Loading...
HomeMy WebLinkAboutAppendix L - Trip Generation AssessmentTECHNICAL MEMORANDUM 260 East Baker Street | Suite 200 | Costa Mesa, CA 92624 | (949) 660-1994 | urbanxroads.com DATE: November 14, 2025 TO: David Ornelas, T&B Planning, Inc. FROM: Charlene So, Urban Crossroads, Inc. JOB NO: 16758-03 TG Memo SUBJECT: ALMOND AVENUE TRAILER YARD (MCN25-0059) TRIP GENERATION ASSESSMENT Urban Crossroads, Inc. is pleased to submit the following Trip Generation Assessment for the Almond Avenue Trailer Yard development (referred to as Project), which is located at 9882 Almond Avenue (west of Almond Avenue and approximately 1,220 feet south of San Bernardino Avenue) within the Southwest Industrial Park Specific Plan (SWIP) in the City of Fontana. Specifically, the Project is located within the Speedway Industrial District (SID) of the SWIP. This trip generation letter describes the proposed Project trip generation and follows the City’s Traffic Impact Analysis (TIA) Guidelines for Vehicle Miles Traveled (VMT) and Level of Service Assessment (City Guidelines) dated October 21, 2020. Specifically, the purpose of the following trip generation assessment is to describe the proposed Project trip generation methodology and determine whether any traffic operations analysis is required per the City Guidelines. PROJECT DESCRIPTION It is our understanding that the Project is to consist of a 9.49-acre trailer yard with a 1,248 square foot pre-fabricated office building and 294 12-foot by 53-foot trailer stalls. It is anticipated that the project will be processed as a CEQA Addendum to the SWIP Environmental Impact Report (EIR), as such, a comparative assessment of what is allowed under the SWIP EIR for the subject site will be included, as applicable. Exhibit 1 shows the preliminary site plan. Although there are existing uses on the site, no credit will be taken for the existing uses for the purposes of this assessment. The Project proposes a single access point on Almond Avenue. The Project’s anticipated Opening Year is 2027. 16758-03 TG Memo 2 Almond Avenue Trailer Yard EXHIBIT 1: SITE PLAN TRIP GENERATION Trip generation represents the amount of traffic that is attracted and produced by a development and is based upon the specific land uses planned for a given project. PROPOSED PROJECT In order to develop the traffic characteristics of the proposed project, trip-generation statistics published in the Institute of Transportation Engineers (ITE) Trip Generation Manual (12th Edition, 2025) were used to estimate the trip generation based on the Truck and Trailer Parking (ITE Land Use Code 035) land use category (see Table 1). Since the ITE Trip Generation Manual does not provide a truck mix for 2-axle, 3-axle, and 4+-axle trucks, the truck trip generation is categorized as 2-4+-axle trucks. The trip generation summary illustrating daily, and peak hour trip generation estimates for the proposed Project are shown in Table 2. The proposed Project is anticipated to generate 238 two-way trip-ends per day with 15 AM peak hour trips and 18 PM peak hour trips. 202 ELECTR I C A L / D A T A 103 RESTR O O M ADA 201VENDING 401 MAINT E N A N C E 402 RESTRO O M 301LOUNG E 102 REST R O O M 101SERVIC E 403 RESTRO O MADA W.H . Ow n e r : Pr o j e c t : Co n s u l t a n t s : HP A I n c . 18 8 3 1 B a r d e e n A v e n u e , S t e . 1 0 0 Ir v i n e , C A 9 2 6 1 2 Te l : 9 4 9 - 8 6 3 - 1 7 7 0 AL M O N D A V E N U E TR A I L E R Y A R D CI V I L ST R U C T U R A L ME C H A N I C A L PL U M B I N G EL E C T R I C A L LA N D S C A P E FI R E SO I L S Th i e n e s ---- MI G -- TI T L E Pr o j e c t N u m b e r : Dr a w n B y : Da t e : - 25 0 2 9 JC 06 / 2 6 / 2 0 2 5 Re v i s i o n : Sh e e t : CAUTION : IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINT 98 8 2 A l m o n d A v e n u e Fo n t a n a , C A . MAN GNOY LICENSED A RCHITECT STATEOF C ALIFORNIA DA T E RE N E W A L 3- 3 1 - 2 7 C- 2 9 4 5 1 DL J F o n t a n a L L C 98 9 5 D o u b l e R . B l v d . Re n o , N V . Te l : 9 4 9 - 8 4 2 - 3 0 7 4 OV E R A L L S I T E P L A N DA B - A 1 . 1 AERIAL MAP Of f i c i a l U s e O n l y TABULATIONSI T E SITE LEGEND GR A V E L - S E E " C " D R A W I N G S . F O R TH I C K N E S S CO N C R E T E P A V I N G S E E " C " D R W G S . FO R T H I C K N E S S STANDARD PARKING STALL9'X19'VAN ACCESSIBLE PARKING STALL12'X19'+5' W/ ACCESSIBLE AISLE LA N D S C A P E D A R E A PR O P E R T Y L I N E LANDSCAPE AREA. SEE "L" DWGS. PROVIDE METAL, MANUAL OPERATED G A T E S W / K N O X - P A D NOT USED GRAVELCONCRETE WALKWAY.SITE PLAN KEYNOTES123456789101112LOCK PER FIRE DEPARTMENT STANDAR D S P E R D R I V E W A Y . TRUNCATED DOME.8'H TUBE STEEL FENCE.DRIVEWAY APRONS TO BE CONSTRUCT E D P E R " L " D R A W I N G S . 1314REFUSE AND RECYCLING ENCLOSURE.NOT USEDNOT USEDNOT USEDNOT USED 14' HIGH SCREEN WALL 16758-03 TG Memo 3 Almond Avenue Trailer Yard Passenger Car Equivalent (PCE) factors were applied to the trip generation rates for heavy trucks (large 2-axles, 3-axles, 4+-axles). PCEs allow the typical “real-world” mix of vehicle types to be represented as a single, standardized unit, such as the passenger car, to be used for the purposes of capacity and level of service analyses. The PCE factors are consistent with the recommended PCE factors in City Guidelines. The proposed Project is anticipated to generate 33 PCE AM peak hour trips and 38 PCE PM peak hour trips. Since the Project is speculative, this trip generation assessment conservatively assumes these trucks are all 4+-axles (for the purposes of applying the PCE factor). TABLE 1: PROJECT TRIP GENERATION SUMMARY Land Use ITE LU Code Units AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Truck/Trailer Parking Passenger Cars: 35 Acres 0.386 0.205 0.590 0.276 0.574 0.850 10.480 2-4+-Axle Trucks: 0.395 0.545 0.940 0.608 0.422 1.030 14.430 Proposed Project Quantity Units AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Actual Vehicles: Truck/Trailer Parking 9.49 Acres Passenger Cars: 4 2 6 3 5 8 100 2-4+-Axle Trucks: 4 5 9 6 4 10 138 Total Trips (Actual Vehicles)1 8 7 15 9 9 18 238 Passenger Car Equivalent (PCE): Truck/Trailer Parking 9.49 Acres Passenger Cars: 4 2 6 3 5 8 100 2-4+-Axle Trucks (PCE = 3.0): 12 15 27 18 12 30 414 Total Trips (PCE)1 16 17 33 21 17 38 514 1 The City Guidelines indicate that any use which contributes less than 50 peak hour trips to any off- site intersections and generates fewer than 250 two-way peak hour trips, are exempt from Traffic Analysis requirements. The Proposed Project is anticipated to generate fewer than 50 peak hour trips in both actual vehicles and PCE (see Table 1). Similarly, the proposed Project is anticipated to fall below the 50 peak hour trip threshold as the highest trip generation for the PM peak hour is 36 PCE trips. As such, additional traffic analysis is not required for this Project based on the City Guidelines. 16758-03 TG Memo 4 Almond Avenue Trailer Yard APPROVED SOUTHWEST INDUSTRIAL PARK (SWIP) The following section pertaining to the SWIP is provided for informational purposes only in order to be utilized as part of the overall Environmental Impact Report (EIR) Addendum, but is not substantive to the findings disclosed above with the Project’s anticipated trip generation. The Project site is located within the SID of the SWIP. The SID is “proposed to include uses that promote the continued use and expansion of industrial, distribution and logistics-based, and warehousing developments in conjunction with service-related commercial uses.” The SID area is proposed to include a mixture of warehousing and light industrial related uses. The SID is bounded by Calabash Avenue to the west, the I-10 Freeway to the south, Cherry Avenue to the east, and just south of San Bernardino Avenue. As discussed in the SWIP Project Traffic Analysis (prepared by RBF Consulting, September 29, 2011), the SWIP included a net increase of 930,121 SF of light industrial use, 762,191 SF of warehousing use, and 13,264 SF of service commercial use within the SID area, for a total of 1,705,576 SF on 126.2 acres. Reductions of 20 residential dwelling units, 9,355 SF of institutional use, and 64,729 SF of commercial/office use have also been accounted for. The SWIP allows for a maximum floor-to-area-ratio (FAR) of 0.55 for industrial uses. As shown in Table 2, the SWIP Project Traffic Analysis concluded that the SID area would generate 8,358 two-way trips per day, with 987 trips generated during the AM peak hour and 1,046 trips generated during the PM peak hour. A trip generation rate for uses within the SID has been developed by dividing the trip generation by the proposed 126.2 acres of future warehousing and light industrial development. The Project site acreage is 9.49 acres. As such, based on the trip generation rates for the currently approved use within the SID the proposed Project is anticipated to generate 630 two-way trips per day, with 74 trips generated during the AM peak hour and 79 trips generated during the PM peak hour (see Table 2). TABLE 2: CURRENTLY APPROVED LAND USE TRIP GENERATION SUMMARY Speedway Industrial District (SID) Quantity Units Daily Approved Project Trip Generation: 9.49 Acres 65 9 74 11 68 79 630 As shown in Table 3, the development of the Proposed Project is anticipated to generate 116 fewer two-way PCE trips per day with a net reduction of 41 PCE AM peak hour trips and 41 PCE PM peak hour trips as compared to the currently approved uses within the SID. Note that the SWIP Project Traffic Analysis did not include any PCE trip generation information. As such, actual vehicle trip generation has been used in Table 3 below. 16758-03 TG Memo 5 Almond Avenue Trailer Yard TABLE 3: TRIP GENERATION COMPARISON Trip Generation Comparison AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Almond Avenue Trailer Parking Proposed Project (in PCE) (Table 1) 16 17 33 21 17 38 514 Net Change (PCE) -49 8 -41 10 -51 -41 -116 FINDINGS The City Guidelines indicate that any use which contributes less than 50 peak hour trips to any off- site intersections and generates fewer than 250 two-way peak hour trips, are exempt from Traffic Analysis requirements. The Proposed Project is anticipated to generate fewer than 50 peak hour trips in both actual vehicles and PCE (see Table 1). Similarly, the proposed Project is anticipated to fall below the 50 peak hour trip threshold as the highest trip generation for the PM peak hour is 36 PCE trips. As such, additional traffic analysis is not required for this Project based on the City Guidelines. In order to support the EIR Addendum, the comparison of the Project’s trip generation to the uses approved as part of the SWIP for the SID area indicates that the Proposed Project would result in a net reduction in trips. As such, the impacts are anticipated to be the same or less than those previously identified in the SWIP Traffic Study at off-site study area intersections. If you have any questions, please contact me directly at cso@urbanxroads.com. 16758-03 TG Memo 6 Almond Avenue Trailer Yard APPENDIX 1: CITY SCOPING AGREEMENT Traffic Impact Analysis -14-Al 2008 Preparation Guide Exhibit B SCOPING AGREEMENT FOR TRAFFIC IMPACT STUDY This letter acknowledges the Riverside County Transportation Department requirements for traffic impact analysis of the following project. The analysis must follow the Riverside County Transportation Department Traffic Study Guidelines dated February 2005. Case No. (i.e. TR, PM, CUP, PP) Related Cases - SP No. Provide SP No. and list of other approved or active projects within the SP. EIR No. GPA No. CZ No. Project Name: Project Address: Project Description: Consultant Developer Name: Address: Telephone: Fax: A. Trip Generation Source: (ITE 7th Edition or other) Current GP Land Use Provide General Plan Land Use Designation (e.g.: MDR, CR, etc) Proposed Land Use Current Zoning Proposed Zoning Current Trip Generation Proposed Trip Generation In Out Total In Out Total AM Trips PM Trips Internal Trip Allowance Yes No (% Trip Discount) Pass-By Trip Allowance Yes No (% Trip Discount) A pass-by trip discount is allowed for appropriate land uses per ITE trip generation handbook 3rd edition. The pass-by trips at adjacent study area intersections and project driveways shall be indicated on a report figure. (Attach table for detailed trip generation) B.Trip Geographic Distribution:N % S % E % W % (attach exhibit for detailed assignment) C. Background Traffic Project Opening & Future Build-Out Year: Phase Year(s) _________________ Annual Ambient Growth Rate: % Other area projects to be analyzed: Model/Forecast methodology April 2021 Traffic Impact Analysis -5-April 2021 Preparation Guide Exhibit B – Scoping Agreement – Page 2 D. Study intersections: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments from other agencies.) 1. 2. 3. 4. 5. E. Study Roadway Segments: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments from other agencies.) 1. 2. 3. 4. 5. E. Other Jurisdictional Impacts Is this project within a City’s Sphere of Influence or one-mile radius of City boundaries? Yes No If so, name of City Jurisdiction: F. Site Plan (please attach reduced copy) G. Specific issues to be addressed in the Study (in addition to the standard analysis described in the Guideline) (To be filled out by Transportation Department) (NOTE: If the traffic study states that “a traffic signal is warranted” (or “a traffic signal appears to be warranted,” or similar statement) at an existing unsignalized intersection under existing conditions, 8-hour approach traffic volume information must be submitted in addition to the peak hourly turning movement counts for that intersection.) H. Existing Conditions Traffic count data must be new or recent. Provide traffic count dates if using other than new counts. Date of counts______________________________________________________________________ I. VMT Assessment Provide VMT screening/assessment per the latest TIA & VMT Guidelines. NOTE* Traffic Study Submittal Form and appropriate fee must be submitted with, or prior to submittal of this form. Transportation Department staff will not process the Scoping Agreement prior to receipt of the fee. Recommended by: ______________________________ _________ Consultant’s Representative Date Scoping Agreement Submitted on _____________ Revised on ___________________ Approved Scoping Agreement: 6. 7. 8. 9. 10. 6. 7. 8. 9. 10.