Loading...
HomeMy WebLinkAbout6616-50REVISION DESCRIPTIONREV. SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH AND CARRIED FORTH IN A DILIGENT MANNER, THE STANDARDS IN EFFECT. DATE ENGR.APPR.DATE APPROVED BY: GIA LAM KIM, CITY ENGINEER R.C.E. 62296 CITY OF FONTANA, CALIFORNIA DRAWN BY: DESIGNED BY: CHECKED BY: 59DATE: DRAWING NO.: SCALE: DATE:Orange, California 92868 2141 W. Orangewood Ave., Suite A Tel: (714) 573-0317 Fax: (714) 573-9534 SIGNING AND STRIPING PLAN 50 CITRUS AVENUE FROM FOOTHILL BOULEVARD TO VALLEY BOULEVARD FO-SS-11 7/10/2025AS-BUILT AMC 23-1002919 DRAGAN BUHA, PE 1/18/23 FO-SS-11 6616 GLK 2/24/26