HomeMy WebLinkAbout6616-48REVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMANCE WITH
AND CARRIED FORTH IN A DILIGENT MANNER, THE
STANDARDS IN EFFECT.
DATE ENGR.APPR.DATE
APPROVED BY:
GIA LAM KIM, CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DRAWN BY:
DESIGNED BY:
CHECKED BY:
59DATE:
DRAWING NO.:
SCALE:
DATE:Orange, California 92868
2141 W. Orangewood Ave., Suite A
Tel: (714) 573-0317 Fax: (714) 573-9534
CITRUS AVENUE
FROM FOOTHILL BOULEVARD TO
VALLEY BOULEVARD
SIGNING AND STRIPING PLAN
48
FO-SS-09
7/10/2025AS-BUILT AMC
11/19/2024 REVISION #4 - REVISED STRIPING PER CITY
DIRECTION
AMC
REVISED
REVISED
23-1002919
DRAGAN BUHA, PE
1/18/23
FO-SS-09
6616
GLK
GLK
2/24/26
2/24/26