HomeMy WebLinkAbout6139-5 (2)SEWER IMPROVEMENT PLANS
6
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
CITY ENGINEER R.C.E. 51152
CITY OF FONTANA, CALIFORNIADATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS
NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF
APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT
MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT.
DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-21 6139
NOV. 2021
AS SHOWNHD
-
SE
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ GNIREENEIGN
2850 Inland Empire Blvd., Suite B, Ontario, California 91764
tel 909.581.0676 fax 909.581.0696 www.fuscoe.com
LYTLE CREEK ROAD
CITY OF FONTANA
SEWER IMPROVEMENT PLANS
SHEET INDEX MAP
ENGINEER:
FUSCOE ENGINEERING INC.
2850 INLAND EMPIRE BOULEVARD, SUITE B
ONTARIO, CALIFORNIA 91764
PHONE: (909) 581-0676
GEOTECHNICAL:
GEO TEK, INC.
1548 NORTH MAPLE STREET
CORONA, CA. 92880
PHONE: (951) 710-1160
PROJECT NO. 2541-CR
SOIL REPORT DATED: OCTOBER 16, 2020
CONTACT: ANNA M. SCOTT - PROJECT GEOLOGIST
ELECTRIC:
SOUTHERN CALIFORNIA EDISON COMPANY
7951 REDWOOD AVENUE
FONTANA, CA 92336
PHONE: 909.357.6221
NATURAL GAS:
THE GAS COMPANY, SEMPRA UTILITIES
16231 VALLEY BLVD.
FONTANA, CA 92235
PHONE: 800.427.2200, 909.428.8411
WATER:
WEST VALLEY DISTRICT
855 W. BASELINE ROAD
RIALTO, CA 92377
PHONE: 909.875.1361
SEWER:
CITY OF FONTANA
8353 SIERRA AVENUE
FONTANA, CA 92235
PHONE: 909.350.6632
SEWER TREATMENT FACILITIES
INLAND EMPIRE UTILITY AGENCY
12645 6TH STREET
RANCHO CUCAMONGA, CA 91739
PHONE: 909.947.4131
SOLID WASTE:
BURRTEC WASTE
9454 CHERRY AVENUE
FONTANA, CA 92335
PHONE: 909.822-9739
TELEPHONE:
AT&T
11464 TELEGRAPH ROAD
SANTA FE SPRINGS, CA 90670
PHONE: 714.666.5415
CABLE SERVICES:
TIME WARNER CABLE
1205 DUPONT AVENUE
ONTARIO, CA 91761
PHONE: 909.390.4738
CITY OF FONTANA UTILITY NOTIFICATION LIST:
PRIVATE ENGINEER'S NOTICE TO CONTRACTORS:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF
AVAILABLE RECORDS; TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE
CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT
SHOWN ON THESE DRAWINGS.
THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THIS PROJECT; INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS SHALL APPLY CONTINUOUSLY AND NOT BE
LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING
FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ENGINEER PRIOR TO THE
COMMENCEMENT OF ANY WORK. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER OF ANY DISCREPANCY PRIOR TO
CONSTRUCTION.
BEGINNING OF WORK MEANS ACCEPTANCE OF CONDITIONS.
CONTRACTOR SHALL COMPLY WITH ALL N.P.D.E.S. REQUIREMENTS.
CONTRACTOR SHALL ADJUST TO FINISH GRADE ALL MANHOLE RIMS, WATER VALVE BOXES, UTILITY BOXES AND LIDS, ETC.
CONTRACTOR SHALL PROVIDE ALL THE NECESSARY PIPE FITTINGS TO COMPLETE THE WORK.
THE ENGINEER PREPARING THESE PLANS SHALL NOT BE HELD RESPONSIBLE OR LIABLE FOR UNAUTHORIZED CHANGES TO OR USES THESE
PLANS. ALL CHANGES TO THESE PLANS MUST BE REQUESTED IN WRITING AND MUST BE APPROVED BY THE ENGINEER OF RECORD.OWNER DEVELOPER:
FRONTIER COMMUNITIES
2851 E. CONVENTION CENTER WAY, SUITE 114
ONTARIO, CALIFORNIA 91764
PHONE: 909.354.8040
CONTACT: GORDON NICHOLS PROJECT MANAGER
15
VICINITY MAP
LEGEND:
CENTERLINE
PROPERTY LINE
RIGHT OF WAY
EXISTING LOTLINE
EXISTING EASEMENT
x1790.3 EXISTING SPOT ELEVATION
EXISTING CONTOUR
PROPOSED CONTOUR
PROPOSED EASEMENT
PROPOSED LOTLINE
EDGE OF EX. AC PAVEMENT
EXISTING SEWER
EXISTING RECLAIMED WATER
EXISTING WATER
EXISTING GAS
EXISTING STORM DRAIN
EXISTING FIRE HYDRANT
EXISTING POWER POLE
PROPOSED WATER
PROPOSED STORM DRAIN
PROPOSED SEWER
PROPOSED FIRE WATER
PROPOSED RECYCLE WATER
SEWER OR STORM DRAIN MANHOLE
CATCH BASIN & LOCAL DEPRESSION
WATER SERVICE METER
FLOW ARROW & GRADE
GRADED SWALE
STREET LIGHT
TOP OF SLOPE
TOE OF SLOPE
LIST OF ABBREVIATIONS:
ANGLE POINT
A.C., AC ASPHALT CONCRETE
AC.ACRE
A.B.AGGREGATE BASE
BC BEGIN OF CURVE
BCR BEGIN OF CURB RETURN
BVC BEGIN VERTICAL CURVE
CF CURB FACE
CB CATCH BASIN
C/G CURB & GUTTER
C/L, CL, CENTER LINE
CONC.CONCRETE
CY CUBIC YARD
D-LOAD RCP DESIGN LOAD
DW, W DOMESTIC WATER, WATER
DWY DRIVEWAY
E.A., EA EACH
EC END OF CURVE
ECR END OF CURB RETURN
EG EXISTING GROUND
EL., ELEV ELEVATION
EP EDGE OF PAVEMENT
EVC END VERTICAL CURVE
EX., EXIST.,(E)EXISTING
FH FIRE HYDRANT
FG FINISH GRADE
FL FLOWLINE
FS FINISHED SURFACE
GB GRADE BREAK
HP HIGH POINT
INV INVERT
JT., JNT.JOINT
L LENGTH
L.F., LF LINEAL FEET
L.S.LUMP SUM
MAX MAXIMUM
MIN MINIMUM
MH MANHOLE
(N)NEW
N.T.S., NTS NOT TO SCALE
PCC POINT OF COMPOUND CURVE
P.C.C.PORTLAND CEMENT CONCRETE
PI POINT OF INTERSECTION
PRC POINT OF REVERSE CURVE
P/L, PL PROPERTY LINE
PROP.PROPOSED
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
R/W RIGHT OF WAY
RW RETAINING WALL
SCE SOUTHERN CALIFORNIA EDISON
SD STORM DRAIN
S=SLOPE
S, SW, SS SEWER, SANITARY SEWER
SIM.SIMILAR
SF, S.F.SQUARE FEET
SDMH STORM DRAIN MANHOLE
SMH SEWER MANHOLE
STA STATION
TC TOP OF CURB
TYP., TYP TYPICAL
V.C.P., VCP VITRIFIED CLAY PIPE
W, DW WATER, DOMESTIC WATER
<PT
QUANTITIES SHOWN HEREON ARE PROVIDED FOR PERMIT AND BONDING PURPOSES ONLY. CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THEIR OWN QUANTITIES PRIOR TO BIDDING AND CONSTRUCTION. THE ENGINEER IS NOT
RESPONSIBLE FOR DISCREPACIES IN FINAL CONSTRUCTION QUANTITIES.
1
TITLE SHEET
SEWER GENERAL NOTES:
1.ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (“GREEN
BOOK”). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE
NOTED.
2.WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLED BY
REFERENCE TO PRECEDENCE PROVISIONS IN THE “GREEN BOOK”, THE CONTRACTOR SHALL IMMEDIATELY
REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3.ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER
4.CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT
DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL
BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF -WAY
WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5.THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES
DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON-METRIC EDITION UNLESS
OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OF OTHER
TRAFFIC CONTROL DEVICES AT ALL TIMES.
7.THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OF TRENCH WORK FOR TRENCHES 5 FEET
OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8.THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY
SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE
DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL
ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9.NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE
PERMIT FOR THAT PURPOSE.
10.THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION HOWEVER, IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND
ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO
THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS
BEFORE EXCAVATION
11.THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC
WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES
SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12.THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE
AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR
VALVE OPERATION AND WATER REQUIREMENTS.
13.STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE NOTED.
14.ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO
CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PRESERVATION OF BENCHMARK AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION
15.THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENT , MONUMENT TIES OR BENCH MARKS
WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
16.REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT
TIES AND BENCH MARKS, SHALL DE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED.
THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN E ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
17.THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES A MINIMUM
12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND
EMERGENCY VEHICLES.
18.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING
ADEQUATE WATERING, AT ALL TIMES.
19.THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO
PUBLIC OF PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR
WRITTEN APPROVAL
20.NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
21.A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED
DENSITY SHALL REQUIRE RE-WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS
OBTAINED.
22.CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET
IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY
NON-ERODEABLE SWALES ENTERING OF LEAVING IMPROVEMENTS.
23.ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING
CONCRETE.
24.IF SEWER CONSTRUCTION IS TO BE DONE IN PHASES, THE CONTRACTOR SHALL PROVIDE A TERMINAL
CLEANOUT AT THE PHASE BOUNDARY, NOT MORE THAN 150 FEET FROM THE DOWN STREAM MANHOLE, SEE CITY
OF FONTANA STANDARD DETAIL FOR TERMINAL CLEANOUT.
25.SANITARY SEWER LINES SHALL BE CONSTRUCTED OF BELL AND SPIGOT OR BAND SEAL TYPE VITRIFIED CLAY
PIPE (V.C.P.) EXTRA STRENGTH CLASS AND SHALL CONFORM TO THE PROVISIONS OF THE ASTM DESIGNATION
C700 FOR V.C.P..
26. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY
ENGINEER.
27.SHORT VCP STUBS WITH FLEXIBLE COMPRESSION JOINTS SHALL BE USED AT MANHOLE WALLS TO ALLOW FOR
MINOR DEFLECTIONS IN ALIGNMENT.
28.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES AND VERIFY ELEVATION AND
LOCATION OF CONNECTION. CITY APPROVAL OF CONNECTION TO EXISTING FACILITIES DOES NOT IMPLY
CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS.
29.ALL 4" HOUSE LATERALS SHALL BE INSTALLED AT A 2% MINIMUM GRADE UNLESS OTHERWISE APPROVED BY THE
CITY ENGINEER.
30.TERMINATE ALL 4" HOUSE SE\PER LATERALS 3 FEET INSIDE THE LOT WITH A PLUG 12" BELOW THE GROUND
SURFACE. WHEN PUBLIC UTILITY EASEMENTS EXIST NEXT TO THE STREET RIGHT-OF-WAY, THE LATERAL SHALL
TERMINATE 3 FEET INSIDE THE LOT AS MEASURED FROM THE UTILITY EASEMENT.
31.THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER
LATERAL.
32.IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY.
33.NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED
AND APPROVED.
34. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
35.APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT.
36.ALL MANHOLES CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
37.UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES,
AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
38.AS-BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD. WHO SHALL
PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
SITE
LYTLE CREEK ROAD
SHEET INDEX
SHT. NO.DESCRIPTION
1 TITLE SHEET
2 PLAN AND PROFILE STA. 10+00 - 21+50.00
3 PLAN AND PROFILE STA. 21+50.00 - 32+00.00
4 PLAN AND PROFILE STA. 32+80.00 - 43+80.00
5 PLAN AND PROFILE STA. 43+80.00 - 52+47.27
6 DETAIL SHEET
SEWER CONSTRUCTION NOTES:
INSTALL 12" EXTRA STRENGTH V.C.P. SEWER MAIN, PIPE BEDDING PER CITY OF FONTANA STD. 2009.3076 LF
INSTALL 48" MANHOLE PER CITY OF FONTANA STD DWG. 2001.6 EA
INSTALL 10" EXTRA STRENGTH V.C.P. SEWER MAIN, PIPE BEDDING PER CITY OF FONTANA STD. 2009.1110 LF
REMOVE EXSITNG PLUG AND PIPE AND CONNECT TO RE-CHANNELIZED EXSITNG MANHOLE.2 EA
INSTALL MANHOLE SHAFT LEDGE (AT 10' DEPTH SPACING) PER S.P.P.W.C. STD. PLAN NO. 330-2, SEE
SHEET 6 4 EA
INSTALL 60" MANHOLE PER INLAD EMPIRE UTILITIES AGENCY STD. EXHIBIT 6A, SEE SHEET 6.4 EA
INSTALL 72" MANHOLE PER INLAD EMPIRE UTILITIES AGENCY STD. EXHIBIT 6A, SEE SHEET 6.4 EA
CONSTRUCT 26' SEWER ACCESS ROAD PER SECTION ON SHEET 6 AND SOILS RECOMMENDATION.90,100 SF
1
2
3
4
5
6
7
8
EX.
MWD
FAC
I
L
I
T
Y
SHEET
3
SHEET
4
SH
E
E
T
5
MH NO. 1
MH NO. 3
MH NO. 4
MH NO. 5
MH NO. 6
MH NO. 7
MH NO. 8
MH NO. 9
MH NO. 10 MH NO. 11
MH NO. 12
MH NO. 13
MH NO. 14
SH
E
E
T
2
MH NO. 2
11-19-21
1/10/2022
N
REV 1 ONLY:1
LE
11/13/25
SEE SHEET 51
PROFILE
SEWER IMPROVEMENT PLANS
6
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
CITY ENGINEER R.C.E. 51152
CITY OF FONTANA, CALIFORNIADATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS
NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF
APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT
MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT.
DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-21 6139
NOV. 2021
AS SHOWNHD
-
SE
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ GNIREENEIGN
2850 Inland Empire Blvd., Suite B, Ontario, California 91764
tel 909.581.0676 fax 909.581.0696 www.fuscoe.com
LYTLE CREEK ROAD
2
RAINIER LANE
SCALE: 1" = 40'
40'20'0'40'80'
1650 -
1640 -
1660 -
1670 -
- 1650
- 1640
- 1660
- 1670
- 16801680 -
MA
T
C
H
L
I
N
E
-
S
T
A
.
2
1
+
5
0
.
0
0
-
S
E
E
S
H
E
E
T
3
MA
T
C
H
L
I
N
E
ST
A
.
2
1
+
5
0
.
0
0
M
A
T
C
H
L
I
N
E
S
T
A
.
1
6
+
0
0
.
0
0
MA
T
C
H
L
I
N
E
ST
A
.
1
6
+
0
0
.
0
0
SE
E
S
H
E
E
T
3
17+00 18+00 19+00 20+00 21+0016+0015+0014+0013+0012+0011+0010+00 22+00
PLAN AND PROFILE STA. 10+00 - 21+50.00
SEWER CONSTRUCTION NOTES:
INSTALL 12" EXTRA STRENGTH V.C.P. SEWER MAIN, PIPE BEDDING PER CITY OF FONTANA STD. 2009.
INSTALL 48" MANHOLE PER CITY OF FONTANA STD DWG. 2001.
REMOVE EXSITNG PLUG AND PIPE AND CONNECT TO RE-CHANNELIZED EXSITNG MANHOLE.
INSTALL MANHOLE SHAFT LEDGE (AT 10' DEPTH SPACING) PER S.P.P.W.C. STD. PLAN NO. 330-2, SEE
SHEET 6
CONSTRUCT 26' SEWER ACCESS ROAD PER SECTION ON SHEET 6 AND SOILS RECOMMENDATION.
1
2
4
5
8
S=0.0228
S=0.0228
S=0.0227
S=0.0229
17
+
9
2
.
8
0
B
C
/
E
C
CL
M
H
N
O
.
3
RI
M
=
1
6
7
3
.
9
9
15
+
0
3
.
0
9
CL
M
H
N
O
.
2
RI
M
=
1
6
6
7
.
6
7
12
+
5
5
.
1
2
B
C
CL
M
H
N
O
.
1
RI
M
=
1
6
6
1
.
0
8
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
251.12 LF 12" EXTRA STRENGTH V.C.P. SEWER
243.97 LF 12" EXTRA STRENGTH V.C.P. SEWER
285.71 LF 12" EXTRA STRENGTH V.C.P. SEWER
285.71 LF 12" EXTRA STRENGTH V.C.P. SEWER
96.49 LF 12" EXTRA STRENGTH V.C.P. SEWER
O
U
T
-
S
1647.66 INV
OUT-S
1
6
5
3
.
4
1
I
N
V
O
U
T
-
S
1660.11 INV
O
U
T
-
S
1666.81 INV
IN-N
1
6
4
1
.
9
0
I
N
V
I
N
-
N
1647.86 INV
IN-N
1653.61 INV
IN-N
1660.31 INV
I
N
-
N
1667.01 INV
S=0.0228
17
+
9
4
.
8
0
B
E
G
P
I
P
E
15
+
0
5
.
0
9
B
E
G
P
I
P
E
20
+
8
4
.
5
2
B
E
G
P
I
P
E
12
+
5
7
.
1
2
B
E
G
P
I
P
E
10
+
0
2
.
0
0
B
E
G
P
I
P
E
12
+
5
3
.
1
2
E
N
D
P
I
P
E
15
+
0
1
.
0
9
E
N
D
P
I
P
E
17
+
9
0
.
8
0
E
N
D
P
I
P
E
20
+
8
0
.
5
2
E
N
D
P
I
P
E
21
+
5
0
.
0
0
16
6
8
.
3
7
I
N
V
10
+
0
0
.
0
0
CL
E
X
I
S
T
I
N
G
M
H
RI
M
=
1
6
5
5
.
0
8
20
+
8
2
.
5
2
E
C
CL
M
H
N
O
.
4
RI
M
=
1
6
8
1
.
3
5
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
EXIST. 15"
SDR 26
SEWER MAIN
(1
6
4
1
.
6
9
)
I
N
V
OU
T
-
S
166
9
.
1
2
B
O
T
1
8
"
P
V
C
W
A
T
.
166
1
.
8
0
T
O
P
1
2
"
S
S
7.
3
2
'
C
L
E
A
R
EXISTING 48" RCP
EXISTING 60" RCP
FUTURE 48" RCP
FUTURE 48" RCP
RIM-INV = 13.42'
RIM-INV = 14.26'
RIM-INV = 13.88'
RIM-INV = 14.54'
1
6
6
7
.
7
3
B
O
T
2
4
"
E
X
.
C
M
L
&
C
W
A
T
.
1659.87 12" SS
7.85' CLEAR
BOT. S.D. M.H.
CONVERSION DATUM REFERENCE
(1639.30) INV. PER DWG. NO. 5987
1641.90 INV.
DIFFERENCE: 2.6'
BOT. S.D. M.H.
BOT. S.D. M.H.
1659.58 BOT 2" EX. WAT.
1
6
5
2
.
7
6
T
O
P
1
2
"
S
S
6
.
8
4
'
C
L
E
A
R
16+00
17+00 18+00
19+00
20
+
0
0
21
+
0
0
20+
8
2
.
5
2
E
C
2
CL
S
S
M
H
N
O
.
4
C2
C3
FUTURE R/W
FUTURE R/W
1
17
+
9
2
.
8
0
B
C
/
E
C
2
CL
S
S
M
H
N
O
.
3
EXISTING R/W
8
1
L2
DW
X
-
I
N
G
17
+
3
5
.
7
1
16
6
7
.
7
3
B
O
T
2
4
"
D
W
16
5
9
.
8
7
T
O
P
1
2
"
S
S
CL
E
A
R
=
7
.
5
6
'
DW
X
-
I
N
G
18
+
1
5
.
1
7
16
6
9
.
1
2
B
O
T
1
2
"
D
W
16
6
1
.
8
0
T
O
P
1
2
"
S
S
CL
E
A
R
=
7
.
3
2
'
26
'
5'
21'
6'
10'
2
1
'
CENTERLINE OF
FUTURE LYTLE
CREEK ROAD
FUTURE 12"
WATER MAIN
EXIST. 24" CML&C
WATER LINE CENTERLINE OF
EXISTING LYTLE
CREEK ROAD
FUTURE
MEDIAN
FUTURE CURB
AND GUTTER
FUTURE CURB
AND GUTTER
EXISTING
BARRICADE
TO REMAIN
EX.
AC
PVMT.
FUTURE 48" STORM
DRAIN
LINE DATA
LINE #
L1
L2
BEARING
S00°55'45"E
S83°38'31"W
DISTANCE
251.12'
96.49'
CURVE TABLE
CURVE #
C1
C2
C3
RADIUS
560.00'
560.00'
560.00'
LENGTH
243.97'
285.71'
285.71'
TANGENT
123.95
146.04
146.04
24°57'43"
29°13'56"
29°13'56"
10+00 11+00 12+00 13+00
14+00
15
+
0
0
16
+
0
0
12
+
5
5
.
1
2
B
C
2
CL
S
S
M
H
N
O
.
1
L1
C1
C2
1
1
EXISTING R/W
FUTURE R/W10
+
0
7
.
1
4
4
EX
I
S
T
.
P
L
U
G
T
O
B
E
RE
M
O
V
E
D
10
+
0
0
.
0
0
CL
E
X
I
S
T
.
S
S
M
H
1
330' SC
E
E
A
S
E
M
E
N
T
15
+
0
3
.
0
9
2
CL
S
S
M
H
N
O
.
2
7.5'
6'
DW
X
-
I
N
G
14
+
2
7
.
3
6
16
5
9
.
5
8
B
O
T
2
"
D
W
16
5
2
.
7
6
T
O
P
1
2
"
S
S
CL
E
A
R
=
6
.
8
4
'
13
.
5
'
VA
R
I
E
S
21'
S00°55'45"E
EXIST. 60" RCP
S.D.
EXIST. 24" CML&C
WATER LINE PER (D20023)
EXIST. 24" CML&C
WATER LINE
FUTURE 48"
STORM
DRAIN
FUTURE 12"
WATER MAIN
EXISTING 48" R.C.P.
S.D.
EXIST. 15" SEWER
DRAWING NO. 5987
FUTURE CURB &
GUTTER
EX. S.D.
M.H.
A
C
P
V
M
T
.
EXIST. 2" WATER
(CRAWFORD CANYON)
11-19-21
1/10/2022
PROFILE
SEWER IMPROVEMENT PLANS
6
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
CITY ENGINEER R.C.E. 51152
CITY OF FONTANA, CALIFORNIADATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS
NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF
APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT
MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT.
DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-21 6139
NOV. 2021
AS SHOWNHD
-
SE
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ GNIREENEIGN
2850 Inland Empire Blvd., Suite B, Ontario, California 91764
tel 909.581.0676 fax 909.581.0696 www.fuscoe.com
LYTLE CREEK ROAD
3
MA
T
C
H
L
I
N
E
-
S
T
A
.
2
1
+
5
0
.
0
0
-
S
E
E
S
H
E
E
T
2
28+00 29+00 30+00 31+00 32+0027+0026+0025+0024+0023+0022+0021+00 33+00
MA
T
C
H
L
I
N
E
-
S
T
A
.
3
2
+
8
0
.
0
0
-
S
E
E
S
H
E
E
T
4
SE
E
S
H
E
E
T
2
MA
T
C
H
L
I
N
E
-
S
T
A
.
3
2
+
8
0
.
0
0
- 1680
- 1670
- 1690
- 1700
- 1710
1680 -
1670 -
1690 -
1700 -
1710 -
MA
T
C
H
L
I
N
E
-
S
T
A
.
2
1
+
5
0
.
0
0
SE
E
S
H
E
E
T
4
SCALE: 1" = 40'
40'20'0'40'80'
PLAN AND PROFILE STA. 21+50.00 - 32+00.00
SEWER CONSTRUCTION NOTES:
INSTALL 12" EXTRA STRENGTH V.C.P. SEWER MAIN, PIPE BEDDING PER CITY OF FONTANA STD. 2009.
INSTALL 48" MANHOLE PER CITY OF FONTANA STD DWG. 2001.
1
2
INSTALL 60" MANHOLE PER INLAD EMPIRE UTILITIES AGENCY STD. EXHIBIT 6A, SEE SHEET 6.
INSTALL 72" MANHOLE PER INLAD EMPIRE UTILITIES AGENCY STD. EXHIBIT 6A, SEE SHEET 6.
6
7
8 CONSTRUCT 26' WIDE ACCESS ROAD PER SECTION, SEE SHEET 6
S=0.0227
29
+
2
0
.
0
2
CL
M
H
N
O
.
8
RI
M
=
1
7
0
3
.
3
2
26
+
5
8
.
7
1
CL
M
H
N
O
.
7
RI
M
=
1
6
9
6
.
0
7
23
+
9
7
.
3
9
E
C
CL
M
H
N
O
.
6
RI
M
=
1
6
8
8
.
7
7
21
+
8
3
.
0
0
B
C
CL
M
H
N
O
.
5
RI
M
=
1
6
8
3
.
4
5
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
256.82 LF 12" EXTRA STRENGTH V.C.P. SEWER
256.32 LF 12" EXTRA STRENGTH V.C.P. SEWER
395 LF 12" EXTRA STRENGTH V.C.P. SEWER
OUT-S
1669.21 INV
OUT-S
1674.19 INV
OUT-S
1680.24 INV
OUT-S
1
6
8
6
.
2
7
I
N
V
IN-N
1
6
6
9
.
4
1
I
N
V
I
N
-
N
1
6
7
4
.
3
9
I
N
V
IN-N
1
6
8
0
.
4
4
I
N
V
IN-N
1
6
8
6
.
4
7
I
N
V
S=0.0228
S=0.0227
S=0.0227
29
+
2
2
.
5
2
B
E
G
P
I
P
E
26
+
6
1
.
2
1
B
E
G
P
I
P
E
23
+
9
9
.
3
9
B
E
G
P
I
P
E
21
+
8
5
.
0
0
B
E
G
P
I
P
E
21
+
8
1
.
0
0
E
N
D
P
I
P
E
23
+
9
5
.
3
9
E
N
D
P
I
P
E
26
+
5
6
.
2
1
E
N
D
P
I
P
E
29
+
1
7
.
5
2
E
N
D
P
I
P
E
21
+
5
0
.
0
0
16
6
8
.
3
7
I
N
V
32
+
8
0
.
0
0
16
9
4
.
4
2
I
N
V
96.49 LF 12" EXTRA STRENGTH V.C.P. SEWER
210.39 LF 12" EXTRA STRENGTH V.C.P. SEWER
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
FUTURE 48" RCP
FUTURE 42" RCP
FUTURE 42" RCP
FUTURE 42" RCP
RIM-INV
= 14.24'
RIM-INV = 14.58'
RIM-INV = 15.83'
RIM-INV = 17.05'
BOT. S.D. M.H.
BOT. S.D. M.H.
BOT. S.D. M.H.
22+00
23+00
24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00
21
+
8
3
.
0
0
B
C
2
CL
S
S
M
H
N
O
.
5
23
+
9
7
.
3
9
E
C
2
CL
S
S
M
H
N
O
.
6
26
+
5
8
.
7
1
6
CL
S
S
M
H
N
O
.
7
29
+
2
0
.
0
2
6
CL
S
S
M
H
N
O
.
8
L2
C3
L3
L4
L5
1 1
1
FUTURE 12"
WATER MAIN
FUTURE 42" STORM DRAIN
FUTURE 12"
WATER MAIN
CENTERLINE OF FUTURE LYTLE CREEK
ROAD
FUTURE R/W
FUTURE R/W
10
'
FUTURE CURB AND
GUTTER
FUTURE CURB AND GUTTER
FUTURE CURB ISLAND DIVIDER
6'6'
11
'
10
'
FUTURE
MEDIAN
16
.
5
'
11
'
6.
5
'
5'
33
0
'
S.
C
.
E
.
EA
S
E
M
E
N
T
826
'
8
26
'
1
FUTURE 48" STORM
DRAIN
CURVE TABLE
CURVE #
C3
RADIUS
990.00'
LENGTH
210.39'
TANGENT
105.59 12°10'34"
LINE DATA
LINE #
L2
L3
L4
L5
BEARING
S83°38'31"W
S71°14'04"W
S71°14'04"W
S71°14'04"W
DISTANCE
96.49'
257.32'
257.32'
396.00'
11-19-21
1/10/2022
PROFILE
SEWER IMPROVEMENT PLANS
6
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
CITY ENGINEER R.C.E. 51152
CITY OF FONTANA, CALIFORNIADATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS
NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF
APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT
MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT.
DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-21 6139
NOV. 2021
AS SHOWNHD
-
SE
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ GNIREENEIGN
2850 Inland Empire Blvd., Suite B, Ontario, California 91764
tel 909.581.0676 fax 909.581.0696 www.fuscoe.com
LYTLE CREEK ROAD
4
40+00 41+00 42+00 43+00 44+0039+0038+0037+0036+0035+0034+0033+00
MA
T
C
H
L
I
N
E
-
S
T
A
.
3
2
+
8
0
.
0
0
-
S
E
E
S
H
E
E
T
3
MA
T
C
H
L
I
N
E
-
S
T
A
.
4
3
+
8
0
.
0
0
-
S
E
E
S
H
E
E
T
5
SE
E
S
H
E
E
T
3
MA
T
C
H
L
I
N
E
-
S
T
A
.
4
3
+
8
0
.
0
0
- 1700
- 1690
- 1710
- 1720
- 1730
1700 -
1690 -
1710 -
1720 -
1730 -
MA
T
C
H
L
I
N
E
-
S
T
A
.
3
2
+
8
0
.
0
0
SE
E
S
H
E
E
T
5
SCALE: 1" = 40'
40'20'0'40'80'
PLAN AND PROFILE STA. 32+80.00 - 43+80.00
SEWER CONSTRUCTION NOTES:
INSTALL 12" EXTRA STRENGTH V.C.P. SEWER MAIN, PIPE BEDDING PER CITY OF FONTANA STD. 2009.
INSTALL 10" EXTRA STRENGTH V.C.P. SEWER MAIN, PIPE BEDDING PER CITY OF FONTANA STD. 2009.
INSTALL MANHOLE SHAFT LEDGE (AT 10' DEPTH SPACING) PER S.P.P.W.C. STD. PLAN NO. 330-2, SEE
SHEET 6
INSTALL 60" MANHOLE PER INLAD EMPIRE UTILITIES AGENCY STD. EXHIBIT 6A, SEE SHEET 6.
INSTALL 72" MANHOLE PER INLAD EMPIRE UTILITIES AGENCY STD. EXHIBIT 6A, SEE SHEET 6.
CONSTRUCT 26' SEWER ACCESS ROAD PER SECTION ON SHEET 6 AND SOILS RECOMMENDATION.
1
3
5
6
7
8
S=0.0228
41
+
2
0
.
0
2
B
C
CL
M
H
N
O
.
1
1
RI
M
=
1
7
3
4
.
4
9
37
+
2
0
.
0
2
CL
M
H
N
O
.
1
0
RI
M
=
1
7
2
2
.
8
6
33
+
2
0
.
0
2
CL
M
H
N
O
.
9
RI
M
=
1
7
1
3
.
9
8
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
394.5 LF 12" EXTRA STRENGTH V.C.P. SEWER
326.03 LF 10" EXTRA STRENGTH V.C.P. SEWER
O
U
T
-
S
1
6
9
5
.
4
5
I
N
V
O
U
T
-
S
1
7
0
4
.
6
4
I
N
V
OUT-S
1713.82 INV
I
N
-
N
1
6
9
5
.
6
5
I
N
V
IN-N
1
7
0
4
.
8
4
I
N
V
IN-N
1714.02 INV
S=0.0228
S=0.0227
41
+
2
3
.
0
2
B
E
G
P
I
P
E
37
+
2
2
.
5
2
B
E
G
P
I
P
E
33
+
2
2
.
5
2
B
E
G
P
I
P
E
33
+
1
7
.
5
2
E
N
D
P
I
P
E
37
+
1
7
.
5
2
E
N
D
P
I
P
E
41
+
1
7
.
0
2
E
N
D
P
I
P
E
32
+
8
0
.
0
0
16
9
4
.
4
2
I
N
V
43
+
8
0
.
0
0
17
1
9
.
7
9
I
N
V
S=0.0227
395 LF 12" EXTRA STRENGTH V.C.P. SEWER
395 LF 12" EXTRA STRENGTH V.C.P. SEWER
EXIST. GRADE
SURFACE OVER CL
MAIN SEWER PIPE
FUTURE 42" RCP
FUTURE 42" RCP
FUTURE 36" RCP
RIM-INV =
18.53'
RIM-INV =18.22'
RIM-INV =20.67'
BOT. S.D. M.H.
BOT. S.D. M.H.
OUT-S
1713.82 INV
EL. 1728.16
SAFETY LEDGE
ROOF SLAB
EL. 1719.32
SAFETY LEDGE
33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00
42+00
43+00
FUTURE 42" STORM DRAIN
FUTURE 12"
WATER MAIN
CENTERLINE OF FUTURE
LYTLE CREEK ROAD
FUTURE R/W
FUTURE R/W
FUTURE 42" STORM
DRAIN
FUTURE 30" STORM
DRAIN
33
+
2
0
.
0
2
6
CL
S
S
M
H
N
O
.
9
L5
L6
L7
C4
FUTURE MEDIAN
5'
FUTURE CURB AND
GUTTER
FUTURE CURB AND
GUTTER
FUTURE CURB ISLAND
DIVIDER
5
8 26
'
26
'
81
1
3
21
'
16
.
5
'
10
'
10
'
V
A
R
I
E
S
41
+
2
0
.
0
2
B
C
7
CL
S
S
M
H
N
O
.
1
1
37
+
2
0
.
0
2
6
CL
S
S
M
H
N
O
.
1
0
LINE DATA
LINE #
L5
L6
L7
BEARING
S71°14'04"W
S71°14'04"W
S71°14'04"W
DISTANCE
396.00'
396.00'
396.00'
CURVE TABLE
CURVE #
C4
RADIUS
821.96'
LENGTH
328.03'
TANGENT
166.23 22°51'57"
11-19-21
1/10/2022