Loading...
HomeMy WebLinkAbout6526-6DATE: SCALE: DRAWING NO. DATE APPROVED BY:CHECKED BY: DESIGNED BY: DRAWN BY: GIA LAM KIM / CITY ENGINEER R.C.E. 62296 CITY OF FONTANA, CALIFORNIA DATECITYENGR.DATEREVISION DESCRIPTIONREV. SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT.DATE: PREPARED UNDER THE SUPERVISION OF: STEVEN L. ELLIS EXP. 12-31-25 STREET IMPROVEMENT PLANS 7 September 2025 AS SHOWNJV CA SE/LAF BENCH MARK:BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE) AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014, 11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867 THE CONTOURS AND ELEVATIONS SHOWN HEREON ARE BASED ON THE FOLLOWING BENCH MARK: BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK) DATUM: NAVD 88 1993 ADJ 6526 PROFILE PLAN 1"= 40' VERT 1"= 4' HORIZ 1"= 40' 909.581.0676 3257 E Guasti Rd, Suite 300 Ontario, California 91761 fuscoe.com 9/16/25 LEGEND:CN AC PAVEMENT P.C.C. SIDEWALK A.C. PAVEMENT GRIND AND OVERLAY 1 3 4 276 277 278 279 280 281 -1752 LT CURB -1752 RT CURB 1733 RT CURB- 275 1733 CL- -1752 CL 27 5 + 0 0 . 0 0 - M A T C H L I N E SE E S H E E T 5 2 8 1 + 0 0 . 0 0 - M A T C H L I N E S E E S H E E T 7 6 JOHN PREVITI AVENUE PLAN & PROFILE ID E N T I C A L PO I N T S ID E N T I C A L PO I N T S 1733 LT CURB- 27 5 + 0 0 . 0 0 - M A T C H L I N E SE E S H E E T 5 28 1 + 0 0 . 0 0 - M A T C H L I N E SE E S H E E T 7 STREET CONSTRUCTION NOTES: PROTECT IN PLACE CONSTRUCT 6 1/2" AC PAVEMENT (MIN.) OVER 12" NATIVE MATERIAL COMPACTED TO 95% (SEE GENERAL NOTES 30 & 31). CONSTRUCT 8" CF P.C.C. CURB & GUTTER PER CITY STD. PLAN NO. 1000. CONSTRUCT 4" THICK P.C.C. SIDEWALK PER CITY STD. PLAN NO. 1006 (W= PER PLANS) & DETAIL B/3 ON SHEET 3 WHERE APPLICABLE CONSTRUCT LOCAL DEPRESSION PER CITY OF FONTANA STD. PLAN NO. 3003, CASE PER PLAN AND DETAILS ON SHEET 3 CONSTRUCT CATCH BASINS PER STORM DRAIN PLANS DWG. 6527 INSTALL STREET LIGHT PER STREET LIGHT PLAN PER DWG. 6526LT AND DETAIL ON B ON SHEET 3 WHEN APPLICABLE ADJUST MANHOLE TO GRADE ADJUST WATER VALVE RIM TO GRADE INSTALL IRRIGATION PIPE SLEEVES 1-6" AND 1-4" CONSTRUCT EARTHEN SWALE ALONG EDGE OF SLOPE PER DETAIL C/3 ON SHEET 3 CONSTRUCT 8" CF P.C.C. CURB PER CITY STD. PLAN NO. 1000. CONSTRUCT 8" A.C. DIKE PER CITY STD. PLAN NO. 1007. P 1 2 3 5 6 7 8 9 12 14 16 17 1733 LT CURB- MEDIAN 1733 RT CURB- MEDIAN ID E N T I C A L PO I N T S ID E N T I C A L PO I N T S ID E N T I C A L PO I N T S -1752 RT CURB MEDIAN -1752 LT CURB MEDIAN NOTE: SIGNING & STRIPING TO BE INSTALLED PER DWG. 6510 CLOUDED AREAS ARE NOT A PART OF PLAN APPROVAL DATED ____________, 2025. C7 L10 L11 27 5 + 0 8 . 5 5 B C 17 3 2 . 7 0 T C EN D S I D E W A L K IM P R O V E M E N T S 27 5 + 0 8 . 5 5 B C 17 3 2 . 8 0 F S 2 7 8 + 3 8 . 7 5 CL C B N O . 1 0 W= 1 4 ' 2 7 8 + 8 3 . 1 0 C L C B N O . 1 1 W = 1 4 ' VENTANA PA-4 VENTANA PA-3 L23 L24 27 5 + 1 0 . 5 3 B C 17 3 3 . 4 2 T C 27 7 + 6 9 . 8 6 E C 17 4 1 . 3 6 T C JOHN PREVITI AVENUE 27 7 + 9 5 . 6 8 B C 17 4 2 . 2 7 T C 2 7 8 + 4 9 . 8 8 E C 1 7 4 4 . 0 4 T C 2 7 8 + 6 9 . 4 4 B C 1 7 4 4 . 6 8 T C 2 8 0 + 6 4 . 3 1 E C 1 7 5 1 . 0 9 T C 2 8 0 + 6 1 . 2 5 E C 1 7 5 0 . 3 9 T C 2 8 0 + 3 9 . 4 2 E C 1 7 4 9 . 4 8 T C 2 8 0 + 5 1 . 2 6 E C 1 7 5 0 . 7 4 T C C8 C9 C10 C11 C26 C27 C28 C29 C30 C31 C 3 2 E N D O F C U R B / B E G I N A . C . D I K E E N D O F C U R B / B E G I N A . C . D I K E 27 9 + 0 0 . 0 0 17 4 5 . 0 8 T C 28 0 + 0 0 . 0 0 17 4 8 . 4 5 T C 28 1 + 0 0 . 0 0 17 5 1 . 5 7 T C 27 8 + 5 0 . 0 0 17 4 3 . 3 9 T C 27 9 + 5 0 . 0 0 17 4 6 . 7 7 T C 28 0 + 5 0 . 0 0 17 5 0 . 0 4 T C 28 0 + 1 8 . 7 2 G B 17 4 9 . 0 9 T C 3.38% PROPOSED TOP OF 8" CURB @ 34' E'LY EXISTING GROUND @ 34' E'LY 27 8 + 0 0 . 0 0 17 4 1 . 7 0 T C 27 8 + 8 3 . 1 0 17 4 4 . 5 1 T C H=8' CL C B # 1 1 EN D O F C U R B / BE G I N A . C . D I K E 28 0 + 6 1 . 2 5 17 5 0 . 3 9 T C 3.38% 28 0 + 1 8 . 7 2 G B 17 4 9 . 1 9 F S EXISTING GROUND @ CL 27 8 + 0 0 . 0 0 17 4 1 . 8 0 F S PROPOSED FINISHED SURFACE @ CL 27 9 + 0 0 . 0 0 17 4 5 . 1 8 F S 28 0 + 0 0 . 0 0 17 4 8 . 5 6 F S 28 1 + 0 0 . 0 0 17 5 1 . 6 3 F S 27 8 + 5 0 . 0 0 17 4 3 . 4 9 F S 27 9 + 5 0 . 0 0 17 4 6 . 8 7 F S 28 0 + 5 0 . 0 0 17 5 0 . 1 3 F S 27 6 + 0 0 . 0 0 17 3 5 . 1 6 T C 27 8 + 0 0 . 0 0 17 4 1 . 5 7 T C 27 5 + 2 5 . 0 0 17 3 3 . 1 2 T C 27 5 + 5 0 . 0 0 17 3 3 . 7 7 T C 27 5 + 7 5 . 0 0 17 3 4 . 4 5 T C 27 6 + 2 5 . 0 0 17 3 5 . 8 9 T C 27 6 + 5 0 . 0 0 17 3 6 . 6 4 T C 27 6 + 7 5 . 0 0 17 3 7 . 4 2 T C 27 7 + 5 0 . 0 0 17 3 9 . 9 0 T C 200.00' VC 27 7 + 0 0 . 0 0 E V C 17 3 8 . 2 3 T C PVI STA = 276+00.00 PVI ELEV = 1734.95 27 5 + 0 0 . 0 0 B V C 17 3 2 . 4 9 T C PROPOSED TOP OF 8" CURB @ 34'-48' W'LYEXISTING GROUND @ 34'-48' W'LY 200.00' VC PVI STA = 276+00.00 PVI ELEV = 1735.62 27 6 + 0 0 . 0 0 G B 17 3 5 . 8 1 T C 27 8 + 0 0 . 0 0 G B 17 4 2 . 2 4 T C 2.45% 2.54% 2.76% 2.99% 3.21% 3.34% 3.33% 27 5 + 5 0 . 0 0 G B 17 3 4 . 4 3 T C 27 6 + 5 0 . 0 0 G B 17 3 7 . 3 0 T C 27 7 + 5 0 . 0 0 G B 17 4 0 . 5 8 T C 27 5 + 0 0 . 0 0 B V C 17 3 3 . 1 6 T C 27 6 + 0 0 . 0 0 G B 17 3 5 . 8 1 T C 27 7 + 0 0 . 0 0 E V C 17 3 8 . 9 1 T C PROPOSED TOP OF 8" MEDIAN CURB @ 5' W'LY EXISTING GROUND @ 5' W'LY 27 9 + 0 0 . 0 0 17 4 4 . 9 0 T C 28 0 + 0 0 . 0 0 17 4 8 . 2 4 T C 28 1 + 0 0 . 0 0 17 5 1 . 2 7 T C 27 8 + 5 0 . 0 0 17 4 3 . 2 4 T C 27 9 + 5 0 . 0 0 17 4 6 . 5 7 T C 28 0 + 5 0 . 0 0 17 4 9 . 7 9 T C 3.34% 28 0 + 1 8 . 7 2 G B 17 4 8 . 8 7 T C PROPOSED TOP OF 8" CURB @ 34'-48' W'LY EXISTING GROUND @ 34'-48' W'LY 27 8 + 0 0 . 0 0 17 4 1 . 5 7 T C CL C B # 1 0 H=5' 27 8 + 3 8 . 7 5 17 4 2 . 8 6 T C 28 0 + 3 9 . 4 2 17 4 9 . 4 8 T C EN D O F C U R B / BE G I N A . C . D I K E 27 6 + 0 0 . 0 0 17 3 5 . 1 8 T C 27 8 + 0 0 . 0 0 17 4 1 . 7 0 T C 27 5 + 2 5 . 0 0 17 3 3 . 1 2 T C 27 5 + 5 0 . 0 0 17 3 3 . 7 8 T C 27 5 + 7 5 . 0 0 17 3 4 . 4 6 T C 27 6 + 2 5 . 0 0 17 3 5 . 9 2 T C 27 6 + 5 0 . 0 0 17 3 6 . 6 9 T C 27 6 + 7 5 . 0 0 17 3 7 . 5 0 T C 27 7 + 5 0 . 0 0 17 4 0 . 0 1 T C PROPOSED TOP OF 8" CURB @ 34' E'LY EXISTING GROUND @ 34' E'LY 27 5 + 0 8 . 5 5 B C 17 3 2 . 7 0 T C 200.00' VC 27 7 + 0 0 . 0 0 E V C 17 3 8 . 3 3 T C PVI STA = 276+00.00 PVI ELEV = 1734.95 27 5 + 0 0 . 0 0 B V C 17 3 2 . 4 9 T C CURVE DATA CURVE # C7 C8 C9 C10 C11 C26 C27 C28 C29 C30 C31 C32 RADIUS 798.00' 798.00' 859.00' 859.00' 825.00' 827.00' 50.00' 830.00' 120.00' 200.00' 818.00' 3.50' LENGTH 513.92' 56.73' 575.52' 40.82' 591.54' 544.20' 13.95' 260.87' 26.17' 19.45' 193.22' 10.01' DELTA 36°53'57" 4°04'23" 38°23'15" 2°43'21" 41°04'56" 37°42'11" 15°59'26" 18°00'29" 12°29'35" 5°34'22" 13°32'03" 163°53'32" 27 6 + 0 0 . 0 0 17 3 5 . 8 5 T C 27 5 + 5 0 . 0 0 17 3 4 . 4 5 T C 27 6 + 5 0 . 0 0 17 3 7 . 3 7 T C 27 7 + 5 0 . 0 0 17 4 0 . 6 9 T C 200.00' VC 27 7 + 0 0 . 0 0 E V C 17 3 9 . 0 0 T C PVI STA = 276+00.00 PVI ELEV = 1735.62 27 8 + 0 0 . 0 0 G B 3.55% 3.76% 27 7 + 9 5 . 6 8 B C 17 4 2 . 2 7 T C 27 6 + 0 0 . 0 0 17 3 5 . 8 5 T C PROPOSED TOP OF 8" MEDIAN CURB @ 5' E'LY EXISTING GROUND @ 5' E'LY 27 5 + 0 0 . 0 0 B V C 17 3 3 . 1 6 T C 27 8 + 0 0 . 0 0 G B 17 4 2 . 4 4 T C L.O.C.= 26.17' 8'CF 27 7 + 6 9 . 8 6 E C 17 4 1 . 3 6 T C 27 5 + 1 0 . 5 3 B C 17 3 3 . 4 2 T C 27 9 + 0 0 . 0 0 G B 17 4 5 . 5 8 T C 28 0 + 0 0 . 0 0 G B 17 4 8 . 9 2 T C 3.34% 3.34% 3.34% 3.35% 3.11% 2.94%3.26% 28 0 + 5 1 . 2 6 E C 17 5 0 . 5 1 T C 28 0 + 6 5 . 2 9 B C 17 5 0 . 9 7 T C 27 8 + 5 0 . 0 0 G B 17 4 3 . 9 1 T C 27 9 + 5 0 . 0 0 G B 17 4 7 . 2 5 T C 28 0 + 5 0 . 0 0 17 5 0 . 4 8 T C 27 8 + 0 0 . 0 0 G B 17 4 2 . 2 4 T C 27 9 + 0 0 . 0 0 G B 17 4 5 . 5 8 T C PROPOSED TOP OF 8" MEDIAN CURB @ 5' W'LY EXISTING GROUND @ 5' W'LY 27 8 + 0 0 . 0 0 G B 17 4 2 . 4 4 T C 27 9 + 0 0 . 0 0 G B 17 4 5 . 7 1 T C 28 0 + 0 0 . 0 0 G B 17 4 9 . 0 9 T C 3.76%3.73% 3.09% 3.26% 3.38% 3.38% 3.38% 3.14% 3.00% 27 8 + 0 9 . 9 2 G B 17 4 2 . 8 1 T C 27 8 + 6 9 . 4 4 B C 17 4 4 . 6 8 T C 28 0 + 6 4 . 3 1 E C 17 5 1 . 0 9 T C 27 9 + 5 0 . 0 0 G B 17 4 7 . 4 0 T C 28 0 + 5 0 . 0 0 G B 17 5 0 . 6 6 T C PROPOSED TOP OF 8" MEDIAN CURB @ 5' E'LY EXISTING GROUND @ 5' E'LY 17 4 2 . 4 4 T C 27 9 + 0 0 . 0 0 G B 17 4 5 . 7 1 T C 28 0 + 0 0 . 0 0 G B 17 4 9 . 0 9 T C 27 8 + 4 9 . 8 8 E C 17 4 4 . 0 4 T C L.O.C.= 19.45' 8'CF PROPOSED FINISHED SURFACE @ CL EXISTING GROUND @ CL 27 6 + 0 0 . 0 0 17 3 5 . 2 8 F S 27 8 + 0 0 . 0 0 17 4 1 . 8 0 F S 200.00' VC 27 7 + 0 0 . 0 0 E V C 17 3 8 . 4 3 F S PVI STA = 276+00.00 PVI ELEV = 1735.05 27 5 + 0 0 . 0 0 B V C 17 3 2 . 5 9 F S 27 5 + 0 8 . 5 5 B C 17 3 2 . 8 0 F S 27 5 + 2 5 . 0 0 17 3 3 . 2 2 F S 27 5 + 5 0 . 0 0 17 3 3 . 8 8 F S 27 5 + 7 5 . 0 0 17 3 4 . 5 6 F S 27 6 + 2 5 . 0 0 17 3 6 . 0 2 F S 27 6 + 5 0 . 0 0 17 3 6 . 8 0 F S 27 6 + 7 5 . 0 0 17 3 7 . 6 0 F S 27 7 + 5 0 . 0 0 17 4 0 . 1 2 F S LINE DATA LINE # L10 L11 BEARING N71°14'04"E N71°14'04"E DISTANCE 8.50' 8.50' 9/24/2025