Loading...
HomeMy WebLinkAbout6792SAN BERNARDINO GENERAL NOTES FOR STORM DRAIN IMPROVEMENT PLANS: 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 5. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 6. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 8. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 9. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 10. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 11. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 12. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 13. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 14.STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE NOTED. 15.ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20.THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 21.NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 22.A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 23.CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 24.ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 25.NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. 26.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS. 27.1E EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. 28.NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29.ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30.APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31.ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 32.UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 33.AS-BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. 1-11 rKvvr SLOVER AVENUE STORM EDRAIN IM ROV M NT P ANS z w w w � < Z w �w w w > ¢ �= z Q ww FOR UQ Q SANTA ANA AVENUE _ FIM 20467 m g o 0 0 SITE U z C) HENRY J o m Q KAISER Of JURUPA AVE HS 4CALABASH INIDUSTRIA D V OPM NT 3 FONTANA, CALIFORNIA LEGEND: fp -PROPERTY LINE HOLD HARMLESS INDEMNIFICATION CLAUSE: R/W -RIGHT OF WAY -CENTERLINE ARCH. -ARCHITECTURAL THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE T.C. -TOP OF CURB CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT INCLUDING SAFETY OF ALL PERSONS AND F.L. -FLOW LINE PROPERTY; THAT, THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING F.S. -FINISH SURFACE HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CITY OF FONTANA, THE OWNER, T.S. -TOP OF CONCRETE SLAB AND THE PRIVATE ENGINEERS HARMLESS FOR ANY AND ALL LIABILITY; REAL OR ALLEGED, IN CONNECTION WITH H.P. -HIGH POINT PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF F.F. -FINISH FLOOR THE OWNER OR ENGINEER. R.D. -ROOF DRAIN R.C.P. -REINFORCED CONCRETE PIPE EXISTING UNDERGROUND STRUCTURES= -INVERT S S = -SLOPE F.G. -FINISH GRADE ALL UNDERGROUND UTILITIES OR STRUCTURE, REPORTED OR FOUND ON PUBLIC RECORDS, ARE INDICATED WITH S.D. -STORM DRAIN THEIR APPROXIMATE LOCATION AND EXTENT. THE OWNER, BY ACCEPTING THESE PLANS OR PROCEEDING WITH T.R. -TOP OF RAIL THE IMPROVEMENTS HEREON, AGREES TO ASSUME LIABILITY AND TO HOLD THE ENGINEER HARMLESS FOR ANY ST.LT. -STREET LIGHT DAMAGES RESULTING FROM THE EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED OR G.B. -GRADE BREAK INDICATED ON PUBLIC RECORDS, OR THOSE CONSTRUCTED AT VARIANCE WITH REPORTED ARE RECORD H.P. -HIGH POINT LOCATIONS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES H -HEIGHT OF RETAINING OR STRUCTURES SHOWN AND ANY OTHERS FOUND AT THE SITE. IT SHALL BE THE CONTRACTOR'S C.F. -CURB FACE RESPONSIBILITY TO NOTIFY THE OWNERS OF ALL UTILITIES STRUCTURES CONCERNED BEFORE STARTING WORK. B.W. -BACK OF WALK L.S. -LANDSCAPING NOTICE TO CONTRACTOR= A.B. -AGGREGATE BASE P.V.C. -POLY VINYL CHLORIDE C.I.P. -CAST IRON PIPE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL REPORT DISCREPANCIES TO THE F.H. -FIRE HYDRANT ENGINEER PRIOR TO THE COMMENCEMENT OF WORK. P.P. -POWER POLE V.C.P. -VITRIFIED CLAY PIPE BASIS OF BEARINGS: THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA STATE PLANE COORDINATE SYSTEM (CCS83), ZONE 5, NORTH AMERICAN DATUM 1983 (NAD83) BASED LOCALLY ON CONTINUOUSLY OPERATING REFERENCE STATIONS (CORS) "EWPP" AND "GISA" AS BEING NORTH 82°35' 1 1 " WEST (BASIS OF BEARINGS) (GRID) AND REPRESENTED HEREON BY THE CENTERLINE OF BANANA AVENUE AS BEING NORTH 00°20'03" EAST. (2010.0 EPOCH) BENCH MARK: CITY OF FONTANA BENCHMARK NO "585" FD. R.R. SPK. IN PPlI320908 AT NORTHWEST CORNER OF SANTA ANA AVENUE & ALMOND AVENUE. (PER STREET IMPROVEMENT PLAN # 3487) ELEVATION = 965.46' (CIRCUIT 16172) TOLL FREE ® 1-800-422-4133 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT INDEX MAP SCALE: 1 " = 100' C.B. CATCH BASIN B.C.R. BEGINNING OF CURB RETURN E.C.R. -END OF CURB RETURN L.P. -LOW POINT S.W. -STEM WALL T.O.P. -TOP OF PIPE B.O.P. -BOTTOM OF PIPE R -RADIUS T.F. -TOP OF FOOTING T.W. -TOP OF WALL C.M.B. -CRUSHED MISC. BASE S.F. -SQUARE FEET (0.00) -EXISTING ELEVATION B.O.W. -BOTTOM OF WALL T.G. -TOP OF GRATE N.G. -NATURAL GRADE TOP -TOP OF SLOPE TOE -TOE OF SLOPE E.P. -EDGE OF PAVEMENT A.C. -ASPHALT CONCRETE C.L.F. -CHAIN LINK FENCE CONC. -CONCRETE PKWY DRAIN -PARKWAY DRAIN H.C. -HANDICAP EXIST. -EXISTING TRANS PAD -TRANSFORMER PAD BLDG -BUILDING M.H. -MANHOLE T.B. -TOP OF BERM 0 50 100 200 300 SCALE:1 "= 100' UTILITY CONTACTS: THE CONTRACTOR SHALL NOTIFY THE FOLLOWING UTILITIES OR AGENCIES A MINIMUM OF TWO WORKING DAYS PRIOR TO COMMENCING CONSTRUCTION. AT&T: (510) 645-2929 CITY OF FONTANA: (909) 350-7610 TIME WARNER CABLE: (909) 975-3398 SOUTHERN CALIFORNIA GAS COMPANY: (909) 335-7583 FONTANA WATER COMPANY: (909) 201-7333 SOUTHERN CALIFORNIA EDISON COMPANY: (909) 928-8270 INLAND EMPIRE UTILITIES AGENCY: (909) 993-1600 PRIVATE ENGINEER'S NOTE: THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR ASSUMING THE ACCURACY AND ACCEPTABILITY OF THE WORK HEREON. IN THE EVENT OF DISCREPANCIES ARISING DURING CONSTRUCTION THE PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING AN ACCEPTABLE SOLUTION AND REVISING THE PLANS FOR APPROVAL BY THE CITY. SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH REV. REVISION DESCRIPTION DATE ENGR. I CITY DATE STANDARDS IN EFFECT. S%p OOFE A���'�,RD SF4b �70 * R.C.E. N0. 56155 r * Exp. 12-31-24 Q 97F 01 V OF C A\_\� VICINITY MAP N.T.S. STORM DRAIN CONST. NOTES: OUANTITY: 40 CONSTRUCT 18" RCP, D-LOAD PER PROFILE. 198 LF 41 CONSTRUCT 24" RCP, D-LOAD PER PROFILE. 304 LF 42 CONSTRUCT 36" RCP, D-LOAD PER PROFILE. 36 LF 43 CONSTRUCT 72" RCP, D-LOAD PER PROFILE. 588 LF 44 CONSTRUCT CURB -OPENING CATCH BASIN PER CITY OF FONTANA STD. PLAN 3004. W AND V PER PLAN, WITH BIO CLEAN CPS UNIT. 7 EA 45 CONSTRUCT MANHOLE PER CITY OF FONTANA STD. PLAN 3013. 1 EA CONSTRUCT MANHOLE PER S.P.P.W.C. STD. PLAN 323-2. SEE DETAIL 46 ON SHEET 5. 2 EA 47 INSTALL CATCH BASIN STENCIL PER CITY OF FONTANA STD. PLAN 6002. 7 EA 48 CONSTRUCT CONCRETE COLLAR PER CITY OF FONTANA STD. PLAN 3 EA 3022. 49 CONSTRUCT MANHOLE PER CITY OF FONTANA STD. PLAN 3012. 2 EA 50 CONSTRUCT BRICK BULKHEAD PER DETAIL ON SHEET 3. 5 EA D CONSTRUCT JUNCTION STRUCTURE PER CITY OF FONTANA 4 EA STD. PLAN 3009, CASE 1. CONSTRUCT JUNCTION STRUCTURE PER S.P.P.W.C. STD. PLAN 333-2. SEE 52 DETAIL ON SHEET 5. 3 EA 53 REMOVE EXISTING CATCH BASIN. 8 EA 54 REMOVE EXISTING MANHOLE. 2 EA 55 REMOVE EXISTING STORM DRAIN. 190 LF CONSTRUCTION TRANSITION STRUCTURE PER S.P.P.W.C. STD. PLAN 342-2. 2 EA 56 SEE DETAIL ON SHEET 5. 57 REMOVE EXISTING RISER. 1 EA 58 CONSTRUCT CONCRETE SLURRY (2,000 PSI) EXTENDING 4 INCHES 36 LF MINIMUM AND 12 MAXIMUM ABOVE THE TOP OF PIPE. SCONSTRUCT MONOLITHIC CONNECTION PER CITY OF FONTANA 2 EA STD. PLAN 3005. g0 CONSTRUCT MANHOLE PER CITY OF FONTANA STD. PLAN 3011. 1 EA CONSTRUCT 7'WX4H' CONCRETE SINGLE BOX PER CALTRANS STD. PLAN D80. 373 LF 61 SEE DETAIL ON SHEET 3. g2 CONSTRUCT JUNCTION STRUCTURE PER CITY OF FONTANA STD. PLAN 3010. 1 EA 63 CONSTRUCT STORMTEK CONNECTOR PIPE SCREEN. SEE DETAIL ON SHEET 5. 7 EA SHEET INDEX 1 TITLE SHEET 2 CALABASH STORM DRAIN PLAN AND PROFILE 3 CALABASH LATERAL PROFILES AND DETAILS 4 JURUPA LATERALS PLAN AND PROFILES 5 STORM DRAIN DETAILS Prepared Under The Supervision Of lhienes Engineering, Inc. CIVIL ENGINEERING • LAND SURVEYING 14349 FIRESTONE BOULEVARD DRAWN BY: LA MIRADA, CALIFORNIA 90638 PH. (714)521-4811 FAX(714)521-4173 M H Date : EINHARD STENZEL RCE NO. 56155 MH BW MCN23-0099/ELP022-000036 CITY OF FONTANA, CALIFORNIA PUBLIC STORM DRAIN IMPROVEMENT PLAN TITLE SHEET SCALE: FOR AS SHOWN CALABASH INc)ue-rRiAL c)EVBLOPMENT DATE: PM 204437 2/6/2025 APPROVED BY: DRAWING NO.: 1 DATE: GIA LAM KIM CITY ENGINEER R.C.E. 62296 6792 Last Update: 02/06/2025 0:\3900-3999\3941\PUBLIC STORM DRAIN\3941SD01-TITLE.dwg MESSESSE -------------------- —---------------------------- —------------------------------ ----- --------------- — — -----------_=__ _---- 100201 ME 100100100100100 ME 1001MEMESSESSE ME ________ __________ __________ C_________ _____ _____ __________ ____ ;._�_____ mlml�EMIZ_ ___SCOMM __ _____ ___ _ _________ _ __________ ___________ _ ____ __________ _____ _ A 11 • 11 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ ME 220202 ME SEE __________________________________________■_____---_____=_ _________________-_==_-------■Ili■------------------- EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEME MOMM EEE EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE EEEEEEEEEE= .��—==EEEEEEEeEEEE EEEEEEEEEEEEEEEEEEE EEEEEEEEEEEEEEEE EEEEEEEE EEEEEEEE E EE— EEEEEEE EEEEEEEE EEEEEEE EEEEE.====E��� —EEEE EEE!IlEEEEEEEEEEEEE EE 001 M'WOSSECOMM 1MM0M=0II1S�IMCOOMSMME0M=C1100=00N11 Z10Z0SgZo' MEFl E�Ml MM7coMMm EwNilE 100 EMIMMMM MMMM 220 MMM ________________■■________■■________■■_■___■■■_______■■________■■____---■■ _-=_____====■Ills■====■■I■ ■__ ■■■■■■■■■_______■■========■■======EE■■■■ EE■■■===___==■■=======E■■■■■ _ .E==EWWEEEEEEEE■W■===EE■■I■ 1 :ii■========WEE= ■== ---------------- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ J _ _ _ _ ■ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ • _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __—� _ _ _ _ _ ■ — _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 _ _ _ _ ___ __■EEEEE E_______ _____________====■m■�E=__� w■====_______________ ______-._ '1'1 1 ____ �__________ �E________ __�- ______ __ ■■■■■■■■■■■■■■■■■■ ■_■ ■■ === ■W■■■=====__� = ■_�_ =■ E=__=__MM ■==■I■: ■================ ------------------ �_________ ___ —0__ __��WE===■■=______■■ _ ■■ ��—====EEEEEEEEEEEEEE ------------------ ----------------------------------------------------- m --------- - -- ------------------- ------------------- _ _ _ _ _ _ ----------- - ------------------------------------ -- -------�_------------------- ----------- - -- -- _ ------------------- _ I� _ _ _ " _ _ _ _ _ _ �i _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ i -------- — -- _--- ---------------------------------- _—SEE-- ------------ -- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -� - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -------- — -------------------------- ------------�----------- E-- ----------------- ------ I Iu�------� EE - -- -- M MM=■ ■■■■(1!S■ ■■___________________milli■■ ' ' _____■=__________=_- -��=EEEEE■■ ■■■■i■■■■■- - - ___■■ ' : -■■ - • ________________■■ WE==WWWW=EW,iNE■ ;■■Will■EEEEEEEWW---EEEE=im■■ ===WEE==EE-==■E====■■■W■WEE■■■■■ •- ■■EW■EEEEE EEEEE :- __EEEEEEEEEEEEEEEEEE �_� mwm_ ----- ____ _1-_ _______ ____ ��_______—_�__ ____ __ �_ �._ _________ ---------------1--------- ----iW-------------- ---- -- -- ------------ ----- ------------------ _ _ _■_- _ 1 11 _ _ _ _ _ _ _ _ _ _ �� _ _ _ _ --_ __ ____ _______.w�• �omom"■■■ EEEEE _MEE�._ i-■■________■ • • _______��a��■ Cis 1 = __ � __ _ ________ ___ ____ _________ ����_== — EEEEEEEEEEE E_____E== E_=WEE==---------=EEEEEEEEE___--EEEE==EEEEEEEEE=WEE= __ �___________■m■_____________________________________________________________ =rii W■ ir■ _ . __------------------_ ---■■------------------_■■ ______---------------------■_ ■■---------■_ ___= W■i■============================================================= ME -------------------------------- ---- E EE======WEE EEEE100100100 EEEE EEEEEEEEEEEE EEEE■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■____■________________________■■ — -- --- -------------------------------------------------------------- ----- ME MEN SCO __ __ _____________________■W■■■=■■■■■■■■■_■■■■___------------------------___---------------------■___---------------------■■ ---■■ ------------------------------- -- --------------------- ------------------------------------------------------------------------------------------------------------- - _ ------------------------------------------------------------I:I■■------- ■ --------------------------------------- - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 100100 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 • ■• 1' 1 1 1 ■=====mmE=ME==========================��■�=====■■====================================■■====== == o7:i,v,■D7:r±\I lff4KO • �MAWAT �A u x 1DO- YEAR PROPOSED SURFACE EA Q CD WQC7 d N ZQ + O mrn •Z N J CONST. 15.58 L.F. 24" RCP D-LOAD 1350 10+00 11+00 Pipe OPOSED -� - RFACE - ,G.L. 1 )O-YEAR _ �0 1111®Mpffi EXISTING 8" WATER TO BE RELOCATED AS NECESSARY 1' SEPARATION. >Z_ EX. 12"* CV o LLi REQUIRED SEWER .- aM zN mrn U) wrn CONST. 27.46 L.F. 24" RCP 4 D-LOAD 1350 10+00 I Precast concrete end I I block to be placed flush I I I with end of pipe as 1 I directed by the Engineer. I I I iv v I I I PLAN It b It 411 0 galvanized steel pipe _ (total 2) M `� I Add -46 bars x w(-Tco (total 2) - E CL I p a: 1 --t- O \ � rn O It all bars ELEVATION -Al IIVL 020 930 ION! EX 2" _.1 GAS LINE *GAS H.G.L. 11+00 PIPE CLOSURE- TYPE "AEI NOTES_ (Precast Concrete End Block) I. "a11=#4 bars (g) 12° o.c. unless otherwise noted on the plans. BRICK BU LK H EA D 2. "151 = 1211 unless otherwise noted on plans. 3. "tll = 6" unless otherwise noted on plans. REVISIONS OWN. DY DATE H.H.H. 2-14-80 AODEDDhWNSIONs vww FILE NO. S. P. 176 01 11T1RICH•POST CLEARPRINT 1010.10 BRICK BULKHEAD DETAIL N.T.S. LLI2NE RA 920.32 ICp NV 10+00 1 CONST. 17.80 L.F. 24" RCP D-LOAD 1350 -A5 11+00 PROFILE SCALE: HORIZ. - 1" = 40' VERT. - 1" = 4' N i 11 • ' 1 MIN M INV.' In �' +0�? OA N0::> O� �CD LJj +=Z U^ +CLZ OUP HZ CS FL-� z� tn:Z- LUM zLq LU`r N H WL2 I CA to mrn �CONST. 34.36 L.F. 18" RCP D-LOAD 1750 SD LINE 134.11111111111111111 1 11 11 SPAN, 5 4' 5' 6' 7' e' HEIGHT, H 2' 1 3' 1 4' 2' 3' 1 4' 1 5' 3' 1 4' 1 5' 6' 1 3' 4' 1 5' 1 6' 7' 4' 1 5' 6'1 7' 8' MAXIMUM EARTH COVER 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 20' 10' 20' 10' 20' 10' 20, 10' 20' 10, 20' 10' 20' 10' 20' 10, 20, 10, 20, 10, 20, 10' 20' 10' 20, 10' 20, 10' 20' u ROOF T 7. TI �� 7. TI �� 7. 71 �� 71 . 8. TI �� 8. 71 �� 8. 8. 8. 9 9. 8�� 9. 8. 10. 8. 10. 8. 0�/i 8�/z' 0%z 8%i' 0�/i 6�/i'11�/z 8�/z'11�/z 8�/z' 1%z 8�/�� 1%'8%z' 1%z o WALLS T 6. 6. 6i/. 6i/ 7�� 71 �� 6. 6. 61 �� 61 �� 7. 7�� 8. 7�� 7 8" 8�� 9 2� 6i/�� 7�� 6i/�� 7i/� 7. 8�� 7��. 9 Y. 81 „ 11�� 61 �� 71 �� 7�� 81/z" 71 �� 91/z' 8%i' II 9�� 21 `� INVERT 13 7" 7�/z' 7" 7%z' 7" 7%z' 7%z� 8�� 7i/z� 8�� li/,. 8�� 8�� 8. 9� 9i/z' 8" 9�/2- 8" 0�/i 8" 0�/z 8" 0�/z 8" 01/' 81 p�/z 81 �'11�/2 81 �� 11/2 8� �� 12�� 81 �� 12�� 81 �� 12�, SPACING 7" 6" T' 6" 7" 6" 8 " 6" 8�/2' S�/" 8" 5� 5" 7� " 5 5" 7" q� " 6" 41/" 6" 411 " 6" 5 " 6" 5 " 6" 5� " 51/" 5" 5�/' S" 6" 4%z' S� "q z 5� "q 2 'd "a" SIZE BAR #6 #6 #6 #6 #6 #6 #T #7 #7 #7 #7 #7 #6 #7 #6 #6 #7 #6 #7 #6 #7 #6 #7 #7 #7 #7 #7 #7 #7 #T #7 #7 #7 #7 #7 #7 #7 #7 SIZE BAR #4 #4 #5 #6 #5 #6 #4 #4 #5 #5 #5 #6 #6 #4 # #6 #7 #6 #4 #4 #5 #5 #6 #7 #7 #7 #7 #7 #5 #6 #6 06 #7 #6 #7 #7 #7 #7 xw CONCRETE CF/LF 7.8 8.3 9.2 9.6 10.711.6 9.5 10.0 10.9 11.4 12.412.9 141.115.1 13.1 14.18.0 17.8 21.2 14.017.5 15.1 19.1 16.7 1.318.8 24.5 21.8 28.317.2 22.718.8 25.1 0.6 28.3 23.3 32.1 25.5 36.4 REINFORCEMENT LB/LF 7.7 51.157.8 71.4 63.5 $0.8 57.8 T3.T 66.6 92.5 83.0 111 114 77.694. 126 132 152 102 106 115 124 134 166 160 181 173 196 135 166 156 177 184 208 197 252 209 269 x-X SOIL PRESSURE (k f) 5 4 4.6 2 REGISTER CIVIL ENGINEER s 2.4 4.5 2.4 4.5 2.5 4.6 2.4 4.5 2.4 4.5 2. .6 2.5 .4 4.612 4.6 2.5 4.7 2.4 4.6 2.4 4.6 2.5 4.7 2.5 4.7 2.6 4.8 2.4 4.6 4.7 2.6 4.8 "d" BARS FOR EARTH COVERS UP TO AND INCLUDING 10'-0" SPAN 4' S' 6' 7' 8' SPAN, S 10' 12, 14, HEIGHT, H 5' 6' 7' 8' 9' 10, 6' 7' 1 8' 9' 1 10' 11' 12' 7' 8' 9' 10, 11' 12' 13, 14' MAXIMUM EARTH COVER 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 1 ' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' 10' 20' a ROOF 9� "12" 9� 12" 9� 12" 9� 12" 9� " 12" 9� " 12" 0 4� ' 0� ' 4� ' 0 4� ' O z 4� 0 4� ' 0 4� 02 4� ' 12"16� ' 12" 6 12" 61 ' 12" 6� ' 12" 61 ' 12" 6� ' 12" 6� ' 12" 61 p WALLS 8� "8 " 8 " 9� " 9" O 9" 12" 10' 3Y ' IV I .. 9" 0 9" 0 ' 9 " 12" 10" 3 11" 15" 2� ' 6 ' 3� ' IB" 9 IV. 12 10' 13 z 11 15" 21 ' 6 ' 31 ' 18" 15" 9� ' 6� ' 11 ' V INVERT 10" 2 10 2 10' 2 10" 13" 10" 13" 10" 13" 11" 4 11" 15 11" 15 11" 15" 11 15 11 215 11 "5 2 17" 2 17 2 17 2 7 2 7 13" 7� ' 13" 18" 13 18" SPACING 11" 12" 12 12" 11" 11" IV' 11" 10' 10' 11" IV' 9' 10" V IV' 9" 10" 8" 10" 8" 10" 10" 9" 9" 8" IV 9" 10" 9" IV, 8" 10" 8" 9" 8" 8" 10" 10" IV' 10 9" x4E" " SIZE BAR #7 #8 #7 #8 #7 #T 116 #7 %6 #7 #7 #7 #6 #7 #6 #T #6 #7 #6 s7 #6 #7 %7 #7 *6 #6 #7 #8 #7 #8 #7 #7 #7 #7 #7 #7 #6 #8 #7 #7 #7 #7 .b.. SIZE BAR %7 #7 #6 #7 #6 #7 #6 #7 #6 %7 #7 #7 116 #7 >� #7 #6 #7 #6 #8 #7 #8 #7 #8 #6 #T #7 #7 #7 #7 #7 #7 #8 #7 #8 %7 #7 #8 #7 #8 %8 %8 DIMENSION "B" ff-Inch 2-11 2-112-11 3-0 2-11 3-9 2-11 3-9 2-11 3-9 2-11 3-9 3-1 3-2 3-9 3-9 3-9 3-9 3-7 3-9 3-7 4-4 3-7 4-4 4-4 4-4 2-9 4-2 3-4 4-4 3-4 4-6 3-5 4-6 3-6 4-6 3-6 4-6 3-6 4-6 4-9 6-0 y DIMENSION "BJ' ff-Inc# -1 5-0 4-10 5-0 4-1 5-0 4-1 5-0 4-1 5-0 4-7 4-T 6-0 5-10 6-2 6-7 6-2 6-7 4-11 4-114-11 4-11 4-114-11 4-4 4-4 6-5 T-0 7-0 8-4 7-0 8-4 6-0 6-0 6-0 6-0 6-0 6-0 5-0 6-0 4-6 6-0 SIZE BAR # #6 #7 #6 #7 #6 #7 #6 #7 #7 #7 #7 #7 06 #7 #6 #7 #6 #7 #6 #7 #6 #7 #7 #7 #7 #7 #7 #7 #7 #7 #7 #7 #7 #7 #7 #7 #7 #8 #8 #8 #8 #8 DIMENSION "C" ft-lldi 3-4 3-6 T-4 4-8 7-7 4-8 8-2 4-8 7-7 5-2 7-7 5-11 4-4 3-1 8-1 5-7 8-1 5-7 8-1 5-T 8-1 5-7 8-1 6-4 8-1 6-1 4-3 4-2 6-9 6-9 5-105-10 6-0 6-4 8-11 6-4 8-11 7-0 6-11 7-7 8-11 7-9 W'e SIZE BAR #4 #4 #4 #5 #6 #6 #6 #7 #7 #7 #8 #8 #4 #4 #4 #4 #4 #5 #4 #5 41 s5 #6 #6 #6 #6 #4 #4 #4 #4 #4 #4 #5 #5 #5 #5 #5 #6 #7 #7 #7 x7 a _ CONCRETE CF/LF 25.1 30.4 27.1 33.1 29.2 36.2 30.7 41 34 45.8 3T.6 51 33.2 43.T 34.7 46.1 37 50.4 39.5 55.3 43.7 60.6 48.7 67.1 53.1 73.5 42.9 57 44.5 60.7 47 65.6 51.7 71.8 55.8 77.7 60.9 84.2 66.9 91.8 T3.4 101 -= REINFORCEMENT LB/LF 271 296 278 333 341 366 359 406 428 469 487 530 322 371 379 417 390 449 430 477 499 500 527 610 530 614 413 529 467 595 46 6608 526 632 633 651 630 717 688 737 747 861 +EiE+f SOIL PRESSURE (ksf) 3.7 4.7 3.8 4.7 3.8 4.8 3.A 4.8 3.9 4.9 3.9 5.0 3.6 4.8 3.6 4.8 3.6 4.9 3.6 4.9 3.7 5.0 3.7 5.0 3.8 5.1 3.4 4.9 3.5 4.9 3.5 4.9 NUMBER 117 8 9 10 1 11 12 15 20 x INVERT Elev SLOPE 48:1 s FM SLOPED INVERT SPI I * See Note 5 SLOPE 4:1 41it See Note 6 SEE NOTE 9 SLOPE 6:1 INVERT 1tN4f See Note 10 x INVERT x INVERT i Elev "C" F Elev � Elev .c' 1 or RCB S/6 S/3 )'i" Min FILLETS BARS "b" BARS "c' BARS w - S/4 OPTIONAL Coast Jt "a" nF BARS - - #4 0 12 Max "b" ; BARS x x SEE NOTE 4 T ' b "a" BARS #4 0 12" Max 6" T- SEE NOTE 6 . TRAPEZOIDAL INVERT a FLAT INVERT V INVERT g^ "a" BARS • Y4" Min FILLETS -Z� _PACING ALTERNATIVE INVERTS #q (SEE NOTE 6) OPTIONAL Const Jt ; r "d" #4 "d" BARS 0.25 S I� m SPACING NOTES: 0.25 S BARS #4 0 12 Max I� 4 0 12 Max OR °f #4 0 12 Max 1. For boxes with span or height less than any of those shown in table, II FOR COVER OVER 10 -0 �� 1.15EE NOTE T ROOF SECTION use next greater size box concrete dimensions and reinforcement. Make 6 RCB #4 TOTAL 3 necessary changes in bar lengths and quantities. Il *' #5� 01z SPANS 10' THRU 14' SEE NOTE T�� "e" � ,SEE 2. Quantities are approximate and for design purposes only. INVERT SIMILAR NOTE 4 I 3. For boxes with span or height or cover greater than those shown in #5 C 0 12 " Cl I yP tables, a special design is required. #4 0 12 Max Typ rt RCB #q 0 12 Max 2" Clr 4. It Is permissible to eliminate the 180" hooks on every other bar. ALTERNATIVE "e" BARS Typ 5. "e" bars are at half spacing (spans 10'- 14' only). Const Jt Con6t Jt SEE NOTE 5 ALTERNATIVE "b" BARS 6. "a" bars are at half spacing (spans 10'- 14'only). "o"(� BARS Const Jt m z 7. Provide paving notch when top is exposed and when pavement Is tO SEE NOTE 4 concrete, and adjust quantities. " BARS Coast Jt a - io 8. For design and details not shown, see Standard Plan D82. F SEE NOTE 6 #4, Typ N 9. For exposed top, provide #4 0 12 each way, lap "c" bars 2'-0" or 1#4 0 12 use full span length. #4, Typ -axTyp ' v, "C" BARS 10. Soil pressures shown are factored per AASHTO LRFD and include soil weight of fill over box, self weight of box and live load where applicable. S/2 "B" #q 0 12 Max "e" BARS STATE OF CALIFORNIA "C" SEE NOTE 5 DEPARTMENT OF TRANSPORTATION TYPICAL SECTION s/2 T SPANS 4' THRU 8' WALL SECTION CAST -IN -PLACE TYPICAL SECTION SPANS 10' THRU 14' REINFORCED CONCRETE SPANS 10' THRU 14' SINGLE BOX CULVERT NO SCALE D 8 0 - CALTRANS SINGLE RCB DETAIL N.T.S. Return to Table of Contents SURFACE - Q100=26.10 CFS Vmax=5.3 FPS R/W EXISTING SURFACE EX.2" GAU -GAS*I GAS H.G.L. 100-YEAR S=0.0020 Oar IN EnWM CONST. 36.23 L.F. 36" RCP _ D-LOAD 2000 LINE 10+00 BRICK *CONTRACTOR TO VERIFY LOCATION AND INVERT ELEVATIONS OF EXISTING UTILITIES AND DRAINAGE SYSTEMS AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO ANY CONSTRUCTION. _ 11+00 MCN23-0099/ELPC22-000036 BASIS OF BEARINGS: BENCH MARK: p O SHOULD CONSTRUCTION OF THE REQUIRED Q�OFEss/pNq Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA THE BASIS OF BEARINGS FOR THIS SURVEY CITY OF FONTANA BENCHMARK NO "585" IV � �F Thienes En ineerin Inc. IMPROVEMENTS NOT COMMENCE WITHIN TWO ��, TF PUBLIC STORM DRAIN IMPROVEMENT PLAN IS THE CALIFORNIA STATE PLANE � R S COORDINATE SYSTEM (CCS83), ZONE 5, CIVIL ENGINEERING • LAND SURVEYING NORTH AMERICAN DATUM 1983 (NAD83) FD. R.R. SPK. IN PP#320908 AT o YEARS OF THE DATE OF APPROVAL SHOWN HEREON Lv �� m 14349 FIRESTONE BOULEVARD DRAWN BY: SCALE: BASED LOCALLY ON CONTINUOUSLY NORTHWEST CORNER OF SANTA ANA (� LA MIRADA, CALIFORNIA 90638 FtOF=1LE AND DETAILS OPERATING REFERENCE STATIONS (COBS) AVENUE & ALMOND AVENUE. DIAL AND CARRIED FORTH IN A DILIGENT MANNER, THE R.C.E. N0. 56155r * PH.(714�521-4811 FAX(714)521-4173 MH FOR AS SHOWN ••EWPP•' AND "GISA•' AS BEING NORTH "" TWO WORKING DESIGNED BY: PER STREET IMPROVEMENT PLAN 3487 Exp. 12-31-24 Q CALr4BA8H IN�UBTRIAL_ CEVEL_OPMENT DATE: 82.35.11" WEST (BASIS OF BEARINGS) < # � BEFORE DAYS BEFORE CITY ENGINEER MAY REQUIRE REVISIONS TO THE � (GRID) AND REPRESENTED HEREON BY THE Y❑U DIG YOU DIG PLANS TO BRING THEM INTO CONFORMANCE WITH 9�F C/V��' o��9"""� Date 2/6/25 CHECKEDMBY: APPROVED BY: PM 204�7 DRAWING CENTERLINE OF BANANA AVENUE AS BEING ELEYAT/ON = 965.46' (CIRCUIT F) 72 TOLL FREE 1-800-422-4133 OF �F NORTH 00.20'03•' EAST. (2010.0 EPOCH) t �/ ) A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT STANDARDS IN EFFECT. � A� BW DATE: 6792 REV. REVISION DESCRIPTION DATE ENGR. CITY DATE REINHARD STENZEL RCE NO. 56155 GIA LAM KIM CITY ENGINEER R.C. . 62296 5 Last Update: 02/06/2025 0:\3900-3999\3941\PUBLIC STORM D RAI N\3941 SD03- CALABASH.dwg --------------------------------------- ---------- --------------------- ---- ----------------------------------- --------------------- - - - - - _ -------------------- ------------------------------------------------------------ ----- --------------------------------------------- -- - - - __________ -------------------- ------------------------------------------------------------ ----- --------------------------------------------- ----- __________ -------------------- -------------------------------------------------------------------------------------------------------------- ----- __________ ---------- ---- --- ------------------- ------------------------------- ---- ------ ----- ------------------------ --------------------- - - - - - _ __ _ _ _ -a _ _ _ _ _ _ _ _ _ _ .ar_ • • _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ • _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___________.1�■,�.,,,-ate_ ________ _ ______ ________ _______ __ _rrr,-______ ________________ ______ __J�� ter_ _________ ■. � •�•� 1 __ �-- _____ 11 ___--___ __ ________ray._______________________ --------- «--------- ®i--------------------------------------- E------------------- --------------------------------------------------------- ------------------- - - - - - - - 1 - - - - - - - - - - - - - - - - - - - - = = - - - - - - - - - - - - - - - - - - - - - - - - - - ��������� 1 1_�iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii:iiiiiii::iii��� 1 • ��� ___________ _________________ ������� 1 1 ' �� iiiiiii:iiiiiii:iiiiiii:iiiiiii:ririm:riri Ewgj_� _ _ _ _ _ _ _ _ __ _ � _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ • _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ lira ----------------------------------------� _ --------------- ------------- - — -- -----� E �—------------------- --------------------------------------------------------------- — -- ----- — ------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1-LOAD 171 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - i 1 /`1 11 CO_________-����■��_ �. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .�- �■ _ _ ri �� _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ 21 WA12111111 I LINE D L A T A 7.Ai AM - *CONTRACTOR TO VERIFY LOCATION AND INVERT -------------------- -------------------------------------------------- ---- -------------------------------------------------------- - - - - - _ - ------------------- ------------------- --------------------- - -- ----------- ----- ------------------------ ----------- - - - _ -------------------- ---------------------------------------- - ----------- ----- ----------------------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 1 - 1 1'`_ 1 1 1 1SYSTEMS _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ DISCREPANCIES PRIOR TO ANY CONSTRUCTION. DRM DRAIN QQNST. NQTE$: 57 REMOVE EXISTING RISER. _ // /Q/ /iP 4 d x B OR C� SIZE AND SPACING OF STEEL AS SHOWN ON PROJECT DRAWINGS, EXCEPT THAT 5 BARS ON EACH SIDE OF SHAFT SHALL BE NOT SMALLER THAN #5 ® 4" (#16M ® 100 mm) OC OR EQUIVALENT A PLAN (SHAFT NOT SHOWN) SECTION A - A MANHOLE FRAME AND COVER PER SPPWC 630---1 r MANHOLE SHAFT PER SPPWC 324 5"x2"(125mm x50mm) PIPE SEAT OMIT FILLET UNDER SHAFT 7" (17 5 ® 4" (#16M ® 100 mm) OC x 5'-0" 1.5 m) LONG OR C 5 BARS 7'-0" 2.1 m LONG, 4' 100 mm OC, OF SIZE SHOWN FOR TRANSVERSE STEEL, BUT NOT SMALLER THAN #5 (#16M� BARS. WARP THESE BARS UNDE BARS HAT HAVE BEEN CUT FOR SHAFT OPENING STREET GRADE I CONCRETE RINGS PER SPPWC 324 5"x 1" 125 mm x 25 mm) RING SEAT i -STREET GRADE w M a w w 5" 125m SECTION B - B 610 m 5" (125 rr OMIT FILLET UNDER SHAFT 7" 175 mm STEPS SECTION C - C TABLE OF VALUES FOR M (SEE NOTE 1) SECTION PAVED STREET UNPAVED STREET MAX MIN MAX MIN B - B - 2'-10 1/2" (867 mm) - 3'-6" (1060 mm) C - C 11" (282 mm) 8 1/2" (217 mm) 16"(410 mm) 15" (380 mm) STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION PR MULGATED THE WORKS PUBLIC WORKS STANDARDS INC. MANHOLE CONCRETE STANDARD PLAN GREENBO COMMITTEE BOX STORM DRAIN 323- 2 1992 19 REV. 1996, 2009 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 0 = FN O Q 00 0 Uj w B o Uj � a H d N + N NO F H­ H­ I- Z _ I I A-�- RCP OR I RC ARCH* 1 I I m / NOTES 1. WHEN DEPTH M FROM STREET GRADE TO THE TOP OF THE BOX IS LESS THAN 2'-10 1/2" (867 mm) FOR PAVED STREETS OR 3'-6" (1060 mm) FOR UNPAVED STREETS, CONSTRUCT SHAFT PER SECTION C-C. 2. STATIONS OF MANHOLES SHOWN ON PLANS. APPLY AT CENTERLINE LINE OF SHAFT. ELEVATIONS ARE SHOWN AT CENTERLINE OF SHAFT. 3. REINFORCEMENT SHALL CONFORM TO ASTM A 615, GRADE 40 (ASTM A 615M, GRADE 300), AND SHALL TERMINATE 40 mm (1 1/2") CLEAR OF CONCRETE SURFACES UNLESS OTHERWISE SHOWN. 4. STEPS SHALL CONFORM TO SPPWC 635 OR 636. UNLESS OTHERWISE SHOWN, STEPS SHALL BE UNIFORMLY SPACED 14" (350 mm) TO 15" (375 mm) OC. THE LOWEST STEP SHALL NOT BE MORE THAN 24" (600 mm) ABOVE THE INVERT. 5. MANHOLE FRAME AND COVER SHALL CONFORM TO SPPWC 630 UNLESS OTHERWISE SHOWN. 6. MANHOLE SHAFT SHALL CONFORM TO SPPWC 324 UNLESS OTHERWISE SHOWN. 7. WHERE A MANHOLE SHAFT - 36" (900 mm) WITHOUT REDUCER IS SPECIFIED REFER TO SPPWC 326. 8. WHERE A PRESSURE MANHOLE SHAFT - WITH ECCENTRIC REDUCER IS SPECIFIED REFER TO SPPWC 328. 9. WHERE A PRESSURE MANHOLE SHAFT - 36" (900 mm) WITHOUT REDUCER IS SPECIFIED REFER TO SPPWC 329. 10. THE FOLLOWING SPPWC ARE INCORPORATED HEREIN: 324 MANHOLE SHAFT - WITH ECCENTRIC REDUCER 326 MANHOLE SHAFT - 36" (900 mm) WITHOUT REDUCER 328 PRESSURE MANHOLE SHAFT - WITH ECCENTRIC 329 PRESSURE MANHOLE SHAFT - 36" (900 mm) WITHOUT REDUCER 630 24" (600 mm) MANHOLE FRAME AND COVER 633 36" (900 mm) MANHOLE FRAME AND COVER 635 STEEL STEP 636 POLYPROPYLENE PLASTIC STEP STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN 323-2 MANHOLE - CONCRETE BOX STRORM DRAIN SHEET 2 OF 2 S.P.P.W.C. STD. 323-2 DETAIL N.T.S. RCB OR RC ARCH* ..0 O w rT ---- w ¢ o O w B / dF- F FN Z PLAN FN * ARCH MAY HAVE A HORSESHOE - SHAPED, CIRCULAR, ELLIPTICAL ° CE ° 0 Uj M OR SIMILAR CROSS SECTION. wa ° w V)w �1 I >r� r.-r �--r. -•--ram �--�-. I P, SEE NOTE 5 I _ _ I I ELEVATION STATION L i ELEVATION STATION I tL �L O 0 0� w :7i�=".�_. ° w "T w a - ° N w a -s t a F FLr z SECTION A -A Fn SECTION B-B FD � ILLL FA I ItKIN Z FNUWIN IJ -1CTORIAL ONLY, SEE NOTES 2 AND 7 OPTIONAL CONSTRUCTION JOINT: RCB OR ARCH TO RCP USE CONST JOINT OF RCB OR ARCH. RCB TO ARCH, USE CONST JOINT OF RCB STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION PROMULGATED BY THE PUBLIC WORKS STANDARDS INC. TRANSITION STRUCTURE STANDARD PLAN GREENBOOK 1992 COMMITTEE RCB TO PIPE 342- 2 REV. 1995. 2009 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NOTES 1. THE HORIZONTAL ANGLE OF DIVERGENCE OR CONVERGENCE, G, SHALL NOT EXCEED 5' 45'. 2. REINFORCING STEEL BAR SIZES, SPACING, PATTERN AND COVER OVER THE STEEL SHALL BE AS FOLLOWS: RCB TO RCP AND RCB TO ARCH - THAT OF RCB SECTION. ARCH TO RCP - THAT OF ARCH SECTION. ARCH TO ARCH - THAT OF ARCH SECTION HAVING THE THICKER WALLS. THE BAR LENGTHS SHALL VARY UNIFORMLY THROUGHOUT THE TRANSITION. 3. THE CONCRETE THICKNESS SHALL BE AS FOLLOWS: RCB TO RCP AND ARCH TO RCP - THAT OF ARCH OR RCB SECTION UNLESS THE WALL THICKNESS OF THE RCP PLUS 100 mm (4") GREATER, IN WHICH CASE THE CONCRETE THICKNESS SHALL VARY UNIFORMLY FROM THAT OF THE ARCH OR RCB SECTION TO THAT OF THE RCP WALL PLUS 100 mm (4"). RCB TO ARCH AND ARCH TO ARCH - THAT OF THE ADJOINING RCB OR ARCH SECTION AT EACH END OF THE TRANSITION AND SHALL VARY UNIFORMLY BETWEEN THE TWO ENDS. 4. THE INTERIOR SURFACE SHALL BE SMOOTH AND VARY UNIFORMLY BETWEEN THE TWO ADJOINING SECTIONS. 5. AT RCP JUNCTURE, EMBEDMENT P SHALL BE 130 mm (5") FOR PIPE SIZE OF 2400 mm (96") OR LESS, AND 200 mm (8") FOR PIPE SIZES OVER 2400 mm (96"). 6. Vc= 28 MPa (4000 PSI) AT 28 DAYS AND THE CONCRETE SHALL BE THE SAME MIX AS THE ADJACENT RCB. 7. ALL STEEL, EXCEPT LONGITUDINAL STEEL SHALL BE GRADE 400 (60) BILLET STEEL CONFORMING TO ASTM A 615 M (A 615) AND SHALL TERMINATE 40 mm (1 1/2") CLEAR OF CONCRETE SURFACE UNLESS OTHERWISE SHOWN. 8. KEYED CONSTRUCTION JOINTS OF THE SAME DIMENSIONS AS THOSE OF THE RCB OR ARCH SECTION MAY BE CARRIED THROUGH THE TRANSITION STRUCTURE AT THE CONTRACTOR'S OPTION. SEE SECTION B-B. 9. THE TRANSITION STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE THE STRUCTURAL NOTES APPLYING TO RCB OR ARCH STRUCTURES SHOWN ON THE PLANS. STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN 342-2 TRANSITION STRUCTURE RCB TO PIPE SHEET 2 OF 2 C MAIN t LINE RCB I T I I IEl C51E N U) +VWV BARS 1 SEE NOTE 3 ROUND EDGE TO 3" (75 mm) R STATION POINT, SEE NOTE 2� Z /I I 1 I 2-H BARS 4" OC (100 mm), SEE NOTE-3-7 - CONSTRUCTION JOINT T v #4 ®18" OC / #13M ® 450 mm) I t LATERAL / F CONNECTOR PIPE �F BARS T B T n '1/ 4 ®18" OC Q O# ®13M 450 mm) 0 OTH WAYS TO - BE USED WHEN F �� B IS 60" (1500 mm) OR MORE BARS � 3 0R #4 1 18 10M ®450 m) oc SECTION G-G ROUND EDGES TO APPROXIMATE R B T m OF ID OF LATERAL WITH A MAXIMUM 8 OF 3'-0" (1.0 m) = a w m D & E BARS o D, E, H & G BARS CONSTRUCTION JOINT NEW OR EXISTING RCB, SEE NOTE 6 W BARS D BARS ANY STANDARD F BARS PIPE JOINT FI ROUND EDGES #3 OR #4 ® 18" OC i (10M 0 450 mm) m P EL S SEE NOTE 8 E BARS BARS 4"OC, SEE NOTE 3 (10 �T• EL R, SEE NOTE 8 UNDISTURBED EARTH asp' BACKFILL WITH 450-C-2000 (265-C-14) MIX CONCRETE, OR COMPACT SOIL TO RELATIVE DENSITY REQUIRED BY SPECIFICATIONS. BACKFILL MAY BE OMITTED IF STRUCTURE IS LAID ON UNDISTURBED EARTH TO STORM T, DRAIN WALL. STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION PROMULGATED BY THE STANDARD PLAN PUBLICGREEBooKSCOMMITTEE'"°- 1984 JUNCTION STRUCTURE PIPE TO RCB 333-2 REV. 1996, 2009 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION For individual use only by fernando@thieneseng.com as per copyright law. Order ID: 0096147435 NOTES 1. VALUES FOR A, B AND C SHALL BE SHOWN ON THE PLANS. ELEVATION R AND ELEVATION S SHALL BE SHOWN WHEN REQUIRED PER NOTE 8. 2. STATIONS SPECIFIED ON THE PLANS APPLY AT THE INTERSECTION OF CENTERLINES OF MAIN LINE AND LATERALS, EXCEPT THAT STATIONS FOR CATCH BASIN CONNECTOR PIPES APPLY AT INSIDE WALL OF STRUCTURE. 3. REINFORCING STEEL SHALL CONFORM TO ASTM A 615, GRADE 40, (ASTM A 615M, GRADE 300), AND SHALL TERMINATE 1 1/2" (40 mm) CLEAR OF CONCRETE SURFACE UNLESS OTHERWISE SHOWN. a. W BARS ARE OF SIZE AND SPACING SPECIFIED FOR WALL STEEL ON PLANS, AND SHALL BE CUT IN CENTER OF OPENING AND BENT INTO TOP AND BOTTOM OF JUNCTION STRUCTURE. b. OMIT H BARS WHEN SOFFIT OF SPUR IS 12" (300 mm) OR LESS BELOW SOFFIT OF MAIN LINE, AND OMIT G BARS WHEN INVERT OF SPUR IS 12" (300 mm) OR LESS ABOVE FLOOR OF MAIN LINE. 4. JUNCTION STRUCTURE SHALL BE POURED MONOLITHICALLY WITH MAIN LINE, MANHOLE OR TRANSITION STRUCTURE. 5. FLOOR OF STRUCTURE SHALL BE STEEL -TROWELED TO THE SPRING LINE. 6. WHEN CONNECTING TO EXISTING RCB, BREAKOUT LIMITS AND DETAILS SHALL BE SHOWN ON THE PLANS. 7. EMBEDMENT, P, SHALL BE 5" (130 mm) FOR B = 96" (2400 mm) OR LESS 8" (200 mm) FOR B OVER 96" (2400 mm). 8. IF ELEVATION R AND ELEVATION S ARE NOT SHOWN ON THE PLANS THEN THE INLET OPENING SHALL FALL 6" (150 mm) BELOW THE SOFFIT OF THE MAIN LINE WITH THE INLET PIPE LAID ON A STRAIGHT GRADE FROM MAIN LINE TO CATCH BASIN OR TO GRADE BREAK IN INLET LINE. ELEVATION S SHALL BE SHOWN ON THE PLANS IF THE INLET OPENING FALLS MORE THAN 6" (150 mm) BELOW THE SOFFIT OF THE MAIN LINE WITH THE INLET PIPE LAID ON A STRAIGHT GRADE AS STATED ABOVE. ELEVATION R SHALL BE SHOWN ON THE PLANS ONLY WHEN A STUB IS TO BE PROVIDED FOR A FUTURE CONNECTION. 9. LATERALS OR CONNECTOR PIPES 24" (600 mm) OR LESS IN DIAMETER SHALL BE NO MORE THAN 5' (1.5 m) ABOVE THE INVERT. LATERALS OR CONNECTOR PIPES 27" (675 mm) OR LARGER IN DIAMETER SHALL BE NO MORE THAN 18" (450 mm) ABOVE THE INVERT, WITH THE EXCEPTION THAT CATCH BASIN CONNECTOR PIPES LESS THAN 50' (15 m) IN LENGTH SHALL NOT BE MORE THAN 5' (1.5 m) ABOVE THE INVERT. 10. THE NEED FOR AN EDGE BEAM AND/OR ADDITIONAL REINFORCEMENT SHALL BE INVESTIGATED BY THE ENGINEER FOR ANY ONE OF THE FOLLOWING CONDITIONS: a. ANGLE A IS LESS THAN 30' b. TOP OF INLET PIPE IS LESS THAN 6" (150 mm) BELOW THE SOFFIT c. FLOW LINE OF INLET PIPE IS LESS THAN 7" (180 mm) ABOVE THE THE FLOOR OF THE RCB AT THE INSIDE FACE STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN JUNCTION STRUCTURE - PIPE TO RCB SHEET 2 OF 2 SHEET For individual use only by fernando@thieneseng.com as per copyright law. Order ID: 0096147435 S.P.P.W.C. STD. 333-2 DETAIL N.T.S. StormTekTM ST3/ST3G Installation: Connector Pipe Screen Filter Plan View a) StormTekTM ST3/ST3G b) StormTekTM is installed in front of the outflow pipe is supported by the frame mounted on the existing catch basin wall c) This device is designed to capture trash, sediment and debris from entering the storm water system. Deflector Plate only with ST3G Model Basin Sump \ StormTekTI ST3/ST3G Outflow Pipe Structural Support Bars (Bypass) Y Stainless Steel 1" flat bars 1/8" thickness Stainless Steel Frame (2" flat bars, 3/16" thick) mounted to wall Device fastens on pins Heavy -Gage Sheet Metal Screen S-304 Stainless Steel 5mm openings Section A General Notes: - Bypass has equivalent or greater flow rate as outflow pipe - Device is retro-fitted to catch basin specifications Deflector plate is the only difference between ST3 & ST313 1 10/25/2018 No. Revision/Issue iswlM & s4 Maime,wca Services P.O. Box 1627 Discovery Bay, CA 94505 StormTekTM Pipe Screen Model ST3/ST3G P.O. Box 1627 W1MSDiscovery Bay, CA 94505 NorCal: 925.516.8966 stormTekTI Storm Water Inspection & �11�~� Maintenance Services SoCal: 949.542.7234 No Scale www.swimsclean.com 1 of 1 15 S.P.P.W.C. STD. 342-2 DETAIL 5 6 CONNECTOR PIPE SCREEN DETAIL 6 3 N.T.S. N.T.S. MCN23-0099/ELPC22-000036 BASIS OF BEARINGS: BENCH MARK: p O SHOULD CONSTRUCTION OF THE REQUIRED QROFESS/pNq Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA THE BASIS OF BEARINGS FOR THIS SURVEY CITY OF FONTANA BENCHMARK NO �585" �� D lF Th%eneS En %neer%n Inc. IMPROVEMENTS NOT COMMENCE WITHIN TWO A�, TF PUBLIC STORM DRAIN IMPROVEMENT PLAN IS THE CALIFORNIA STATE PLANE R S COORDINATE SYSTEM (CCS83), ZONE 5, CIVIL ENGINEERING • LAND SURVEYING NORTH AMERICAN DATUM 1983 (NAD83) FD. R. R. SPK. IN PPJJ20908 AT o YEARS OF THE DATE OF APPROVAL SHOWN HEREON Lv 2� 14349 FIRESTONE BOULEVARD DRAWN BY: SCALE: BASED LOCALLY ON CONTINUOUSLY NORTHWEST CORNER OF SANTA ANA Of (n LA M/RADA, CALIFORN/A 90638 DETAILS OPERATING REFERENCE STATIONS (cogs) AVENUE &ALMOND AVENUE. DIAL AND CARRIED FORTH IN A DILIGENT MANNER, THE * R.C.E. N0. 56155r * PH.(714)521-4811 FAX(714)521-4173 MH FOR AS SHOWN ••EWPP•' AND "GISA•' AS BEING NORTH "" T 40 W❑RKING DESIGNED BY: PER STREET IMPROVEMENT PLAN 3487 Exp. 12-31-24 Q CALA.BA8H IN�UBTRIAL CEVELOPMENT DATE: 82.35.11" WEST (BASIS OF BEARINGS) (# ) BEFORE DAYS BEF❑RE CITY ENGINEER MAY REQUIRE REVISIONS TO THE � 25 (GRID) AND REPRESENTED HEREON BY THE Y❑U DIG Y❑u DIG PLANS TO BRING THEM INTO CONFORMANCE WITH 9�F C/v\� o`�= ""� Date 2/6/25 CHECKED�BY: APPROVED BY: PM 204�7 DRAWING CENTERLINE OF BANANA AVENUE AS BEING ELEYAT/ON = 965.46' /CIRCUIT 6 72 TOLL FREE 1-800-422-4133 OF �F NORTH 00.20'03•' EAST. (2010.0 EPOCH) t/ A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT STANDARDS IN EFFECT. 0 A�" BW DAB 6792 REV. REVISION DESCRIPTION DATE ENGR. CITY DATE REINHARD STENZEL RCE N0. 56155 GIA LAM KIM CITY ENGINEER R.C.E. 62296rJ Last Update: 02/06/2025 0:\3900-3999\3941\PUBLIC STORM DRAIN\3941SD05-DE(AIL.dwg