Loading...
HomeMy WebLinkAbout6782-114 15 16 17 14 ABANDON EXISTING VEHICLE LOOP DETECTOR IN PLACE. 15 ABANDON EXISTING STUB-OUT CONDUIT. REMOVE CONDUCTORS. 16 REMOVE EXISTING PULL BOX. 17 CONNECT NEW AND EXISTING 2" CONDUIT, REMOVE EXISTING DETECTOR LEAD-IN CABLES, INSTALL 2 NEW CABLES THROUGH CONDUIT RUN NOS. 2 3 4 8 9 TO THE CONTROLLER CABINET. 18 18 FURNISH AND INSTALL #5 PULL BOX. 19 19 INSTALL 6' DIA. VEHICLE LOOP DETECTOR 20 20 FURNISH AND INSTALL 2" DIA. STUB-OUT CONDUIT 1 1 1 REMOVE AND INSTALL PHASE 2 ADVANCE VEHICLE LOOP AND ASSOCIATED PULL BOX AND CONDUIT TO ACCOMMODATE NEW DRIVEWAY. 17. INTERSECTION TO REMAIN IN OPERATION DURING CONSTRUCTION 1 REMOVE AND INSTALL PHASE 2 ADVANCE VEHICLE LOOP AND ASSOCIATED PULL BOX AND CONDUIT TO ACCOMMODATE 1 7-8-2026 J.B. NEW DRIVEWAY 8/31/26JPS