Loading...
HomeMy WebLinkAbout1.0_14970 Jurupa Ave_Architectural Set_PC6MOUNTAIN VIEW INDUSTRIAL PARK 13 14970 JURUPA AVE. FONTANA, CA 92337 PR O J E C T 3/24/2025 9:31:11 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A0 TITLE SHEET MT N V I E W I N D P A R K 1 3 T 5,000 SF OFFICE 5,000 SF MEZZ. LANDSCAPE AREA CONCRETE PAVING WHEN OCCURS @ PARKING AREAS, DRIVE AISLES, & OR TRUCK COURT. SEE CIVIL DRAWINGS FOR PAVING SECTIONS FIRE HYDRANT. PROVIDE PIPE BOLLARD PROTECTION POSTS AS REQUIRED BY THE FIRE AUTHORITY. SEE 3/AD1.1 STREET LIGHT INDICATES AN ACCESSIBLE ROUTE. MUST COMPLY w/ SITE PLAN GENERAL NOTE #6 PROPERTY LINENORTH PROJECT LOCATION JURUPA AVE LI V E O A K A V E HE M L O C K A V E CH E R R R Y A V E BE E C H A V E EL M A V E FWY 10 SLOVER AVE SANTA ANA AVE 1. THE SITE PLAN SHALL MEET ALL ENGINEERING & NPDES REQUIREMENTS. 2. GENERAL CONTRACTOR TO REVIEW THE SOILS REPORT AND ALL AMMENDMENTS LISTED ON THE TITLE SHEET AND FOLLOW ALL RECOMMENDATIONS. 3. U.O.N., ALL DIMENSIONS TO CONCRETE WALLS AND CURBS ARE EITHER TO THE CENTER (SHOWN WITH A CENTERLINE) OR FACE OF THE WALL OR CURB. ALL DIMESIONS TO FRAMED WALLS ARE EITHER TO THE CENTER LINE OF THE WALL FRAMING (SHOWN WITH A CENTERLINE) OR THE FACE OF THE WALL FINISH. 4. REFER TO CIVIL, AND MEP PLANS TO CONFIRM UTILITY INFORMATION SHOWN ON THE ARCHITECT'S SITE PLAN AND FOR ADDITIONAL UTILITY INFORMATION. GENERAL CONTRACTOR TO COORDINATE ALL POINTS OF CONNECTION. 5. REFER TO CIVIL DRAWINGS FOR ALL FINISHED GRADES AND SLOPES. ALL FINISHED GRADES TO PROVIDE POSITIVE DRAINAGE AWAY FROM THE BUILDING. GENERAL CONTRACTOR TO FIELD VERIFY. 6. ALL ACCESSIBLE ROUTES INDENTIFIED ON THE SITE PLAN DRAWINGS SHALL CONFORM TO THE FOLLOWING: a)SLOPES IN THE DIRECTION OF TRAVEL DO NOT EXCEED 5%. CROSS SLOPES DO NOT EXCEED 2%. 6. b)THE CLEAR WIDTH OF ALL WALKWAYS IS 4'-0" MIN. c)CHANGES IN LEVEL UP TO 1/2" COMPLY w/ 11/A0.2.1. CHANGES IN LEVEL GREATER THAN 1/2" IF THEY OCCUR AR E RAMPED. SEE PLANS. d)THE VERTICAL CLEARANCE ALONG THE ACCESSIBLE ROUTE IS 80" MIN. 7. ALL PAVED AND LANDSCAPED AREAS TO BE BOUND BY A MIN . 6" HIGH, 6" WIDE CONCRETE CURB U.O.N. 8. A CONCRETE MOW STRIP EXTENDING 12" BEYOND EA END OF THE OPENING SHALL BE PROVIDED @ ALL EXTERIOR GLAZIN G WHERE THE SILL IS WITHIN 3' VERICAL OF THE FINISHED GRADE. SEE 2/AD1.1 9. PROVIDE PIPE BOLLARD PROTECTION POSTS AS REQUIRED B Y UTILITY COMPANIES AND OR FIRE AUTHORITIES AT ALL EX TERIOR ELECTRICAL EQUIPMENT AND FIRE PREVENTION DEVICES. IF PIPE BOLLARD PROTECTION POST DETAILS ARE NOT PROVIDED B Y UTILITY COMPANIES AND OR FIRE AUTHORITY SEE DETAIL 3/AD1.1 10. ALL EXPOSED BIORETENSION DEVICE COVERINGS SHALL BE PAINTED FORREST GREEN. 11. WHERE OCCURS, GENERAL CONTRACTOR TO PROVIDE FLUID APPLIED DAMP PROOFING AT ALL RETAINING AND PLANTER WALLS WHERE THE SIDE OF THE WALL OPPOSITE THE SOIL SIDE IS EXPOSED TO VIEW AND ALL EXTERIOR WALLS WHER E THE ADJACENT FLOOR SLAB IS BELOW GRADE. SEE 6/AD1.2 12. PROVIDE A HOSE BIB NEAR THE MAIN BUILDING ENTRANCE THE . SEE PLAN FOR LOCATION. 60 DOCK DOORS PROPOSED PROPOSED BUILDING 42' CLEAR SLAB IS FLAT PER CIVIL 5,000 SF OFFICE 5,000 SF MEZZ. 5,000 SF OFFICE 5,000 SF MEZZ. 8' - 0" 48' - 0" TYP. 58' - 0" 19' - 0" 30' - 0" 19' - 0" 50 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 60 ' - 0 " TYP. 58' - 0" 48' - 0" 8' - 0" 19' - 0" 30' - 0" 19' - 0" 20' - 5" +/- 70 ' - 0 " 55 ' - 0 " 5 5 ' - 0 " JURUPA AVE. LI V E O A K A V E . HE M L O C K A V E . 48 0 ' - 0 " 1140' - 0" 106' - 0" 928' - 0" 106' - 0" 146 ELEC. ROOM ROOF ACCESS BA T T E R Y CH A R G I N G PUMP ROOM 1 A1_1 4 A1_1 3 A1_1 A1_2 2 A1_31 3 A1_3 3 A1_3 159 159 15 11 14 14 9 13 1412 1414 14 9 9 5 A1_1 FUTURE OFFICE 30 ' F I R E L A N E 30' FIRE LANE 30 ' F I R E L A N E FUTURE OFFICE 12 8 12' - 0" A1_2 1 A1_32 19' - 10" +/-115' - 5" +/- 2 A1_1 1 A1_4 2 A1_4 3 A1_4 PROPOSED BUS TURN-OUT 48 0 ' - 0 " 3 A1_4 SIM SE T B A C K 30 ' B L D G 1 A1_5 2 A1_5 14 9 5 10 143 114 114 114 114 20' - 0" 178 20' - 0" 70 ' - 0 " 19 ' - 0 " 2 6 ' - 0 " 10 ' - 0 " 19 ' - 0 " 2 6 ' - 0 " 2 7 ' - 0 " 20 ' - 0 " 10 ' - 0 " 20 ' - 0 " 22 ' - 0 " 22 ' - 0 " 178 9 10 8 6 DR I V E 35 ' - 0 " 1 4 8 ' - 1 1 3 / 4 " + / - 1 1 0 ' - 1 1 1 / 8 " + / - DR I V E 50 ' - 0 " 135135 135135 156 156 107 10 ' - 1 1 " 50 ' - 0 " 20 ' - 0 " 20 ' - 0 " 27 6 ' - 0 " 40' - 0" +/-96' - 5" +/- 29 6 ' - 0 1 / 4 " + / - 96' - 3" +/-34' - 5" +/- 174174 16 6 ' - 0 " 109 TY P . 9' - 0 " 11 ' - 8 " + / - 3' - 0 " 12 ' - 1 1 " 19' - 0" 19' - 0" 10' - 0" 9' - 6" 10' - 0" 26' - 0" 19' - 0" 8' - 6" 5' - 0" 19' - 0" TY P . 9' - 0 " 13 ' - 0 " 14 4 ' - 0 " + / - 14 1 ' - 8 " + / - 119 96' - 7" +/-34' - 5" +/- 18 ' - 0 " 179179 112 112 111 112 112 111 111 112 111 111 111 112 111 112 111 111 112 112 112 112 111 111 DR I V E 50 ' - 0 " R 19' - 0" R 1 9' - 0 " R 4 8 ' - 0 " R 4 8 ' - 0 " R 4 8 ' - 0 " R 48' - 0" R 19' - 0" R 1 9 ' - 0 " 30 1 ' - 0 1 / 4 " + / - DR I V E 35 ' - 0 " 20' - 0"19' - 0" 30' - 0" 19' - 0" 60 ' - 4 " + / - 18 ' - 4 " + / - 21 0 ' - 0 " + / - 22 1 ' - 4 " + / - R 4 0 ' - 0 " R 4 0' - 0" R 18' - 0" R 2 0 ' - 0 " 27' - 0" 27' - 0" 5' - 0" 8' - 6" 180180 5' - 7 " + / - PR O J E C T 3/24/2025 9:31:16 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A1 SITE PLAN MT N V I E W I N D P A R K 1 3 KEYNOTES LOT AREA (EXCL. OF BLDG) % LANDSCAPING REQUIRED AREA LANDSCAPING PROVIDED % LANDSCAPING PROVIDED 487191 SF 15% 109990 SF 22.6% SQUARE FOOTAGE ACRES NET 969431 SF 22.26 SPACE TYPE SPACES REQUIRED STANDARD STALLS 55 STANDARD ACCESSIBLE STALLS 3 VAN ACCESSIBLE STALLS 2 EV CAPABLE STALL (w/o EVSE) 55 EVCS (EV CAPABLE STALL w/ EVSE) 1 STANDARD ACCESSIBLE EVCS (EV CAPABLE STALL w/ EVSE) 1 VAN ACCESSIBLE EVCS (EV CAPABLE STALL w/ EVSE) 2 AMBULATORY ACCESSIBLE EVCS (EV CAPABLE STALL w/ EVSE) 2 TOTAL 121 SPACE TYPE SPACES PROVIDED STANDARD STALLS 110 STANDARD ACCESSIBLE STALLS 5 VAN ACCESSIBLE STALLS 2 EV CAPABLE STALL (w/o EVSE) 106 EVCS (EV CAPABLE STALL w/ EVSE) 1 STANDARD ACCESSIBLE EVCS (EV CAPABLE STALL w/ EVSE) 4 VAN ACCESSIBLE EVCS (EV CAPABLE STALL w/ EVSE) 2 AMBULATORY ACCESSIBLE EVCS (EV CAPABLE STALL w/ EVSE) 4 TOTAL 234 99 128 NAME AREA LEVEL 01 WAREHOUSE 472240 SF OFFICE 5000 SF OFFICE 5000 SF 482240 SF MEZZANINE OFFICE 5000 SF OFFICE 5000 SF 10000 SF GROUND LEVEL + MEZZANINE WAREHOUSE 472240 SF OFFICE 20000 SF TOTAL BUILDING AREA 492240 SF SITE LEGENDSITE PLAN GENERAL NOTESSCOPE OF WORK CONSTRUCT NEW ONE STORY + MEZZANINE CONCRETE TILT-U P WAREHOUSE/DISTRIBUTION FACILITY WITH ELECTRICAL AND PLUMBING SERVICES, EXTERIOR LIGHTING, LANDSCAPING & IRRIGATION, TRASH ENCLOSURES, CONCRETE SCREEN WALLS, AND SLIDING/SWINGING METAL GATES. FIR E SPRINKLER AND GRADING PLANS TO BE A SEPARATE SUBMITTAL AND PERMIT LEGAL DESCRIPTION & ZONING LEGAL DESCRIPTION: SEE CIVIL DRAWINGS. ASSESSOR'S PARCEL NO: 0237-121-03 & 0237-122-07 A1 SITE PLAN A1_1 ENLARGED SITE PLANS A1_2 GATE & FENCE ELEVATIONS A1_3 GATE & FENCE ELEVATIONS A1_4 LINE OF SIGHT A1_5 LINE OF SIGHT A2_1 GROUND LEVEL FLOOR PLANS A2_2 MEZZANINE LEVEL FLOOR PLANS A3 ROOF PLAN A4_1 EXTERIOR ELEVATIONS A4_2 COLOR ELEVATIONS A4_3 RENDERINGS A5 COLOR BOARD C1 CONCEPT GRADING PLAN C2 CONCEPT GRADING SECTIONS C3 CONCEPT UTILITY PLAN L1 PRELIMINARY LANDSCAPE PLAN L2 PRELIMINARY LANDSCAPE PLAN FC-1.0 PHOTOMETRIC PLAN SHEET INDEX PROLOGIS 3546 CONCOURSE ST., SUITE 100 ONTARIO CA 91764 CONTACT: D.J. ARELLANO PHONE: 562.376.92333 EMAIL: DARELLANO@PROLOGIS.COM DEVELOPER/OWNER HERDMAN ARCHITECTURE & DESIGN, INC. 3800 E. COAST HIGHWAY STE 6 CORONA DEL MAR, CA 92625 CONTACT: BRIDGET HERDMAN PHONE: 714.389.2800 EMAIL: PROJECTADMIN@HERDMAN-AD.COM APPLICANT'S REPRESENTATIVE/ARCHITECT VICINITY MAP TOTAL PARKING REQUIRED REQUIRED PARKING BREAKDOWN PARKING PROVIDED TRAILER PARKING PROVIDED TRAILER PARKING REQUIRED 1/5000 LANDSCAPE AREA SUMMARY BUILDING AREA SUMMARY FLOOR AREA RATIO LOT AREA BUILDING AREA SITE AREA FAR ALLOWABLE FAR PROVIDED 492240 SF 969431 SF 55% 50.8% 107 (N) SIDEWALK. 109 (N) TRANSFORMER LOCATION. 111 TYP U.O.N., STANDARD PARKING STALL. 9'-0" WIDE x 19'-0" DEEP 112 EV (ELECTRIC VEHICLE) CAPABLE PARKING STALL. PROVIDE FOR FUTURE EVSE (ELECTRIC VEHICLE SUPPLY EQUIPMENT). MATCH STANDARD STALL SIZE 114 ACCESSIBLE PARKING SITE ENTRANCE SIGN. 119 TRUCK TRAILER PARKING STALL. 135 CONCRETE TILT-UP SCREEN WALL. MIN HEIGHT 8'ABOVE HIGHEST ADJACENT FINISHED GRADE. PAINT BOTH SIDES AND TOP OF WALL. SEE PLANS FOR COLOR SCHEDULE. 143 PAINTED STEEL ROLLING GATE(S). MIN HEIGHT 8' ABOVE HIGHEST ADJACENT FINISHED GRADE OR AS SHOWN ON EXTERIOR ELEVATIONS. PROVIDE KNOX BOX AS REQUIRED BY FIRE AUTHORITY. 146 2 POSITION BIKE RACK. 156 FUTURE GUARD SHACK. 159 MONUMENT SIGN. 174 12"h x 6"w CONCRETE CURB TYP @ ALL CURBS IN TRUCK COURT AREA. 178 20' WIDE EMERGENCY VEHICLE ACCESS POINT WITH A MANUAL GATE, LESS THAN 14% GRADE (SEE CIVIL & LANDSCAPE DWGS). 179 EXISTING SCREEN WALL ON NEIGHBORING PROPERTY. 180 EXISTING CURB ALONG PROPERTY LINE. BUILDING USE BUILDING AREA PARKING RATIO 1/X REQ. PARKING OFFICE 20000 SF 5000 4 WAREHOUSE 20000 SF 1000 20 WAREHOUSE 20000 SF 2000 10 WAREHOUSE 432240 SF 5000 87 TOTAL 492240 SF 121 BUILDING ADDRESS:14970 JURUPA AVE. CONSTRUCTION TYPE:III-B OCCUPANCY:B / S -1 FIRE SPRINKLER:YES (ESFR NFPA 72, NFPA 13 & NFPA 24) CLEAR HEIGHT:42' @ 6" INSIDE FIRST COLUMN LINE ZONING: GENERAL PLAN:IL (LIGHT INDUSTRIAL) SPECIFIC PLAN:JURUPA NORTH RESERACH & DEVELOPMENT DISTRICT (JND) - SOUTHWEST INDUSTRIAL PARK S.P. FEMA FLOOD ZONE: NO FLOOD ZONE BUILDING SETBACKS: FRONT SETBACK: 30' SIDE SETBACK:20' REAR SETBACK:- MAX. HEIGHT: 60' ALLOWABLE AREA: UNLIMITED AREA PER CBC 507 OR X SF PER TABLE 506.2 PROJECT INFORMATION & AREA ANALYSIS A1 Scale. 1" = 50'-0" PROPOSED SITE PLAN1 PROJECT DESCRIPTION THE APPLICANT FOR THE PROPOSED PROJECT IS REQUESTIN G APPROVAL FROM THE CITY OF FONTANA TO REMOVE EXISTING STRUCTURES F ROM THE SITE AND TO CONSTRUCT A NEW 492,240 SF LOGISTICS AND DISTRIBUTION FACILITY WITH PARKING, LANDSCAPINNG, AND ON-SITE IMPROVEMENTS. LANDSCAPE AREA CONCRETE PAVING WHEN OCCURS @ PARKING AREAS, DRIVE AISLES, & OR TRUCK COURT. SEE CIVIL DRAWINGS FOR PAVING SECTIONS FIRE HYDRANT. PROVIDE PIPE BOLLARD PROTECTION POSTS AS REQUIRED BY THE FIRE AUTHORITY. SEE 3/AD1.1 STREET LIGHT INDICATES AN ACCESSIBLE ROUTE. MUST COMPLY w/ SITE PLAN GENERAL NOTE #6 PROPERTY LINE NOTES: 1. ALL IMPERFECTIONS ON THE SURFACE OF THE CONCRETE WALL PANELS SHALL BE PATCHED / SACKED / SANDED SMOOTH PRIOR TO PAINTING. 2. ALL INTERIOR AND EXTERIOR FABRICATED STEEL SHALL BE SHOP PRIMED WITH A GRAY, RUST INHIBITIVE PRIMER PRIOR TO DELIVERY TO THE JOB SITE. ANY AND ALL DAMAGE TO THE PRIMER COAT SHALL BE TOUCHED UP PRIOR TO ADDITIONAL FINAL COLOR PAINTING OR COMPLETION OF THE PROJECT. 3. PAINT MAN DOORS, STAIR & RAMP GUARD WALLS, GUARD RAILS, DOWN SPOUTS, LOUVERS, & ROOF LEVEL WALL PANEL RETURNS TO MATCH ADJACENT BUILDING WALL COLOR, U.O.N. 4. U.O.N., EXTERIOR SIDE OF TRUCK DOORS TO BE "A" INTERIOR SIDE TO BE PRE-FINISHED WITH MANUFACTURER'S LIGHT GRAY. 5. POWER WASH EXTERIOR CONCRETE WALLS PRIOR TO PAINTING TO REMOVE ALL CHEMICALS AND DIRT THAT WILL IMPEDE THE PRIMER COAT FROM ADHERING TO THE WALLS. 6. PAINT EXTERIOR WALLS w/ 1- COAT SPRAYED AND BACK ROLLED ACRYLIC FLAT PRIMER AND 2-COATS SPRAYED-ON FLAT FINISH IN THE FINAL WALL COLOR. FINISHED JOB SHALL BE SMOOTH AND FREE OF LAPPING AND OR STREAKING, REGARDLESS OF THE COLOR. 7. EXCEPT WHERE NOTED OTHERWISE ON THE PLANS ALL PANEL JOINTS SHALL BE CAULKED PER DETAIL 1/AD4.1. 8. PAINT CONCRETE BEHIND ANY OPEN TRELLIS WORK THE COLOR OF THE TRELLIS. 9. @ SOLID BROWS WITH GLAZING DIRECTLY ABOVE OR BELOW, PAINT THE EXPOSED WALL CHAMFER JUST ABOVE OR BELOW THE BROW TO MATCH THE BROW COLOR. 10. PAINT ALL WALL REVEALS THE COLOR OF THE ADJACEN T WALL. WHEN THERE IS A COLOR CHANGE AT THE REVEAL, SEE 2/AD4.1 11. U.O.N., PAINT THE SIDE OPPOSITE THE SIDE SHOWN OF SCREEN WALLS THE SAME COLOR AS THE SIDE SHOWN. IF THERE ARE TWO COLORS SHOWN, USE THE BASE COLOR. 12. ALL PAINTS USED SHALL BE AS SPECIFIED BY THE MANUFACTURER FOR THE PROPOSED USE EXTERIOR PAINT COLOR: PLD-9 PURE WHITE EXTERIOR PAINT COLOR: PLD-6 STABLE EXTERIOR PAINT COLOR: PLD-7 LIQUORICE TINT EXTERIOR PAINT COLOR: PLD-8 DRAKE EXTERIOR PAINT COLOR: PLD-5 NEW DARK GREEN ACM PANEL COLOR: CHARCOAL ANODIZED PAINT COLOR FOR EXPOSED STEEL BROW & CANOPY FRAMING, WALL BEHIND OPEN TRELLIS (KEY NOTE 428, OR 429) WHEN OCCURS & TRASH ENCLOSURE METAL ROOF, ROOF BEAMS, & SUPPORT COLUMNS. ACM PANEL COLOR:GREEN ANODIZED EXTERIOR STOREFRONT FRAMING COLOR: CLEAR ANODIZED MULLION EXTERIOR GLASS COLOR FOR SINGLE GLAZING & EXTERIOR LAYER OF INSULATED GLASS: GREEN. EXTERIOR GLASS COLOR FOR THE INNER LAYER OF INSULATED GLASS: CLEAR GLASS A B C D E F G H 1. THE SITE PLAN SHALL MEET ALL ENGINEERING & NPDES REQUIREMENTS. 2. GENERAL CONTRACTOR TO REVIEW THE SOILS REPORT AND ALL AMMENDMENTS LISTED ON THE TITLE SHEET AND FOLLOW ALL RECOMMENDATIONS. 3. U.O.N., ALL DIMENSIONS TO CONCRETE WALLS AND CURBS ARE EITHER TO THE CENTER (SHOWN WITH A CENTERLINE) OR FACE OF THE WALL OR CURB. ALL DIMESIONS TO FRAMED WALLS ARE EITHER TO THE CENTER LINE OF THE WALL FRAMING (SHOWN WITH A CENTERLINE) OR THE FACE OF THE WALL FINISH. 4. REFER TO CIVIL, AND MEP PLANS TO CONFIRM UTILITY INFORMATION SHOWN ON THE ARCHITECT'S SITE PLAN AND FOR ADDITIONAL UTILITY INFORMATION. GENERAL CONTRACTOR TO COORDINATE ALL POINTS OF CONNECTION. 5. REFER TO CIVIL DRAWINGS FOR ALL FINISHED GRADES AND SLOPES. ALL FINISHED GRADES TO PROVIDE POSITIVE DRAINAGE AWAY FROM THE BUILDING. GENERAL CONTRACTOR TO FIELD VERIFY. 6. ALL ACCESSIBLE ROUTES INDENTIFIED ON THE SITE PLAN DRAWINGS SHALL CONFORM TO THE FOLLOWING: a. SLOPES IN THE DIRECTION OF TRAVEL DO NOT EXCEED 5%. CROSS SLOPES DO NOT EXCEED 2%. b. THE CLEAR WIDTH OF ALL WALKWAYS IS 4'-0" MIN. c. CHANGES IN LEVEL UP TO 1/2" COMPLY w/ 11/A0.2.1. CHANGES IN LEVEL GREATER THAN 1/2" IF THEY OCCUR ARE RAMPED. SEE PLANS. d. THE VERTICAL CLEARANCE ALONG THE ACCESSIBLE ROUTE IS 80" MIN. 7. ALL PAVED AND LANDSCAPED AREAS TO BE BOUND BY A MIN. 6" HIGH, 6" WIDE CONCRETE CURB U.O.N. 8. A CONCRETE MOW STRIP EXTENDING 12" BEYOND EA END OF THE OPENING SHALL BE PROVIDED @ ALL EXTERIOR GLAZING WHERE THE SILL IS WITHIN 3' VERICAL OF THE FINISHED GRADE. SEE 2/AD1.1 9. PROVIDE PIPE BOLLARD PROTECTION POSTS AS REQUIRED BY UTILITY COMPANIES AND OR FIRE AUTHORITIES AT ALL EXTERIOR ELECTRICAL EQUIPMENT AND FIRE PREVENTION DEVICES. IF PIPE BOLLARD PROTECTION POST DETAILS ARE NOT PROVIDED BY UTILITY COMPANIES AND OR FIRE AUTHORITY SEE DETAIL 3/AD1.1 10. ALL EXPOSED BIORETENSION DEVICE COVERINGS SHALL BE PAINTED FORREST GREEN. 11. WHERE OCCURS, GENERAL CONTRACTOR TO PROVIDE FLUID APPLIED DAMP PROOFING AT ALL RETAINING AND PLANTER WALLS WHERE THE SIDE OF THE WALL OPPOSITE THE SOIL SIDE IS EXPOSED TO VIEW AND ALL EXTERIOR WALLS WHERE THE ADJACENT FLOOR SLAB IS BELOW GRADE. SEE 6/AD1.2 12. PROVIDE A HOSE BIB NEAR THE MAIN BUILDING ENTRANCE THE . SEE PLAN FOR LOCATION. 116 115 117 176 113 162 163 110 110 123 6" 3' - 0" 163 121 120 122 9' - 0 " 1 0 ' - 0 " 5 ' - 0 " 9 ' - 0 " 9 ' - 0 " 5 ' - 0 " 1 2 ' - 0 " 2' - 0 " 106 112 117 110 115 115 162 110 121 163 6" 3' - 6" 9' - 0 " 5 ' - 0 " 9 ' - 0 " 1 2 ' - 0 " 5 ' - 0 " 9 ' - 0 " 117 123 146 146 176 115 112 162 106 163 110 3' - 6" 6" 121 5' - 0 " 9 ' - 0 " 123 115 116 117 163 176 120 122 162 110 110 121 0" 1 5 ' - 0 " 9 ' - 0 " 1 2 ' - 0 " 5 ' - 0 " 9 ' - 0 " 2 ' - 0 " 123 123 6" 1' - 6 " 5' - 0 " 1' - 6 " 6" 9' - 0 " R 3' - 0" R 3 ' - 0 " 19' - 0" 106 @ E N D O F C U R B S 2' - 0 " T Y P . PR O J E C T 3/24/2025 9:31:20 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A1_1 ENLARGED SITE PLANS MT N V I E W I N D P A R K 1 3 KEYNOTES EXTERIOR COLOR SCHEDULE 106 @ SHADING, PROPOSED LANDSCAPING. SEE LANDSCAPE PLANS. 110 ACCESS AISLE FOR ACCESSIBLE PARKING STALL. 5'-0" WIDE 112 EV (ELECTRIC VEHICLE) CAPABLE PARKING STALL. PROVIDE FOR FUTURE EVSE (ELECTRIC VEHICLE SUPPLY EQUIPMENT). MATCH STANDARD STALL SIZE 113 EVCS (ELECTRIC VEHICLE CHARGING STATION). PROVIDE EVSE (ELECTRIC VEHICLE SUPPLY EQUIPMENT). MATCH STANDARD STALL SIZE. 115 STANDARD ACCESSIBLE PARKING STALL. 9'-0" WIDE x DEPTH OF STANDARD STALL. 116 VAN ACCESSIBLE PARKING STALL. 12'-0" WIDE x DEPTH OF STANDARD STALL 117 STANDARD ACCESSIBLE EVCS (ELECTRICAL VEHICLE CHARGING STATION). 9'-0" WIDE x DEPTH OF STANDARD STALL. PROVIDE ELECTRIC VEHICLE SUPPLY EQUIPMENT. 120 TRUNCATED DOME DETECTABLE WARNING SURFACE. MIN 3'-0" DEEP IN THE DIRECTION OF TRAVEL. 121 PRECAST CONCRETE WHEEL STOP. 122 ZERO CURB FACE. 123 CURB RAMP. 8.33% MAX SLOPE w/ 2% MAX CROSS SLOPE. 146 2 POSITION BIKE RACK. 162 ACCESSIBLE BUILDING ENTRANCE. 163 FUTURE EVCS CHARGING EQUIPMENT. 176 AMBULATORY ACCESSIBLE EVCS (ELECTRICAL VEHICLE CHARGING STATION). 10'-0" WIDE x DEPTH OF STANDARD STALL. PROVIDE ELECTRIC VEHICLE SUPPLY EQUIPMENT. SITE PLAN GENERAL NOTES SITE LEGEND A1_1 Scale. 1/8" = 1'-0" ENLARGED SITE PLAN NORTHWEST CORNER1 A1_1 Scale. 1/8" = 1'-0" ENLARGED SITE PLAN SOUTH WEST CORNER2 A1_1 Scale. 1/8" = 1'-0" ENLARGED SITE PLAN SOUTH EAST CORNER3 A1_1 Scale. 1/8" = 1'-0" ENLARGED SITE PLAN NORTHEAST CORNER4 A1_1 Scale. 1/8" = 1'-0" ENLARGED PLANTER PLAN5 NOTES: 1. ALL IMPERFECTIONS ON THE SURFACE OF THE CONCRETE WALL PANELS SHALL BE PATCHED / SACKED / SANDED SMOOTH PRIOR TO PAINTING. 2. ALL INTERIOR AND EXTERIOR FABRICATED STEEL SHALL BE SHOP PRIMED WITH A GRAY, RUST INHIBITIVE PRIMER PRIOR TO DELIVERY TO THE JOB SITE. ANY AND ALL DAMAGE TO THE PRIMER COAT SHALL BE TOUCHED UP PRIOR TO ADDITIONAL FINAL COLOR PAINTING OR COMPLETION OF THE PROJECT. 3. PAINT MAN DOORS, STAIR & RAMP GUARD WALLS, GUARD RAILS, DOWN SPOUTS, LOUVERS, & ROOF LEVEL WALL PANEL RETURNS TO MATCH ADJACENT BUILDING WALL COLOR, U.O.N. 4. U.O.N., EXTERIOR SIDE OF TRUCK DOORS TO BE "A" INTERIOR SIDE TO BE PRE-FINISHED WITH MANUFACTURER'S LIGHT GRAY. 5. POWER WASH EXTERIOR CONCRETE WALLS PRIOR TO PAINTING TO REMOVE ALL CHEMICALS AND DIRT THAT WILL IMPEDE THE PRIMER COAT FROM ADHERING TO THE WALLS. 6. PAINT EXTERIOR WALLS w/ 1- COAT SPRAYED AND BACK ROLLED ACRYLIC FLAT PRIMER AND 2-COATS SPRAYED-ON FLAT FINISH IN THE FINAL WALL COLOR. FINISHED JOB SHALL BE SMOOTH AND FREE OF LAPPING AND OR STREAKING, REGARDLESS OF THE COLOR. 7. EXCEPT WHERE NOTED OTHERWISE ON THE PLANS ALL PANEL JOINTS SHALL BE CAULKED PER DETAIL 1/AD4.1. 8. PAINT CONCRETE BEHIND ANY OPEN TRELLIS WORK THE COLOR OF THE TRELLIS. 9. @ SOLID BROWS WITH GLAZING DIRECTLY ABOVE OR BELOW, PAINT THE EXPOSED WALL CHAMFER JUST ABOVE OR BELOW THE BROW TO MATCH THE BROW COLOR. 10. PAINT ALL WALL REVEALS THE COLOR OF THE ADJACEN T WALL. WHEN THERE IS A COLOR CHANGE AT THE REVEAL, SEE 2/AD4.1 11. U.O.N., PAINT THE SIDE OPPOSITE THE SIDE SHOWN OF SCREEN WALLS THE SAME COLOR AS THE SIDE SHOWN. IF THERE ARE TWO COLORS SHOWN, USE THE BASE COLOR. 12. ALL PAINTS USED SHALL BE AS SPECIFIED BY THE MANUFACTURER FOR THE PROPOSED USE EXTERIOR PAINT COLOR: PLD-9 PURE WHITE EXTERIOR PAINT COLOR: PLD-6 STABLE EXTERIOR PAINT COLOR: PLD-7 LIQUORICE TINT EXTERIOR PAINT COLOR: PLD-8 DRAKE EXTERIOR PAINT COLOR: PLD-5 NEW DARK GREEN ACM PANEL COLOR: CHARCOAL ANODIZED PAINT COLOR FOR EXPOSED STEEL BROW & CANOPY FRAMING, WALL BEHIND OPEN TRELLIS (KEY NOTE 428, OR 429) WHEN OCCURS & TRASH ENCLOSURE METAL ROOF, ROOF BEAMS, & SUPPORT COLUMNS. ACM PANEL COLOR:GREEN ANODIZED EXTERIOR STOREFRONT FRAMING COLOR: CLEAR ANODIZED MULLION EXTERIOR GLASS COLOR FOR SINGLE GLAZING & EXTERIOR LAYER OF INSULATED GLASS: GREEN. EXTERIOR GLASS COLOR FOR THE INNER LAYER OF INSULATED GLASS: CLEAR GLASS A B C D E F G H A 135 402402 26' - 0" 26' - 0" 24' - 0" 145 24' - 4"6' - 3" +/- TC 961 975.63 T.O.W. 965.13 FF 976.63 T.O.W. TO TOP OF TRUCK 14' - 0" *ALL GRADE CALL-OUTS FROM CIVIL GRADING PLANS 10 ' - 8 " + / - 1. THE SITE PLAN SHALL MEET ALL ENGINEERING & NPDES REQUIREMENTS. 2. GENERAL CONTRACTOR TO REVIEW THE SOILS REPORT AND ALL AMMENDMENTS LISTED ON THE TITLE SHEET AND FOLLOW ALL RECOMMENDATIONS. 3. U.O.N., ALL DIMENSIONS TO CONCRETE WALLS AND CURBS ARE EITHER TO THE CENTER (SHOWN WITH A CENTERLINE) OR FACE OF THE WALL OR CURB. ALL DIMESIONS TO FRAMED WALLS ARE EITHER TO THE CENTER LINE OF THE WALL FRAMING (SHOWN WITH A CENTERLINE) OR THE FACE OF THE WALL FINISH. 4. REFER TO CIVIL, AND MEP PLANS TO CONFIRM UTILITY INFORMATION SHOWN ON THE ARCHITECT'S SITE PLAN AND FOR ADDITIONAL UTILITY INFORMATION. GENERAL CONTRACTOR TO COORDINATE ALL POINTS OF CONNECTION. 5. REFER TO CIVIL DRAWINGS FOR ALL FINISHED GRADES AND SLOPES. ALL FINISHED GRADES TO PROVIDE POSITIVE DRAINAGE AWAY FROM THE BUILDING. GENERAL CONTRACTOR TO FIELD VERIFY. 6. ALL ACCESSIBLE ROUTES INDENTIFIED ON THE SITE PLAN DRAWINGS SHALL CONFORM TO THE FOLLOWING: a. SLOPES IN THE DIRECTION OF TRAVEL DO NOT EXCEED 5%. CROSS SLOPES DO NOT EXCEED 2%. b. THE CLEAR WIDTH OF ALL WALKWAYS IS 4'-0" MIN. c. CHANGES IN LEVEL UP TO 1/2" COMPLY w/ 11/A0.2.1. CHANGES IN LEVEL GREATER THAN 1/2" IF THEY OCCUR ARE RAMPED. SEE PLANS. d. THE VERTICAL CLEARANCE ALONG THE ACCESSIBLE ROUTE IS 80" MIN. 7. ALL PAVED AND LANDSCAPED AREAS TO BE BOUND BY A MIN. 6" HIGH, 6" WIDE CONCRETE CURB U.O.N. 8. A CONCRETE MOW STRIP EXTENDING 12" BEYOND EA END OF THE OPENING SHALL BE PROVIDED @ ALL EXTERIOR GLAZING WHERE THE SILL IS WITHIN 3' VERICAL OF THE FINISHED GRADE. SEE 2/AD1.1 9. PROVIDE PIPE BOLLARD PROTECTION POSTS AS REQUIRED BY UTILITY COMPANIES AND OR FIRE AUTHORITIES AT ALL EXTERIOR ELECTRICAL EQUIPMENT AND FIRE PREVENTION DEVICES. IF PIPE BOLLARD PROTECTION POST DETAILS ARE NOT PROVIDED BY UTILITY COMPANIES AND OR FIRE AUTHORITY SEE DETAIL 3/AD1.1 10. ALL EXPOSED BIORETENSION DEVICE COVERINGS SHALL BE PAINTED FORREST GREEN. 11. WHERE OCCURS, GENERAL CONTRACTOR TO PROVIDE FLUID APPLIED DAMP PROOFING AT ALL RETAINING AND PLANTER WALLS WHERE THE SIDE OF THE WALL OPPOSITE THE SOIL SIDE IS EXPOSED TO VIEW AND ALL EXTERIOR WALLS WHERE THE ADJACENT FLOOR SLAB IS BELOW GRADE. SEE 6/AD1.2 12. PROVIDE A HOSE BIB NEAR THE MAIN BUILDING ENTRANCE THE . SEE PLAN FOR LOCATION. 150143150 24' - 0" 20' - 0" 10' - 0" 20' - 0" 26' - 0" 402135402 1 A1_5 145 143 5' - 1" +/- TC 964.9 TC 964.1 TC 963.7 975.9 T.O.W. ALIGN WITH (E) SCREEN WALL AT NEIGHBORING PROPERTY 977.63 T.O.W. 965.13 FF TO TOP OF TRUCK 14' - 0" 974.63 T.O.W. 977.63 T.O.W. *ALL GRADE CALL-OUTS FROM CIVIL GRADING PLANS 11 ' - 0 " + / - PR O J E C T 3/24/2025 9:31:21 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A1_2 GATE & FENCE ELEVATIONS MT N V I E W I N D P A R K 1 3 KEYNOTES SITE PLAN GENERAL NOTES EXTERIOR COLOR SCHEDULE 135 CONCRETE TILT-UP SCREEN WALL. MIN HEIGHT 8'ABOVE HIGHEST ADJACENT FINISHED GRADE. PAINT BOTH SIDES AND TOP OF WALL. SEE PLANS FOR COLOR SCHEDULE. 143 PAINTED STEEL ROLLING GATE(S). MIN HEIGHT 8' ABOVE HIGHEST ADJACENT FINISHED GRADE OR AS SHOWN ON EXTERIOR ELEVATIONS. PROVIDE KNOX BOX AS REQUIRED BY FIRE AUTHORITY. 145 PAINTED STEEL SWINGING PEDESTRIAN GATE. WHEN OCCURS IN TUBE STEEL FENCE, ALIGN TOP w/ FENCE HEIGHT. WHEN OCCURS IN CONCRETE SCREEN WALL, U.O.N., ALIGN TOP w/ SCREEN WALL. PROVIDE KNOX BOX AS REQUIRED BY FIRE AUTHORITY. 150 STEEL PIPE BOLLARD PROTECTION POST. 402 WALL REVEAL. A1_2 Scale. 1/4" = 1'-0" NORTHWEST GATE & TYPICAL SCREEN WALL ELEVATION2 A1_2 Scale. 1/4" = 1'-0" NORTHWEST GATE & TYPICAL SCREEN WALL ELEVATION1 NOTES: 1. ALL IMPERFECTIONS ON THE SURFACE OF THE CONCRETE WALL PANELS SHALL BE PATCHED / SACKED / SANDED SMOOTH PRIOR TO PAINTING. 2. ALL INTERIOR AND EXTERIOR FABRICATED STEEL SHALL BE SHOP PRIMED WITH A GRAY, RUST INHIBITIVE PRIMER PRIOR TO DELIVERY TO THE JOB SITE. ANY AND ALL DAMAGE TO THE PRIMER COAT SHALL BE TOUCHED UP PRIOR TO ADDITIONAL FINAL COLOR PAINTING OR COMPLETION OF THE PROJECT. 3. PAINT MAN DOORS, STAIR & RAMP GUARD WALLS, GUARD RAILS, DOWN SPOUTS, LOUVERS, & ROOF LEVEL WALL PANEL RETURNS TO MATCH ADJACENT BUILDING WALL COLOR, U.O.N. 4. U.O.N., EXTERIOR SIDE OF TRUCK DOORS TO BE "A" INTERIOR SIDE TO BE PRE-FINISHED WITH MANUFACTURER'S LIGHT GRAY. 5. POWER WASH EXTERIOR CONCRETE WALLS PRIOR TO PAINTING TO REMOVE ALL CHEMICALS AND DIRT THAT WILL IMPEDE THE PRIMER COAT FROM ADHERING TO THE WALLS. 6. PAINT EXTERIOR WALLS w/ 1- COAT SPRAYED AND BACK ROLLED ACRYLIC FLAT PRIMER AND 2-COATS SPRAYED-ON FLAT FINISH IN THE FINAL WALL COLOR. FINISHED JOB SHALL BE SMOOTH AND FREE OF LAPPING AND OR STREAKING, REGARDLESS OF THE COLOR. 7. EXCEPT WHERE NOTED OTHERWISE ON THE PLANS ALL PANEL JOINTS SHALL BE CAULKED PER DETAIL 1/AD4.1. 8. PAINT CONCRETE BEHIND ANY OPEN TRELLIS WORK THE COLOR OF THE TRELLIS. 9. @ SOLID BROWS WITH GLAZING DIRECTLY ABOVE OR BELOW, PAINT THE EXPOSED WALL CHAMFER JUST ABOVE OR BELOW THE BROW TO MATCH THE BROW COLOR. 10. PAINT ALL WALL REVEALS THE COLOR OF THE ADJACEN T WALL. WHEN THERE IS A COLOR CHANGE AT THE REVEAL, SEE 2/AD4.1 11. U.O.N., PAINT THE SIDE OPPOSITE THE SIDE SHOWN OF SCREEN WALLS THE SAME COLOR AS THE SIDE SHOWN. IF THERE ARE TWO COLORS SHOWN, USE THE BASE COLOR. 12. ALL PAINTS USED SHALL BE AS SPECIFIED BY THE MANUFACTURER FOR THE PROPOSED USE EXTERIOR PAINT COLOR: PLD-9 PURE WHITE EXTERIOR PAINT COLOR: PLD-6 STABLE EXTERIOR PAINT COLOR: PLD-7 LIQUORICE TINT EXTERIOR PAINT COLOR: PLD-8 DRAKE EXTERIOR PAINT COLOR: PLD-5 NEW DARK GREEN ACM PANEL COLOR: CHARCOAL ANODIZED PAINT COLOR FOR EXPOSED STEEL BROW & CANOPY FRAMING, WALL BEHIND OPEN TRELLIS (KEY NOTE 428, OR 429) WHEN OCCURS & TRASH ENCLOSURE METAL ROOF, ROOF BEAMS, & SUPPORT COLUMNS. ACM PANEL COLOR:GREEN ANODIZED EXTERIOR STOREFRONT FRAMING COLOR: CLEAR ANODIZED MULLION EXTERIOR GLASS COLOR FOR SINGLE GLAZING & EXTERIOR LAYER OF INSULATED GLASS: GREEN. EXTERIOR GLASS COLOR FOR THE INNER LAYER OF INSULATED GLASS: CLEAR GLASS A B C D E F G H 1. THE SITE PLAN SHALL MEET ALL ENGINEERING & NPDES REQUIREMENTS. 2. GENERAL CONTRACTOR TO REVIEW THE SOILS REPORT AND ALL AMMENDMENTS LISTED ON THE TITLE SHEET AND FOLLOW ALL RECOMMENDATIONS. 3. U.O.N., ALL DIMENSIONS TO CONCRETE WALLS AND CURBS ARE EITHER TO THE CENTER (SHOWN WITH A CENTERLINE) OR FACE OF THE WALL OR CURB. ALL DIMESIONS TO FRAMED WALLS ARE EITHER TO THE CENTER LINE OF THE WALL FRAMING (SHOWN WITH A CENTERLINE) OR THE FACE OF THE WALL FINISH. 4. REFER TO CIVIL, AND MEP PLANS TO CONFIRM UTILITY INFORMATION SHOWN ON THE ARCHITECT'S SITE PLAN AND FOR ADDITIONAL UTILITY INFORMATION. GENERAL CONTRACTOR TO COORDINATE ALL POINTS OF CONNECTION. 5. REFER TO CIVIL DRAWINGS FOR ALL FINISHED GRADES AND SLOPES. ALL FINISHED GRADES TO PROVIDE POSITIVE DRAINAGE AWAY FROM THE BUILDING. GENERAL CONTRACTOR TO FIELD VERIFY. 6. ALL ACCESSIBLE ROUTES INDENTIFIED ON THE SITE PLAN DRAWINGS SHALL CONFORM TO THE FOLLOWING: a. SLOPES IN THE DIRECTION OF TRAVEL DO NOT EXCEED 5%. CROSS SLOPES DO NOT EXCEED 2%. b. THE CLEAR WIDTH OF ALL WALKWAYS IS 4'-0" MIN. c. CHANGES IN LEVEL UP TO 1/2" COMPLY w/ 11/A0.2.1. CHANGES IN LEVEL GREATER THAN 1/2" IF THEY OCCUR ARE RAMPED. SEE PLANS. d. THE VERTICAL CLEARANCE ALONG THE ACCESSIBLE ROUTE IS 80" MIN. 7. ALL PAVED AND LANDSCAPED AREAS TO BE BOUND BY A MIN. 6" HIGH, 6" WIDE CONCRETE CURB U.O.N. 8. A CONCRETE MOW STRIP EXTENDING 12" BEYOND EA END OF THE OPENING SHALL BE PROVIDED @ ALL EXTERIOR GLAZING WHERE THE SILL IS WITHIN 3' VERICAL OF THE FINISHED GRADE. SEE 2/AD1.1 9. PROVIDE PIPE BOLLARD PROTECTION POSTS AS REQUIRED BY UTILITY COMPANIES AND OR FIRE AUTHORITIES AT ALL EXTERIOR ELECTRICAL EQUIPMENT AND FIRE PREVENTION DEVICES. IF PIPE BOLLARD PROTECTION POST DETAILS ARE NOT PROVIDED BY UTILITY COMPANIES AND OR FIRE AUTHORITY SEE DETAIL 3/AD1.1 10. ALL EXPOSED BIORETENSION DEVICE COVERINGS SHALL BE PAINTED FORREST GREEN. 11. WHERE OCCURS, GENERAL CONTRACTOR TO PROVIDE FLUID APPLIED DAMP PROOFING AT ALL RETAINING AND PLANTER WALLS WHERE THE SIDE OF THE WALL OPPOSITE THE SOIL SIDE IS EXPOSED TO VIEW AND ALL EXTERIOR WALLS WHERE THE ADJACENT FLOOR SLAB IS BELOW GRADE. SEE 6/AD1.2 12. PROVIDE A HOSE BIB NEAR THE MAIN BUILDING ENTRANCE THE . SEE PLAN FOR LOCATION. A 150 24' - 4" 24' - 2" 26' - 0" 26' - 0" 143 402402 135 145 TC 961 TC 963.9 TO TOP OF TRUCK 14' - 0" 976.63 T.O.W. 976.63 T.O.W. 977.63 T.O.W. 965.13 FF TO T O P O F T R U C K 14 ' - 0 " 10' - 5" +/- 10 ' - 6 " + / - 150 135 402402 30' - 5 1/8" 10' - 0" 20' - 0" 26' - 0" 26' - 0" 150 2 A1_5 143 143 TC 963.9 TC 964.6 TC 966.3 978.63 T.O.W.978.6 T.O.W. ALIGN WITH (E) SCREEN WALL AT NEIGHBORING PROPERTY 156 977.63 T.O.W. 965.13 FF TOP OF TRUCK 14' - 0" 979.63 T.O.W. 6' - 7" +/-10' - 5" +/- 12 ' - 4 " + / - A1_3 4 A1_35 A1_3 6 A1_3 7 13' - 6" 135 164 142 141 TYP.8' - 8 " 8 ' - 8 " 7 ' - 0 " 8' - 0"5' - 6" CLEAR 5' - 0" 120 17 ' - 4 " 150 24 ' - 4 " 142 135 120 150 135 A 141141141141141 6' - 0 " 2' - 6 " 142 150 A 135 141141141141141 2' - 6 " 150 172 A1_3 Scale. 1/4" = 1'-0" NORTHEAST GATE & TYPICAL SCREEN WALL ELEVATION1 A1_3 Scale. 1/4" = 1'-0" ENLARGED WEST TRASH ENCLOSURE PLAN3 A1_3 Scale. 1/4" = 1'-0" NORTH TRASH ENCLOSURE ELEVATION4 A1_3 Scale. 1/4" = 1'-0" EAST TRASH ENCLOSURE ELEVATION5 A1_3 Scale. 1/4" = 1'-0" WEST TRASH ENCLOSURE ELEVATION6 A1_3 Scale. 1/4" = 1'-0" SOUTH TRASH ENCLOSURE ELEVATION7 A1_3 Scale. 1/4" = 1'-0" NORTHEAST GATE & TYPICAL SCREEN WALL ELEVATION2 PR O J E C T 3/24/2025 9:31:25 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A1_3 GATE & FENCE ELEVATIONS MT N V I E W I N D P A R K 1 3 KEYNOTES SITE PLAN GENERAL NOTES EXTERIOR COLOR SCHEDULE 120 TRUNCATED DOME DETECTABLE WARNING SURFACE. MIN 3'-0" DEEP IN THE DIRECTION OF TRAVEL. 135 CONCRETE TILT-UP SCREEN WALL. MIN HEIGHT 8'ABOVE HIGHEST ADJACENT FINISHED GRADE. PAINT BOTH SIDES AND TOP OF WALL. SEE PLANS FOR COLOR SCHEDULE. 141 PAINTED STEEL ROOF COVERING. HSS COLUMNS, HSS BEAMS, AND METAL DECK ROOFING. 142 PAINTED STEEL TRASH ENCLOSURE GATES. ALIGN TOP OF GATES WITH TOP OF ADJACENT ENCLOSURE WALL. 143 PAINTED STEEL ROLLING GATE(S). MIN HEIGHT 8' ABOVE HIGHEST ADJACENT FINISHED GRADE OR AS SHOWN ON EXTERIOR ELEVATIONS. PROVIDE KNOX BOX AS REQUIRED BY FIRE AUTHORITY. 145 PAINTED STEEL SWINGING PEDESTRIAN GATE. WHEN OCCURS IN TUBE STEEL FENCE, ALIGN TOP w/ FENCE HEIGHT. WHEN OCCURS IN CONCRETE SCREEN WALL, U.O.N., ALIGN TOP w/ SCREEN WALL. PROVIDE KNOX BOX AS REQUIRED BY FIRE AUTHORITY. 150 STEEL PIPE BOLLARD PROTECTION POST. 156 FUTURE GUARD SHACK. 164 6"h x 6"w CONCRETE CURB. 172 CONCRETE TILT-UP TRASH ENCLOSURE WALL. MIN HEIGHT 6'-0" ABOVE HIGHEST ADJACENT FINISHED GRADE. PAINT BOTH SIDES AND TOP OF WALL. SEE PLANS FOR COLOR SCHEDULE. 402 WALL REVEAL. PR O P E R T Y L I N E LI V E O A K A V E N U E LINE OF SIG HT PROPOSED MECHANICAL EQUIPMENT 40' - 0"96' - 5 1/4" FINISH FLOOR 965.1 961.5 @ LIVE OAK962 @ LIVE OAK 964.8 @ LIVE OAK 965 @ AT LIVE OAK & JURUPA 955 @ AT LIVE OAK & JURUPA *ALL GRADE CALL-OUTS FROM CIVIL GRADING PLANS PR O P E R T Y L I N E HE M L O C K A V E N U E L I N E O F S I G H T PROPOSED MECHANICAL EQUIPMENT 34' - 0" 111' - 0" 967 @ HEMLOCK & JURUPA FINISH FLOOR 965.1965 @ BOTH 970 @ HEMLOCK970.3 HEMLOCK 964 @ HEMLOCK 963 @ HEMOCK @ JURUPA *ALL GRADE CALL-OUTS FROM CIVIL GRADING PLANS PR O P E R T Y L I N E JU R U P A A V E . L I N E O F S I G H T 30' - 0" 52' - 0" FUTURE MECHANICAL EQUIPMENT 955.8 @ JURUPA & LIVE OAK 964.8 @ BUS TURN -OUT AT JURUPA & HEMLOCKFINISH FLOOR 965.1 964 @ BUS TURN -OUT AT JURUPA & HEMLOCK 956 @ JURUPA & LIVE OAK *ALL GRADE CALL-OUTS FROM CIVIL GRADING PLANS PR O J E C T 3/24/2025 9:31:26 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A1_4 LINE OF SIGHT MT N V I E W I N D P A R K 1 3 KEYNOTES A1_4 Scale. 1" = 10'-0" LINE OF SIGHT - BUILDING FROM LIVE OAK AVE.1 A1_4 Scale. 1" = 10'-0" LINE OF SIGHT - BUILDING FROM HEMLOCK AVE.2 A1_4 Scale. 1" = 10'-0" LINE OF SIGHT - BUILDING FROM JURUPA AVE.3 PR O P E R T Y L I N E LI V E O A K A V E N U E LINE OF SIGHT 40' - 0"96' - 5 1/4" FINISH FLOOR BEYOND 965.1 135 964.7964.2 964964 961.1 TRUCK COURT BEYOND 963.7 *ALL GRADE CALL-OUTS FROM CIVIL GRADING PLANS SEE A1_2 FOR T.O.W. W/14' TRUCK SCREENING PR O P E R T Y L I N E HE M L O C K A V E N U E LINE OF SIGHT 96' - 3 5/8" +/-34' - 7" FINISH FLOOR BEYOND 965.1 135 970.4 970 967 963.2 964 TRUCK COURT BEYOND 961.1 *ALL GRADE CALL-OUTS FROM CIVIL GRADING PLANS SEE A1_3 FOR T.O.W. W/14' TRUCK SCREENING PR O J E C T 3/24/2025 9:31:27 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A1_5 LINE OF SIGHT MT N V I E W I N D P A R K 1 3 KEYNOTES 135 CONCRETE TILT-UP SCREEN WALL. MIN HEIGHT 8'ABOVE HIGHEST ADJACENT FINISHED GRADE. PAINT BOTH SIDES AND TOP OF WALL. SEE PLANS FOR COLOR SCHEDULE. A1_5 Scale. 1" = 10'-0" LINE OF SIGHT - BUILDING FROM LIVE OAK AVE.1 A1_5 Scale. 1" = 10'-0" LINE OF SIGHT - BUILDING FROM HEMLOCK AVE.2 1. WHERE A MEZZANINE OCCURS AND A 1" TOPPING IS CALLED OUT FOR IN THE STRUCTURAL DRAWINGS, PROVIDE A 1" THICK TOPPING OF GYP -CRETE 2000 WITH A MINIMUM STRENGTH OF 2,500 PSI. 2. PROVIDE FIRE EXTINGUISHERS AS REQUIRED BY THE FIRE DEPARTMENT AND THE CBC/CFC. REQUIREMENTS AND LOCATIONS TO BE DETERMINED IN THE FIELD BY THE FIRE DEPARTMENT INSPECTOR. 3. ALL PENETRATIONS THROUGH FIRE RATED PARTITIONS SHALL BE SEALED WITH APPROVED FIRE CAULKING. SEE SHTS AD2.3, & AD2.4. 4. U.O.N., ALL DIMENSIONS TO CONCRETE WALLS ARE EITHER TO THE CENTER (SHOWN WITH A CENTERLINE) OR FACE OF THE WALL. ALL DIMENSIONS TO FRAMED WALLS ARE EITHER TO THE CENTER OF THE WALL FRAMING (SHOWN WITH A CENTERLINE) OR FACE OF THE WALL FINISH. 5. PROVIDE ILLUMINATED AND TACTILE EXIT SIGNAGE. SEE EXITING & SIGNAGE PLANS. 6. SEE CIVIL DRAWINGS FOR ALL UTILITY POINTS OF CONNECTION. GENERAL CONTRACTOR TO VERIFY LOCATIONS. 7. PROVIDE PIPE BOLLARD PROTECTION POSTS @ FIRE RISERS & ELECTRICAL GEAR AS REQUIRED BY THE ELECTRICAL AND FIRE PROTECTION PLANS. SEE 7/AD5.0 FOR ADDITIONAL INFORMATION. 8. FOR REQUIRED LANDINGS @ ALL INTERIOR & EXTERIOR DOORS, SEE 11/A0.2.1. 9. NO SMOKING IS ALLOWED WITIHN 25' OF ALL BUILDING ENTRANCES, PER GREEN BUILDING STANDARD CODE DIVISION 5.504.7. POST REQUIRED SIGNAGE. 10. U.O.N @ INTERIOR PARTITIONS, FINISHED HINGE SIDE OF JAMB TO BE 6" FROM FINISHED SURFACE OF INTERSECTING WALL. EXTERIOR CONCRETE TILT -UP WALL PANEL OR INTERIOR CONCRETE TILT -UP MEZZANINE SHEAR WALL PANEL. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION STOREFRONT GLAZING SYSTEM. SEE ENLARGED FLOOR PLANS AND EXTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION METAL STUD NON BEARING PARTITION WALL. SEE ENLARGED FLOOR PLANS & WALL TYPE SCHEDULE FOR ADDITIONAL INFORMATION STRUCTURAL BUILDING COLUMNS WOOD STUD BEARING WALL. SEE ENLARGED FLOOR PLANS & WALL TYPE SCHEDULE FOR ADDITIONAL INFORMATION. PROVIDE VAPOR BARRIER UNDER PROPOSED AND OR FUTURE OFFICE AREA FLOOR SLAB. EXTEND MIN 40'-0" BEYOND T.I. AREA OR AS DIMENSIONED ON THE FLOOR PLAN. SEE 4/AD1.0 FIRE SPRINKLER RISER. SEE FIRE PROTECTION PLANS AND 7/AD5.0. DOOR TAG. SEE SHEET A8.0 FOR DOOR SCHEDULE WINDOW TAG. SEE SHEET A8.0 FOR WINDOW SCHEDULE WALL TAG 0000 A STOREFRONT TAG. SEE SHEETS A8.0.1 & A8.0.2 FOR STOREFRONT SCHEDULE 00 000 1. THE FLOOR SLAB THICKNESS TO BE X". SEE STRUCTURAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. 2. THE FLOOR SLAB TO BE CLASS V PER ACI 302 -1R -04 TABLE 21. 3. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE OWNER WHETHER OR NOT TO PROVIDE JOINT FILLER AT FLOOR SLAB CONTROL AND CONSTRUCTION JOINTS. 4. SLOPE POUR STRIPS @ EXTERIOR PEDESTRIAN AND OVERHEAD DOORS. SEE 5, 7, & 10/AD4.1. 5. CRANES, CONCRETE TRUCKS, AND SIMILAR HEAVY EQUIPMENT ARE PROHIBITED ON THE FLOOR SLAB DURING CONSTRUCTION. 6. BELOW FLOOR SLAB SOIL COMPACTION TO BE 95% MIN. 7. TRENCH SOIL COMPACTION TO BE 90% MIN. 8. SLAB FINISH TO BE STEEL FLOAT HARD TROWEL BURNISHED FINISH. 9. THE GENERAL CONTRACTOR TO MAINTAIN A CLEAN FLOOR SLAB. ALL TRUCKS AND EQUIPMENT TO BE DIAPERED. 10. ALL CONSTRUCTION MARKINGS SHALL BE REMOVED FROM THE FLOOR SLAB PRIOR TO SEALING. 11. SEE 6/AD2.1 FOR SLAB PATCHING DETAIL. 12. PROVIDE 10'-0" WIDE PERIMETER FLOOR POUR -STRIPS AT ALL TRUCK DOCK WALLS AND 5'-0" WIDE AT ALL OTHER WALLS UNLESS NOTED OTHERWISE ON STRUCTURAL DRAWINGS. NO UNDERGROUND PIPING, CONDUITS, ETC ALLOWED IN POUR -STRIPS AT DOCK DOORS TO ALLOW FOR CURRENT OR FUTURE RECESSED DOCK LEVELERS. 13. ALL FLOOR SLAB NAIL OR BRACE FRAME HOLES TO BE FILL ED WITH APPROVED 2 -PART EPOXY COMPOUND TO MATCH CONCRETE COLOR. PEGA BOND LV 2000, BURKE EPOXY INJECTION RESIN OR =. 14. ALL FLOOR SLAB PANEL FORM NAIL HOLES TO BE PREDRILLED AND WOOD DOWELED PRIOR TO NAILING. BRACE HOLES TO BE PREDRILLED. 15. CHAMFER AND REVEAL STRIPS ATTACHED TO THE FLOOR SLAB MUST BE PROPERLY PATCHED PRIOR TO SEALING THE FLOOR SLAB. 1 2 3 A B C D E 7 8 9 10 11 F 12 13 14 15 16 17 18 19 20 21 G H I 4 5 6 30' - 0" 6' - 0" 30' - 0" 30' - 0" 10' - 0" 26' - 0" 18' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0"26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 10' - 0" 30' - 0" 30' - 0" 6' - 0" 30' - 0" 48' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 48' - 0" 1140' - 0" 48 0 ' - 0 " 50 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 7 0 ' - 0 " 201 3 A2_1 2 A2_1 ELEC. ROOM ROOF ACCESS BA T T E R Y CH A R G I N G PUMP ROOM 30 ' - 0 " 6 ' - 0 " 3 0 ' - 0 " 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 8 " 2 8 ' - 4 " 2 9 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0" 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 6 ' - 0 " 3 0 ' - 0 " 2 4 ' - 0 " 3 0 ' - 0 " 60 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 7 0 ' - 0 " 48' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 48' - 0" 30' - 0" 24' - 0" 30' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 6' - 0" 26' - 0" 26' - 0" 6' - 0" 26' - 0"26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 27' - 0" 27' - 0" 30' - 0" 30' - 0" 27' - 0" 27' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 6' - 0" 26' - 0" 26' - 0" 6' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 30' - 0" 24' - 0" 30' - 0" 5,000 SF OFFICE 5,000 SF MEZZ. 5,000 SF OFFICE 5,000 SF MEZZ. 30 ' - 0 " 6 ' - 0 " 3 0 ' - 0 " 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 1 0 " 2 8 ' - 2 " 2 9 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 6 ' - 0 " 3 0 ' - 0 " 2 4 ' - 0 " 3 0' - 0 " 271 201270 267 268 264 263 269 265 266 261 262 259 260 257 258 256 255 253 254 251 252 249 250 247 248 246 245 243 244 241 242 239 240 238 237 235 236 233 234 231 232 229 230 228 227 225 226 223 224 221 222 220 219 217 218 215 216 213 214 211 212 210 209 207 208 205 206 203 204 404 110100101109 407300 406 402 301 302 272 200 106 303 304 401 400 403 405 102 103 104 105 108107 3 A B 7456 26' - 0" 18' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 2' - 6" 3' - 0" 5' - 0" 12' - 0" 3' - 6" 7' - 0" 9' - 0" 2' - 0" 2' - 0" 9' - 0" 4' - 0" 9' - 0" 2' - 0"2' - 0" 3' - 0" 4' - 0" 4' - 0" 2' - 0" 9' - 0" 2' - 0"2' - 0" 9' - 0" 2' - 0" 4' - 0" 4' - 0" 3' - 0" 2' - 0" A4_15 149 RA M P 6' - 0 " CU R B LA N D I N G 6' - 0 " 2 4 ' - 6 " R A M P LA N D I N G 5' - 0 " 2 3 ' - 0 " R A M P LA N D I N G 6' - 6 " 65 ' - 0 " 120 120 443 443 407 58' - 0" 58' - 0" 58' - 0" 58' - 0" 12 ' x 7 0 ' M I N . DO C K S P A C E , T Y P . 120 A B 15 16 17 18 19 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 2' - 0" 9' - 0" 2' - 0" 4' - 0" 4' - 0" 3' - 0" 2' - 0"2' - 0" 3' - 0" 4' - 0" 4' - 0" 2' - 0" 9' - 0" 2' - 0"2' - 6" 3' - 0" 5' - 0" 15' - 6"2' - 0" 9' - 0" 4' - 0" 9' - 0" 2' - 0" A4_1 6 149 CU R B R A M P 6' - 0 " 3 0 ' - 6 " R A M P LA N D I N G 5' - 0 " 2 3 ' - 0 " R A M P LA N D I N G 6' - 6 " 65 ' - 0 " 120 12 ' x 7 0 ' M I N . DO C K S P A C E , T Y P . 120 PR O J E C T 3/24/2025 9:31:32 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A2_1 GROUND LEVEL FLOOR PLANS MT N V I E W I N D P A R K 1 3 PR O J E C T 3/24/2025 9:31:32 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A2_1 GROUND LEVEL FLOOR PLANS MT N V I E W I N D P A R K 1 3 KEYNOTES FLOOR PLAN LEGEND FLOOR PLAN GENERAL NOTES FLOOR SLAB GENERAL NOTES 120 TRUNCATED DOME DETECTABLE WARNING SURFACE. MIN 3'-0" DEEP IN THE DIRECTION OF TRAVEL. 149 CONCRETE TRUCK RAMP w/ 42" HIGH CONCRETE TILT-UP GUARD ON OPEN SIDE(S). PAINT ALL SIDES OF GUARD WALLS AND HANDRAILS.SEE ARCHITECTURAL DRAWINGS FOR COLOR SCHEDULE. 201 STRUCTURAL BUILDING COLUMN. 407 PAINTED HOLLOW METAL PEDESTRIAN DOOR. 443 4'-0"w x 8'-0"h PAINTED STEEL WALL LOUVER. TOP @ +10'-0". A2_1 Scale. 1" = 40'-0" PROPOSED BUILDING FLOOR PLAN1 A2_1 Scale. 1" = 20'-0" ENLARGED DOCK PLAN2 A2_1 Scale. 1" = 20'-0" ENLARGED DOCK PLAN3 1. WHERE A MEZZANINE OCCURS AND A 1" TOPPING IS CALLED OUT FOR IN THE STRUCTURAL DRAWINGS, PROVIDE A 1" THICK TOPPING OF GYP -CRETE 2000 WITH A MINIMUM STRENGTH OF 2,500 PSI. 2. PROVIDE FIRE EXTINGUISHERS AS REQUIRED BY THE FIRE DEPARTMENT AND THE CBC/CFC. REQUIREMENTS AND LOCATIONS TO BE DETERMINED IN THE FIELD BY THE FIRE DEPARTMENT INSPECTOR. 3. ALL PENETRATIONS THROUGH FIRE RATED PARTITIONS SHALL BE SEALED WITH APPROVED FIRE CAULKING. SEE SHTS AD2.3, & AD2.4. 4. U.O.N., ALL DIMENSIONS TO CONCRETE WALLS ARE EITHER TO THE CENTER (SHOWN WITH A CENTERLINE) OR FACE OF THE WALL. ALL DIMENSIONS TO FRAMED WALLS ARE EITHER TO THE CENTER OF THE WALL FRAMING (SHOWN WITH A CENTERLINE) OR FACE OF THE WALL FINISH. 5. PROVIDE ILLUMINATED AND TACTILE EXIT SIGNAGE. SEE EXITING & SIGNAGE PLANS. 6. SEE CIVIL DRAWINGS FOR ALL UTILITY POINTS OF CONNECTION. GENERAL CONTRACTOR TO VERIFY LOCATIONS. 7. PROVIDE PIPE BOLLARD PROTECTION POSTS @ FIRE RISERS & ELECTRICAL GEAR AS REQUIRED BY THE ELECTRICAL AND FIRE PROTECTION PLANS. SEE 7/AD5.0 FOR ADDITIONAL INFORMATION. 8. FOR REQUIRED LANDINGS @ ALL INTERIOR & EXTERIOR DOORS, SEE 11/A0.2.1. 9. NO SMOKING IS ALLOWED WITIHN 25' OF ALL BUILDING ENTRANCES, PER GREEN BUILDING STANDARD CODE DIVISION 5.504.7. POST REQUIRED SIGNAGE. 10. U.O.N @ INTERIOR PARTITIONS, FINISHED HINGE SIDE OF JAMB TO BE 6" FROM FINISHED SURFACE OF INTERSECTING WALL. EXTERIOR CONCRETE TILT -UP WALL PANEL OR INTERIOR CONCRETE TILT -UP MEZZANINE SHEAR WALL PANEL. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION STOREFRONT GLAZING SYSTEM. SEE ENLARGED FLOOR PLANS AND EXTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION METAL STUD NON BEARING PARTITION WALL. SEE ENLARGED FLOOR PLANS & WALL TYPE SCHEDULE FOR ADDITIONAL INFORMATION STRUCTURAL BUILDING COLUMNS WOOD STUD BEARING WALL. SEE ENLARGED FLOOR PLANS & WALL TYPE SCHEDULE FOR ADDITIONAL INFORMATION. PROVIDE VAPOR BARRIER UNDER PROPOSED AND OR FUTURE OFFICE AREA FLOOR SLAB. EXTEND MIN 40'-0" BEYOND T.I. AREA OR AS DIMENSIONED ON THE FLOOR PLAN. SEE 4/AD1.0 FIRE SPRINKLER RISER. SEE FIRE PROTECTION PLANS AND 7/AD5.0. DOOR TAG. SEE SHEET A8.0 FOR DOOR SCHEDULE WINDOW TAG. SEE SHEET A8.0 FOR WINDOW SCHEDULE WALL TAG 0000 A STOREFRONT TAG. SEE SHEETS A8.0.1 & A8.0.2 FOR STOREFRONT SCHEDULE 00 000 1. THE FLOOR SLAB THICKNESS TO BE X". SEE STRUCTURAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. 2. THE FLOOR SLAB TO BE CLASS V PER ACI 302 -1R -04 TABLE 21. 3. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE OWNER WHETHER OR NOT TO PROVIDE JOINT FILLER AT FLOOR SLAB CONTROL AND CONSTRUCTION JOINTS. 4. SLOPE POUR STRIPS @ EXTERIOR PEDESTRIAN AND OVERHEAD DOORS. SEE 5, 7, & 10/AD4.1. 5. CRANES, CONCRETE TRUCKS, AND SIMILAR HEAVY EQUIPMENT ARE PROHIBITED ON THE FLOOR SLAB DURING CONSTRUCTION. 6. BELOW FLOOR SLAB SOIL COMPACTION TO BE 95% MIN. 7. TRENCH SOIL COMPACTION TO BE 90% MIN. 8. SLAB FINISH TO BE STEEL FLOAT HARD TROWEL BURNISHED FINISH. 9. THE GENERAL CONTRACTOR TO MAINTAIN A CLEAN FLOOR SLAB. ALL TRUCKS AND EQUIPMENT TO BE DIAPERED. 10. ALL CONSTRUCTION MARKINGS SHALL BE REMOVED FROM THE FLOOR SLAB PRIOR TO SEALING. 11. SEE 6/AD2.1 FOR SLAB PATCHING DETAIL. 12. PROVIDE 10'-0" WIDE PERIMETER FLOOR POUR -STRIPS AT ALL TRUCK DOCK WALLS AND 5'-0" WIDE AT ALL OTHER WALLS UNLESS NOTED OTHERWISE ON STRUCTURAL DRAWINGS. NO UNDERGROUND PIPING, CONDUITS, ETC ALLOWED IN POUR -STRIPS AT DOCK DOORS TO ALLOW FOR CURRENT OR FUTURE RECESSED DOCK LEVELERS. 13. ALL FLOOR SLAB NAIL OR BRACE FRAME HOLES TO BE FILL ED WITH APPROVED 2 -PART EPOXY COMPOUND TO MATCH CONCRETE COLOR. PEGA BOND LV 2000, BURKE EPOXY INJECTION RESIN OR =. 14. ALL FLOOR SLAB PANEL FORM NAIL HOLES TO BE PREDRILLED AND WOOD DOWELED PRIOR TO NAILING. BRACE HOLES TO BE PREDRILLED. 15. CHAMFER AND REVEAL STRIPS ATTACHED TO THE FLOOR SLAB MUST BE PROPERLY PATCHED PRIOR TO SEALING THE FLOOR SLAB. 1 2 3 A B C D E 7 8 9 10 11 F 12 13 14 15 16 17 18 19 20 21 G H I 4 5 6 48' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 48' - 0" 1140' - 0" 30' - 0" 6' - 0" 30' - 0" 30' - 0" 10' - 0" 26' - 0" 18' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0"26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 10' - 0" 30' - 0" 36' - 0" 30' - 0" 48 0 ' - 0 " 50 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 7 0 ' - 0 " 48' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 48' - 0" 30' - 0" 24' - 0" 30' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 6' - 0" 26' - 0" 26' - 0" 6' - 0" 26' - 0"26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 168' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 6' - 0" 26' - 0" 26' - 0" 6' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 30' - 0" 24' - 0" 30' - 0" 50 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 6 0 ' - 0 " 7 0 ' - 0 " 30 ' - 0 " 6 ' - 0 " 3 0 ' - 0 " 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 8 " 2 8 ' - 4 " 2 9 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0" 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 6 ' - 0 " 3 0 ' - 0 " 2 4 ' - 0 " 3 0 ' - 0 " A1_31 30 ' - 0 " 6 ' - 0 " 3 0 ' - 0 " 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 1 0 " 2 8 ' - 2 " 2 9 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 2 6 ' - 0 " 6 ' - 0 " 3 0 ' - 0 " 2 4 ' - 0 " 3 0' - 0 " PR O J E C T 3/24/2025 9:31:35 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A2_2 MEZZANINE LEVEL FLOOR PLANS MT N V I E W I N D P A R K 1 3 PR O J E C T 3/24/2025 9:31:35 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A2_2 MEZZANINE LEVEL FLOOR PLANS MT N V I E W I N D P A R K 1 3 KEYNOTES FLOOR PLAN LEGEND FLOOR PLAN GENERAL NOTES FLOOR SLAB GENERAL NOTES A2_2 Scale. 1" = 40'-0" MEZZANINE1 1. GENERAL CONTRACTOR TO PROVIDE A 4 -PLY BUILT -UP ASPHALT ROOF BY MALARKY (CCRR -0333), GAF (UL ER 1306 -02 ), JOHNS MANVILLE (UL ER 10167 -03), OR AN EQUAL APPROVED BY THE OWNER. ROOF TO HAVE A UL CLASS "A" FIRE RATING. ASPHALT TO BE "TRUMBAL" ASPHALT OR AN APPROVED EQUAL. PROVIDE A 15 YEAR NO DOLLAR LIMIT WARRANTY. SEE DETAIL 1/AD3.0 FOR TYPICAL ROOFING CROSS SECTION. 2. FOR TYPICAL PARAPET DETAILS, SEE 2 & 3/AD3.0 FOR TYPICAL ROOF TOP PIPE SUPPORT DETAIL, SEE 4/AD3.1 FOR PRE -FAB EQUIPMENT CURB DETAIL, SEE 5/AD3.0 FOR EQUIPMENT PLATFORM DETAIL, SEE 6/AD3.0 FOR TYPICAL ROOF PENETRATION DETAILS, SEE 10, 11, & 12/AD3.0 3. ROOFING DETAILS SHOWN ON THESE PLANS ARE MINIMUM STANDARDS. ROOFING DETAILS PROVIDED BY THE BUILT UP ROOFING MANUFACTURER SHALL TAKE PRECEDENCE IF THEY REQUIRE MORE THAN THE ROOF PLAN GENERAL REQUIREMENTS ON THESE PLANS. 4. GENERAL CONTRACTOR SHALL CONFIRM THE ROOF ELEVATIONS SHOWN ON THE ARCHITECTURAL ROOF PLAN WITH THE STRUCTURAL DRAWINGS. 5. GENERAL CONTRACTOR SHALL VERIFY THERE IS POSITIVE ROOF DRAINAGE AT ALL AREAS OF THE ROOF PRIOR TO INSTALLING RIGID INSULATION OR BUILT UP ROOFING. 6. GENERAL CONTRACTOR TO PROVIDE CRICKETING ON THE HIGH SIDE OF ALL SKYLIGHTS, SMOKE HATCHES, ROOF HATCHES, AND MECHANICAL EQUIPMENT. SEE 9/AD3.0 7. GENERAL CONTRACTOR TO COORDINATE ALL ROOF PENETRATIONS. 8. ALL MECHANICAL EQUIPMENT CONDENSATE DRAIN LINES TO BE RUN BELOW THE ROOF. 9. GENERAL CONTRACTOR TO PROVIDE WALKING PADS FROM THE ROOF HATCH TO ALL OFFICE AREA ROOF TOP MECHANICAL EQUIPMENT. THE WALKING PADS SHALL BE A PRODUCT APPROVED BY THE MANUFACTURER OF THE ROOFING SYSTEM. 10. ALL EXPOSED WOOD CURBS TO BE PRESSURE TREATED DOUGLAS FIR. 11. ALL ROOF TOP EXHAUST FANS SHALL BE CENTERED DIRECTLY ABOVE A SPRINKLER HEAD. COORDINATE LOCATION AND INSTALLATION WITH THE FIRE PROTECTION PLANS. 12. GENERAL CONTRACTOR TO PROVIDE FULL TIME INSPECTION FOR OSB MOISTURE CONTENT AND GAP BETWEEN PANELS BY A QUALIFIED ROOFING INSPECTION FIRM APPROVED BY THE OWNER AND THE OSB MANUFACTURER. INSPECTION FIRM TO BE ON SITE PRIOR TO COMMENCING ANY BUILT -UP ROOFING WORK. 13. GENERAL CONTRACTOR TO PROVIDE FOR CONTINUOUS ROOFING INSPECTION BY AN IRC ROOFING CONSULTANT OR AN EQUAL APPROVED BY THE OWNER. 14. WHEN REQUIRED BY TITLE 24 (SEE MECHANICAL DRAWINGS) THE ROOFING CAP SHEET OVER ALL CONDITIONED SPACES SHALL HAVE A MINIMUM 3 -YEAR AGED SOLAR REFLECTANCE EQUAL TO OR GREATER THAN 0.63, AND AN SRI EQUAL TO OR GREATER THAN 75 (COOL ROOF). 15. ALL SUB -PURLIN HANGERS SHALL BE "Z -MAX" TRIPLE ZINC COATED BY "SIMPSON" OR EQUAL. 16. PROVIDE A ROOF TOP HOSE BIB NEAR THE OFFICE AND OR FUTURE OFFICE AREA. SEE PLAN FOR LOCATION. 17. PROVIDE WHITE FSKF SKRIM MEMBRANE OVER THE ENTIRE WAREHOUSE CEILING. SEE 4/AD3.2. CONFIRM REQUIREMENT WITH THE OWNER PRIOR TO ORDERING MATERIAL. 18. REGARDING ROOF DRAINAGE -ROOF AND OVERFLOW DRAIN SIZES PER PLUMBING PLANS. OVERFLOW SCUPPER AND EXTERIOR DOWNSPOUT SIZES PER ARCHITECTURAL PLANS UNLESS PLUMBING PLANS CALL OUT FOR LARGER SIZES. OFFICE AREA BELOW CURB MOUNTED SKYLIGHT. "SKYLIGHT/SMOKE HATCH NOTES" THIS SHEET FOR ADDITIONAL INFORMATION. SOLAR READY ROOF AREA. SEE "SOLAR READY ROOF NOTES", THIS SHEET FOR ADDITIONAL INFORMATION INTERIOR ROOF AND OVERFLOW DRAINS IN ROOF SUMP. SEE 13/AD3.0 INTERIOR ROOF DRAIN IN ROOF SUMP w/ EXTERIOR OVERFLOW SCUPPER. SEE 14/AD3.0 BILCO TYPE S 30"x36" ALUMINUM FRAME SELF FLASHING ROOF HATCH w/ "BIL -GUARD" 2.0 SAFETY RAILING SYSTEM & "LADDER UP" SAFETY POST OR =. SEE 7 & 8/AD3.0 FOR TYPICAL DETAILS EXTERIOR DOWNSPOUT w/ (2) OVERFLOW SCUPPERS. SEE 17/AD3.0 & 3/AD3.1 EXTERIOR DOWNSPOUT w/ (1) OVERFLOW SCUPPER. SEE 18/AD3.0 & 3/AD3.1 CURB MOUNTED SMOKE HATCH. "SKYLIGHT/SMOKE HATCH NOTES" THIS SHEET FOR ADDITIONAL INFORMATION. NOTE: SOME ITEMS SHOWN IN THE LEGEND MAY NOT BE IN THE PROJECT SCOPE 1 2 3 A B C D E 7 8 9 10 11 F 12 13 14 15 16 17 18 19 20 21 G H I 4 5 6 ROOF RIDGE 10 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 9 ' - 1 1 1 / 4 " 302302 302302 302302 302302 302302 302302 302302 302302 302302 302302 302302 302302 302302 302302 302302 302302 302302 302302302302 302302 PR O J E C T 3/24/2025 9:31:38 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A3 ROOF PLAN MT N V I E W I N D P A R K 1 3 KEYNOTES ROOF PLAN LEGEND ROOF PLAN GENERAL NOTES 302 SLOPE ROOF MINIMUM 1/4"/FOOT TOTAL ROOF AREA % OF ROOF AREA REQ. FOR OPENINGS TOTAL AREA OF OPENINGS REQ. NUMBER OF 4X8 UNITS REQ. 478653 SF 2.5% 11966 SF 374 (AREA * RIDGE HEIGHT / 9000 CF) TOTAL ROOF AREA RIDGE HEIGHT REQUIRED SMOKE HATCHES 478653 SF 48' - 0" 80 TOTAL OPENINGS REQ. BY OWNER, SKYLIGHTS + SMOKE HATCHES TOTAL OPENINGS REQ. BY CODE SMOKE HATCHES ONLY TOTAL SKYLIGHTS & SMOKE HATCHES PROVIDED SKYLIGHTS 295 SMOKE HATCHES 80 GRAND TOTAL 375 A3 Scale. 1" = 40'-0" PROPOSED ROOF PLAN1 GROSS ROOF AREA SKYLIGHT / SMOKE HATCH % OF ROOF AREA SKYLIGHT / SMOKE HATCH AREA NET ROOF AREA 15% OF ROOF AREA AREA PROVIDED EXCLUSIVE OF SKYLIGHTS 478653 SF 2.5% 11966 SF 466686 SF 70003 SF 70528 SF SOLAR READY ROOF NOTES NOTES: 1. ALL IMPERFECTIONS ON THE SURFACE OF THE CONCRETE WALL PANELS SHALL BE PATCHED / SACKED / SANDED SMOOTH PRIOR TO PAINTING. 2. ALL INTERIOR AND EXTERIOR FABRICATED STEEL SHALL BE SHOP PRIMED WITH A GRAY, RUST INHIBITIVE PRIMER PRIOR TO DELIVERY TO THE JOB SITE. ANY AND ALL DAMAGE TO THE PRIMER COAT SHALL BE TOUCHED UP PRIOR TO ADDITIONAL FINAL COLOR PAINTING OR COMPLETION OF THE PROJECT. 3. PAINT MAN DOORS, STAIR & RAMP GUARD WALLS, GUARD RAILS, DOWN SPOUTS, LOUVERS, & ROOF LEVEL WALL PANEL RETURNS TO MATCH ADJACENT BUILDING WALL COLOR, U.O.N. 4. U.O.N., EXTERIOR SIDE OF TRUCK DOORS TO BE "A" INTERIOR SIDE TO BE PRE-FINISHED WITH MANUFACTURER'S LIGHT GRAY. 5. POWER WASH EXTERIOR CONCRETE WALLS PRIOR TO PAINTING TO REMOVE ALL CHEMICALS AND DIRT THAT WILL IMPEDE THE PRIMER COAT FROM ADHERING TO THE WALLS. 6. PAINT EXTERIOR WALLS w/ 1- COAT SPRAYED AND BACK ROLLED ACRYLIC FLAT PRIMER AND 2-COATS SPRAYED-ON FLAT FINISH IN THE FINAL WALL COLOR. FINISHED JOB SHALL BE SMOOTH AND FREE OF LAPPING AND OR STREAKING, REGARDLESS OF THE COLOR. 7. EXCEPT WHERE NOTED OTHERWISE ON THE PLANS ALL PANEL JOINTS SHALL BE CAULKED PER DETAIL 1/AD4.1. 8. PAINT CONCRETE BEHIND ANY OPEN TRELLIS WORK THE COLOR OF THE TRELLIS. 9. @ SOLID BROWS WITH GLAZING DIRECTLY ABOVE OR BELOW, PAINT THE EXPOSED WALL CHAMFER JUST ABOVE OR BELOW THE BROW TO MATCH THE BROW COLOR. 10. PAINT ALL WALL REVEALS THE COLOR OF THE ADJACEN T WALL. WHEN THERE IS A COLOR CHANGE AT THE REVEAL, SEE 2/AD4.1 11. U.O.N., PAINT THE SIDE OPPOSITE THE SIDE SHOWN OF SCREEN WALLS THE SAME COLOR AS THE SIDE SHOWN. IF THERE ARE TWO COLORS SHOWN, USE THE BASE COLOR. 12. ALL PAINTS USED SHALL BE AS SPECIFIED BY THE MANUFACTURER FOR THE PROPOSED USE EXTERIOR PAINT COLOR: PLD-9 PURE WHITE EXTERIOR PAINT COLOR: PLD-6 STABLE EXTERIOR PAINT COLOR: PLD-7 LIQUORICE TINT EXTERIOR PAINT COLOR: PLD-8 DRAKE EXTERIOR PAINT COLOR: PLD-5 NEW DARK GREEN ACM PANEL COLOR: CHARCOAL ANODIZED PAINT COLOR FOR EXPOSED STEEL BROW & CANOPY FRAMING, WALL BEHIND OPEN TRELLIS (KEY NOTE 428, OR 429) WHEN OCCURS & TRASH ENCLOSURE METAL ROOF, ROOF BEAMS, & SUPPORT COLUMNS. ACM PANEL COLOR:GREEN ANODIZED EXTERIOR STOREFRONT FRAMING COLOR: CLEAR ANODIZED MULLION EXTERIOR GLASS COLOR FOR SINGLE GLAZING & EXTERIOR LAYER OF INSULATED GLASS: GREEN. EXTERIOR GLASS COLOR FOR THE INNER LAYER OF INSULATED GLASS: CLEAR GLASS A B C D E F G H NOTES: 1. FOR GLASS AND MULLION COLORS, SEE EXTERIOR COLORS, LEGEND & NOTES, THIS SHEET. 2. PROVIDE TEMPERED GLASS @ THE FOLLOWING: A. ALL SPANDREL SYSTEM GLAZING IN FRONT OF CONCRETE WALL PANELS B. ALL GLAZING WITHIN 18" OF AN ADJACENT WALKING SURFACE. C. ALL GLAZING WITH 24" OF ANY PORTION OF A DOOR. 3. @ SPANDREL SYSTEM GLAZING IN FRONT OF CONCRETE WALL PANELS, PROVIDE 1" DIA. VENTILLATION HOLES IN THE CONCRETE A MAX OF 5'-0" O.C. CONTRACTOR TO PROVIDE A SMOOTH FINISH ON THE GLASS FACING CONCRETE SURFACES AND TO PAINT THEM & ALL STOREFRONT FRAMES AND CLIPS BEHIND THE GLASS BLACK. 4. @ SPANDREL SYSTEM GLAZING NOT IN FRONT OF A CONCRETE WALL PANEL, PROVIDE TENCATE MIRAFI 140N FILTER FABRIC SHADE CLOTH. SPANDREL SYSTEM GLAZING: FOR EXTERIOR SPANDREL GLAZING USE 1/4" PILKINGTON EVERGREEN SPANDREL TEMPERED. BACK PAINTING OF GLASS NOT REQUIRED. VISION SYSTEM GLAZING: FOR EXTERIOR VISION GLAZING USE 1/4" PILKINGTON EVERGREEN ECLIPSE ADVANTAGE LOW E #2 TEMP 1/2" SPACER - AIR 1/4" PPG SOLARBAN 60XL #3 TEMP STOREFRONT FRAMING: U.O.N @ VISION SYSTEM, MIN 2"x4 1/2" OFFSET SYSTEM. U.O.N. @ SPANDREL SYSTEM, 2"x1 3/4" OFFSET SYSTEM. STOREFRONT SYSTEM TO BE DESIGN BUILD BY THE GENERAL CONTRACTOR . DESIGN SHALL COMPLY WITH ALL RELEVANT CODE & WIND LOADING REQUIREMENTS. LEVEL 01 0' -0" MEZZANINE 15' -0" 123789101112131415161718192021456 48' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 58' - 0" 48' - 0" 30' - 0" 6' - 0" 30' - 0" 30' - 0" 10' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0"26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 18' - 0" 26' - 0" 10' - 0" 30' - 0" 30' - 0" 6' - 0" 30' - 0" 54 ' - 0 " 50 ' - 0 " 52 ' - 0 " 48 ' - 0 " 46 ' - 0 " 48 ' - 0 " 46 ' - 0 " 48 ' - 0 " 46 ' - 0 " 48 ' - 0 " 46 ' - 0 " 48 ' - 0 " 46 ' - 0 " 48 ' - 0 " 46 ' - 0 " 48 ' - 0 " 46 ' - 0 " 50 ' - 0 " 54 ' - 0 " 46 ' - 0 " 50 ' - 0 " 50 ' - 0 " 52 ' - 0 " LEVEL 01 0' -0" MEZZANINE 15' -0" 1 2 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21456 48' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"58' - 0"48' - 0" 30' - 0"24' - 0"30' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"6' - 0"26' - 0"26' - 0"6' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"27' - 0"27' - 0"30' - 0"30' - 0"54' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"6' - 0"26' - 0"26' - 0"6' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"30' - 0"24' - 0"30' - 0" 54 ' - 0 " 48 ' - 0 " 48 ' - 0 " 52 ' - 0 " 48 ' - 0 " 48 ' - 0 " 52 ' - 0 " 48 ' - 0 " 50 ' - 0 " 48 ' - 0 " 48 ' - 0 " 50 ' - 0 " 48 ' - 0 " 52 ' - 0 " 48 ' - 0 " 50 ' - 0 " 48 ' - 0 " 52 ' - 0 " 48 ' - 0 " 52 ' - 0 " 54 ' - 0 " 48 ' - 0 " 52 ' - 0 " 50 ' - 0 " 54 ' - 0 " LEVEL 01 0' -0" MEZZANINE 15' -0" ABCDEFGHI 70' - 0"60' - 0"60' - 0"60' - 0"60' - 0"60' - 0"60' - 0"50' - 0" 30' - 0"24' - 0"30' - 0"6' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"29' - 0"29' - 0"26' - 0"26' - 0"26' - 0"26' - 0"26' - 0"6' - 0"30' - 0"6' - 0"30' - 0" 48 ' - 0 " 52 ' - 0 " 52 ' - 0 " 48 ' - 0 " 48 ' - 0 " 54 ' - 0 " 54 ' - 0 " 49 ' - 6 " 54 ' - 0 " 52 ' - 0 " 52 ' - 0 " 50 ' - 0 " LEVEL 01 0' -0" MEZZANINE 15' -0" A B C D E F G H I 70' - 0" 60' - 0" 60' - 0" 60' - 0" 60' - 0" 60' - 0" 60' - 0" 50' - 0" 30' - 0" 24' - 0" 30' - 0" 6' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 29' - 0" 29' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 26' - 0" 6' - 0" 30' - 0" 6' - 0" 30' - 0" 54 ' - 0 " 54 ' - 0 " 48 ' - 0 " 52 ' - 0 " 48 ' - 0 " 50 ' - 0 " 52 ' - 0 " 52 ' - 0 " 52 ' - 0 " 52 ' - 0 " 52 ' - 0 " 54 ' - 0 " 50 ' - 0 " 52 ' - 0 " 49 ' - 6 " 48 ' - 0 " 50 ' - 0 " 50 ' - 0 " LEVEL 01 0' -0" MEZZANINE 15' -0" AB 70' - 0" 26' - 0" 18' - 0" 26' - 0" 49 ' - 0 " 48 ' - 0 " 50 ' - 0 " LEVEL 01 0' -0" MEZZANINE 15' -0" A B 70' - 0" 26' - 0"18' - 0"26' - 0" 49 ' - 0 " 50 ' - 0 " 48 ' - 0 " PR O J E C T 3/24/2025 9:31:43 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A4_1 EXTERIOR ELEVATIONS MT N V I E W I N D P A R K 1 3 KEYNOTES GLAZING LEGEND & NOTES EXTERIOR WALL COLOR LEGEND & NOTES A4_1 Scale. 1" = 40'-0" PROPOSED NORTH ELEVATION1 A4_1 Scale. 1" = 40'-0" PROPOSED SOUTH ELEVATION2 A4_1 Scale. 1" = 40'-0" PROPOSED EAST ELEVATION3 A4_1 Scale. 1" = 40'-0" PROPOSED WEST ELEVATION4 A4_1 Scale. 1" = 40'-0" PROPOSED EAST TRUCK COURT RETURN5 A4_1 Scale. 1" = 40'-0" PROPOSED WEST TRUCK COURT RETURN6 NOTES: 1. ALL IMPERFECTIONS ON THE SURFACE OF THE CONCRETE WALL PANELS SHALL BE PATCHED / SACKED / SANDED SMOOTH PRIOR TO PAINTING. 2. ALL INTERIOR AND EXTERIOR FABRICATED STEEL SHALL BE SHOP PRIMED WITH A GRAY, RUST INHIBITIVE PRIMER PRIOR TO DELIVERY TO THE JOB SITE. ANY AND ALL DAMAGE TO THE PRIMER COAT SHALL BE TOUCHED UP PRIOR TO ADDITIONAL FINAL COLOR PAINTING OR COMPLETION OF THE PROJECT. 3. PAINT MAN DOORS, STAIR & RAMP GUARD WALLS, GUARD RAILS, DOWN SPOUTS, LOUVERS, & ROOF LEVEL WALL PANEL RETURNS TO MATCH ADJACENT BUILDING WALL COLOR, U.O.N. 4. U.O.N., EXTERIOR SIDE OF TRUCK DOORS TO BE "A" INTERIOR SIDE TO BE PRE-FINISHED WITH MANUFACTURER'S LIGHT GRAY. 5. POWER WASH EXTERIOR CONCRETE WALLS PRIOR TO PAINTING TO REMOVE ALL CHEMICALS AND DIRT THAT WILL IMPEDE THE PRIMER COAT FROM ADHERING TO THE WALLS. 6. PAINT EXTERIOR WALLS w/ 1- COAT SPRAYED AND BACK ROLLED ACRYLIC FLAT PRIMER AND 2-COATS SPRAYED-ON FLAT FINISH IN THE FINAL WALL COLOR. FINISHED JOB SHALL BE SMOOTH AND FREE OF LAPPING AND OR STREAKING, REGARDLESS OF THE COLOR. 7. EXCEPT WHERE NOTED OTHERWISE ON THE PLANS ALL PANEL JOINTS SHALL BE CAULKED PER DETAIL 1/AD4.1. 8. PAINT CONCRETE BEHIND ANY OPEN TRELLIS WORK THE COLOR OF THE TRELLIS. 9. @ SOLID BROWS WITH GLAZING DIRECTLY ABOVE OR BELOW, PAINT THE EXPOSED WALL CHAMFER JUST ABOVE OR BELOW THE BROW TO MATCH THE BROW COLOR. 10. PAINT ALL WALL REVEALS THE COLOR OF THE ADJACEN T WALL. WHEN THERE IS A COLOR CHANGE AT THE REVEAL, SEE 2/AD4.1 11. U.O.N., PAINT THE SIDE OPPOSITE THE SIDE SHOWN OF SCREEN WALLS THE SAME COLOR AS THE SIDE SHOWN. IF THERE ARE TWO COLORS SHOWN, USE THE BASE COLOR. 12. ALL PAINTS USED SHALL BE AS SPECIFIED BY THE MANUFACTURER FOR THE PROPOSED USE EXTERIOR PAINT COLOR: PLD-9 PURE WHITE EXTERIOR PAINT COLOR: PLD-6 STABLE EXTERIOR PAINT COLOR: PLD-7 LIQUORICE TINT EXTERIOR PAINT COLOR: PLD-8 DRAKE EXTERIOR PAINT COLOR: PLD-5 NEW DARK GREEN ACM PANEL COLOR: CHARCOAL ANODIZED PAINT COLOR FOR EXPOSED STEEL BROW & CANOPY FRAMING, WALL BEHIND OPEN TRELLIS (KEY NOTE 428, OR 429) WHEN OCCURS & TRASH ENCLOSURE METAL ROOF, ROOF BEAMS, & SUPPORT COLUMNS. ACM PANEL COLOR:GREEN ANODIZED EXTERIOR STOREFRONT FRAMING COLOR: CLEAR ANODIZED MULLION EXTERIOR GLASS COLOR FOR SINGLE GLAZING & EXTERIOR LAYER OF INSULATED GLASS: GREEN. EXTERIOR GLASS COLOR FOR THE INNER LAYER OF INSULATED GLASS: CLEAR GLASS A B C D E F G H NOTES: 1. FOR GLASS AND MULLION COLORS, SEE EXTERIOR COLORS, LEGEND & NOTES, THIS SHEET. 2. PROVIDE TEMPERED GLASS @ THE FOLLOWING: A. ALL SPANDREL SYSTEM GLAZING IN FRONT OF CONCRETE WALL PANELS B. ALL GLAZING WITHIN 18" OF AN ADJACENT WALKING SURFACE. C. ALL GLAZING WITH 24" OF ANY PORTION OF A DOOR. 3. @ SPANDREL SYSTEM GLAZING IN FRONT OF CONCRETE WALL PANELS, PROVIDE 1" DIA. VENTILLATION HOLES IN THE CONCRETE A MAX OF 5'-0" O.C. CONTRACTOR TO PROVIDE A SMOOTH FINISH ON THE GLASS FACING CONCRETE SURFACES AND TO PAINT THEM & ALL STOREFRONT FRAMES AND CLIPS BEHIND THE GLASS BLACK. 4. @ SPANDREL SYSTEM GLAZING NOT IN FRONT OF A CONCRETE WALL PANEL, PROVIDE TENCATE MIRAFI 140N FILTER FABRIC SHADE CLOTH. SPANDREL SYSTEM GLAZING: FOR EXTERIOR SPANDREL GLAZING USE 1/4" PILKINGTON EVERGREEN SPANDREL TEMPERED. BACK PAINTING OF GLASS NOT REQUIRED. VISION SYSTEM GLAZING: FOR EXTERIOR VISION GLAZING USE 1/4" PILKINGTON EVERGREEN ECLIPSE ADVANTAGE LOW E #2 TEMP 1/2" SPACER - AIR 1/4" PPG SOLARBAN 60XL #3 TEMP STOREFRONT FRAMING: U.O.N @ VISION SYSTEM, MIN 2"x4 1/2" OFFSET SYSTEM. U.O.N. @ SPANDREL SYSTEM, 2"x1 3/4" OFFSET SYSTEM. STOREFRONT SYSTEM TO BE DESIGN BUILD BY THE GENERAL CONTRACTOR . DESIGN SHALL COMPLY WITH ALL RELEVANT CODE & WIND LOADING REQUIREMENTS. PR O J E C T 3/24/2025 9:31:43 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A4_2 COLOR ELEVATIONS MT N V I E W I N D P A R K 1 3 KEYNOTES GLAZING LEGEND & NOTES EXTERIOR WALL COLOR LEGEND & NOTES PR O J E C T 3/24/2025 9:31:44 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A4_3 RENDERINGS MT N V I E W I N D P A R K 1 3 VIEW FROM HEMLOCK AVE. & JURUPA AVE. NIGHT VIEW FROM HEMLOCK AVE. & JURUPA AVE. VIEW FROM LIVE OAK AVE. & JURUPA AVE. NIGHT VIEW FRO M LIVE OAK AVE. & JURUPA AVE. VIEW FROM LIVE OAK AVE. PR O J E C T 3/24/2025 9:31:44 AM 6T H E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . FO N T A N A , C A 03.26.2025 A5 COLOR BOARD MT N V I E W I N D P A R K 1 3 15 11 14 14 9 13 1412 14 14 14 9 9 128 14 9 5 109 10 8 6 FC-1.0 SITE PHOTOMETRIC PLAN ELECTRICAL SITE PHOTOMETRIC PLAN 1 LI V E O A K A V E N P: \ A 2 3 - 2 0 6 5 P r o l o g i s 3 0 1 T e n n e s s e e S t R e d l a n d s \ D R A W I N G S \ E N T I T L E M E N T P H A S E \ C A D E X P O R T \ 2 4 0 1 2 2 _ T B \ A 2 3 - 2 0 6 5 P r o l o g i s 3 0 1 T e n n e s s e e S t R e d l a n d s _ n a t a l i e H 9 X 3 F - P L G S - 1 4 2 0 7 1 2 0 . p n g PR O J E C T 6TH E N T I T L E M E N T S U B M I T T A L A24-2007 14 9 7 0 J U R U P A A V E . F O N T A N A , C A 03.26.2025 MT N V I E W I N D P A R K 1 3 HE M L O C K A V E JURUPA AVE