Loading...
HomeMy WebLinkAbout6573-3A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT BEFORE YOU DIG TOLL FREE DIAL DAYS BEFORE 1-800-227-2600 TWO WORKING YOU DIG REV.REVISION DESCRIPTION ENGR.DATE CITY DATE CHECKED BY: DESIGNED BY: AND CARRIED FORTH IN A DILIGENT MANNER, THE STANDARDS IN EFFECT. PLANS TO BRING THEM INTO CONFORMANCE WITH CITY ENGINEER MAY REQUIRE REVISIONS TO THE IMPROVEMENTS NOT COMMENCE WITHIN TWO SHOULD CONSTRUCTION OF THE REQUIRED YEARS OF THE DATE OF APPROVAL SHOWN HEREON Prepared Under The Supervision Of : DRAWN BY: 14 CITY OF FONTANA, CALIFORNIA APPROVED BY:DRAWING NO.: DATE: SCALE: STREET IMPROVEMENT PLAN VALLEY BLVD. & JUNIPER AVE. GIA LAM KIM DATE: AS SHOWN CR CR DCDAVID J. CURTIS R.C.E. 75791 PROFILE SCALE: HORIZ: 1"=40' VERT: 1"=4' BASIS OF BEARINGS BENCH MARK: CITY OF FONTANA BENCHMARK THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA STATE PLANE COORDINATE SYSTEM, ZONE 5, CONSTRAINED LOCALLY BETWEEN CONTINUOUS GPS STATIONS EWPP & RTHS. SAID BEARING IS S84°19'30"E (NAD83(2011) 2017.50 EPOCH.) GPS CONTINUOUS OPERATING REFERENCE STATION EWPP. THE ANTENNA IS AN ASHTECH 701945B_M W/SCIT DOME. TRUE VERTICAL ANTENNA HEIGHT IS FROM THE GEODETIC REFERENCE POINT TO THE BOTTOM OF THE ANTENNA PRE-AMP(BPA) AND IS 0.027 FEET. ELEVATION = 1194.52 R.C.E. 62296 CITY ENGINEER 1650 SPRUCE STREET, SUITE 400 RIVERSIDE, CA 92507 951.787.8421 www.psomas.com Date: 6573 3/5/26 3/5/26 PARCEL MAP 20669No. C75791REGISTERED P ROFESSIONAL E N G I N E ER S T A TE OF CA L I F O R NIA CI V I L DAV I D J . CU R T I S EXP. 6/30/26 MCN22-000145 / ELPC24-00109 3 GRAPHIC SCALE SCALE: 1" = 0 40 80 40 2040 14+0013+0012+0011+0010+00 MA T C H L I N E S T A . 1 7 + 0 0 SE E S H E E T 4 MA T C H L I N E S T A . 1 7 + 0 0 SE E S H E E T 4 15+00 16+00 17+00 1117- 1119- 1118- 1120- 1118- 1120- 1116- 1118- 1120- 1116- 1115- 1116- PLAN AND PROFILE - VALLEY BOULEVARD (10+63.67 - 17+00) SD WM WM SD SS SS SS SD SS SD E T SS SS SSSS E SD 4"W 8"W 8"W 8"W 12"S 21"S S S S N89°25'05"E 1319.51' (1319.52' R2) FD 1" I.P. W/ TAG, LS 7809, DN 0.20', AS SHOWN ON R2. ACCEPTED AS THE INTERSECTION OF VALLEY BLVD. & CYPRESS AVE. 13+23.00, 5.00 R BC 10+61.67, 3.00 R (1118.17)FS 10+61.67, 9.00 R (1118.08)FS 10+63.67, 5.99 R 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 2' 13+78.91, 0.26 L EC 14+77.65, 14.23 L EC 14+34.55, 10.81 L BC EXIST. DWY. 1 13 1 1 13 13 EXIST. R/W EXIST. R/W EXIST. R/W EXIST. R/W EXIST. BUS STOP 15+20.78, 12.97 L BC C5 L4C6 L5 C7 C1 L1 L6 VALLEY BLVD. CY P R E S S A V E . 6 6 30 ' 22 . 1 ' 27 . 6 ' 66 ' 67 ' 13 3 ' 12 ' 54 ' 55 ' 12 ' 23 ' 12 ' 12 ' VA R I E S VA R I E S 12 ' 16 13 66 ' 67 ' EXIST. R/W 11+50.00, 6.00 L ANGLE PT. 11+00.00, 10.00 L ANGLE PT.13+71.25, 6.00 L ANGLE PT.15 ' 11 ' 5'2'CENTERLINE SURVEY CENTERLINE IMPROVEMENTS 15 ' STREET CONSTRUCTION NOTES ITEM DESCRIPTION 1 12" MIN OF 95% COMPACTED NATIVE SUBGRADE, PER CITY OF FONTANA STD. 1011. SAWCUT AND REMOVE EXISTING A.C PAVEMENT AND CONSTRUCT 6.5" A.C PAVEMENT OVER 15 + 6 7 . 6 8 (1 1 1 8 . 1 7 ) T C 14 + 7 8 . 0 1 (1 1 1 7 . 8 2 ) T C 14 + 0 0 . 0 0 (1 1 1 7 . 6 0 ) T C 13 + 0 0 . 0 0 (1 1 1 7 . 4 4 ) T C 12 + 0 0 . 0 0 (1 1 1 6 . 9 6 ) T C 11 + 0 0 . 0 0 (1 1 1 7 . 6 7 ) T C (0.29%) (0.36%)(0.29%)(-0.85%)(0.16%)(0.48%) EXISTING SOUTHERLY TOP OF CURB VALLEY BLVD - SOUTHERLY CURB 11 + 0 9 . 0 0 (1 1 1 7 . 7 4 ) T C 13 + 2 3 . 0 0 B C 11 1 9 . 6 2 T C 13 + 7 8 . 9 1 E C 11 1 9 . 6 7 T C 56.23' ALONG CURVE 43.32' ALONG CURVE 104.36' ALONG CURVE 14 + 0 0 . 0 0 11 1 9 . 6 7 T C 12 + 2 5 . 0 0 11 1 9 . 4 2 T C 11 + 0 0 . 0 0 11 1 9 . 0 8 T C 10 + 6 3 . 6 7 11 1 8 . 8 4 T C PROPOSED MEDIAN NORTH TOP OF CURB EXISTING CENTERLINE ELEVATION VALLEY BLVD - MEDIAN (NORTH) 0.66%0.40%0.08%0.24%0.18%0.01%0.03%0.14%0.24%0.07% 14 + 3 4 . 5 5 B C 11 1 9 . 6 6 T C 14 + 7 7 . 6 5 E C 11 1 9 . 7 2 T C 15 + 2 0 . 7 8 B C 11 1 9 . 8 2 T C 16 + 2 5 . 0 0 11 2 0 . 0 7 T C 43.15' ALONG CURB 75.00' ALONG CURVE 17 + 0 0 . 0 0 11 2 0 . 1 2 T C 11 + 2 5 . 0 0 11 1 9 . 1 8 T C 0.24% 12 + 5 0 . 0 0 11 1 9 . 4 4 T C 13 + 5 0 . 0 0 11 1 9 . 6 6 F S 0.01% 10 + 5 5 . 2 9 B C R (1 1 1 7 . 7 2 ) T C 12 + 0 0 . 0 0 (1 1 1 7 . 6 9 ) T C 13 + 0 0 . 0 0 (1 1 1 7 . 9 4 ) T C 14 + 0 0 . 0 0 (1 1 1 8 . 1 8 ) T C 15 + 1 6 . 0 2 (1 1 1 8 . 5 6 ) T C 15 + 4 0 . 7 5 (1 1 1 8 . 5 6 ) T C 15 + 6 5 . 8 4 (1 1 1 8 . 4 2 ) T C 16 + 4 0 . 7 9 (1 1 1 8 . 7 4 ) T C 14 + 6 6 . 2 7 (1 1 1 8 . 3 2 ) T C 10 + 6 3 . 1 4 (1 1 1 7 . 5 8 ) T C 11 + 0 0 . 0 0 (1 1 1 7 . 5 3 ) T C (0.29%)(0.43%) (0.56%)(0.00%) (0.48%)(0.22%)(0.23%)(0.25%)(0.16%)-(0.15%) -(1.81 % ) EXISTING NORTHERLY TOP OF CURB VALLEY BLVD - NORTHERLY CURB PAVEMENT LEGEND ASPHALT PAVING GRIND & OVERLAY PCC SIDEWALK CURVE TABLE CURVE # C1 RADIUS 1.00' LENGTH 3.14' DELTA 180°00'00" TANGENT INF' LINE TABLE LINE # L1 LENGTH 857.16' BEARING N89°25'05"E L4 L5 L6 43.15' 56.63' 258.34' S88°54'46"E N78°40'41"E N89°25'05"E C5 C6 C7 7000.00' 200.00' 300.00' 203.92' 43.32' 56.23' 001°40'09" 012°24'33" 010°44'24" 101.97' 21.74' 28.20' CONSTRUCT 8" CURB PER CITY OF FONTANA STD. 1000.13 6 GRIND AND OVERLAY PER CITY OF FONTANA STD. 1008. DEPTH=2" MIN. AND 5' WIDE MIN. FROM EDGE OF SAWCUT UNLESS OTHERWISE NOTED PROPOSED MEDIAN SOUTH TOP OF CURB EXISTING CENTERLINE ELEVATION VALLEY BLVD - MEDIAN (SOUTH) 10 + 6 3 . 6 7 11 1 8 . 8 1 T C 11 + 0 0 . 0 0 11 1 8 . 9 1 T C 12 + 0 0 . 0 0 11 1 9 . 1 2 T C 13 + 0 0 . 0 0 11 1 9 . 3 0 T C 14 + 0 0 . 0 0 11 1 9 . 5 1 T C 15 + 0 0 . 0 0 11 1 9 . 6 9 T C 0.27%0.21%0.18%0.21%0.18%0.16%0.14% 16 + 0 0 . 0 0 11 1 9 . 8 5 T C 17 + 0 0 . 0 0 11 1 9 . 9 9 T C 3/26/2026