HomeMy WebLinkAboutAppendix N - Errata_Fontana Walnut Residential Project IS-MNDP:\2024\20241904_Walnut Residential Project\IS-MND\Final IS-MND\Errata_Fontana Walnut Residential Project IS-MND.docx 1 FONTANA WALNUT RESIDENTIAL PROJECT MASTER CASE NO. 24-0060 GENERAL PLAN AMENDMENT (GPA) 24-0004 GENERAL PLAN AMENDMENT (GPA) 24-0007 ZONE CHANGE AMENDMENT (ZCA) 24-0004 ZONE CHANGE AMENDMENT (ZCA) 24-0006 TENTATIVE TRACT MAP NO. 24-0009 (TTM 20712) CONDITIONAL USE PERMIT (CUP) 24-0023 DESIGN REVIEW PROJECT (DRP) 24-0031 FONTANA, SAN BERNARDINO COUNTY, CALIFORNIA ERRATA CHANGES TO THE PUBLIC REVIEW INITIAL STUDY/MITIGATED NEGATIVE DECLARATION DATED OCTOBER 2025 December 3, 2025 The Fontana Walnut Residential Project Initial Study/Mitigated Negative Declaration (IS/MND) was circulated to the public and State agencies for a 30-day public review from October 17 to November 17, 2025. The Final IS/MND incorporates minor changes/additions to the Title Page, Table of Contents, and Figure 2a of the Project Description; addition of two appendices; and minor revisions to Mitigation Measure BIO-1 as a result of (1) inclusion of responses to public/agency comments by the California Department of Fish and Wildlife, and (2) inclusion of this errata in the IS/MND. The following minor changes to the text of the IS/MND are shown below with added text in double underline and deleted text in strikeout: • Title Page and header. October, 2025 December 2025 • Table of Contents (Page iii) I-1: ADMINISTRATIVE DRAFT FINAL RESIDENTIAL DEVELOPMENT SITE TRAFFIC IMPACT ANALYSIS P:\2024\20241904_Walnut Residential Project\IS-MND\Final IS-MND\Errata_Fontana Walnut Residential Project IS-MND.docx 2 M: PUBLIC COMMENT LETTERS AND RESPONSES TO PUBLIC COMMENTS N: ERRATA CHANGES TO THE INITIAL STUDY/MITIGATED NEGATIVE DECLARATION DATED OCTOBER 2025 • Page 2-3, Section 2.2 (Existing Setting) Figure 2a-1: Existing and Proposed General Plan Designations, Figure 2a-2: Existing and Proposed Zoning, Figure 2a: Existing and Proposed General Plan Land Use and Zoning and Figure 2b: Surrounding Land Uses depict the Residential Development Site and surrounding land uses, and Figures 3a through 3d: Site Photographs depict the existing conditions of the Residential Development Site. • Page 5-19, Section 5.3.1 (Air Quality Impact Analysis), Footnote # 47 Translutions, Inc. Final Walnut Street and Highland Avenue Residential Traffic Impact Analysis, Administrative Draft. Section 3.1. October 6, 2025. (Appendix I-1) • Page 5-34, Section 5.4.1 (Biological Resources Impact Analysis) Mitigation Measure BIO-1: Preconstruction surveys for burrowing owl shall be conducted prior to vegetation clearing or grading of the Residential Development Site and Upzone Properties. Two surveys are required and shall follow the methods described in the California Department of Fish and Wildlife (CDFW’s) Staff Report on Burrowing Owl Mitigation. The first survey shall be conducted between 30 and 14 days before initial ground disturbance (grading, grubbing, and construction), and the second survey shall be conducted no more than 24 hours prior to initial ground disturbance. If burrowing owls and/or suitable burrowing owl burrows are identified on the Residential Development Site or Upzone Properties during the survey, the project Applicant(s) shall consult with CDFW and follow the methods listed in the CDFW’s Staff Report on Burrowing Owl Mitigation for avoidance and/or passive relocation. If burrowing owls or suitable burrowing owl burrows with sign (e.g., whitewash, pellets, feathers, prey remains) are identified on the Residential Development Site or Upzone Properties during the survey(s), these features must be completely avoided. If impacts to those features are unavoidable, then the project Applicant(s) must develop a burrowing owl mitigation plan in consultation with CDFW. Mitigation methods may include passive relocation conducted outside of the owl breeding season (between September 1 and February 28). If an active owl burrow is identified, and construction is to proceed, then a qualified biologist (with two or more years of burrowing owl experience) must establish an initial disturbance-limit buffer of 500 feet around the burrow using flagging or staking. The buffer distance may be reduced in coordination with CDFW depending on time of year (i.e., in or out of breeding season), level of construction activity, and observed behavior of the burrowing owls. Construction activities shall not occur within any buffer zones until the burrow is deemed inactive by the qualified biologist. This measure shall P:\2024\20241904_Walnut Residential Project\IS-MND\Final IS-MND\Errata_Fontana Walnut Residential Project IS-MND.docx 3 be implemented to the satisfaction of the City of Fontana Community Development Director or designee. If burrowing owl occupancy is confirmed during the preconstruction surveys, the qualified biologist and Project proponent shall prepare a Burrowing Owl Management Plan that shall be submitted to CDFW for review and approval prior to commencing Project activities. The Burrowing Owl Management Plan shall describe proposed avoidance, minimization, and monitoring actions. The Burrowing Owl Management Plan shall include the number and location of occupied burrow sites, acres of burrowing owl habitat that will be impacted, details of site monitoring, and details on proposed buffers and other avoidance measures if avoidance is proposed. If Project activities are unable to sufficiently avoid impacts to burrowing owl, the Project Proponent shall begin early coordination with CDFW for appropriate CESA authorization (i.e., Incidental Take Permit (ITP) under Fish and Game Code section 2081) prior to commencement of Project activities. The ITP application shall describe, at a minimum, project activities and equipment, proposed avoidance/buffers, temporary and permanent impacts, monitoring, relocation and/or translocation, and minimization and compensatory mitigation actions. ITP compensatory mitigation will be fulfilled by one or more of following options: 1) Permittee-responsible mitigation land acquisition or 2) Conservation or Mitigation Bank credits (if available). • Page 5-156 Section 5.15.1 (Public Services Impact Analysis), Footnote # 213 Translutions, Inc. Final Walnut Street and Highland Avenue Residential Traffic Impact Analysis, Administrative Draft. Tables C through G. October 6, 2025 (Appendix I-1). • Page 5-159 Section 5.15.1 (Public Services Impact Analysis), Footnote # 221 Translutions, Inc. Final Walnut Street and Highland Avenue Residential Traffic Impact Analysis, Administrative Draft. Tables C through G. October 6, 2025 (Appendix I-1). • Page 5-168, Section 5.17 (Transportation) The information and analysis in this section is based on the Final Walnut Street and Highland Avenue Residential Traffic Impact Analysis, Administrative Draft dated October 6, 2025 and Walnut Street and Highland Avenue Residential, City of Fontana Vehicle Miles Traveled Screening Analysis, dated December 13, 2024, both prepared Translutions, Inc., which are included as Appendices I-1 and I-2, respectively, respectively, to this IS/MND. • Page 5-169, Section 5.17.1 (Transportation Impact Analysis), Footnote # 244 Translutions, Inc. Final Walnut Street and Highland Avenue Residential Traffic Impact Analysis, Administrative Draft. October 6, 2025 (Appendix I-1). P:\2024\20241904_Walnut Residential Project\IS-MND\Final IS-MND\Errata_Fontana Walnut Residential Project IS-MND.docx 4