HomeMy WebLinkAbout6406-9N
UU
T
0
Q
0
L�
N
0
0
0
0
0
cn
i
Ln
0
0
Ln
Ld
w
W
U
J
M
cl-
W
cn
cl-
i
z
g
CD
0
0
i
Lc)
co
cn
co
U
W
0
CL-
EXIST. EXIST. FUTURE EXIST. FUTURE
R/W R/W R/W EXIST. EXIST. FUTURE EXIST. EXIST. FUTURE R/W R/W
(WEST) (EAST) (EAST) R/W R/W R/W R/W R/W R/W (EAST) (EAST)
4' (WEST) (EAST) (EAST) (WEST) (EAST) (EAST)
6' 6' 30' 8' 25' GRADED 4' 4' 7.11' 4'
SW LS ASPHALT -MEDIAN, ASPHALT SHOULDER 6' 6' 30' 8' 25' GRADED 6' 6' 30' 8' 25' GRADED CURB 43' 23' GRADED
SW LS ASPHALT MEDIA,N ASPHALT SHOULDER SW LS ASPHALT MEDIAN, ASPHALT SHOULDER AMP ASPHALT SHOULDER SHOULDER
PROP. 8" PROP. 6"1 89,
CURB & MEDIAN PROP. 8" PROP. 7" PROP. 8" GUTTER I
GUTTER I CURB & MEDIAN I PROP. 8" MEDIAN DAYLIGHT
CURB &
DAYLIGHT
2�p° � GUTTER � DAYLIGHT � � � PROP. 8" CURB � LINE _
1�� _� SLOPE 1.5% ? 0% LINE GUTTER 1 2% 2 �o LINE & GUTTER 0f0 2 /o
— 2:1 SLOPE 1 2:1 SLOPE f �� 2:1
EXIST. �`� PROP. EP j J
GROUND DAYLIGHT EXIST. PROP. PROP.77 EXIST. �\ SLOPE
LINE EP EXIST. / PROP. PROP. GROUND \ � PROP. PROP.
GROUND FLOWLINE GROUND EP FLOWLINE EP FLOWLINE
STA. 139+50.00 STA. 139+75.00 STA. 140+00.00 STA. 140+25.00
SCALE: SCALE: SCALE: SCALE:
1 "=20' HORIZ 1 "=20' HORIZ 1 "=20' HORIZ 1 "=20' HORIZ
1 "=2' VERT 1 "=2' VERT 1 "=2' VERT 1 "=2' VERT
EXIST. FUTURE
EXIST. R/W R/W
EXIST. FUTURE
EXIST. FUTURE R/W (EAST) (EAST)
R/W R/W R/W R/W (WEST)
(EAST) (EAST) (EAST) (EAST) EXIST. FUTURE 6' 6' 40' 23' GRADED
4 (EAST) (EAST) SW LS ASPHALT ASPHALT SHOULDER
4, 40' 23' GRADED 4
40' 23' GRADED CURB FACE PROJECTION ASPHALT SHOULDER 40' 23' GRADED
CURB FACE PROJECTION ASPHALT SHOULDER CURB FACE PROJECTION ASPHALT SHOULDER PROP. 8" I
DAYLIGHT
I LINE DAYLIGHT I CURB DAYLIGHT
DAYLIGHT 1_2/o I LINE LINE
_1 \ / _
LINE �` I 2:1 \Yo
2:1
0.3% \ 22230
0 SLOPE �%
—� 2EXIST.�-2%_4_2:1 SLOPE GROUND \ �0 SLOPE EXIST.\ ��SLOPE
EXIST. PROP. PROP. PROP. \ GROUNDGROUND�/ . EP FLOWLINE
EP FLOWLINE EXIST. ✓ PROP. PROP. PROP. PROP.
GROUND EP FLOWLINE
EP FLOWLINE
STA. 140+50.00 STA. 140+75.00 STA. 141 +00.00 STA. 141 +25.00
SCALE: SCALE: SCALE: SCALE:
1 "=20' HORIZ 1 "=20' HORIZ 1 "=20' HORIZ 1 "=20' HORIZ
1 "=2' VERT 1 "=2' VERT 1 "=2' VERT 1 "=2' VERT
EXIST. EXIST. FUTURE EXIST. EXIST. FUTURE EXIST. EXIST. FUTURE EXIST. EXIST. FUTURE
R/W R/W R/W R/W R/W R/W R/W
(WEST) (EAST) 4' (EAST) (WEST) (EAST) 4' (EAST) (WEST) (EAST) 4' (EAST) R/W R/W R/W
6' 6' 40' 21.88' GRADED 6' 6' 40' 20.23' GRADED (WEST) (EAST) 4' (EAST)
6' 6' 40' 23' GRADED SW LS ASPHALT ASPHALT SHOULDER SW LS ASPHALT ASPHALT SHOULDER 6' 6' 40' 17.82' GRADED
SW LS ASPHALT ASPHALT SHOULDER SW LS ASPHALT ASPHALT SHOULDER
PROP. 8"
PROP. 8" CURB
CURB PROP. 8" PROP. 8"
I I DAYLIGHT I I CURB CURB
� LINE � DAYLIGHT
/ 3.60 DAYLIGHT 3 �/
�� LINE DAYLIGHT
\ �� \ \ , LINE\ \_ \ \ 3.
� I LINE
EXIST. \ 1 30/ 2:1 EXIST. � \ � 36/ 2:1 SLOPE EXIST. � / % � �
GROUND \ \� SLOPE GROUND \ / ti GROUND / 2:1 SLOPE EXIST. \ 2:1 SLOPE
PROP. PROP. PROP
GROUND �
PROP. PROP. PROP. PROP. . PROP.
EP FLOWLINE
EP FLOWLINE EP FLOWLINE EP FLOWLINE
STA. 141 +50.00 STA. 141 +75.00 STA. 142+00.00 STA. 142+25.00
SCALE: SCALE: SCALE: SCALE:
1 "=20' HORIZ 1 "=20' HORIZ 1 "=20' HORIZ 1 "=20' HORIZ
1 "=2' VERT 1 "=2' VERT 1 "=2' VERT 1 "=2' VERT
EXIST. EXIST. FUTURE EXIST. EXIST. FUTURE
EXIST. EXIST. FUTURE EXIST. EXIST. FUTURE
R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
(WEST) (EAST) 4' (EAST) (WEST) (EAST) 4' (EAST) (WEST) (EAST) 4' (EAST) (WEST) (EAST) 4' (EAST)
6' 6' 40' 14.65' GRADED 6' 6' 40' 10.56' GRADED 6' 6' 40' 7' GRADED 6' 6' 40' 4.18' GRADED
SW LS ASPHALT ASPHALT SHOULDER SW LS ASPHALT ASPHALT SHOULDER SW LS ASPHALT AC SHOULDER SW LS ASPHALT AC SHOULDER
PROP. 8" PROP. 8" PROP. 8" PROP. 8"
CURB CURB CURB & CURB
I I GUTTER
\ 3?% DAYLIGHT \ I DAYLIGHT I \ �? o DAYLIGHT
\ � DAYLIGHT \ 3�% 3 ° LINE
LINES \ �� LINE \ ��� LINE \ i
LI EXIST.
EXIST. \ ti \ 3 o \ 3 �, — GROUND
GROUND \ 2:1 SLOPE EXIST. 2:1 SLOPE 2:1 SLOPE \ \ 2:1 SLOPE
EXIST.
� GROUND \ � GROUND \ PROP.
PROP. PROP. \ PROP. PROP. PROP. P FLOWLINE PROP. FLOWLINE
EP FLOWLINE EP FLOWLINEEP
STA. 142+50.00 STA. 142+75.00 STA. 143+00.00 STA. 143+25.00
SCALE: SCALE: SCALE: SCALE:
1 "=20' HORIZ 1 "=20' HORIZ 1 "=20' HORIZ 1 "=20' HORIZ
1 "=2' VERT 1 "=2' VERT 1 "=2' VERT 1 "=2' VERT
WDID: 8 36C403114
BASIS OF BEARINGS: BENCHMARK: Q 0PREPAREDNDERTHE SUPERVISION OF: CITY OF FONTANA, CALIFORNIA
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE QROF E SS 0IV I 1 IRS
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA THE CONTOURS AND ELEVATIONS SHOWN HEREON �° FN L ' Fow
a It= STREET IMPROVEMENT PLANS
COORDINATE SYSTEM OF 1983 (CCS 83), ZONE V (2011.00 EPOCH DATE) ARE BASED ON THE FOLLOWING BENCH MARK: WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED �� `�, 40E N � I N E E R I N c
( F
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE D �o o 2 Z DRAWN BY: SCALE:
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK) FORTH IN A DILIGENT MANNER THE CITY ENGINEER MAY REQUIRE REVISIONS TO w NO. C 047255 rn L L C I R C L T H 1 N K I N G JV
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014, DATUM: NAVD 881993 ADJ DIAL TWO WORKING x Exp. 12/31/25 ;U2850 Inland Empire Blvd 909.581.0676 DESIGNED Y: CITRUS AVENUE SECTIONS DATE:
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID Sul B
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT BEFORE DAYS BEFORE THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
YOU DIG O io, Cali a fuscoe.com CA July 24
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID YOU DIG STANDARDS IN EFFECTsr civi\- �`P DATE:7/17/24 CHECKED BY: APPROVED BY:
. qTe Foe G'-`� 7/17/2024 DRAWING N0. 9
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867 TOLL FREE 811 OF C^`� STEVEN L. ELLIS EXP. 12-31-25 SE/LAF
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. REVISION DESCRIPTION DATE ENGR. CITY DATE 6406
GIA LAM KIM /CITY ENGINEER R.C.E. 62296 DATE 10