CONTENT5 AND REMA~5:
Compaction Reports Job. No. 90381-1
Sewer manhole backfill., Beech Inter Sewer, Beech Ave.
at Baseline Ave.
Sewer Trench Backfill (Settlement A~ea), Beech
Intercepter Sewer, Beech Ave, North of Foothill
Boulevard,
Howard Colburn
HC/ss
6101 Cherry Avenue · Fontana, CA 92336 · (714) 899-2581
· INCORPORATED
P.O. Box 1790 · 1355 E. Cooley Drive, Suite E, Colton, CA 92324
Phone (714) 824-7211 · Fax (714) 824-7209
February 12, 1991
City of Fontana Job No. 90381-1
c/o Fontana Heritage West End Associates
6101 Cherry Avenue
Fontaria, California 92336
Attention: Howard Colburn
Gentlemen:
This letter transmits five copies of the Compaction Report, Sewer
Trench Backfill (Settlement Area), Beech Intercepter Sewer, Beech
Avenue, North of Foothill Boulevard, Fontana, California, prepared
for City of Fontana.
We appreciate this opportunity to provide geotechnical services for
this )~roJect. If you have questions or comments concerning this
report, please contact us at your convenience.
Respectfully submitted,
· . OT CHNICAL, INC.
h .
J perations Manager
RJJ/BW:ff
11910 H6speria Road, Suite 2, Hesperia, CA 92345 · Phone (619) 949-0006 · Fax (619) 949-0023
GEOTECHNICAL ENGINEERING · MATERIALS TESTING AND [~VALUATION · CONSTRUCTION OBSERVATION
· INCORPORATED
P.O. Box 1790 · 1355 E. Cooley Drive, Suite E, Colton, CA 92324
Phone (714) 824-7211 · Fax (714) 824-7209
February 12, 1991
City of Fontana Job No. 90381-1
c/o Fontana Heritage West End Associates
6101 Cherry Avenue
Fontana, California 92336
Attention: Howard Colburn
Subject: Compaction Report
Sewer Trench Backfill (Settlement Area)
Beech Interceptor Sewer
Beech Avenue, North of Foothill Boulevard
Fontana, California
Gentlemen:
This report covers the results of in-place density tests taken to
date on the sewer trench backfill (settlement area) at the above
referenced location.
All tests were taken in coordination with and as requested by the
client; ' s representative.
FIELD PROCEDURE:
A total of five in-place density tests were taken by the sand volume
method on January 29, 1991. Representative samples of the soils
encountered were returned to the laboratory for determination of the
Optimum Moisture Content - Maximum Dry Density curves.
The locations of the in-place density tests are indicated on the
attached Field Compaction Test Summary Sheet.
11910 Hesperia Road, Suite 2, Hesperia, CA 92345 · Phone (619) 949-0006 · Fax (619) 949-0023
GEOTECHNICAL ENGINEERING · MATERIALS TESTING AND EVALUATION · CONSTRUCTION OBSERVATION
Page No. 2
Job No. 90381-1
OPTIMUM MOISTURE - MAXIMUM DENSITY RELATION:
ASTM D 1557-70, Method C; 4-inch diameter mold; 1/30 cubic foot
volume; lO-pound rammer; 18-inCh fall; 5 layers; 25 blows per layer.
Soil Optimum Moisture Maximum Dry Density
Type Classification (Percent) (Lbs./Cu. Ft.)
2 ;Band, fine, with 8.0 135.0
medium, coarse,
.gravel to 1-1/2"
and silt, brown
(SP)
8 Sandy Gravel, fine 9.0 141.0
to coarse and
.gravel to 3/4",
gray (GP), Import
RESULTS:
The results of the in-place density tests taken to date, and the
relative compaction in each case, are shown on the attached Field
Compaction Test Summary Sheet.
Respectfully submitted,
iEXPIRATION ~rE ~ o 443
President j
~ 3-31-93 ~
RO8/BW:ff ~~
Enclosure: Field Compaction Test Summary Sheet
Distribution: City of Fontaria (4)
Hall & Foreman, Znc. (l)
FIELD COMPACTION TEST SUMMARY SHEET
Job No. 90381-1
Sh 1 of. 1
PRO_ECT' CITY OF FONTANA - SEWER TRENCH BACKFILL (SETTLEMFNT ARFA), _
BEECH INTERCEPTOR SEWER, BEECH AVENUE, NORTH OF FOOTHILL BOULEVARO
FONTANA, CALIFORNIA
Depth DENSITIES
Date Test Location Of Test Depth Of Of Dry Max. Rel. MC% I Type Retest Of
No.
Cut Fill Test (Ibs/cubic foot)
1-29-91 BF-1 Feedull Blvd., ~. 146+50 6.0 0.0-0.5 132.6 137.5 96 5.4 2 10% RX C"
BF-2 Foothtll Bird., ~ 146.Y00 6.0 0.0-0.5 140.3 141.5 99 6.2 2 .25% RX
BF-3 Foothill Blvd., Sta. 146485 6.0 0.0-0.5 137.6 140.0 ~ 8.9 2 20% RX
BF-4 Feol. hill Blvd., Sta. 1464-95 6.0 0.0--0.5 137.7 143.0 96 8.6 2 30% RX
B3-1 F-eoth~ BIrd., Sin. 14(M-70 6.0 6.0 0.0-0.5 133.5 141.0 95 8.4 8 }
(
LEGEND: (SG) Tests on Subgrade Elevation; (BF) Tests on Backfill; (FP} Tests an Fill in Progress
(FG) Testson Finish Grade Elevation; (Mc) Moisture Content; (REL) Relative; (RX) Rock Corrected; (*) Denotes Failure
· INCORPORATED
P.O. Box 1790 · 1355 E. Cooley Drive, Suite E, Colton, CA 92324
Phone (714) 824-7211 · Fax (714) 824-7209
February 12, 1991
City of Fontana Job No. 90381-1
c/o Fontana Heritage West End Associates
6101 Cherry Avenue
Fontana, California 92336
Attention: Howard Colburn
Gentlemen:
This letter transmits five copies of the Compaction Report, Sewer
Manhole Backfill, Beech Intercepter Sewer, Beech Avenue at Baseline
Avenue, Fontana, California, prepared for City of Fontana.
We appreciate this opportunity to provide.geotechnical services for
this project. If you have questions or comments concerning this
report, please contact us at your convenience.
Respectfully submitted,
r ons Manager
RJJ/BW:ff
11910 Hesperia Road, Suite 2, Hesperia, CA 92345 · Phone (619) 949-0006 · Fax (619) 949-0023
GEOTECHNICAL ENGINEERING · MATERIALS TESTING AND EVALUATION · CONSTRUCTION OBSERVATION
· INCORPORATED
P.O. Box 1790 · 1355 E. Cooley Drive, Suite E, Colton, CA 92324
Phone (714) 824-7211 · Fax (714) 824-7209
February 12, 1991
City of Fontana Job No. 90381-1
c/o Fontana Heritage West End Associates
6101 Cherry Avenue
Fontena, California 92336
Attention: Howard Colburn
Subject: Compaction Report
Sewer Manhole Backfill
Beech Interceptor Sewer
Beech Avenue at Baseline Avenue
Fontana, California
Gentlemen:
This report covers the results of. in-place density tests taken to
date on the sewer manhole backfill at the above referenced location.
The tests were taken in coordination with and as requested by the
client's representative.
FIELD PROCEDURE:
A total of two in-place density tests were taken by the sand volume
method on January 23, 1991. A representative sample of the soil
encountered was returned to the laboratory for determination of the
Optimum Moisture Content - Maximum Dry Density curve.
The locations of the in-place density tests are indicated on the
attached Field Compaction Test Summary Sheet.
11910 Hesperia Road, Suite 2, Hesperia, CA 92345 · Phone (619) 949-0006 · Fax (619) 949-0023
GEOTECHNICAL ENGINEERING · MATERIALS TESTING AND EVALUATION · CONSTRUCTION OBSERVATION
Page No. 2
Job No. 90381-1
OPTIMUM MOISTURE - MAXIMUM DENSITY RELATION:
ASTM D 1557-70, Method C; 4--inch diameter mold; 1/30 cubic foot
volume; 10-pound rammer; 18-inch fall; 5 layers; 25 blows per layer.
Soil Optimum Moisture Maximum Dry Density
Type Classification (Percent) (Lbs./Cu. Ft.)
1 Gravelly Sand, fine 9.5 131.0
to medium, with
coarse; gravel to
1-1/2" and silt,
brown (SP)
RESULTS:
The zesults of the in-place density tests taken to date, and the
relative compaction in each case, are shown on the attached Field
Compaction Test Summary Sheet.
Respectfully submitted,
C.H.J GEOT NICAL, INC.
EXP[eATIaN DAT~ Robert J. Jo? ~er~+_~E. 443
~<d" %~ President
RJJ/BW:ff
Enclosure: Field Compaction Test Summary Sheet
Distribution: City Of Fontana (4)
Hall & Foreman, Inc. (1)
FIELD COMPACTION TEST SUMMARY SHEET
Job No.90381'1
PROJECT: CITY OF FONTANA - SEWER MANHOLE BACKFILL, BEECH INTERCEPTOR Sh. ~ of Z
SEWER, BEECH AVENUE AT BASELINE AVENUE, FONTANA, CALIFORNIA
Depth DENSITIES
I I ' s. Remarks or
Test Location Of Test Depth Of Of Dry Max. Rel./IC% T~ ~e
Date No. -~ . Retest Of
Cut Fill Test (Ibs/cubic foot)
1-23-91 BF-1 Beech Ave., Sta. 1934-95 1.6 6.06.5 124.3 131.0 95 10.4
BF-2 Beech Ave., Sta. 1934-% 1.6 3.1)-3.5 126.8 133.5 95 10.7
LEGEND: (SG) Tests on Subgrade Elevation; (BF) Tests on Backfill; (FP) Tests on Fill in Progress
(FG) Tests on Finish Grade Elevation; (Mc) Moisture Content; (REL) Relative; (RX) Rock Corrected; (*) Denotes Failure
~!%1f~ CITY OF F(.~.~TANA --.~R .URC.AS,.~ .E O.L~'
~ DISTRIBUTION BALANCE $
'CHANGE ORDER AMouNT oF INCREASE S S~-~:' c~
L AMOUNT OF DECREASE $
TO: PURCHASING TOTAL ADJUSTMENT $ ~ I L~,~
FROM: Pub~Lc ~o~kB/~ng. COMPLETION DATE Ic:,l
Deparlment P,O. PACKET NO.
2~956
CHANGE ORDER NO. ~ O~ ..... TO PURCHASE ORDER NO.
VENDOR ~ C.~.~. geotea~nLaa~ Znc. _ Poo~b~/Beea~ 5e~e~ B~ojec~
PLEASE ATTACH A COPY OF THE PURCHASE ORDER WITH THIS FORM.
PLEASE CHECK APPROPRIATE LINE:
~ ~CREASE PURCHASE ORDER AMOUNT OF INCREASE $~ 5,000
DECREASE PURCHASE ORDER AMOUNT OF DECREASE $
7'~ CANCEL PQ~CHASE ORDER
CHANGE ACCOUNT NUMBER(S)
D
JUSTIFICATION __.~L~, ~e~.~ ~es~n~_~e~ by p[o~ect ~anageE
(g:~eg BuckneZ~).
':":: ......... ' ......
IF THERE IS MORE THAN (1) ALCOUNT NUMBER INVOLVED, USE SPACE PROVIDi:D BELOW.
ACCOUNT NUMBER AMOUNT ACCOUNT NUMBER AMOUNT
FINANCE DIRECTOR DATE
REVISED
White-Purchasing Dept Yellow-Dept. Completion Pink Accounts Payable Goldenrod-Originating Dept 2-~5-89
CITY OF FOIN'VANA r-~,.,RcHAs,NG usE oNLY
DISTRIBUTION BALANCE $
CHANGE ORDER AMouNT oF iNcREAsE S
AMOUNT OF DECREASE $
TO: PURCHASING TOTAL ADJUSTMENT $
FROM Publ'ic Works/'~ng. COMPLETION DATE
Departmeir~t P.O, PACKET NO.
CHANGE ORDER NO. ONE ...... TO PURCHASE ORDER NO, 21956
VENDOR C.H.J. Geotechnicat Inc. ~_Fo__ot_h~itl~/B~eeqh' S~Wer project __
PLEASE ATTACH A COPY OF THE PURCHASE ORDER WiTH THIS FORM.
PLEASE CHECK APPROPRIATE LINE:
XX INCREASE PURCHASE ORDER AMOUNT OF INCREASE $ 5,000
DECREASE PURCHASE ORDER AMOUNT OF DECREASE $
CANCEL PURCHASE ORDER
CHANGE ACCOUNT NUMBER(S)
JUSTIFICATION __Additional ma~e~ia~ testing r~equ_est~e~d byeproject manage_r_
(Greg Bucknell).
IF THERE IS MORE THAN ("1) ACCOUNT NUMBER INVOLVED, USE SPACE PROVIDED BELOW.
ACCOUNT NUMBER AMOUNT ACCOUNT NUMBER AMOUNT
SHIP TO:
../ENDOR: I 0 ~ ? 51
C,~,J, GE~T!.:CHNICAL iNC, CITY OF ;CNTANA ~qlO~l~O
I'55 E, COCLEY DRIVE E~GIN':';ERING DIVISION
.,8~ SIERRA ~VENU5
CGLTON/CA ~3a4 FCNTANA/CA 9~335 9O/OOleO
T~CH~ZCAL NATE~Z&L$ T~TZN~ FCR THE
FQOT.ZLL/SE~CH SEkER PRQJ~CT~e
~$ PE~ &TTACHfD CCNTRACTo
O?l-TZlq-293Q 9#319,00
BLANKETP. O.
CONTRACT ON
REQUISITION
DEPT.
DIVISION
GEOTECHNICAL
PO. Box 1790 · 1355 E. CooleyDrive, Suite E, Oolton, OA92324 · Phone(714)824-7211 · Fax (714)824-7209
1t91oHesperiaRoad, Suite2, Hesperia, CA92345 Phone (619) 949-0006 · Fax(619) 949-0023
September 13, 1990
City of Fontana Job No. 90381-1
P. O. Box 518
Fontana, California 92335
Gentlemen:
This letter transmits six copies of the Compaction Report, Sewer
Trench Backfill, Beech Interceptor Sewer, Foothill Boulevard and
Beech Avenue, Fontana, California, prepared for City of Fontana.
We appreciate this opportunity to provide geotechnical services for
this project. If you have questions or comments concerning this
report, please contact us at your convenience.
Respectfully submitted,
C H GEO~ t~
.~ CHNICAL,.INC.
J algi ns Manager
RJJ/GLT:dlh
GEOTECHNIGAL ENGINEERING · MATERIALS TESTING AND EVALUATION · CONSTRUCTION OBSERVATION
'Ii il d
· INCORPORATED
P.O. Box 1 790 · 1355 E. CooleyDrive, SuiteE, Colton, CA92324 , Phone(714)824-7211 · Fax (714)824-7209
11910HesperiaRoad, Suite2, Hesperia, CA92345 Phone(619) 949-0006 · Fax(619) 949-0023
September 13, 1990
City of Fontaria Job No. 90381-1
P. O. Box 518
Fontana, California 92335
Subject: Compaction Report
Sewer Trench Backfill
Beech Interceptor Sewer
Foothill Boulevard and Beech Avenue
Fontana, California
Gentlemen:
This report covers the results of in-place density tests taken to
date on the sewer trench backfill at the above referenced location.
All tests were taken in coordination with and as requested by the
client's representative.
FIELD PROCEDURE:
A total of 25 in-place density tests were taken by the sand volume
method between August 6 and September 7, 1990. Representative
samples of the soils encountered were returned to the laboratory for
determination of the Optimum Moisture Content - Maximum Dry Density
curves.
The locations of the in-place density tests are indicated on the
attached Field Compaction Test Summary Sheets.
OPTIMUM MOISTURE - MAXIMUM DENSITY RELATION:
ASTM D 1557-70, Method C; 4-inch diameter mold; 1/30 cubic foot
volume; 10-pound rammet; 18-inch fall; 5 layers; 25 blows per layer.
GEOTECHNICAL ENGINEERING · MATERIALS TESTING AND EVALUATION · CONSTRUCTION OBSERVATION
Page No. 2
Job No. 90381-1
Soil Optimum Moisture Maximum Dry Density
Type Classification (Percent) (Lbs./Cu. Ft.)
1 Gravelly Sand, fine 9.5 131.0
to medium, with coarse,
gravel to 1-1/2", and
silt, brown (SP)
OPTIMUM MOISTURE - MAXIMUM DENSITY RELATION:
Caltrans Method 216
Soil Optimum Moisture Maximum Dry Density
Type Classification (Percent) (Lbs./Cu. Ft.)
2 Sand, fine, with 8.0 135.0
medium, coarse,
gravel to 1-1/2"
and silt, brown
(SP)
3 Sand, fine to 8.0 134.0
medium, with coarse,
gravel, cobbles to
5'l' and silt, brown
(SP)
RESULTS:
The results of the in-place density tests taken to date, and the
relative; compaction in each case, are shown on the attached Field
Compaction Test Summary Sheets.
~0~44 ~ ~ H.~O INC
, ~ ~ C. . . ECHNICA~ .
iHXP;RAT]0M DAT~
~ Q" '~ %~ Robert J. 443
~ President
RJJ/GLT: dlh
Enclosures: Field Compaction Test Summary Sheets
Distribution: City of Fontana ( 6 )
FIELD COMPACTION TEST SUMMARY SHEET
Job No. 90381-1
PROJECT: CITY OF FONTANA - SEWER TRENCH BACKFILL, BEECH INTERCEPTOR Sh. i of
SEWER, FOOTHILL BOULEVARD AND BEECH AVENUE, FONTANA, CALIFOR'R1Sz~
Depth DENSITIES
Test Depth Of I I S, il Remarks or
Date No. Location Of Test Of Dry Max. Rel. MC~ T~ m Retest Of
Cut Fill Test (Ibs/cubic foot)
8-06-90 BF-1 Beech Avenue, Station 141+95 10.0 4.5-5.0 130.1 138.0 94 7.6 ('
8-11-90 BF-2 Foothill Boulevard Station 140+50 5.0 0.0-0.5 128.6 134.0 95 8.4
BF-3 Foothill Boulevard Station 141+50 5.0 2.5-3.0 134.1 140.5 95 8.2 3 25% RX
8-18-90 BF-4 Foothill Boulevard Station 142-t410 10.0 1.0-1.5 133.0 140.0 95 3.2 2 20% RX
BF-5 Foothffi Boulevard Station 143+25 5.0 0.0~1.5 133.3 135.0 98 4.5 2
BF-6 Foollull Boulevard Station 144+50 5.0 2.0-2.5 135.0 140.0 96 5.4 2 25% RX
BF-7 Foothill Boulevard Station 145+50 10.0 1.5-2.0 1295 135.0 96
BF-8 Foothill Boulevard Station 147+25 5.0 0.0-0.5 131.2 137.5 95 10% RX
BF-9 Foothill Boulevard Station 148+25 5.0 2.0-2.5 137.6 142.0 96 tl)% RX
BF-10 Foothill Boulevard Station 149+25 10.0 1.0-1.5 133.2 136.5 97 10% RX
BF-11 Foothill Boulevard Station 150+25 5.0 0.N.5 134.6 139.0 96 ~0% RX
8-22-90 BF-12 Foothill Boulevard Station 1324110 5.0 0.0-0.5 132.5 140.0 95 ~% RX
BF-13 Foothill Boulevard Station 132+30 10.0 1.5-2.0 135.7 140.0 97 ~0% RX
BF-14 Foothill Boulevard Station 132+60 5.0 2.0-2.5 133.9 139.0 96 15% RX
8-23-90 BF-15 Foothill Boulevard Station 132+50 10.0 0.0-0.5 137.1 137.5 99
8-25-90 BF-16 Foothill Boulevard Station 151+25 10.0 1.0-1.5 133.9 139.0 96 20% RX
BF-17 Foothill Boulevard Station 152+25 5.0 2.5-3.0 117.7 135.0 87 *See BF-17
BF-18 Foothffi Boulevard, Station 152+25 5.0 2.5-3.0 130.8 137.5 95 10% RX
BF-19 Foothill Boulevard, Station 153+25 10.0 1.0-1.5 131.3 139.0 95 RX
BF-20 Foothill Boulevard, Station 155+00 5.0 O.IM}.5 131.7 137.5 96 10% RX
LEGEND: (SG) Tests on Subgrade Elevation; (BF} Tests on Backfill; (FP) Tests on Fill in Progress
(FG) Testson Finish Grade Elevation; (Mc) Moisture Content; (REL) Relative; (RX) Rock Corrected; (*) Denotes Failure
FIELD COMPACTION TEST SUMMARY SHEET
Job No. 90381-1
Sh.
PROJECT: CITY OF FONTANA - 5EI4ER TRENCH BACKFILL, BEFCH HITERCEPTOR SE. Jj_ER,
FOOTHILL BOULEVARD AND BEECH AVENUE, FONTANA, CALIFORNTA
Depth DENSITIES
Test Depth Of I I Remarks or
Date No. Location Of Tesl Of Dry Max. Rel. MC% Soil
Type Retest Of
Cut Fill Test (Ibs/cubic foot)
9-06-90 BF-21 Foolhffi Boulevard, Station 129+50 5.0 Z0-2.5 136.9 137.5 99 11.7 2 10% RX
9-117-90 BF-22 FoXhill Boulevard, Station 135+50 5.0 0.5-1.0 14Z9 143.0 99 11.7 2
BF-23 Foothill Boulevard, Station 134+50 10.0 1.5-Z0 133.6 137.5 97 10.2 2 I10% RX
BF-24 Footl~ Boulevard, Station 136+50 5.0 2.5-3.0 140.9 143.0 98 12.4 2 31)% RX
BF-25 Foothill Boulevard, Station 137+50 5.0 0.5-1.0 136.2 141.5 96 13.7 2 5% RX
I
LEGEND: {SG) Tests on Subgrade Elevation; (BF) Tests on Backfill; (FP) Tests on Fill in Progress
(FG) Tests on Finish Grade Elevation; (Mc) Moisture Conten:t; (REL) Relative; (RX) Rock Corrected; (*) Denotes Failure
INCORPORATED
P,O. BOx 1790 · 1355 E, CooleyDrive, euiteE, Colton, CA92324 · Phone (714)824-721 1 · Fax(714)824-7209
11,~)10HesPeriaRoad, Suite2, Hesperia, CA92345 · Phone(619) 949-O006 · Fax(619) 949-O023
August 7, 1990
City of Fontana Job No. 90381-1
P. O. Box 518
Fontana, California 92335
SubJect: Compaction Report
Sewer Trench Backfill
Beech Interceptor Sewer
Beech Avenue, North of Foothill Boulevard
Fontana, California
Gentlemen:
This :report covers the results of in-place density tests taken to
date on the sewer trench backfill at the above referenced location.
All tests were taken in coordination with and as requested by the
client's representative.
FIELD PROCEDURE:
A total of 66 in-place density tests were taken by the sand volume
method between June 15 and July 27, 1990. A representative sample
of the soil encountered was returned to the laboratory for determ-
ination of the Optimum Moisture Content - Maximum Dry Density curve.
The locations of the in-place density tests are indicated on the
attached Field Compaction Test Summary Sheets and Plat.
OPTIMUM MOISTURE - MAXIMUM DENSITY RELATZON:
ASTM D 1557-70, Method C; 4-inch diameter mold; 1/30 cubic foot
volume; 10-pound rammer; 18-inch fall; 5 layers; 25 blows per layer.
GEOTECHN~CAL ENGINEERING · MATERIALS TESTING AND EVALUATION · CONSTRUCTION OBSERVATION
Page No. 2
Job No. 90381-1
Soil Optimum Moisture Maximum Dry Density
Type Classification (Percent) (Lbs./Cu. Ft.)
1 Gravelly Sand, fine 9.5 131.0
medium, with coarse,
gravel to 1-1/2", and
silt, brown (SP)
RESULTS:
The results of the in-place density tests taken to date, and the
relative compaction in each case, are shown on the attached Field
Compaction Test Summary Sheets.
~ Respectfully submitted,
~ ~0. 443 -~
II EXRRATID~J UATE
Robert J. ~ohnson, G.E. 443
~OF CA~ President
RJJ/RDO: dlh
Enclosures: Field Compaction Test Sumary Sheets
Plat
Distribution: City of Fontana (4)
FIELD COMPACTION TEST SUMMARY SHEET ,
Job No. 90381-1
PROJECT: CITY OF FONTANA - SEWER TRENCH BACKFILL, BEECH INTERCEPTOR __ Sh. I of__ 4
SEWER, BEECH AVE., NORTH OF FOOTHILL BOULEVARD, FONTANA, CA
Depth DENSITIES
Test Depth Of Soil Remarks or
Date Location Of Test Of Dry I Max. I Rel. MC% Type Retest Of
No. Cut Fill Test {Ibs/cubic foot)
6-15-90 BF-1 Bce, eh Avenue, S~ion 144~25, Main 4.0 2,0-2.5 120.6 131.0 92 8.2 1 *Sue BF-3
BF-2 Be~ch Avem~, Slation 143+50, Main 5.0 2.5-3.0 128.1 131.0 98 8.7 1
BF-3 Be, er, h Avem~, Sialion 144+25, Main 4.0 2.0-2.5 129.0 131.0 98 8.9 1
6-19-90 BF-4 Be,~h Avenue, Slation 148+50, Main 4.0 2.0-2.5 129.5 131.0 9~ 8.3 1
BF-5 Be, e~h Avenue, Station 147+50, Main 4.0 2.0-Z5 126.5 131.0 96 7.6 1
BF-6 Beech Avenue, Sation 1454-50, Main 4.0 2.0-2.5 124.7 131.0 95 8.7 1
6-26-90 BF-7 Beech Avenue, Sation 153+50, Main 5.0 2.0-2.5 121.2 131.0 93 5.6 1 *See BF-10
BF-8 Beech Avenue, Station 153+50, Main 5.0 2.0-2.5 118.6 131.0 90 6.9 1 *See BF-10
6-29-90 BF-9 Beech Avenue, Sation 1544.50, Main 5.0 2.0-2.5 124.2 131.0 95 9.2 1
BF-10 Beech Avenue, Station 153+50, Main 5.0 2.0-2.5 124.4 131.0 95 8.9 1
7-05-90 BF-II Beech Avenue, Sation 157+00, Main 5.0 2.0-2.5 127.7 131.0 97 9.4 1
BF-12 Beech Avenue, Sation 159+50, Main 5.0 3.0-3.5 127.8 131.0 97 9.8 1
7--09-90 BF-13 Beech Avenue, Sation 145+50, Main 10.0 4.0-1.5 · 129.1 131.0 98 7.2 1
BF-14 Beech Avenue, Sation 1464-50, Main 10.0 5.0-5.5 129.5 139.0 93 8.7 1 RX
BF-15 Beech Avenue, Sation 149+50, Main 10.0 4.0-4.5 126.1 131.0 96 7.6 1
7-10-90 BF-16 Beech Avenue, Sation 161+(30, Main 10.0 7.0-7.5 124.9 131.0 95 6.9 1
BF-17 Beech Avenue, Sadon 1604.00, Main 10.0 4.0-4.5 125.2 131.0 95 8.2 1
7-11-90 BF-18 Be~ch Avueue9 Sation 144+75, Main 10.0 2.0-2.5 121.0 131.0 92 8.4 1
BF-19 Beech Avenue, Sation 1464.00, Main 10.0 2.0-2.5 125.9 131.0 97 9.2 1
BF-20 Beech Avenue, Station 147400, Main 10.0 2.0-2.5 137.0 137.5 93 3.5 1 RX 24%
LEGEND: (SG) Tests on Subgrade Elevation; (BF) Tests on Backfill; (FP) Tests on Fill in Progress
(FG) Testson Finish Grade Elevation; (Mc) Moisture Content; (REL) Relative; (RX) Rock 'Corrected; (*) Denotes Failure
FIELD COMPACTION TEST SUMMAR1~ SHEET
Job No. 90381-1
PROJECT: CITY OF FONTANA- 5E)4ER TRENCH BACKFILL, BEECH INTERCEPTOR. SEWER Sh. 2 .. of
BEECH AVENUE, NORTH OF F00THILL BOULEVARD, FONTANA, CALIFORNIA
Depth DENSITIES
Test Location Of Test Depth Of Of Dry } Max. J Rel. MC% Soil Remarks or
Date No. Cut Fill Test (Ibs/cubic foot) Type Retest Of
7-11-90 BF-21 Ikcch Avenue, Station 148400, Main 10.0 2.02.5 128.5 138.0 93 5.4 I RX
BF-22 Beech Avenue, Sindon 1494410, Main 10.0 2.0-2.5 124.1 131.0 95 7.2 1
7-12-90 BF-23 Beech Avenue, Sialion 164+00, Main 10.0 6.0=6.5 121.0 131.0 92 6.9 1
BF-24 Beech Avenue, Station 166+50, Main 4.0 2.0-23 120.2 131.0 92 9.8 I *See BF-25
BF-25 Beech Avenue, Sinion 166+50, Main 4.0 2.0-2.5 124.7 131.0 95 9.4 1
7-13-90 BF-26 Beech Avenue, Station 169+00, Main 3.0 1.0-1.5 127.6 131.0 97 8.4 1
BF-27 Beech Avenue, Station 171+50, Main 3.0 1.0-1_5 134.0 136.0 9~ 8.7 1 RX 19%
7-16-90 BF-28 Beech Avenue, ,S~tion 165400, Main 10.0 4.0-4.5 120.3 131.0 92 5.9 1
BF-29 Beech Avenue, Station 166400, Main 10.0 2.0-2.5 121.7 131.0 93 6.5
BF-30 Beech Avenue, Statio~ 167+50, Main 10.0 5.0-5.5 120.6 131.0 92 6.2 1
BF-31 Beech Avenue, Sialion 168+00, Main 10.0 2.5-3.0 119.6 131.0 91 5.4 1
BF-32 Beech Avenue, Station 174-14)0, Main 4.0 2.0-2.5 130.0 131.0 99 9.2 1
7-17-90 BF-33 Beech Avenue, Station 154+00, Main 10,0 4.0-4.5 131.6 137.5 95 5.6 1 RX
BF-34 Beech Avenue, Station 155+00, Main 10.0 2.0-2.5 ' 129.5 13&0 93 8.7 I RX 25%
BF-:35 Beech Avenue, Sta6on 157+50, M~in 10.0 4.5-5.0 137.8 139.5 9~ 7.6 1 RX
BF-36 Beech Avenue, Station 158+00, Main 10.0 Z0-.7,5 123.7 131.0 94 4.5 1
BF-37 Beech Avenue, Station 160+50, Main 10.0 2.5-3.0 123.9 131.0 94 6.2 1
BF-38 Beech Avenue, Station 162+60, Main 10.0 4.0-4.5 137.2 138.5 99 9.8 1 P,X
BF-39 Beech Avenue, Station 163+10, Main 10.0 2.0-25 117.9 131.0 90 5.9
7-18-90 BF-40 Beech Avenue, Station 1704-00, Main 10.0 4.0-4.5 128.1 137.5 93 5.4 1 RX
LEGEND: (SG) Tests on Subgrade Elevation; (BF} Tests on Backfill; (FP) Tests on Fill in Progress
(FG) Tests on Finish Grade Elevation; (Mc) Moisture Content; (REL) Relative; (RX) Rock Corrected; (*) Denotes Failure
FIELD COMPACTION TEST SUMMARY SHEET
Job No. 90381-1
PROJECT: CITY OF FONTANA- SEWER TRENCH BACKFILL, BEECH INTERCEPTOR SEWER Sh. 3 of 4
BEECH AVENUE, NORTH OF FOOTHILL BOULEVARD, FONTANA, CALIFORNIA
Depth DENSITIES
Test Location Of Test Depth Of Of Dry Max. Rel. M( ;% Ty~
Date No. Retest Of
Cut Fill Test (Ibs/cubic foot)
7-18-90 BF~I-1 Beech Avenue, Station 171+00 Ma/n 10.0 2.0-2.5 120.4 131.0 92 9.4
BF-42 Beech Avenue, Station 172+50 Main 10,0 5,0-5.5 126.6 131.0 96 9.2
BF--43 Beech Avenue, Slation 173+50 Main 10.0 Z0-Z5 120.8 131.0 92 7.2
BF-44 Beech Avenue, Station 1764-50 Main 4.0 2.662.5 125.4 131.0 95 4.8
BF-45 Beech Avenue, Station 179+00 Main 4.0 2.0-Z5 133.6 13&0 96 &7 RX
7-19-9(} BF-46 Bet. ch Avenue, Station 176+50 Main 4.0 2,662.5 130.6 138.0 95 8.2 1 RX 25%
BF-47 Beech Avenue, Station 177+50 Main 10.0 4.5-5.0 125.3 131.0 96
BF~,Y, Beech Avenue, Station 178+50 Main 10.0 Z0-Z5 122.0 131.0 93
7-20--90 BF-49 Beech Avenue, Station 180+00 Main 10.0 4.04.5 121.9 131.0 93
BF-50 Beech Avenue, Station 181-1.00 Main 10.0 2.0-Z5 125.5 131.0 96
BF-51 Beech Avenue, Station 181+50 Main 4.0 Z0-2.5 125.0 131.0 95
BF-52 Beech Avenue, Station 184+00 Main t 3.0 1.0-1.5 124.1 131.0 95
BF-53 Beech Avenue, Station 186+50 Main ' 3.0 1.0-1.5 126.5 131.0 96
7-23-90 BF-54 Beech Avenue, Station 182+50 Main 10.0 4.5-5.0 131.1 135.5 96 RX 18%
BF-55 Beech Avenue, Station 183+50 Main 10.0 2.0-Z5 120.5 134~ 90 RX 14%
BF-56 Beech Avenue, Station 185+00 Main 10.0 4.0-4.5 119.1 131.0 91
BF-57 Beech Avenue, Station 189+00 Main 4.0 2.0-2.5 118.6 131.0 90 *See BF-60
7-24-90 BF-58 Beech AvenUe, Station 186+00 Main 10.0 Z0-Z5 130.5 134.0 97 RX 10%
BF-59 Beech Avenue, Station 187+50 Main 10.0 4.0~..5 131.1 134.5 97 RX 13%
BF-60 Beech Avenue, Station 189,00, Main 4.0 2.0-2.5 128.8 131.0
LEGEND: (SG) Tests on Subgrade Elevation; (BF) Tests on Backfill; (FP) TesTs on Fill in Progress
(FG) Testson Finish Grade Elevation; (Mc} Moisture Content; |REL) Relative; (RX) RoCk Corrected; (*) Denotes Failure
FIELD COMPACTION TEST SUMMARY SHEET
Job No., 90381~1
PROJECT: CITY OF FONTANA - SEtqER TRENCH BACKFILL, BEECH INTERCEPTOR SEWER Sh._ 4 of. 4
BEECH AVENUE, NORTH OF FOOTHILL BOULEVARD, FONTANA, CALIFORNIA
Depth DENSITIES
Test Depth Of I { Soil Remarks or
Date No. Location Of Test Of Dry Max. Rel. MC% Type Retest Of
Cut Fill Test (Ibs/cubic foot)
7-25-90 BFqS1 Be.~h Avenue, Stadon 188+50, Main 10.0 2.0-2.5 132.0 136.5 96 4.3 i 1 RX 20% (
BF-62 Beech Avenue. Station 190+00, Main 10.0 4.0-4.5 134.0 139.5 96 13.0 1 RX
7-26-90 BF-63 Beech Avenue, Station 191-1-00, Main 10.0 2.0-2.5 128.2 135.0 95 6.2 1 RX 15%
BF-64 Beech Avenue, Station 192+00, Main 4.0 Z0-2.5 126.1 131.0 96 8.7 ' 1
7-27-90 BF-65 Beech Avenue, Station 193+00, Ma/n 10.0 4.0d,.5 i19.6 131.0 91 8.9 i 1
BF-66 Beech Avenue, Station 194+00, Main 10.0 Z0-Z5 119.! 131.0 91 7.6 I i
LEGEND: (SG) Tests on Subgrade Elevation; (B F) Tests on Backfill; (FP) Tests on Fill in Progress
(FG) Tests on Finish Grade Elevation; (Mc) Moisture Content; (REL) Relative; (RX) Rock Corrected; {*) Denotes Failure
BEECH AVENUE
BEECH AVENUe"'
d
u, "'% WE.
BEECH AVENUE
PLAT
~ FOR: ENCLOSURE
SCALE ~'=m~OBackfilI Tests BEECH INTERCEPTOR SENER
City of Fontana BEECH AVENUE, NORTH OF FOOTHILL BOULEVARD
JOB NUMBER
DATE: August 1990 FONTANA, CALIFORNIA 90381-1
GEOTECHNICAL
ten. J INCOf~P0RATED