Loading...
HomeMy WebLinkAbout6527-7DATE: SCALE: DRAWING NO. DATE APPROVED BY:CHECKED BY: DESIGNED BY: DRAWN BY: GIA LAM KIM / CITY ENGINEER R.C.E. 62296 CITY OF FONTANA, CALIFORNIA DATECITYENGR.DATEREVISION DESCRIPTIONREV. SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT.DATE: PREPARED UNDER THE SUPERVISION OF: STEVEN L. ELLIS EXP. 12-31-25 STORM DRAIN IMPROVEMENT PLANS 7 September 2025 AS SHOWNJV CEA/RE SE/LAF BENCH MARK:BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE) AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014, 11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867 THE CONTOURS AND ELEVATIONS SHOWN HEREON ARE BASED ON THE FOLLOWING BENCH MARK: BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK) DATUM: NAVD 88 1993 ADJ F : \ P R O J E C T S \ 1 6 5 5 \ 0 0 8 \ P L A N S \ S T O R M D R A I N \ 1 6 5 5 - 0 0 8 - S D 0 7 D T . D W G ( 0 9 - 1 6 - 2 5 2 : 1 0 : 2 7 P M ) P l o t t e d b y : c a g u i r r e Exp. 12/31/25 E S S I O N A L E N G I N E E R FORP DERET S I G E R V I LIC C A L I F O R N I A FO ET A T S NO. C 047255 S .LNEVETS I L L E 6527 909.581.0676 3257 E Guasti Rd, Suite 300 Ontario, California 91761 fuscoe.com 9/16/25 7 - 1TRENCHING AND BEDDING DETAIL - 2RCP PIPE COLLAR DETAIL - 3END OF LINE CAP CONCRETE SHALL BE CLASS 'A'. T=12" PIPE I.D. = PER PLAN PIPE O.D. = I.D. + 6" 3" 3" MIN. DETAIL SHEET #4 REBAR WELDED TYP. 3/8" BOLT 1/2"x2" STEEL STRAP WITH GRATE ASSEMBLY 6" TYP. MIN. 8" TEE STD. C.S.P. 6" MIN. 1/2" TO 1-1/2" DIA. CENTER AND BY BUILDING OFFICIAL CONCRETE OR METHOD APPROVED ANCHOR BLOCK MIN. 5 SACK/C.Y. 18" MIN. HOLES, 10"-12" ON 1/2" SLOT OR 3 1 FLOW INSIDE TO DRAIN CONCRETE FOOTING & TROWEL SET TEE SECTION IN WET H (HEAD) 1.00' 2' CSP FG PER TABLE 1 WATER SURFACE ELEVATION TOP OF DEPRESSED AREA FG PER TABLE 1 PIPE DIAMETER AND INVERT PER TABLE 1 STAGGEREDRISER PER TABLE 1 TOP OF RISER WITH WIRE MESH OVER FILTER FABRIC WRAP PERIMETER OF RISER TABLE 1 RISER LOCATION CSP RISER (D) (IN.) OUTLET DIAMETER (IN.) OUTLET INVERT BOTTOM OF DEPRESSED AREA TOP OF RISER H (FT.) TOP OF DEPRESSED AREA 1 36 36 1732.41 1738.00 1739.00 2 1743.00 2 36 36 1728.00 1733.00 1734.00 2 1738.00 3 48 36 1708.00 1714.00 1715.00 1 1718.00 4 48 36 1694.00 1700.00 1701.00 2 1705.00 (D) PER TABLE 1 PER TABLE 1 PER TABLE 1 - 4RISER DETAIL BOTTOM OF DEPRESSED AREA