SEWER IMPROVEMENT PLAN
FOR
WASHINGTON DRIVE
PARCEL MAP NO. 20669
VICINITY MAP
OWNER/DEVELOPER
JPI COMPANIES
SIRI SMITH
SAN DIEGO, CA 92130
PHONE: (858) 771-9147
CIVIL ENGINEER
PSOMAS
DAVID J. CURTIS, P.E.
RIVERSIDE, CA 92507
PHONE: (213) 223-1524
1650 SPRUCE STREET, SUITE 400
11988 EL CAMINO REAL, SUITE 200
SOURCE OF TOPOGRAPHY
HILLWIG-GOODROW, INC.
31419 OUTER HIGHWAY 10, SUITE 1-200
PHONE: (909) 794-2673
REDLANDS, CA 92373
SOILS ENGINEER
LEIGHTON AND ASSOCIATES, INC.
10532 ACACIA STREET, SUITE B-6
PHONE: (909) 484-2205
RANCHO CUCAMONGA, CALIFORNIA 91730
UTILITY NOTIFICATIONS
WATER:.........FONTANA WATER COMPANY.........(909) 201-7312
SEWER:.........CITY OF FONTANA........................(909) 350-7610
GAS:.............SOCAL GAS...................................(800) 423-1391
COMM:..........AT&T.............................................(800) 332-1321
ELECTRICITY..SOUTHERN CALIFORNIA EDISON...(800) 611-1911
COMM:..........SPECTRUM.....................................(844) 708-0654
SHEET INDEX
SHEET NO
1
SHEET NAME
TITLE SHEET AND QUANTITIES
2 WASHINGTON DRIVE SEWER PLAN AND PROFILE
SEWER CONSTRUCTION NOTES
ITEM DESCRIPTION
1
2 INSTALL 12" PUBLIC VCP SEWER LATERAL WITH BEDDING PER CITY OF FONTANA
QTY
1
38
3 INSTALL CAST IN PLACE SEWER MANHOLE WITH COVER AND REINFORCED CONCRETE1
NOT TO SCALE
1
GENERAL NOTES
1.ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS
AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND
STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2.WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO
PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY
ENGINEER FOR RESOLUTION.
3.ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4.CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING
DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS
PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5.THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF
CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON-METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC
ENGINEER.
6.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL
DEVICES AT ALL TIMES.
7.THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN
DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8.THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING
OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE
STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND
MOVEMENT.
9.NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT
PURPOSE.
10.THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES,
AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE
ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11.THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS,
TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER,
STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO
WORK AROUND THEIR FACILITIES.
12.THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY
AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER
REQUIREMENTS.
13.STATIONING REFERS TO THE CENTERLINE OF SEWER EXCEPT WHERE OTHERWISE NOTED.
14.ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE
WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND
CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
15.THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR
NOTIFICATION TO THE CITY ENGINEER.
16.REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS,
SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED
AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO
CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
17.THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE
SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
18.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL
TIMES.
19.THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE
PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
20.NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
21.A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE
RE-WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
22.CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION
OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
23.ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE.
24.IF SEWER CONSTRUCTION IS TO BE DONE IN PHASES, THE CONTRACTOR SHALL PROVIDE A TERMINAL CLEANOUT AT THE PHASE
BOUNDARY, NOT MORE THAN 150 FEET FROM THE DOWNSTREAM MANHOLE, SEE CITY OF FONTANA STANDARD DETAIL FOR TERMINAL
CLEANOUT.
25.SANITARY SEWER LINES SHALL BE CONSTRUCTED OF EXTRA STRENGTH VITRIFIED CLAY PIPE (V.C.P.) MANUFACTURED IN ACCORDANCE
WITH ASTM C700, USING TYPE āGā JOINTS (POLYURETHANE COMPRESSION), OR SOLID WALL SDR 26 UNPLASTICIZED PVC PLASTIC
PIPE MANUFACTURED IN ACCORDANCE WITH ASTM D3034 USING ELASTOMERIC GASKET JOINTS.
26.NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE
CITY ENGINEER.
27.SHORT VCP STUBS WITH FLEXIBLE COMPRESSION JOINTS SHALL BE USED AT MANHOLE WALLS TO ALLOW FOR MINOR DEFLECTIONS IN
ALIGNMENT.
28.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF
CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR
LOCATIONS SHOWN ON THE PLANS.
29.ALL 4" HOUSE LATERALS SHALL BE INSTALLED AT A 2% MINIMUM GRADE UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER.
30.TERMINATE ALL 4" HOUSE SEWER LATERALS 3 FEET INSIDE THE LOT WITH A PLUG 12" BELOW THE GROUND SURFACE. WHEN PUBLIC
UTILITY EASEMENTS EXIST NEXT TO THE STREET RIGHT OF WAY, THE LATERAL SHALL TERMINATE 3 FEET INSIDE THE LOT AS
MEASURED FROM THE UTILITY EASEMENT.
31.THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL.
32.IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE
ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY.
33.NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
34.ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
35.APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
STD. NO. 2009.
COLLAR PER CITY OF FONTANA STD. PLAN NO.2000,2001 & 2003 - CASE III
INSTALL 48" PRECAST CONCRETE SEWER MANHOLE PER SPPWC 200-4 (24"
FRAME AND COVER).
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
BEFORE
YOU DIG
TOLL FREE
DIAL
DAYS BEFORE
811
TWO WORKING
YOU DIG
REV.REVISION DESCRIPTION ENGR.DATE CITY DATE
CHECKED BY:
DESIGNED BY:
AND CARRIED FORTH IN A DILIGENT MANNER, THE
STANDARDS IN EFFECT.
PLANS TO BRING THEM INTO CONFORMANCE WITH
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
IMPROVEMENTS NOT COMMENCE WITHIN TWO
SHOULD CONSTRUCTION OF THE REQUIRED
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
Prepared Under The Supervision Of :
DRAWN BY:
2
CITY OF FONTANA, CALIFORNIA
APPROVED BY:DRAWING NO.:
6574
DATE:
SCALE:
SANITARY SEWER IMPROVEMENT PLAN
PARCEL MAP 20669
WASHINGTON DRIVE
GIA LAM KIM
DATE:
AS SHOWN
CR
CR
DC
11/14/25
BASIS OF BEARINGS BENCH MARK:
CITY OF FONTANA BENCHMARK THE BASIS OF BEARINGS FOR THIS SURVEY IS THE
CALIFORNIA STATE PLANE COORDINATE SYSTEM,
ZONE 5, CONSTRAINED LOCALLY BETWEEN
CONTINUOUS GPS STATIONS EWPP & RTHS. SAID
BEARING IS S84°19'30"E (NAD83(2011) 2017.50
EPOCH.)
GPS CONTINUOUS OPERATING REFERENCE STATION
EWPP. THE ANTENNA IS AN ASHTECH 701945B_M
W/SCIT DOME. TRUE VERTICAL ANTENNA HEIGHT IS
FROM THE GEODETIC REFERENCE POINT TO THE
BOTTOM OF THE ANTENNA PRE-AMP(BPA) AND IS
0.027 FEET.
ELEVATION = 1194.52
R.C.E. 62296 CITY ENGINEER
1650 SPRUCE STREET, SUITE 400
RIVERSIDE, CA 92507
951.787.8421 www.psomas.com
Date:
DAVID CURTIS R.C.E. 75791
11/14/25
MCN22-000145 / ELPC24-00109
No. C75791REGISTERED P R OFESSIONAL
E
N
G
I
N
E
ER
S
T
A
TE OF CA L I F O R NIA
CI V I L
DAV I D J . CU
R
T
I
S
EXP. 6/30/26
36.ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY
THE PAVING CONTRACTOR UPON COMPLETION OF PAVING.
37.UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES,
AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
38.AS-BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL
PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
GENERAL NOTES CONTINUED:
TITLE SHEET AND QUANTITIES
PRIVATE ENGINEER'S NOTES:
1.UNLESS SPECIFIED IN THE PROJECT SPECIFIC CONSTRUCTION DOCUMENTS, ALL CONSTRUCTION SHOWN HEREON
SHALL BE IN ACCORDANCE WITH THE GOVERNING AGENCY ADOPTED VERSION OF THE UNIFORM BUILDING CODE, THE
"STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION" (CURRENT EDITION) AND THE "STANDARD PLANS
FOR PUBLIC WORKS CONSTRUCTION" (CURRENT EDITION).
2.THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OF STRUCTURES SHOWN ON THESE PLANS
WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. THESE LOCATIONS ARE APPROXIMATE AND SHALL BE
CONFIRMED IN THE FIELD BY THE CONTRACTOR, SO THAT ANY NECESSARY ADJUSTMENTS CAN BE MADE IN
ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENTS. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER LINES NOT OF RECORD OR
NOT SHOWN ON THESE PLANS.
3.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL POSITION OF ALL
POINTS OF CONNECTION TO EXISTING STRUCTURES. THIS SHALL INCLUDE BOTH ABOVE GROUND AND BELOW
GROUND POINTS OF CONNECTION. THE ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES PRIOR TO BEGINNING
CONSTRUCTION.
4.CONTRACTOR TO VERIFY CLEARANCE AT ALL UTILITY CROSSINGS. IF INTERFERENCE OCCURS, OTHER THAN NOTED
ON PLAN, CONTRACTOR TO CONTACT DESIGN ENGINEER FOR POSSIBLE REDESIGN. IF REDESIGN IS UNFEASIBLE,
CONTRACTOR TO RELOCATE UTILITY AT NOT EXPENSE TO ENGINEER.
5.THE ESTIMATES OF IMPROVEMENT QUANTITIES AS SHOWN HEREON ARE PROVIDED ONLY FOR THE PURPOSE OF
SATISFYING AGENCY PLAN INFORMATION REQUIREMENTS. THE CONTRACTOR SHALL PERFORM AN INDEPENDENT
ESTIMATE OF ALL IMPROVEMENT QUANTITIES AND SHALL USE SAME AS A BASIS FOR HIS BID(S) AND CONTRACT(S).
6.THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND
PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING
HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER, THE CITY OF FONTANA,
AND ENGINEEER HARMLESS FROM ANY AND ALL LIABILITY REAL OR ALLEGED IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE
OWNER, THE CITY OF FONTANA, OR THE ENGINEER.
7.THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTABILITY
OF THE DESIGN HEREON. IN THE EVENT OF DISCREPANCIES ARISING AFTER APPROVAL OR DURING CONSTRUCTION,
THE PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING AN ACCEPTABLE SOLUTION AND REVISING THE
PLANS FOR APPROVAL BY THE CITY.