an' You$ uf Pant anw/I a ~;:~ LIA61LITYOF ANYKINDUPONTH~COMPANY.ITSAGENTSO~REPRESENTATIVES.
~RD'2~:r~l~e~ ..... ::~ ~ . ~=: ~. ~... ~..; =: ~ ~;~ ~:======= ;===~;; :: := :, ~ :; :; ~ ~ :; ~ := :~ ~:~}a~
August 31, 1995
Project No. 200646-01
City of Fontana
8353 Sierra Avenue
Fontana, California 92335
Attention: Mr. Yousuf Patanwala
Subject: Compaction Test Results, Sewer Trench Backfill
Washington Drive Sewer ]Project
Fontana, California
City of Fontana Project No. SB-71-94
INTRODUCTION
In accordance with your request and authorization, we have performed field density testing
of the trench backfill for the sewer pipeline which was constructed beneath Washington
Drive, from Cypress Avenue to approximately 800 feet east, in the City of Fontana, California
(Figure 1). This report summarizes our observations, laboratory testing, and field density
testing performed for the project. Our field density testing was performed between June 15
and July 25, 1995.
BACKFILL TESTING OPERATIONS;
Backfill of the sewer trench was performed by S.J. Burkhardt, Inc., under the direction of the
City of Fontaria. Our services included on-call field density testing of the backfill operations
as requested by the City of Fontana, and did not include full-time observation and testing
of the backfill activities. Our firm was generally notified after a section of trench had been
backfilled, and we were then requested to perform field density tests. The field density tests
were performed in test pit excavations provided by the contractor at locations chosen by our
firm. The backfill soils were tested to evaluate whether the soils were compacted to the
project: specifications of 90 percent or more of the maximum dry density, with the top 12
inches of the backfill compacted to tZhe project specifications of 95 percent or more of the
maximum dry density.
10225 Barnes Canyon Road · SolteAl 12 · San Drego, California 92121 · Phone (619) 457 0400 · Fax {619) 558 1236
9272jelonimo Road · Suite 123A · Iivine, California 92718 · Phone (714) 472 5444 · Fax (714) 472 5445
185 West Hospitality L~tne · Suite 165 San Bernard/no, California 92408 · Phone (909) 383-8777 · Fax (909) 383-8776
City of Fontana August 31, 1995
Washington Drive Sewer Project Project No. 200646-01
In-place moisture and density tests of the compacted backfill were performed by ASTM D2922-
91 and ASTM D3017-88 (Nuclear Methods), and by ASTM D1556-90 (Sand Cone Method).
Results of our field density tests are presented in Table 1. The 40-scale improvement plans
prepared by F. Molinos, R.C.E~ were utilized during testing in the field. The approximate
test locations are shown on the attached Plate 1. Native on-site soils were used to backfill
the trench excavation and generally consisted of a brown, silty fine to medium sand with
scattered b~'avel. The maximum dry density and optimum moisture content of the backfill
soils were evaluated in our laboratory by the modified Proctor method (ASTM D1557-91).
The results of our laboratory testing are presented in Table 2.
When a field density test was performed that resulted in less than the m~nimum allowable
relative compaction of 90 percent, the area was generally reworked and a retest was
performed.
CONCLUSIONS
The test pit excavations and subsequent field density testing of the sewer trench backfill
below the top 12 inches indicated that the areas tested by our firm were generally compacted
to the specified relative compaction of 90 percent oi more, as evaluated utilizing ASTM Test
Methods D2922-91 and D3017-88 (Nuclear), D1556-90 (Sand Cone), and D1557-91 (Laboratory
Maximum Dry Density). The field density testing of the top 12 inches of the sewer trench
backfill indicated that the areas tested by our firm were generally compacted to the specified
relative compaction of 95 percent or more using the previously mentioned test methods.
LIMITATIONS
The field and laboratory testing presented in this report have been conducted in accordance
with current practice and the standard of care exercised by geotechnical consultants
performing similar tasks in th~s area. No other warranty, expressed or implied, is made
regarding the opinions expressed in this report. It is important to note that the precision of
field density tests and the maximum dry density tests is not exact and variations should be
expected. Further, we did not observe the majority of the backfill operations and have
City of Fontana August 31, 1995
Washington Drive Sewer Project Project No. 200646-01
therefore provided no opinion regarding compaction or the uniformity of the backfill
between test locations. The reported locations and elevations of the density tests were
estimated from correlations between the project plans and field grade stakes. Further
accuracy is not implied.
We sincerely appreciate the opportunity to be of service on this project. Should you have
any questions regarding this report, we will be pleased to meet with you at your
convenience.
Sincerely,
NINYO & MOORE
RCE 54759 Jalal Vakili, Ph.D., RCE 45350
Project Engineer Principal Engineer
KSY/MAS/JV/wgh
Distribution: (3) Addressee
(1) sJ. nurkhardt nc.
Attachments: Figure 1 - Site Location Map Exp. q
Table 1 - Summary of Field Density Tests
Table 2 - Maximum Dry Density Test Results
Plate I - Field Density Test Location Map
VALLEY ~ I BLVD
"')! .!!~ ~' r-" , , "~-~
~ ...... I JB~RNARDINO I FR~
~"~, ~ ' I
, , ,, , ,,, , I ~ ~:: '.) ~,~,~
-,,..,~.:.,..~-,~..:.., ...:,.
'.,~ ............ ...,.' '{.... :: ......-
: :~:~ :> ..... . .......
· ".' .'1":' ""' "' ~
:'~'~' .....T"T;~7~IDE
, C~ ,,,
IjJy
~.... I ~//I,"' j I I
- t: ..... : -,-'
REFERENCE: 1995 Thoma~ Guide for San Bernardlno and Riverside Counties, Street Guide and Direcloq
NOFITH ~
Approximate Scale In Fee~
r ~ r SITE. LOCATION MAP
PAGE 1 FOR PROJECT NO. 200464-01
of .... ~rtt~' Fietd 0~). Fietd Max. Tested Spec. No.
rAGE Z FOR PROJECT NO. 200464-01
Moisture Dry Retative
Approx Content Densxty Conicaction Soit
Test No. Date of FieEd O~). Field Max, Tested Spec, Type
No.
(%) (pef) (pcf) (%) (%)
41 06/30/95 SM 11+05 1094,0 9.9 6.5 125,1 134, O 93 90 5
42 06/30/95 £M 11+05 1096.0 10.7 6,0 126.9 140,0 91 90 1
43 06/30/95 SM 11+05 I098.0 8,7 6.0 127.9 140,0 91 90 1
44 06/30/95 SM 11+65 1089.5 7.9 6,0 127,0 140.0 91 gO 1
45 06/30/95 SM 11+65 1093.0 7.5 6.0 127.5 140.0 91 90
46 06/30/95 SM 11+70 1096.0 10.2 6,5 124,8 134.0 93 gO 5 RETEST OF ~6
47 06/30/95 SM 11+70 1098.D 9.D 6.5 123.6 134.0 92 90 5
48 06/30/95 SM 11+80 1100.0 8,B 6.0 127.8 140.0 91 90 1
49 ,07/05/95 SM 13+55 1099,5 7.4 6.5 120,7 134.0 90 gO 5
50 07/05/95 SM 13+60 1097.0 9.1 6,5 121,5 134.0 91 90 5
51 07/05/95 SM 13+50 1094.0 8,0 6,5 121.2 134,0 90 90 5
52 07/05/95 SM 13+60 1091.5 %0 6.5 120.4 134.0 90 90
53 07/05/95 SM 13+55 1089.5 7,9 6,5 !26.3 !34.0 94 90 5
54 07/05/~ SM 14+05 1099,0 8,8 6.5 125.6 134.0 94 gO 5
55 07/05/95 SM 14+05 1096.0 7.7 6.0 128,6 140.0 92 90 1
56 07/05/95 SM 14+05 1093,5 8,9 6.0 126.6 140.0 90 90
57 07/05/95 SM 13+95 1091.5 B.3 6.5 124.3 134.D 93 90 5
58 07/05/95 SM 13+95 1089,5 7,7 6.5 121,0 134.0 90 90 5
59 07/05/95 SM %+70 1099.5 9.9 6,5 124.8 134,0 93 90 5
60 07/05/95 SM 14+75 1096.5 8.9 6.0 128.6 140.0 92 90 1
61 07/05/95 SM 14+65 1094.0 9.7 6.5 124,7 134.0 93 90
62 07/05/95 SM 14+70 1092.0 10,1 6.5 124,1 134.0 93 90 5
63 07/05/95 SM 14+75 1090.0 8.0 6.0 127,4 140,0 91 90 1
64 07/05/95 SM 16+15 1099.0 7.9 6.0 127,4 140,0 91 90 1
65 07/05/95 SM 16+20 1096.0 7.8 6,5 120,2 134.0 90 90 5
66 07/05/95 SM 16+15 1093.0 lO,1 6.5 118.6 134,0 89 90 5 RETEST
67 07/05/95 SM 16+25 1093,0 8.5 6.5 122,2 134.0 91 90 5 RETEST OF
68 07/05/95 SM 16+30 1090.0 6.1 6.5 122.7 134,0 92 gO 5
69 07/06/95 SM 10+20 1089.5 11,3 6.0 126,6 140.0 90 90 1
70 07/06/95 SM 10+25 1092.5 11.7 6.0 125.9 140.0 90 90 1
71 07/06/95 SM 10+20 1095.5 9.4 6.0 128,2 140.0 92 90
72 07/06/95 SM 10+25 1098,0 9.3 6.0 128.8 140,D 92 90 1
73 07/06/95 SM 10+30 1100.0 12.3 6,5 124.6 134,0 93 gO 5
74 07/07/95 SM 12+90 1091.0 12,7 6.5 122.7 134.0 92 90 5
75 07/07/95 SM 12+95 1093.0 11,8 6.5 124.5 134.0 93 90 5
76 07/07/95 SM 12+85 1095,5 12,2 6,5 123.9 134.0 92 90
77 07/07/95 SM 12+90 1098.0 11,7 6.5 125.0 134.0 93 90 5
78 07/07/95 SM 12+95 1100.0 11.6 6.5 124.6 134,0 93 90 5
79 0T/25195 SM 10+40 1102.0 5.8 6.0 136.0 140.0 97 90 1
80 07/25/95 SM 12+80 1102.0 7.3 5.5 129.3 135.0 96 90 2
~'A~ 3 FOR PROJECT NO. 200464-01
Hoisture Dry Retative T5~71~
Approx Content Density Co~action '
Test No. Date Test Test Location DeDth R~rks
of (~t) F~etd Field
0~). Max. Test~ S~c. No~
(%) (~f) (~f) (%) (%)
81 07/25/95 SM 14+30 1102.0 6.7 6.0 133.1 140.0 95 90
82 07/25195 SH 15+~ 1102.0 6.4 5.5 130.7 135.0 97 90 2
83 07/25/95 SM 17+60 1102.0 5.7 5.5 128.2 135.0 95 90 2
City of Fontana August 31, 1995
Washington Drive Sewer Project Project No. :200646-01
EXPLANATION FOR SUMMARY OF FIELD DENSITY TESTS
Test No.: 1' Field density test by Sand-Cone Method
(ASTM D1556-90)
Test No.: 1# Field density test by Nuclear Method
(ASTM D2922-91 and 3017-88)
SM - Sewer Main Line
SL - Sewer Lateral
City of Fontana August 31, 1995
Washington Drive Sewer Project Project No. 200646-01
TABLE 2
MAXIMUM DRY DENSITY TEST RESULTS
Soil Maximum Optimum
Type No. Description Density Moisture
1 Brown, silty fine to medium sand with gravel 140.0 6.0
2 Gray brown, silty fine to medium sand with 135.0 5.5
gravel
3 Brown, silty fine sand, trace gravel 124.5 8.5
4 Brown, s~Ity fine sand with gravel 130.5 8.0
5 Brown, silty fine to medium sand with gravel 134.0 6.5
PROJECT NAME: U3~5~It,-~'~,'~
TEST NUM~
DATE ~/2E/~ YEAR
TEST OF
GRID LOCATION
ELEVATION OR DEPTH
A SAND + BOTTLE BEFORE (Ib.) DS
B SAND+ BOTTLE AFTER (Ib.) MS ~.~ ~.~ ~.Za ~-~ S. ~
C SAND IN CONE + HOLE (Ib.) ' DC
D SAND IN CONE (Ib.) MC
E SAND IN HOLE (Ib.)
F UNIT WEIGHT OF SAND (pcf)
~ ~ H TARE(OR RING) (Ib.)
~Z I SOIL+ ROCK (Ib.)
J PLUS 3/4" ROCK (Ib.)
K PERCENT PLUS 3/4" ROCK
L PLUS NO. 4 ROCK (Ib.)
~i N VOLUME OF HOLE(OR R,UG)(ft.3
P WET SOIL+ ROCK + PAN (g)
~ Q DRYSOIL+ROCK+PAN(g)
R MOISTURE WEIGHT (g) ',{ .o { ~7 ~ ~[ ~Z' ( {~'~
8 PAN (g)
~ T DRY SOIL~ ROCK (g)
U PERCENT MOISTURE
V DRY DENSrTY (pcf)
W LABORATORY MAXIMUM DENSITY(pcf)
~ CORRECTED MAXIMUM DENSITY (pcf)
y OPTNUM M~STURE (%)
Z SOIL TY~ NUMBER
SPECIFIC GRAVITY OF
TECHNICIAN'S INI'~ALS
~MARKS
' 'FIELD OBSERVATIONS
Geotechnical ConsultantsDATE
,o2,,,..n..c..yo. Ro.d7I~/~1 m I·
NO, I~ SuiteA-112 PROJ~ NAME~,
, ~}~ROJ. NO. ~4~'~ f
San Diego, CA 92121
(619) 457-0400 CLIENT
PERMIT NO,
DESCRIPTIONOF WORK PERFORMED
;..
FIELD TECHNICIAN HOUI~S O.T. VI~
...... ~'~L .
White-File Copy Yellow-Client Copy Pink-Field Copy Gold- Reviewer's Copy Pa~ ( of [
rE__ FIELD DENSITY TEST
PROJECT NAME: ~5h'(L.~'~J~ ~(2.5;~'-uj ~ PROJECT NUMBER: 2~ ~ ~/~
~ YEAR
~ TEST OF
~ TEST LOCATION/LOT NO./STATION NO.
GRID LOCATION
ELEVATION OR DEPTH -
B SAND.+ BOTTLE AFTER (Ib.) MS
E SAND IN HOLE (Ib.)
~ F UNIT WEIGHT OF SAND (pcf)
~ G SOIL + ROCK + TARE(OR RING) (Ib,)
~ H TARE(OR RING) (Ib.)
~ 2 I SOIL+ ROCK (Ib.)
~ PLUS 3/4" ROCK (Ib,)
~ K PERCENT PLUS a/4" ROCK
WET SOIL+ ROCK + PAN (g)
DRY SOIL.+ ROCK+ PAN (g)
R MOISTURE WEIGHT (g)
S PAN (g)
T DRY SOIL+ ROCK (g)
U PERCENT MOISTURE
V DRY DENSITY (pcf)
W LABORATORY MAXIMUM DENSITY(pcf}
~ CORREC~D MAXIMUM DENSITY (pcf) I
X RELATIVE COMPACTION (%)
~ y OPIUM M~STUE (%)
~ Z SOIL TY~ NUMBER
~ SPECIFIC GRAVITY OF R~K
~CHNICIAN'S INITIALS
~MARKS
rE,,,, FIELD DENSITY TEST
PROJECT NAME: U~ ~--~ I~,'~
Z DATE 7//7/? ~ YEAR
TEST LOCATION/LOT NO./STATION NO.
GRID LOCATION
ELEVATION OR DEPTH
A SAND + BOTTLE BEFORE (Ib.) DS
B SAND+ BOTTLE AFTER (Ib.) MS ~
C SAND IN CONE + HOLE (Ib.) DC ~Z~}~ gZr5 II~ ~ZI~
D SAND IN CONE (Ib.) MC
E SAND IN HOLE (Ib.)
F UNIT WEIGHT OF SAND (pcf)
G SOIL · ROCK + TARE(OR RING) (Ib.)
H TARE(OR RING) (Ib.}
z I SOIL+ ROCK (Ib.)
J PLUS 3/4" ROCK (Ib.) "'
K PERCENT PLUS 3/4' ROCK
L PLUS NO, 4 ROCK (Ib.)
p WET SOIL+ ROCK+ PAN (g)
Q DRY SOIL+ ROCK+ PAN (g)
R MOISTURE WEIGHT (g)
S PAN (g)
T DRY SOIL+ ROCK (g)
U PERCENT MOISTURE
W LABORATORY MAXIMUM DENSlTY(pcf)
~ CORRECTED MAXIMUM DENSITY (pcf)
y OPtMUM M~STU~ (%)
Z SOIL TY~ NUMBER
SPECIFIC GRAVI'rY OF R~K
~CHNICIAN'S INITIALS
~MARKS
Ot'~, 'FIELD OBSERVATIONS
...,...n,...~.n..,,an,. ,A~I~/~tDAY~:~,,~ t A""OR ~,~
19~25 Barnes Canyon Road
~ NO, ~ ~ Suite A-112 PROJ, NAME ~.1(~ NO,~Q
(619) 457-0400 CENT
· , :, · ..j . ,1,
EQUIPME~ W~ER
DAILY YARDA~
PERMIT NO.
DESCRIPTION OF WORK PERFORMED
FELD TECHNICIAN HOURS O.T. VISITORS
CLIENT I~p.
White-File Copy Yellow-Client Copy Pink-Field Copy G~ld- Reviewer's Copy Page ~ of
FIELD:' OBSERVATIONS
10225 Barnes Canyon Road DATE 7 (~ ~/.~ DAY ~ t~C~ c[{ ~ p' ~
EQUIPMENT W~ER
' DAILY YARDA~
PERMIT NO.
DESCRIPTION.OF WORK PERFORMED
, ~
FIELD TECHNICIAN HOURS O.T. VISITORS - ~,' 1; ,"
· q.,.,' c_u ... ,.~S', ~ .' '..-:'..,--,. ,-
':rk-- ~,.~,., <... ....~ ~. "'.. ,.-::'; ;,._....?:,:'~:.-;....,
: Z ..:,:; ' --/
CLIENT REP.: ,., '; ~,
White-File Copy Yellow-Client Copy Pink-Field Copy Gold- Reviewer's COpy Page
FIELD TECHNICIAN HOURS O.T. VISITORS
CLIENT REP.
White-File Copy Yellow-Client Copy pink-Field Copy Gold- Reviewer's Copy Page ~ of (
PROJECT NAME: uJ~,s~-~,l~'T~
GRID LOCATION
ELEVATION OR DEPTH
A SAND+ BOTTLE BEFORE (Ib.) DS
B SAND+ BOTTLE AFTER (Ib.) MS $~7 ...........
C SANDINCONE+HOLE(Ib.) DC I~Z ~J/ I~ IcT~ IO~ t~ ~f
D SAND IN CONE (Ib,) MC 14~
E SAND IN HOLE (Ib.)
F UNIT WEIGHT OF SAND (pcf)
G SOIL · ROCK + TARE(OR RING) (Ib.)
H TARE(OR RING) (Ib,)
~ z I SOIL+ ROCK (Ib.)
J PLUS 3/4' ROCK (lb.)
K PERCENT PLUS 3/4" ROCK
L PLUS NO, 4 ROCK (Ib.)
~ M PERCENT PLUS NO. 4 ROCK
P WET SOIL+ ROCK + PAN (g)
~ Q DRY SOIL + ROCK + PAN (g)
R MOISTURE WEIGHT (g)
~ PAN (g)
T DRY SOIL-F ROCK (g)
U PERCENT MOISTURE
V DRY DENSITY (pcf)
W LABORATORY MAXIMUM DENSITY(pcf)
~ CORRECTED MAXIMUM DENSITY (pcf)
X RELATIVE COMPACTION (%)
~ y OPTIMUM MOISTURE (%)
~ Z SOIL TY~ NUMBER
~ SPECIFIC GRAVITY OF ROCK
~CHNICIAN'S INITIALS
~MARKS
PROJECT NAME: t.~,~s~-~%~.~-r~3
TESTNUM~
DATE ~ ~ ~: YEAR
TEST LOCATION/LOT NO./STATION NO.
GRID LOCATION
ELEVATION OR DEPTH
~ A SAND + BOTTLE BEFORE (Ib,) DS Z
B SAND'+ BOTTLE AFTER (Ib,) MS ~1
D SAND IN CONE (Ib.) MC I~
E SAND IN HOLE (Ib.)
= F UNIT WEIGHT OF SAND (pCf)
~ ~ G SO~L · ROCK + TARE(OR raNG) (~b.)
~ H TARE(OR RING) (Ib.)
J PLUS 3/4" ROCK (Ib.)
~ K PERCENT PLUS 3/4' ROCK
h L PLUS NO, 4 ROCK (Ib.)
M PERCENT PLUS NO. 4 ROCK
WET SOIL+ ROCK+ PAN (g)
DRY SOIL + ROCK + PAN (g)
R MOISTURE WEIGHT (g)
S PAN (g)
U PERCENT MOISTURE
W LABORATORY MAXIMUM DENSITY(pcf)
~ CORREC~D MAXIMUM DENSITY (pcf)
X RELATIVE COMPACnON (%)
~ y OPTIMUM M~STURE (%)
t Z SOIL TY~ NUMBER '
~ SPECIFIC GRAVITY OF R~K
MARKs
FIELD TECHNICIAN HOURS O.T. VISITORS
CLIENT REP.
White-File Col3y Yellow-Client Copy Pink-Field Copy Gold- Reviewer's Copy Page ~ of
P.,__.. FIELD DENSITY TEST
PROJECT NAME: ,~_..~.~-Toto ~ .,~;~3,~ ~TL PROJECT NUMBER: ~ q:,4G
~ GRID LOCATION :
ELEVATIOH OR DEPTH
~ A SAND + BOTTLE BEFORE (Ib.} DS
B SAND+ BOTTLE AFTER (Ib,) MS
~ C SAND IN CONE + HOLE (Ib.)~ DC {~4 ~2 I~ ~t2~ ~7
O~ SAND IN CONE (Ib.) MC
~ ; SAND IN HOLE (Ib.)
~ ~ ' F UNIT WEIGHT OF SAND (pcf)
~ G SOILt ROCK+TARE(OR RING) (Ib,)
~ H TARE(OR RING) (Ib,)
~ ~ L PLUS NO. 4 ROCK (Ib.)
O
P WET SOIL.+ ROCK + PAN (g)
Q DRY SOIL,+ ROCK · PAN (g)
R MOISTURE WEIGHT (g)
h ~ PAN (g)
~ T DRY SOIL~ ROCK (g)
U PERCENT MOISTURE
V DRY DENSITY (pcf) 127. a %Z~,~ ~.Z
W LABORATORY MAXIMUM DENSITY(pcf)
~ CORRECTED MAXIMUM DENSITY (pcf)
X RELATIVE COMPACTION (%)
~ ~ ~
~ y OPIUM M~STURE (%)
~ Z SOIL TY;~ NUMBER '
SPECIFIC QRAVITY OF
PERCENT ~US 3/4'/N0, 4 IN MAX.
~MARKS
E.,, FIELD DENSITY TEST
PROJECT NAME: '~ ~\(&4't.r~ ~,, ~ PROJECT NUMBER:
TEST OF ,, ~'~ ~.2~ CH-~ ~-~-~4 ~-~-~C ~-~ ~-2~-~
TEST LOCAT.ON/LOT NO./STAT.ON NO. ~ 0~0 ~ 1~ .........
A SAND + BOTTLE BEFORE (Ib.) DS ~ _'
B SAND+ BOTTLE AFTER (Ib.) MS ~,? ..... f~7 -- ~
C SAND IN CONE + HOLE (Ib.)~ DC ~ ~2~Z ~ H~ I~ ~Z~ ~ IO~
D SAND IN CONE (Ib.) MC {29,~ }~-~ ~O,~ t~?.~ I~,f tg0.~ I~l I~G
E SAND IN HOLE (Ib.)
~ F UNIT WEIGHT OF SAND (pcf)
G SOIL + ROCK + TARE(OR RING) (Ib.)
H TARE(OR RING) (Ib.)
~ z I SOIL+ ROCK (Ib.)
II K .S.CS.T PLUS a 4' .OC
N VOLUME OF HOLE(OR RING)(ft.3)
p WET SO~L+ ROCK+ PAN (O)
Q DRY SOIL+ ROCK+ PAN (g)
R MOISTURE WEIGHT (g) '
S PAN (g)
I T DRY SOIL+ ROCK (g) ~ - - _
U PERCENT MOISTURE ~'~ ~.f ~,G 7.~ {0-( {~.~ ~O-7 ~.c]
V DRY DENSITY (pcf) ~.~ t~t.~ {~.9 l~.~ I{~~ ~2%,~ }Z~.L }~.} ~Z~.~
W LABORA'rORY MAXIMUM DENSITY(pcf)
~ CORRECTED MAXIMUM DENSITY (pcf) 13~ .C) / ~ ~
~ y OPtMUM M~STU~ (%) ~. ~ ~'
t Z SOIL TY~ NUMBER' ~ /"~ ~--~-~
~ SPECIFIC GRAVITY OF R~K
~ PERCENT ~US 3/4'/NO. 4 IN MAX. I Z'° / I?'D i4.~ (~.~ i~.D {E' {~ o I~
~MARKS
PROJECT NAME: ~,~,~_~,~t,~-~
TEST NUMB~ER
TEST OF
TEST LOCATIOI/LOT NO./STATION NO.
GRID LOCATIOI
ELEVATIO~ OR )EPTH
A SAND+BO'rTLI: BEFORE (Ib,) DS
~ B SAND+ BOTTLI: AFTER (Ib.)
~ SAND IN CONE ~ HOLE (Ib,} DC iZ~ ~? IO~ {Z~ l~3i )~
( SAND IN HOLE (Ib.)
~ ~ ' F UNIT WEIGHT )F SAND (pcf)
G SOIL+ ROCK ~ TARE(OR RING) (Ib.)
H TARE(OR RIN ) (Ib.)
~ ~ I SOIL'+ ROCK Ib.}
J PLUS 3/4" R( ~CK (Ib.)
K PERCENT PL~ S 3 }4" ROCK
~ ~ M PERCENT PL S NO. 4 ROCK
N R RING)(ft.3)
P WET SOIL+ F OCK + PAN (g)
~ Q DRY SOIl. + R 3CK + PAN (g)
R MOISTURE M ~HT (g)
8 PAN (g)
W LABORATOF ' MAXIMUM DENSITY(pcr)
~ CORREC~O MAX~ DENSITY (pcf}
X .ELATIVEC(,MPACTION(%)
~ y OPtMUM MC ISTURE (%)
~ Z 801L TVE UMBER
~ SPECIFIC GRAVI' 'Y OF ~K
~MARKS
E__ FIELD SITY TEST
PROJECT NAME: Ld4%.S~{t~1'~-~ b(.. ~E.L PROJECT NUMBER: ,,
DATE ~/Z~/~'~ YEAR
TESTOF :;L-I SL-~ ~L-~ ~L-~ ~L-~' ~L-~ ~-~ ~,~
ELEVATION OR DEPTH ~'.G' --~'~ -~.d ~ -~,~ ~.r' -I~'~ -
~ A SAND + BOTTLE BEFORE (Ib.) DS
C SAND IN CONE + HOLE (Ib,) ; DC ~.~ {~ j~ I~ t~ f~$O ~)1 IZ~~ i2]~
~ ~ D SAND IN CONE (Ib.} MC lTa.~ ~,~ tGt.~/~,S I?~ 1~7.~t~.~ 1~,3
~ ~ E SAND ,N ,OL,
~ SOIL + ROCK + TARE(OR RING) (Ib.)
TARE(OR RING) (Ib.)
~ :- L PLus ,o. 4 ROC~ ~b.>
M PERCENT PLUS NO. 4 ROCK
~ ~ N VOLUME OF HOLE(OR RING)(ft.3)
~ O WET DENSITY Ipcf) I~,3 ~G~ {bT.I ~3~,F ~4.~ I~.Q ~l~,~ 137,~
P WET SOIL+ RCCK+PAN (g)
Q DRY SOIL~ ROCK+ PAN (g)
R MOISTURE WEIGHT (g)
S PAN (g)
~ T DRY SOIL~ ROCK (g)
U PERCENT MOISTURE ~,~ I~,Z ~,~ ~,I ~ t.3 IQ,~ R. I ~ J,~
W LABORATORY MAXIMUM DENSITY(pcf)
~ CORRECTED MAXIMUM DENSITY (pcf) %~,Q .~ ................... I~ ~,~
X RELATIVE COMBACTION (%) C{ ~ ~ ~ ~ ~ ~0 ~ O c~ ( ~1 ~
~ Z SOIL TY~ NUMBER ' ~ Z ~ ~ ~ ~ ~
~ SPECIFIC GRAVffiTY OF R~K
~ PERCENT ~U8 3/4"/N0. 4 IN MAX, ~.~ %~.P (;,o ~1.~ l~~ iS, ~,~ F&,
~CHNICIAN'S INITIALS ~ .~
rE--- FIELD DENSITY TEST
PROJECT NAME: L~ r~(~rijS~ ?Z:~ hi7--,
TEST'NUM~,
TEST OF
GRID LOCATION
ELEVATION OR DEPTH
A SAND + BO'rTLE BEFORE (Ib.) DS
~ B SAND+ BOTTLE AFTER (Ib.) MS ~.~
~ C SAND IN CONE + HOLE (Ib.) DC ~ZO 1~ }~ {~oq 1~
~0 D SAND IN CONE (Ib.) MC I~,~
~ E SAND IN HOLE lib.)
~ F UNIT WEIGHT OF SAND (pcf)
H TARE(OR RINGI (Ib.)
~ Z J SOIL+ ROCK (Ib,)
K PERCENT PLUS 3/4" ROCK
~ L PLUSNO, 4ROCK(Ib.)
~ 0 WET DENSITY (pcf)
P WET SOIL+ ROCK+ PAN (g)
Q DRY SOIL+ ROCK + PAN (g)
R MOISTURE WEIGHT (g)
~ S PAN (g)
U PERCENT MOISTURE
W LABORATORY MAXIMUM DEN~ITY(pcf)
~ CORRECTED MAXIMUM DENSITY (pcf) }~,~
X RELATIVE COMPACTION (%)
~ y OPTIMUM M~STU~ (%)
~ Z SOSL T~ NUdeS. '
~ SPECIFIC GRAVITY OF R~K
TECHNICIAN'S IffiTIALS
' DALLY REPORT OF
,,.,if~jP/,j/ff'O ',/q/tOOt"'E,. i.C :: F: IELD OBSER V A TIONS
10225 Barnes Canyon Road
San Diego, CA 92121
(619) 457-0400 CLIENT ~ c
EQUIPMENT W~R
DAILY YA~AGE
PERMIT NO. ·
DESCRIPTION OF WORK PERFORMED
FIELD TECHNICIAN HOURS O.T. VISITORS
CLIENT REP.
White-File Copy Yellow-Client Copy Pink-Field Copy Gold~ Reviewer's Copy Page ~ of
r , gi~,FIELD OBSER TIONS
_ 0 E VA
San Diego, CA 92121 ~
(619) 457-0400 CLIENT, ~ T~ ~-'C~
EQUtPMENT 'W~ER
DAILY YARDA~
PERMIT NO.
~ ~CHNICIAN ~S O.T. VISIT~S
CLIENT ~P.
White-File Cooy Yellow-ClientCopy Pink-Field Copy ,Gold)Reviewer's Copy Pa~
, ~/~ z;',~ gore, ',~:~:,i,.!!~i;i,i,~FiELD OBSERVATIONS
~ NO. ~ SuiteA-112 PROJ. NAME ~ O~ ~OJ. NO.Z~~ G4~-O/
San Diego, CA 92121 '
EQUIPME~ W~ER
DAILY YARDA~
PERMIT NO.
L~ ~ ~'~, .' ~):~-
; ' ,"
FELl) TECHNICIAN HOURS :' '0.T. !: VISITORS. ' ..
White-File Copy Yellow-Client Copy Pink-Field Copy G01d-~Reviewer's C~pyi'~';:= Page ~ of ;= '::{
EPORT,OF
- ,-: !. FIELD.;,OBSERVATIONS
P. z
10225 Barnes Canyon Rood: ~:. =: , , '. ~
San Diego, CA 92121
<6~9~ 457-0400 CUENT ' ~ ~y cF ~:~'~1
EQUI~ENT W~ER
DAILY YARDAGE
~ PERMIT NO,
FIELD TECHNICIAN HOURS O,T, VISITORS
White-File Copy Yellow-Client Copy Pink-Field Copy Gold-~Reviewer's Copy Page I of e
- · .:,.:~.~FIELD' ,OBSERVATIONS
10225 Barnes Canyon Road DA ;~, ~ ! ~J~ AUTHOR "F- I~ .
SanDiego, CA 92121
(619) 457-0400 CLIENT
EQUI~ENT W~ER
, DAILY YARDA~
· ' PERMIT NO.
DESCRIPTION .OF WORK PERFORMED '' :~ ':
' ~ ~ ' ~ .~:f' .'
,
,,.,,
White-File Copy Yellow-Client Copy Pink-Fi~ld:~Bp~ ' Gold- Reviewer's Copy Pa~ { of f-
,,.:: FIELD OBSERVATIONS
DA 7~ ~'
~0225 Barnes Canyon Road '
San Diego, CA 92~2~
(6~9) 457-0400 CLIENT ~ ~ ~ ~(~
CONT~CTOR ~ . ~. ~ ~ ~ ~ T FORE~N
- ~ C,~ DAILY YARDAGE
PERMIT NO.
DESCRIPTION OF WORK PERFORMED '~ *
FIELD TECHNICIAN HOURS O;T, ' VISITORS
White-File COpy Yellow-Client COpy ~ Pink-Field Copy Gold- Reviewer's Copy Page
PROJECT NAME: (~ ~' ~ ~P~ ~,s~, I~'~-~ ~r~, %~ ~ ~ ~ E c r PROJECT NUMBER:
GRID LOCATION
~ ~ C::.::,:::::~""''`''''''' ,~,.~ ,,,.~ ;~ ,~.~
P WET SOIl.+ ROCK+ PAN (g)
~ Q DRY SOIL.+ ~OCK+ PAN (g)
~ T DRY SOIt.+ ROCK (g)
U PERCENT MO STURE t Q ,~ ~, ~ ~ ~. ~ ~ ~, ~
W LABORATOR MAXIMUM DENSITY(pCf)
~ CORRECTED IAXIMUM DENSITY (pcf) ~S'~ ~ .~ I~, ~ r~. ~
X RELATIVE CC MPACTION (%) ~ ~ ~ O ~ ~ ~ O
~ y OPIUM MOSTU~ (%)
~ Z SOIL TYF~ NJMBER ~ ~ ~ ~
~ SPECIFIC GRAVITY OF R~K
3BSER A IONS
, ,: V T
10225 Barnes Canyon Road,
'~' NO. ~' Suite A-112 PROJ.: NAME'~t~L~rt(k~'~3~
San Diego, CA 92121
(619) 457-0400 CLIENT C tly ~ ~
CONT~CTOR ~ ~ ~LtC~.~T '/~ FOREMAN
EQUIPMENT ~ ~c~o ~ / ~ ~n ~0~ ~ WB~ER
~ ~:~ L ~u ¢ t~ ':;" ,. DALLY YARDA~ '
PERMIT NO.
DESCRIPTION OF WORK PERFORMED "~'"
' ~, L.
FIELD TECHNICIAN HOURS O.T. VISITORS
CLIENT R~P..4." L'T..'Y,,-,,'/...,z'f-;?'/,,,
White-File Copy Yellow-Client Copy Pink-Field Copy Gold- Reviewer'e Copy Page
pROJECTNAME.~IT~/,3F'~:~'~,
TEST NUM~
TEST OF"
TEST LOCATION/LOT NO./STATION NO.
GRID LOGATION
ELEVATION O~ DEPTH -
~ SAND + BOTTLE BEFORE (Ib,) DS
SAND+ BOTTLE AFTER (Ib.) MS
SAND IN CONE + HOLE (Ib.) ' DC
SAND IN CONE (Ib.) MC
~ SAND IN HOLE (Ib.)
UNIT WEIGHT OF SAND (pCf)
~SOIL · ROCK + TARE(OR RING) (Ib.)
TARE(OR RING) (Ib.)
SOIL+ ROCK (Ib,)
JPLUS 3/~' ROCK {Ib,)
KPERCENT PLUS 374' ROCK
PERCENT PLUS NO, 4 ROCK
VOLUME OF HOLE(OR RING)(ft.3
WET DENSITY (pCf)
~WET SOIL+ ROCK + PAN (g)
DRY SOIl.+ ROCK+ PAN (g)
;MOISTURE WEIGHT (g)
PAN (g)
T DRY SOIl,+ ROCK (g)
U PERCENTMCISTURE
V DRY DENSITY (pcf)
W LABORATORY MAXIMUM DENSITY(pcf)
~ CORRECTED MAXIMUM DENSITY (pcf)
RELATIVE CCMPACTION (%)
y OP~ui MOISTU~ (%)
SOIL TY~ NUMBER
SPECIFIC GRAVITY OF R~K
MARKs
-., ,- FIELD OBSERVATIONS
,4/_ 10225 Barnes Canyon Road 1, ~ ~J F~Z--p
NO, "' SuiteA-112 '~" ...........PROj NAMEt~i~T<~~ ~'
ROJ NO
SanDiego, CA 92121 ' . ~ ~
<e~9} 457-0400 CU~NT:~y ~p'
C~T~CTOR ' , '
FORE~N
~ ~ CC DAILY YARDAGE
PERMIT NO.
PERFORMED .... ' '
DESCRIPTION .OF WORK
FIELD TECHNICIAN HOURS O.T. VISITORS
White-File Copy Yellow-Client Copy Pink-Field Copy ~Gold~Reviewer's ZODy Pa~ ~ of /
__ D NSITY TEST
PROJECT NAME:G{~' ~E~
TEST NUM~
TEST OF .~
TEST LOCATION/LOT NO,/STATION NO. ~O~
GRID LOCATION '
ELEVATION OR DEPTH
~ ~ SAND + BOTTLE BEFORE (Ib.) DS 1~31~.70
~ _D SAND IN CONE (Ib.) MC ~,~
~ F UNIT WEIGHT OF SAND (pcf)
~ ~ G SOIL ~ ROCK + TARE(OR RING) (Ib.)
~ H TARE(OR RIN~) (Ib.)
. SO~L+ ROCK (~b.) ~'~7
~ J PLUS3,."ROC~<~J 1.7~ L~C
~ K PERCENT PLUS 3/4" ROCK
~ L
_~ PLUS NO. 4 POCK (Ib.)
~ ~ N VOLUME OF HOLE(OR RING)(ft.3)
~ ~ WET DENSITY (pcf) ~,
p WET SOIL+ ROCK~PAN (g)
~ Q DRY SOIL+ ;OCK~ PAN (g)
R MOISTURE WEIGHT (g}
S PAN (g)
~ T DRY SOIL+ ROCK (g)
V DRY DENSITY (pcf)
W LABORATORY MAXIMUM DENSITY(pcf) /~
~ CORRECTED MAXIMUM OENSITY (pcf)
X RELATIVE COMPACTION (%)
~ y OPT~UM M~STURE (%)
~ Z SOIL TY~ NUMBER
~ SPECIFIC GRAVITY OF R~K
~MARKS
o SERVAT ONS
B
1022~ Barnes Canyon Roa~
NO. ~ SuiteA-112 PRO~ NAME
Sanole~o, cA S~ .. se'~ ~ Pao~. NO.~ ~
(619) 457-0400 CLIEN~ ~ ~ ' 0 ~ ~:-~~
CONT~CTOR ~,~ .~~,~ FOREMAN ~O~ ~U~(~T
EQUIPMENT W~R
DAILY YARDA~
PERMIT NO,
,..~
F~ ~CHNIC~N - ',~ ~ '~,; O.T.': ' VISITO~ - "' - ': .
White-File Copy Yellow-Client COpy Pink-Field Copy Gold- Reviewer's Copy Pa~ X of X
.,. FIELD DENSITY TEST
PROJECT NAME:~r1y oF'T-~r~F~
E I ~ YEAR
TEST OF
~ST LOCAT~N/LOT NO./STA~ON NO,
GR~ LOCATION
ELEVATION OR DEPTH - I
~ A SAND + BOTTLE BEFORE (~.) DS
C SA~ IN CONE + HOLE (Ib.) ~ DC
D SAND ~N ~ (ib.) MC
E SA~ ~N HO~ (mJ
F UN~TWEI~TOFSA~(pce
~ G SOILf ~CK+TARE(M RING) (Ib.)
H TARE(M RING) 0b.)
I so~+ ROCK (e.)
J PLUS 3/4" ROCK (Ib.)
K ~RCENT PLUS 3/4" RO~
- L PLUS NO, 4 R~K (Ib,)
M PERCENT PLUS NO, 4 ROCK
0 WET DENSITY (pcf}
P WET S~+ R~K+ PAN (~
~ Q DRY S~+ ROCK + PAN (g)
R MOET~ WE~HT (g)
8 PAN (9)
t T DRY SOL+ R~K (~
U ~ENTMOIST~
V DRY DENSITY (pcf) I ~,~
W ~BORATORY MAXIMUM DENSITY(pcf)
~ C~REC~ ~X~ ~NSITY
X ~TIVE CO~AC~N (%)
;y ~UM M~T~ (%)
Z S~L TY~ N~R '
e SPECIF~ GRAVI~ OF R~K .
~S
FIELD ': OBSERVATIONS
G.e,..,.,..,cona.,,an..I
~" 10225 Barnes Canyon Road ~ ~ ~
NO, ; SuiteA-112 . . ~ .
San Diego, CA 92121
(e19) 457-0400 CLIENT ~ {~/O~ ~G~'~
CONTRACTOR ~,; ,'~C ~ ~{, FORE~N ~,~(~b~
EQUIPMENT W~ER
DAILY YARDAGE
PERMIT NO.
FIE~ ~CHNICIAN HO~S O,T. VISITORS
C~ ~ ~ ~ , ' ' '
.,:'.~.~.~.~.~
White-File Copy Yellow-Client Co~y Pink-Field Copy ' Gold- Reviewer's Copy Pa~
TEST NUM~
PATS ~
Q~ LOCATION
ELEVAT~N
5ANO+ BOTTLE
SA~ IN CONE +HOLE (Ib.)
SAND IN CO~
UNIT WEIGHT
~US NO. 4 R~K (Ib,)
PERCENT ~US NO. 4 ROCK
WET DENSITY (pcf)
WET SOIL+
DRY S~L+~(g)
MOIST~EWE~HT(g)
PAN (g)
DRY SOL+ R~K (g)
~ENTMOIST~
DRY DENSITY (pc~
~BORATORY MAXN~ ~NSITY(pCf)
~LATWE COMPAC~N
OPIUM M~T~
~ECF~C GmAWTY OF m~K
~MA~S
,~jP/,j/ff'O~j~ftki} ~ILY. REPORT' OF
,,. ORE'. ;:.:.: FIELD OBSERVATIONS
Geotechnical Consultants DATE DAY
10225 Barnes Canyon Road
NO. SuiteA-112 ' PR ' M
San Diego, CA 92121
(6i9) 457-0400. CLIENT:
EQUIPMENT ~' ~ ~ ~ I~ ~ ~ ~ '
DALLY YARDA~
PERMIT NO,
DESCRIPTION OF WORK PERFORMED
FIELD TECHNICIAN HOURS 0.T, VISITORS
cLiENT
White-File Copy Yellow-Client Copy Pink-Field Copy Gold- Reviewer's COpy Page of