HomeMy WebLinkAbout6616-31REVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMANCE WITH
AND CARRIED FORTH IN A DILIGENT MANNER, THE
STANDARDS IN EFFECT.
DATE ENGR.APPR.DATE
APPROVED BY:
GIA LAM KIM, CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DRAWN BY:
DESIGNED BY:
CHECKED BY:
59DATE:
DRAWING NO.:
SCALE:
DATE:Orange, California 92868
2141 W. Orangewood Ave., Suite A
Tel: (714) 573-0317 Fax: (714) 573-9534
31
CITY OF FONTANA
SBCTA METROLINK STATION ACCESSIBILITY IMPROVEMENTS - PHASE II
TITLE SHEET
STREET IMPROVEMENT PLAN
FO-G-01
BASIS OF BEARINGS: BEARINGS SHOWN HEREON ARE BASED ON THE BEARINGS BETWEEN GPS NO. EWPP
AND GPS NO. RTHS BEING NORTH 84° 19' 30" WEST.
BENCHMARK: CITY OF FONTANA BENCH MARK NO. CS 700-12, NGVD 29 ELEVATION=1254.125'.
DESCRIPTION: FOUND BRASS DISK TOP CURB 55' SOUTH OF AT&SF R.R 28' WEST OF CENTERLINE MANGO.
7/10/2025AS-BUILT AMC
23-1002919
DRAGAN BUHA, PE
1/18/23
FO-G-01
6616
SIDEWALK IMPROVEMENTS
GLK 2/24/26