HomeMy WebLinkAboutAppendix A - Mitigation Monitoring and Reporting Program (MMRP)Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-1 APPENDIX A MITIGATION MONITORING AND REPORTING PROGRAM (MMRP) The Mitigation Monitoring and Reporting Program (MMRP) presented in this section lists the mitigation measures from the SWIP SP EIR that are applicable to the Almond Avenue Trailer Yard project. The Almond Avenue Trailer Yard project does not require any mitigation measures beyond those listed in the MMRP below. MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD Air Quality and Climate Change operation condition so as to reduce emissions. The construction contractor shall ensure that all construction equipment is being properly serviced and maintained as per the manufacturer’s records shall be available at the construction site for City verification. applicable by the City Engineer, shall be included as conditions of the Grading Permit issuance: • Provide temporary traffic controls such as flag person, during all phases of construction to maintain smooth traffic flow. • Provide dedicated turn lanes for movement of construction trucks and equipment on- and off-site. • Reroute construction trucks away from congested streets or sensitive receptor areas. • Appoint a construction relations officer to act as a community liaison concerning on-site construction activity including resolution of issues related to PM10 generation. • Improve traffic flow by signal synchronization, and manufactures’ specifications. and issuance of grading permits; During construction developers/applicants and construction contractors records and equipment design specification data sheets shall be kept on site and available for review by the City during construction. Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-2 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD • (e.g., material delivery trucks and soil import/export). If the lead agency determines that 2010 model year or newer diesel trucks cannot be obtained the lead agency shall use trucks that meet EPA 2007 model year NOX and PM emissions requirements. • During project construction, all internal combustion engines/construction equipment operating on the project site shall meet EPA-Certified Tier 3 emissions standards, or higher according to the following: o January 1, 2012 to December 31, 2014: All off- road diesel- greater than 50 hp shall meet Tier 3 off-road emissions standards. In addition, all construction equipment shall be outfitted with BACT devices certified by CARB. Any emissions control device used by the contractor shall achieve emissions reductions that are no less than what could be achieved by a Level 3 diesel emissions control strategy for a similarly sized engine as defined by CARB regulations. o Post-January 1, 2015: All off-road diesel-powered construction equipment greater than 50 hp shall available. In addition, all construction equipment shall be outfitted with BACT devices certified by CARB. Any emissions control device used by the contractor shall achieve emissions reductions that are no less than what could be achieved by a Level 3 diesel emissions control strategy for a regulations. o A copy of each unit’s certified tier specification, Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-3 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD equipment. shall submit construction plans to the City of Fontana denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the SCAQMD as well as City Planning Staff. and issuance of grading permits; During construction developers/applicants and construction contractors construction plans denoting the proposed schedule and projected equipment use standards noted in SCAQMD Rule 1113. Specifically, the following measures shall be implemented, as feasible: • Use coatings and solvents with a VOC content lower than that required under AQMD Rule 1113. • Construct or build with materials that do not require painting. • Require the use of pre- materials. During construction contractors requirement appears in the construction specifications noted in SCAQMD Rule 1108. During construction contractors requirement appears in the construction specifications, grading plans for future development projects within the project area, future developments shall include a dust control plan as part of the construction contract standard specifications. The dust measures to meet the requirements of SCAQMD Rules 402 and 403. Such measures may include, but are not limited to, the following: • Phase and schedule activities to avoid high-ozone days and first-stage smog alerts. permits and final plan approval; During construction Construction contractors requirement appears in the construction specifications Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-4 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD • alerts. • All haul trucks shall be covered prior to leaving the site to prevent dust from impacting the surrounding areas. • Comply with AQMD Rule 403, particularly to minimize fugitive dust and noise to surrounding areas. • Moisten soil each day prior to commencing grading to depth of soil cut. • Water exposed surfaces at least twice a day under calm conditions, and as often as needed on windy days or during very dry weather in order to maintain a surface crust and minimize the release of visible emissions from the construction site. • Treat any area that will be exposed for extended periods with a soil conditioner to stabilize soil or temporarily plant with vegetation. • Wash mud-covered tires and under carriages of trucks leaving construction sites. • Provide for street sweeping, as needed, on adjacent roadways to remove dirt dropped by construction vehicles or mud, which would otherwise be carried off by trucks departing project sites. • Securely cover all loads of fill coming to the site with a tight fitting tarp. • Cease grading during periods when winds exceed 25 miles per hour. • Provide for permanent sealing of all graded areas, as applicable, at the earliest practicable time after soil disturbance. • Use low-sulfur diesel fuel in all equipment. • Use electric equipment whenever practicable. • Shut off engines when not in use. Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-5 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD requiring that trucks shall not be left idling for prolonged periods pursuant to Title 13 of the California Code of Regulations, Section 2485, which limits idle times to not developers/applicants; construction contractors will verify compliance; prior to the issuance of Certificate of Occupancy be required to incorporate light colored roofing materials. construction compliance at plan check and prior to issuance of incorporation of project design features that achieve a minimum of 28.5 percent reduction in GHG emissions from business as usual conditions. Future projects shall inclu potential design features. Energy Efficiency • Design buildings to be energy efficient and exceed Title 24 requirements by at least 5 percent. • Install efficient lighting and lighting control systems. Site and design building to take advantage of daylight. • Use trees, landscaping and sun screens on west and south exterior building walls to reduce energy use. • Install light colored “cool” roofs and cool pavements. • Provide information on energy management services for large energy users. • Install energy efficient heating and cooling systems, appliances and equipment, and control systems (e.g., minimum of Energy Star rated equipment). • Implement design features to increase the efficiency of the building envelope (i.e., the barrier between conditioned and unconditioned spaces). developers/applicants, architects and construction contractors Division will review project plans for compliance and the City will verify compliance after construction, prior to issuance of Certificate of Occupancy Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-6 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD • and other outdoor lighting. • Limit the hours of operation of outdoor lighting. Renewable Energy • Install solar panels on carports and over parking areas. Ensure buildings are designed to have “solar ready” roofs. • Use combined heat and power in appropriate applications. Water Conservation and Efficiency • Create water-efficient landscapes with a preference for a xeriscape landscape palette. • Install water-efficient irrigation systems and devices, such as soil moisture-based irrigation controls. • Design buildings to be water-efficient. Install water- efficient fixtures and WaterSense labeled products). • Restrict watering methods (e.g., prohibit systems that apply water to nonvegetated surfaces) and control runoff. • Restrict the use of water for cleaning outdoor surfaces and vehicles. • Implement low-impact development practices that maintain the existing hydrologic character of the site to manage storm water and protect the environment. (Retaining storm water runoff on-site can drastically reduce the need for energy-intensive imported water at the site). • Devise a comprehensive water conservation strategy appropriate for the project and location. The strategy Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-7 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD to the specific project. • Provide education about water conservation and available programs and incentives. Solid Waste Measures • Reuse and recycle construction and demolition waste (including, but not limited concrete, lumber, metal, and cardboard). • Provide interior and exterior storage areas for recyclables and green waste and adequate recycling containers located in public areas. • Provide education and publicity about reducing waste and available recycling services. Transportation and Motor Vehicles • Limit idling time for commercial vehicles, including delivery and construction vehicles. • Promote ride sharing programs (e.g., by designating a certain percentage of parking spaces for ride sharing vehicles, designating adequate passenger loading and unloading and waiting areas for ride sharing vehicles, and providing a web site or message board for coordinating rides). • Create local “light vehicle” networks, such as neighborhood electric vehicle (NEV) systems. • Provide the necessary facilities and infrastructure to encourage the use of low or zero-emission vehicles conveniently located alternative fueling stations). • Promote “least polluting” ways to connect people and goods to their destinations. • Incorporate bicycle lanes and routes into street systems, new subdivisions, and large developments. Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-8 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD • design. • For commercial projects, provide adequate bicycle parking near building entrances to promote cyclist safety, security, and convenience. For large employers, provide facilities that encourage bicycle commuting (e.g., locked bicycle storage or covered or indoor bicycle parking). • Create bicycle lanes and walking paths directed to the location of schools, parks points. Biological Resources developments within the project site shall be conducted outside of the State- (February 15 through September 1). If construction during the nesting season must occur, the site shall be evaluated by a City-approved biologist prior to ground disturbance to determine if nesting birds exist on-site. If any nests are discovered, the biologist shall delineate an appropriate buffer zone around the nest, depending on the species and activities approved by the biologist shall take place within the buffer zone until the nest is vacated. construction contractors; site supervisors contracts for these requirements and monitor for compliance removal shall be evaluated by a City-approved biologist for roosting bats. If a roost is present the biologist will develop a plan to minimize impacts to the bats to the greatest extent feasible. disturbance City-approved biologist the presence of roosting bats Cultural Resources during grading, the developer shall retain a qualified archaeologist to monitor construction activities and to specifications include requirement to halt work Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-9 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD for study. protection/preservation measures are implemented for discovered resources encountered before or during grading, the developer shall retain a qualified archaeologist to monitor construction activities and to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Fontana shall: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological developments, using their special qualities at a theme or focal point. • Pursue educating the public about the area’s archaeological heritage. • Propose conditions of approval (if a local government action) to eliminate adverse project effects on significant, following appropriate CEQA guidelines. • Prepare a technical resources management report, documenting the inventory, proposed mitigation of resources within the project area. Submit one copy of the completed report, with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. qualified archaeologist; the City of Fontana specifications include requirement to halt work until a monitor is present; City shall also monitor to ensure protection/preservation measures are implemented for discovered resources by requiring periodic reports from the developer for review and approval law and deemed appropriate by the City, future site-Division Division will verify that it has Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-10 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD Morongo Band of Mission Indians: • In the event Native American cultural resources are discovered during development, all work in the immediate vicinity of the find shall cease and a qualified archaeologist meeting Secretary of Interior standards shall be hired to assess the find. Work on the overall project may continue during this period; • Initiate consultation between the appropriate Native American tribal entity (as determined by a qualified archaeologist meeting Secretary of Interior standards) and the City/project applicant; • Transfer cultural resources investigations to the appropriate Native American entity (as determined by a qualified archaeologist meeting Secretary of Interior standards) as soon as possible; • Utilize a Native American Monitor from the appropriate Native American entity (as determined by a qualified archaeologist meeting Secretary of required by the City, during initial ground disturbing activities, cultural resource surveys, and/or cultural resource excavations. appropriate for individual projects on a case-by-case basis, as well as whether tribal consultation is appropriate specific project within the project site, the program shall include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, earth-disturbing activities shall be diverted elsewhere until the monitor has completed salvage. If developer/applicant Division shall verify that monitoring is part of the project and require periodic reports should resources be discovered Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-11 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD construction and notify the monitor of the find. • All recovered fossils shall be prepared, identified, and curated for documentation in the summary report and transferred to an appropriate depository (i.e., San Bernardino County Museum). • A summary report shall be submitted to City of Fontana. Collected specimens shall be transferred Museum. Hazards materials above the reportable quantity to submit an inventory of the hazardous materials that they manage to the San Bernardino County Fire Department – Hazardous Materials Division in coordination with the Fontana Fire Protection District. Certificate of Occupancy Building and Safety Department and Safety Department will verify compliance prior to Certificate of Occupancy issuance equipment and materials (e.g., solvents, grease, waste- oil), construction materials, miscellaneou construction parts), above ground storage tanks, surface trash, piping, excess vegetation and other deleterious materials. These materials shall be removed off-site and properly disposed of at Once removed, a visual inspection of the areas beneath the removed materials shall be performed. Any stained soils observed underneath the removed materials shall be sampled. In the event concentrations of materials are dete demolition or construction activities, the project applicant shall comply with the following measures in accordance with Federal, State, and local requirements: developer/applicant Division will require for review and approval a report detailing the work plan for the site as well as evidence that federal, State, and local requirements have been fulfilled. Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-12 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD • facility; • On-site remediation, if necessary, or • Other measures as deemed appropriate by the County. 4.5-2c: Prior to the issuance of a grading or building permit, a Certified Environmental Professional shall confirm the presence or absence of ACMs and LBPs prior to structural demolition/renovation activities. Should ACMs or LBPs be present, demolition materials containing ACMs and/or LBPs shall be removed and disposed of at an appropriate permitted facility. grading or building permit applicant/developer review and approve a report submitted by the Certified Environmental Professional regarding his conclusions and any required remedial actions as a result of future development associated with the project, the relocation shall be conducted under the property-handling procedures regar polychlorinated biphenyls (PCBs). building permit purveyor and Safety Department will verify compliance prior to issuance of a building permit shall prepare a Traffic Control Plan for implementation during the construction phase. The Plan may include the following provisions, among others: • At least one unobstructed lane shall be maintained in both directions on surrounding roadways. • At any time only a single lane is available, the developer shall provide a temporary traffic signal, signal carriers (i.e., flagpersons), or other appropriate traffic controls to allow travel in both directions. • If construction activities require the complete closure of a roadway segment, the developer shall provide appropriate signage indicating detours/alternative routes. grading permits applicant/developer and Safety Department will verify the preparation of a Traffic Control Plan and require its implementation as part of construction permits Department shall consult with the City of Fontana Police Engineering Department Engineering Department will Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-13 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD access for emergency vehicles when construction of future projects would result in temporary lane or roadway closures. adequate access for emergency vehicles if construction would result in temporary lane or roadway closures Noise construction is to be conducted within 500 feet of any classroom activities or religious functions. • The City shall restrict noise intensive construction activities to the days and hours Section 18-63 of the City of Fontana Municipal Code. These days and hours shall also apply any servicing of equipment and to the delivery of materials to or from the site. • All construction equipment shall be equipped with mufflers and sound control silencers and noise shrouds) no less effective than those provided on the original equipment and no equipment shall have an unmuffled exhaust. • The City shall require that the contractor maintain and tune-up all construction equipment to minimize noise emissions. • Stationary equipment shall be placed so as to maintain the greatest possible sensitive use structures. • All equipment servicing shall be performed so as to maintain the greatest possible sensitive use structures. • If construction noise does prove to be detrimental to the learning environment, the City shall allow for a developer/applicant and Safety Department will verify that these requirements are included in construction specifications submitted to the City Addendum to the SWIP Specific Plan Update and Annexation PEIR Appendix A: MMRP Almond Av enue Trailer Yard A-14 MITIGATION MEASURES IMPLEMENTATION TIMING RESPONSIBLE PARTY VERIFICATION METHOD construction is to be performed in excess of 500 feet from any residential structures. • The construction contractor shall provide an on-site name and telephone number of a contact person. Construction hours, allowable workdays, and the phone number of the job superintendent shall be clearly posted at all construction entrances to allow for surrounding owners and residents to contact the job superintendent receives a complaint, the superintendent shall investigate, take appropriate corrective action, and report the action taken to the reporting party. In the event that construction noise is construction liaison will revise the construction schedule to preserve the learning environment. proposed Project require off-site import/export of fill material during construction, trucks shall utilize a route that is least disruptive to sensitive receptors, preferably major roadways (Interstate 10, Interstate 15, State Route 60, Sierra Avenue, Beech Avenue, Jurupa Avenue, and Slover Avenue). Construction trucks should, to the extent practical, avoid the weekday and Saturday a.m. and p.m. peak hours (7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m.) Applicant/Developer and Safety Department will verify that these requirements are included in construction specifications submitted to the City.