HomeMy WebLinkAbout6573-1SLOVER AVE
BOYLE AVE
VALLEY BLVD
SI
E
R
R
A
A
V
E
JU
N
I
P
E
R
A
V
E
WASHINTON DRIVE
CY
P
R
E
S
S
A
V
E
OL
E
A
N
D
E
R
A
V
E
VALLEY BLVD
MARYGOLD AVE
SLOVER AVE
JU
N
I
P
E
R
A
V
E
SAN BERNARDINO
F
W
Y
PM 20669
INTERSTATE
10
PM - 20669
SEE SHEET 4
SE
E
S
H
E
E
T
5
SEE SHEET 3
EE
T
E
VALLEY BOULEVARD
JU
N
I
P
E
R
A
V
E
N
U
E
PARCEL 1PARCEL 2
SEE SHEET 6
WASHINGTON DRIVE
STREET CONSTRUCTION NOTES
ITEM DESCRIPTION
1
12" MIN OF 95% COMPACTED NATIVE SUBGRADE, PER CITY OF FONTANA STD. 1011.
2 CONSTRUCT 8" CURB AND GUTTER PER CITY OF FONTANA STD. 1000.
3 CONSTRUCT 4" P.C.C. SIDEWALK PER CITY OF FONTANA STD. 1006.
4 CONSTRUCT LOCAL DEPRESSION AT CATCH BASIN PER CITY OF FONTANA STD. 3003, CASE B;
5 CONSTRUCT CURB ACCESS RAMP PER CITY OF FONTANA STD. 1003.
6
EXISTING TRAFFIC SIGNAL TO BE RELOCATED PER SEPARATE APPROVED
TRAFFIC SIGNAL PLANS.
9
EXISTING TRAFFIC PULLBOX TO BE RELOCATED PER SEPARATE APPROVED
TRAFFIC SIGNAL PLANS.
11
EXISTING FIRE HYDRANT TO BE RELOCATED. 12
10
COMMUNICATION VAULT AND STRUCTURE TO BE PROTECTED IN PLACE.
H=1", H1=2".
8 CONSTRUCT CITY OF FONTANA STANDARD STREET LIGHT PER SEPARATE APPROVED STREET LIGHT PLAN.
GRIND AND OVERLAY PER CITY OF FONTANA STD. 1008. DEPTH=2" MIN. AND 5' WIDE MIN. FROM
CONSTRUCT 8" CURB PER CITY OF FONTANA STD. 1000.13
7 CONSTRUCT DRIVEWAY PER CITY OF FONTANA STD. 1001. W PER PLAN
REMOVE EXISTING BERM14
COMMUNICATION VAULT AND STRUCTURE TO BE RELOCATED.15
SEE SIGNING AND STRIPING PLAN16
SAWCUT AND REMOVE EXISTING A.C PAVEMENT AND CONSTRUCT 6.5" A.C PAVEMENT OVER
EDGE OF SAWCUT UNLESS OTHERWISE NOTED
CONSTRUCT 6" CURB AND GUTTER PER CITY OF FONTANA STD. 1000.17
QUANTITIES
QUANTITY UNIT
24,457 SF
1,123 LF
7,600 SF
2 EA
41,123 SF
600 SF
2,417 LF
2 EA
EA5
EA2
EA3
EA1
EA1
500 LF
2 EA
20 LF
VICINITY MAP
OWNER/DEVELOPER
JPI COMPANIES
SIRI SMITH
SAN DIEGO, CA 92130
PHONE: (858) 771-9147
CIVIL ENGINEER
PSOMAS
DAVID J. CURTIS, P.E.
RIVERSIDE, CA 92507
PHONE: (951) 787-8421
1650 SPRUCE STREET, SUITE 400
11988 EL CAMINO REAL, SUITE 200
SURVEYOR
HILLWIG-GOODROW, INC.
ALAN C. HILLWIG, L.S
REDLANDS, CA 92373
PHONE: (909) 794-2673
31419 OUTER HWY 10
SOILS ENGINEER
LEIGHTON AND ASSOCIATES, INC.
10532 ACACIA STREET, SUITE B-6
PHONE: (909) 484-2205
RANCHO CUCAMONGA, CALIFORNIA 91730
UTILITY NOTIFICATIONS
WATER:.........FONTANA WATER COMPANY.........(909) 201-7312
SEWER:.........CITY OF FONTANA........................(909) 350-7610
GAS:.............SOCAL GAS...................................(800) 423-1391
COMM:..........AT&T.............................................(800) 332-1321
ELECTRICITY..SOUTHERN CALIFORNIA EDISON...(800) 611-1911
COMM:..........SPECTRUM.....................................(844) 708-0654
SHEET INDEX
SHEET NO
1
SHEET NAME
TITLE SHEET
2 TYPICAL SECTIONS AND DETAILS
NOT TO SCALE
PROJECT SITE
GENERAL NOTES
1.ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE
LATEST EDITION UNLESS OTHERWISE NOTED.
2.WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE
PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3.ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4.CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR
TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY
WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5.THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA
MANUAL OF TRAFFIC CONTROLS, LATEST NON-METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL
TIMES.
7.THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE
CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8.THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND
OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA.
TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE OTENTIAL EXISTS FOR GROUND MOVEMENT.
9.NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
10.THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER
PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING
DAYS BEFORE EXCAVATION.
11.THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC,
CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND
CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12.THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13.CURVE DATA REFERS TO THE FACE OF CURB.
14.STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15.ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE
PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING
DURING CONSTRUCTION.
16.THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE
CITY ENGINEER.
17.REMOVAL AND REPLACEMENT OF EXISTING SURVEYCONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE
DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS
CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18.THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE
MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
19.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES.
20.ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR.
21.THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22.NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23.A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE-WORKING
OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
24.CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE
SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
25.THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM
TO THE CITY OF FONTANA STANDARD DETAILS.
26.ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE.
27.THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL.
28.NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
29.ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
30.APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
31.PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY
SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32.ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A
GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
33.ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON
COMPLETION OF PAVING.
34.UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES
TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35.CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE
SATISFACTION OF THE CITY ENGINEER.
36.AS-BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE
CITY ENGINEER.
37.SLURRY SEAL ROADS EFFECTED BY THE DEVELOPMENT AS DIRECTED BY THE INSPECTOR. SLURRY SEAL LIMITS MAY EXTEND PAST THE PROJECT
FRONTAGE TO ADDRESS EXISTING STRIPING/PAVEMENT MARKINGS THAT CONFLICTS WITH NEW STRIPING/PAVEMENT MARKINGS, REPAIR TRENCHES,
AND OTHER AREAS AS DETERMINED BY THE INSPECTOR.
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
BEFORE
YOU DIG
TOLL FREE
DIAL
DAYS BEFORE
811
TWO WORKING
YOU DIG
REV.REVISION DESCRIPTION ENGR.DATE CITY DATE
CHECKED BY:
DESIGNED BY:
AND CARRIED FORTH IN A DILIGENT MANNER, THE
STANDARDS IN EFFECT.
PLANS TO BRING THEM INTO CONFORMANCE WITH
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
IMPROVEMENTS NOT COMMENCE WITHIN TWO
SHOULD CONSTRUCTION OF THE REQUIRED
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
Prepared Under The Supervision Of :
DRAWN BY:
14
CITY OF FONTANA, CALIFORNIA
APPROVED BY:DRAWING NO.:
DATE:
SCALE:
STREET IMPROVEMENT PLAN
DATE:
AS SHOWN
STREET IMPROVEMENT PLANS
CITY OF FONTANA
VALLEY BLVD. & JUNIPER AVE.
BASIS OF BEARINGS BENCH MARK:
GIA LAM KIM R.C.E. 62296 CITY ENGINEER
DAVID J. CURTIS R.C.E. 75791
1650 SPRUCE STREET, SUITE 400
RIVERSIDE, CA 92507
951.787.8421 www.psomas.com
VALLEY BLVD. & JUNIPER AVE.
CR
CR
DC
CITY OF FONTANA BENCHMARK THE BASIS OF BEARINGS FOR THIS SURVEY IS THE
CALIFORNIA STATE PLANE COORDINATE SYSTEM,
ZONE 5, CONSTRAINED LOCALLY BETWEEN
CONTINUOUS GPS STATIONS EWPP & RTHS. SAID
BEARING IS S84°19'30"E (NAD83(2011) 2017.50
EPOCH.)
GPS CONTINUOUS OPERATING REFERENCE STATION
EWPP. THE ANTENNA IS AN ASHTECH 701945B_M
W/SCIT DOME. TRUE VERTICAL ANTENNA HEIGHT IS
FROM THE GEODETIC REFERENCE POINT TO THE
BOTTOM OF THE ANTENNA PRE-AMP(BPA) AND IS
0.027 FEET.
ELEVATION = 1194.52
PARCEL MAP NO. 20669
6573
3/5/26
3/5/26
PARCEL MAP 20669No. C75791REGISTERED P R OFESSIONAL
E
N
G
I
N
E
ER
S
T
A
TE OF CA L I F O R NIA
CI V I L
DAV I D J . CU
R
T
I
S
EXP. 6/30/26
MCN22-000145 / ELPC24-00109
INDEX MAPGRAPHIC SCALE
SCALE: 1" =
0 100 200
100
50100
3 PLAN AND PROFILE - VALLEY BOULEVARD (10+63.67 - 17+00)
6 PLAN AND PROFILE - WASHINGTON DRIVE (16+50.49 - 17+31.78)
1
7 STREET SECTIONS - WASHINGTON DRIVE & VALLEY BOULEVARD
8 STREET SECTIONS - VALLEY BOULEVARD
LEGEND
INVERT OF PIPE ELEVATION
PAD ELEVATIONP.E.
INV.
S/W SIDEWALK
PROPOSED FLOW LINE
PROPOSED FENCE
PROPOSED SEWER
EXISTING SEWER
EXISTING WATER
PROPOSED WATER
PROPOSED SIDEWALK
EXISTING SIDEWALK
EXISTING CURB
PROPOSED CURB
CENTERLINE EXISTING
PROPOSED SEWER MANHOLEM.H.
TOP OF CURBT.C.
EXISTING RIGHT OF WAY
S.F.
F.L.
F.S.
F.G.
C/L
R/W
P/L
DWY
SQUARE FEET
FLOW LINE ELEVATION
FINISH SURFACE ELEVATION
FINISH GRADE ELEVATION
CENTERLINE
RIGHT OF WAY
PROPERTY LINE
DRIVEWAY
FINISH FLOOR ELEVATIONF.F.
PROPOSED AC PAVEMENT
PROPOSED RIGHT OF WAY
PROPOSED CONCRETE SIDEWALK
NATURAL GROUND
EDGE OF GUTTERE.G.
N.G.
NOT TO SCALEN.T.S.
PROPOSED GRIND & OVERLAY
EXISTING ELEVATION(X.XX)
TO BE ABANDONEDT.B.A.
PROTECT IN PLACE
OFFSET O/S
P.I.P.
TO BE REMOVEDT.B.R.
REMOVE AND RELOCATE R&R
10
TITLE SHEET
11
4 PLAN AND PROFILE - VALLEY BOULEVARD (17+00 - 22+68.89)
9 STREET SECTIONS - VALLEY BOULEVARD
13 STREET SECTIONS - JUNIPER AVENUE
14 STREET SECTIONS - JUNIPER AVENUE
12 STREET SECTIONS - VALLEY BOULEVARD
STREET SECTIONS - VALLEY BOULEVARD
STREET SECTIONS - VALLEY BOULEVARD
PRIVATE ENGINEER'S NOTES:
1.UNLESS SPECIFIED IN THE PROJECT SPECIFIC CONSTRUCTION DOCUMENTS, ALL CONSTRUCTION SHOWN
HEREON SHALL BE IN ACCORDANCE WITH THE GOVERNING AGENCY ADOPTED VERSION OF THE
UNIFORM BUILDING CODE, THE "STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION"
(CURRENT EDITION) AND THE "STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION" (CURRENT
EDITION).
2.THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OF STRUCTURES SHOWN ON
THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. THESE LOCATIONS ARE
APPROXIMATE AND SHALL BE CONFIRMED IN THE FIELD BY THE CONTRACTOR, SO THAT ANY
NECESSARY ADJUSTMENTS CAN BE MADE IN ALIGNMENT AND/OR GRADE OF THE PROPOSED
IMPROVEMENTS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO
PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER LINES NOT OF RECORD OR NOT SHOWN ON
THESE PLANS.
3.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL POSITION
OF ALL POINTS OF CONNECTION TO EXISTING STRUCTURES. THIS SHALL INCLUDE BOTH ABOVE
GROUND AND BELOW GROUND POINTS OF CONNECTION. THE ENGINEER SHALL BE NOTIFIED OF ANY
DISCREPANCIES PRIOR TO BEGINNING CONSTRUCTION.
4.THICKNESS OF PAVEMENT AND BASE MATERIAL SHOWN HEREON IS PRELIMINARY ONLY. FINAL
PAVEMENT SECTION TO BE DETERMINED BY SOILS TEST AND RECOMMENDED BY THE SOILS ENGINEER
UPON COMPLETION OF ROUGH GRADING.
5.THE ESTIMATES OF IMPROVEMENT QUANTITIES AS SHOWN HEREON ARE PROVIDED ONLY FOR THE
PURPOSE OF SATISFYING AGENCY PLAN INFORMATION REQUIREMENTS. THE CONTRACTOR SHALL
PERFORM AN INDEPENDENT ESTIMATE OF ALL IMPROVEMENT QUANTITIES AND SHALL USE SAME AS A
BASIS FOR HIS BID(S) AND CONTRACT(S).
6.THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB
SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF
ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE
LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND
HOLD THE OWNER, THE CITY OF FONTANA, AND ENGINEEER HARMLESS FROM ANY AND ALL LIABILITY
REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING
FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER, THE CITY OF FONTANA, OR THE
ENGINEER.
7.THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR ASSURING THE ACCURACY AND
ACCEPTABILITY OF THE DESIGN HEREON. IN THE EVENT OF DISCREPANCIES ARISING AFTER APPROVAL
OR DURING CONSTRUCTION, THE PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING AN
ACCEPTABLE SOLUTION AND REVISING THE PLANS FOR APPROVAL BY THE CITY.
5 PLAN AND PROFILE - JUNIPER AVENUE (13+21.56 - 19+10.94)
3/26/2026