Loading...
HomeMy WebLinkAbout6408-3DATE: SCALE: DRAWING NO. DATE APPROVED BY:CHECKED BY: DESIGNED BY: DRAWN BY: GIA LAM KIM / CITY ENGINEER R.C.E. 62296 CITY OF FONTANA, CALIFORNIA DATECITYENGR.DATEREVISION DESCRIPTIONREV. SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT.DATE: PREPARED UNDER THE SUPERVISION OF: STEVEN L. ELLIS EXP. 12-31-25 SEWER IMPROVEMENT PLANS 5 May 24 AS SHOWNJV DLM SE/LAF BENCH MARK:BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE) AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014, 11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867 THE CONTOURS AND ELEVATIONS SHOWN HEREON ARE BASED ON THE FOLLOWING BENCH MARK: BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK) DATUM: NAVD 88 1993 ADJ 6408 909.581.06762850 Inland Empire Blvd Ontario, California 91764 fuscoe.com RFULLCIRCLETHINKING E N G I N E E R I N G FUSCOE Suite B PROFILE PLAN 1"= 40' VERT 1"= 4' HORIZ 1"= 40' 5/7/24 3 1795 - 1785 - 1775 - 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 SEWER LINE 'A' PROFILE SEWER LINE 'A' -1810 -1800 -1790 31 + 5 0 . 0 0 - M A T C H L I N E S E E S H E E T 2 JOHN PREVITI AVENUE SS PLAN & PROFILE STA 31+50.00 TO 38+50.35 31 + 5 0 . 0 0 - M A T C H L I N E SE E S H E E T 2 SEWER CONSTRUCTION NOTES: INSTALL 8" EXTRA STRENGTH V.C.P. SEWER MAIN, PIPE BEDDING PER CITY OF FONTANA STD. 2009 CONSTRUCT 48" MANHOLE PER CITY OF FONTANA STD. 2001. INSTALL MANUFACTURER APPROVED END CAP AT END OF LINE INSTALL 60" MANHOLE PER I.E.U.A. STANDARD SEWER MANHOLE PER DETAIL ON SHEET 5, MANHOLE TO BE CONSTRUCTED WITH STEEL STEPS PER SPPWC STD. PLAN NO. 635-3, SEE SHEET 5 1 3 4 6 ID E N T I C A L PO I N T S -18201805 - ID E N T I C A L PO I N T S LINE DATA LINE # L3 L4 L8 BEARING N45°48'11"E N45°48'11"E N13°26'08"W DISTANCE 209.00' 196.87' 16.25' DS DS STORAGESTORAGE STORAGE W/H FIRE RISER DS DS DS EL E C T R I C A L MP O E W/ H FI R E RI S E R DSDS DS DS DS DSDS DS DSDS DS DS DS DS DS DS DSDSDSDS DS RD RD RD RD RD 120 0 A M A I N D I S C . RES . MET E R S RES . MET E R S TAP B O X HO U S E M E T E R PV D I S C NGO M ME T E R PV D I S C RES . MET E R S RES . ME T E R S RES . MET E R S MPOE EL E C T R I C A L EL E C T R I C A L W/ H FI R E RI S E R DS DS DS DS DS DS DS DS DS DS DS DSDS RD RD RD MPOE E L E C T R I C A L M P O E DS DS DS EL E C T R I C A L W/H FI R E RI S E R DS DS DS DS DS DS DS DS DS DS DSDSDS RD RD RD MPOE DS DS HB HB HB JOHN PREVITI AVENUE 36 + 4 5 . 9 8 CL S S M H N O . 6 34 + 4 4 . 1 0 CL S S M H N O . 5 32 + 3 0 . 1 0 CL S S M H N O . 4 L3 L4 SD X - I N G 34 + 1 4 . 1 9 17 9 3 . 5 6 B O T 1 8 " S D 17 8 7 . 6 7 T O P 8 " S S CL E A R = 5 . 8 9 ' C3 SD X - I N G 33 + 0 1 . 6 6 17 8 8 . 9 8 B O T 2 4 " S D 17 8 4 . 2 1 T O P 8 " S S CL E A R = 4 . 7 7 ' L8 38 + 8 4 . 3 5 CA P E N D 38 + 5 0 . 3 5 CL S S M H N O . 7 38 + 7 0 . 6 0 CL S S M H N O . 1 2 17 9 6 . 3 1 I N V OU T - S 17 9 6 . 5 1 I N V IN - N 18 0 5 . 3 0 I N V OU T - S S=0.0 4 4 0 36 + 4 3 . 4 8 E N D P I P E 36 + 4 8 . 4 8 B E G P I P E 38 + 8 4 . 3 5 18 0 6 . 2 5 I N V CA P E N D 35 + 5 0 . 0 0 17 9 2 . 8 0 I N V 36 + 4 5 . 9 8 CL S S M H N O . 6 RI M = 1 8 1 2 . 4 7 38+50.35 CL SSMH NO.7 RIM=1820.10 INSTALL 93.48' L.F. 8" EXTRA STRENGTH V.C.P. SEWER S=0.03 7 6 EXISTING FINISH SURFACE PROPOSED FINISH SURFACE INSTALL 199.87' L.F. 8" EXTRA STRENGTH V.C.P. SEWER D= 1 6 . 1 6 ' D= 1 4 . 8 0 ' PROP. STORM DRAIN PER DWG. 6407 18 0 5 . 5 0 I N V IN - E D= 1 4 . 5 7 ' 18 0 6 . 0 2 I N V IN - N INSTALL 16.25' L.F. 8" EXTRA STRENGTH V.C.P. SEWER 38 + 4 8 . 3 5 E N D P I P E 38 + 5 2 . 3 5 B E G P I P E 38 + 6 8 . 6 0 E N D P I P E 38 + 7 2 . 6 0 B E G P I P E INSTALL 11.75' L.F. 8" EXTRA STRENGTH V.C.P. SEWER 38+70.60 CL SSMH NO.12 RIM=1820.39 S=0.0200 18 0 5 . 8 2 I N V OU T - S S=0.0200 R/W 17 8 0 . 6 5 I N V OU T - S 17 8 0 . 8 5 I N V IN - N 17 8 8 . 7 1 I N V OU T - S 17 8 8 . 9 1 I N V IN - N S=0.03 7 6 S=0.03 7 6 INSTALL 209' L.F. 8" EXTRA STRENGTH V.C.P. SEWER INSTALL 103.4' L.F. 8" EXTRA STRENGTH V.C.P. SEWER 32 + 2 7 . 6 0 E N D P I P E 32 + 3 2 . 6 0 B E G P I P E 34 + 4 1 . 6 0 E N D P I P E 34 + 4 6 . 6 0 B E G P I P E INSTALL 77.6' L.F. 8" EXTRA STRENGTH V.C.P. SEWER S=0.0200 31 + 5 0 . 0 0 17 7 9 . 0 9 I N V 35 + 5 0 . 0 0 17 9 2 . 8 0 I N V EXISTING FINISH SURFACE 32 + 3 0 . 1 2 CL S S M H N O . 4 RI M = 1 7 9 8 . 1 4 34 + 4 4 . 0 9 CL S S M H N O . 5 RI M = 1 8 0 5 . 5 1 PROPOSED FINISH SURFACE D= 1 7 . 4 9 ' D= 1 6 . 8 ' SD X-ING 33+01.66 1788.98 BOT 24" SD 1784.12 TOP 8" SS CLEAR: 4.77' SD X-ING 34+14.19 1794.22 BOT 18" SD 1788.35 TOP 8" SS CLEAR: 5.87'PROP. STORM DRAIN PER DWG. 6407 CURVE DATA CURVE # C3 RADIUS 380.00' LENGTH 199.87' DELTA 30°08'08" 5/22/2024