HomeMy WebLinkAbout6060LTCITY OF FONTANA, CALIFORNIA
BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT
DILIGENT MANNER, THE CITY ENGINEER MAY
SHOWN HEREON AND CARRIED FORTH IN A
IMPROVEMENTS NOT COMMENCE WITHIN
REQUIRE REVISIONS TO THE PLANS TO
TWO YEARS OF THE DATE OF APPROVAL
SHOULD CONSTRUCTION OF REQUIRED
(909) 356-1815
Civil Engineering - Land Surveying - Land Planning
ALLARD ENGINEERING
16866 Seville Avenue
Fontana, California 92335
ea
Fax (909) 365-1795
Prepared By:
TRACT NO. 20224
STREET LIGHT LOCATION PLAN
Prepared For:
Date
LENNAR
BASIS OF BEARINGS:
BENCHMARK:CITRUS AVENUE
MONTERADO
STREET LIGHT LOCATION PLAN
CITRUS AVENUE
7/22/2021
5/11/26REMOVE EXIST. STREET LIGHTS SE1
1 1
4
1
1
FUSCOE ENGINEERING INC.
STEVE ELLIS
SELLIS@FUSCOE.COM
909) 560-1902
XP 6/11/26