Loading...
HomeMy WebLinkAbout6616-31REVISION DESCRIPTIONREV. SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH AND CARRIED FORTH IN A DILIGENT MANNER, THE STANDARDS IN EFFECT. DATE ENGR.APPR.DATE APPROVED BY: GIA LAM KIM, CITY ENGINEER R.C.E. 62296 CITY OF FONTANA, CALIFORNIA DRAWN BY: DESIGNED BY: CHECKED BY: 59DATE: DRAWING NO.: SCALE: DATE:Orange, California 92868 2141 W. Orangewood Ave., Suite A Tel: (714) 573-0317 Fax: (714) 573-9534 31 CITY OF FONTANA SBCTA METROLINK STATION ACCESSIBILITY IMPROVEMENTS - PHASE II TITLE SHEET STREET IMPROVEMENT PLAN FO-G-01 BASIS OF BEARINGS: BEARINGS SHOWN HEREON ARE BASED ON THE BEARINGS BETWEEN GPS NO. EWPP AND GPS NO. RTHS BEING NORTH 84° 19' 30" WEST. BENCHMARK: CITY OF FONTANA BENCH MARK NO. CS 700-12, NGVD 29 ELEVATION=1254.125'. DESCRIPTION: FOUND BRASS DISK TOP CURB 55' SOUTH OF AT&SF R.R 28' WEST OF CENTERLINE MANGO. 7/10/2025AS-BUILT AMC 23-1002919 DRAGAN BUHA, PE 1/18/23 FO-G-01 6616 SIDEWALK IMPROVEMENTS GLK 2/24/26