CITY OF FONTANA
STREET IMPROVEMENT PLANS
SHEET INDEX MAP
STREET CONSTRUCTION NOTES:
CN DESCRIPTION QUANTITIES UNIT
PROTECT IN PLACE --
CONSTRUCT 6 1/2" AC PAVEMENT (MIN.) OVER 12" NATIVE MATERIAL COMPACTED TO 95% (SEE GENERAL NOTES 30 & 31).102,680 SF
CONSTRUCT 8" CF P.C.C. CURB & GUTTER PER CITY STD. PLAN NO. 1000.3,417 LF
CONSTRUCT 8" CF P.C.C. CURB PER CITY STD. PLAN NO. 1000.1,335 LF
CONSTRUCT CURB RETURN ACCESS RAMP PER CITY STD. PLAN NO. 1003 PER DETAIL ON SHEET 3.2 EA
CONSTRUCT 4" THICK P.C.C. SIDEWALK PER CITY STD. PLAN NO. 1006 (W= PER PLANS)10,926 SF
CONSTRUCT COMMERCIAL DRIVEWAY PER CITY STD. PLAN NO. 1001 AND DETAIL ON SHEET 3 1 EA
CONSTRUCT LOCAL DEPRESSION PER CITY OF FONTANA STD. PLAN NO. 3003, CASE PER PLAN AND DETAILS ON SHEET 3.5 EA
CONSTRUCT MEDIAN ROCK FINISH/PLANTING PER LANDSCAPE PLANS 4,905 SF
WARP MEDIAN TO WRAP AROUND MANHOLE PER BLOW UP DETAIL ON SHEET 6 1 EA
PROVIDE 2" X 5' GRIND AND OVERLAY, SEE DETAIL C/3 ON SHEET 3 1,670 SF
DEMOLISH EXISTING AC PAVEMENT 37,545 SF
UNDERGROUND EXISTING POWER POLE PER SEPARATE PLANS 1 SF
CONSTRUCT ACCESS RAMP & RAISED CROSSWALK PER DETAIL A/3 ON SHEET 3.1 EA
CONSTRUCT CATCH BASINS PER STORM DRAIN PLANS 5 EA
INSTALL IRRIGATION PIPE SLEEVES 1-4" AND 2-3"655 LF
CONSTRUCT 8" AC DIKE PER CITY STD. PLAN NO. 1007.382 LF
CONSTRUCT TEMPORARY 4" AC OVER 95% COMPACTIVE SUBGRADE PER SOILS ENGINEERS REPORT 2,911 SF
ADJUST MANHOLE TO GRADE 18 EA
INSTALL STREET LIGHT PER STREET LIGHT PLAN PER DWG. 6406LT 19 EA
REMOVE EXISTING AC BERM 200 LF
ADJUST WATER VALVE RIM TO GRADE 24 EA
RESTRICTED USE AREA 1,920 SF
JOIN EXISTING CATCH BASIN 2 EA
CONSTRUCT 18"x18" OLDCASTLE PRECAST CATCH BASIN (MODEL: CB-181830) WITH GALVANIZED GRATE PER DETAIL ON
SHEET 10 (OR APPROVED EQUAL)2 EA
CONSTRUCT 12" RCP STORM DRAIN LINE, TRENCH AND BEDDING DETAIL ON SHEET 3 52 LF
CONSTRUCT CONCRETE PIPE COLLAR PER CITY OF FONTANA STD. PLAN NO. 3022 5 EA
P
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
TITLE SHEET
ENGINEER:
FUSCOE ENGINEERING INC.
2850 INLAND EMPIRE BOULEVARD, SUITE B
ONTARIO, CALIFORNIA 91764
(909) 581-0676
CONTACT: LUIS FIGUEROA
ELECTRIC:
SOUTHERN CALIFORNIA EDISON COMPANY
7951 REDWOOD AVENUE
FONTANA, CA 92336
PHONE: 909.357.6221
NATURAL GAS:
THE GAS COMPANY, SEMPRA UTILITIES
16231 VALLEY BLVD.
FONTANA, CA 92235
PHONE: 800.427.2200, 909.428.8411
WATER:
WEST VALLEY DISTRICT
855 W. BASELINE ROAD
RIALTO, CA 92377
PHONE: 909.875.1361
WATER:
FONTANA WATER COMPANY
15966 ARROW ROUTE
FONTANA, CA 92335
PHONE:909.822.2201
WATER:
CRAWFORD CANYON MUNICIPAL WATER
DISTRICT
21559 LITTON AVE
GRAND TERRACE, CA 92313
PHONE:909.824.5352
SEWER:
CITY OF FONTANA
8353 SIERRA AVENUE
FONTANA, CA 92235
PHONE: 909.350.6632
CITY OF FONTANA UTILITY NOTIFICATION LIST:
QUANTITIES SHOWN HEREON ARE PROVIDED FOR PERMIT AND BONDING PURPOSES ONLY. CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THEIR OWN QUANTITIES PRIOR TO BIDDING AND CONSTRUCTION. THE ENGINEER IS NOT
RESPONSIBLE FOR DISCREPACIES IN FINAL CONSTRUCTION QUANTITIES.
SHEET INDEX:
SHT. NO.DESCRIPTION
1 TITLE SHEET
2 SECTIONS
3 DETAIL SHEET
4 JOHN PREVITI AVENUE PLAN & PROFILE
5 JOHN PREVITI AVENUE PLAN & PROFILE
6 CITRUS AVENUE PLAN & PROFILE
7 CITRUS AVENUE PLAN & PROFILE
8 CITRUS AVENUE SECTIONS
9 CITRUS AVENUE SECTIONS
10 CITRUS AVENUE SECTIONS
OWNER DEVELOPER:
FRONTIER COMMUNITIES
2151 E. CONVENTION CENTER WAY, SUITE 230
ONTARIO, CALIFORNIA 91764
PHONE: 909.354.8092
CONTACT: STEPHEN KING
GEOTECHNICAL:
GEO TEK, INC.
1548 NORTH MAPLE STREET
CORONA, CA. 92880
PHONE: (951) 710-1160
PROJECT NO. 2541-CR
SOIL REPORT DATED: OCTOBER 16, 2020
CONTACT: ANNA M. SCOTT - PROJECT GEOLOGIST
JOHN PREVITI AVENUE
AND CITRUS AVENUE
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
7/17/24
VICINITY MAP
SITE
15
LIST OF ABBREVIATIONS:
ANGLE POINT
A.C., AC ASPHALT CONCRETE
AC.ACRE
A.B.AGGREGATE BASE
BC BEGIN OF CURVE
BCR BEGIN OF CURB RETURN
BVC BEGIN VERTICAL CURVE
CF CURB FACE
CB CATCH BASIN
C/G CURB & GUTTER
C/L, CL, CENTER LINE
CONC.CONCRETE
CY CUBIC YARD
D-LOAD RCP DESIGN LOAD
DW, W DOMESTIC WATER, WATER
DWY DRIVEWAY
E.A., EA EACH
EC END OF CURVE
ECC EDGE OF CONCRETE CHANNEL
ECR END OF CURB RETURN
EG EXISTING GROUND
EL., ELEV ELEVATION
EP EDGE OF PAVEMENT
EVC END VERTICAL CURVE
EX., EXIST.,(E)EXISTING
FH FIRE HYDRANT
FG FINISH GRADE
FL FLOWLINE
FS FINISHED SURFACE
GB GRADE BREAK
HP HIGH POINT
INV INVERT
JT., JNT.JOINT
L LENGTH
L.F., LF LINEAL FEET
L.O.C.LENGTH OF CURB
LSCP, LS LANDSCAPE
MAX MAXIMUM
MIN MINIMUM
MH MANHOLE
(N)NEW
NG NATURAL GROUND
N.T.S., NTS NOT TO SCALE
PCC POINT OF COMPOUND CURVE
P.C.C.PORTLAND CEMENT CONCRETE
PI POINT OF INTERSECTION
PRC POINT OF REVERSE CURVE
P/L, PL PROPERTY LINE
PROP.PROPOSED
R/W RIGHT OF WAY
RW RETAINING WALL
SCE SOUTHERN CALIFORNIA EDISON
SD STORM DRAIN
S=SLOPE
S, SW, SS SEWER, SANITARY SEWER
SIM.SIMILAR
SF, S.F.SQUARE FEET
SDMH STORM DRAIN MANHOLE
SMH SEWER MANHOLE
STA STATION
TC TOP OF CURB
TD TOP OF DIKE
T.I.TRAFFIC INDEX
TYP., TYP TYPICAL
W, DW WATER, DOMESTIC WATER
<PT
LEGEND:
CENTERLINE
PROPERTY LINE
RIGHT OF WAY
EXISTING LOTLINE
EXISTING EASEMENT
x1790.3 EXISTING SPOT ELEVATION
EXISTING CONTOUR
PROPOSED CONTOUR
PROPOSED EASEMENT
PROPOSED LOTLINE
EDGE OF EX. AC PAVEMENT
EXISTING SEWER
EXISTING WATER
EXISTING STORM DRAIN
SEWER OR STORM DRAIN MANHOLE
CATCH BASIN & LOCAL DEPRESSION
FLOW ARROW & GRADE
GRADED SWALE
TOP OF SLOPE
TOE OF SLOPE
PROPOSED STORM DRAIN
DAYLIGHT LINE
STREET GENERAL NOTES:
1.ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT
PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE
SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2.WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY
REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID
CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3.ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4.CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT,
ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO
WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909)350-7610.
5.THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE
STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON-METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE
CITY TRAFFIC ENGINEER.
6.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC
CONTROL DEVICES AT ALL TIMES.
7.THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER
IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8.THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING,
SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL
SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL
EXISTS FOR GROUND MOVEMENT.
9.NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT-OF-WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR
THAT PURPOSE.
10.THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING
UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO.
11.THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE
EXCAVATION. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER,
RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO
WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12.THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY
AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND
WATER REQUIREMENTS.
13.CURVE DATA REFERS TO THE FACE OF CURB.
14.STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15.ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT
THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND
CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
16.THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR
NOTIFICATION TO THE CITY ENGINEER.
17.REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH
MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL
BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER
ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE
MONUMENT.
18.THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE
SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
19.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING,
AT ALL TIMES.
20.ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR.
21.THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR
PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22.NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23.A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL
REQUIRE RE-WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
24.CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS, UPON
INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING
IMPROVEMENTS.
25.THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND
SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
26.ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE.
27.THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL.
28.NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND
APPROVED.
29.ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
30.APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
31.PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER
AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32.ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE
RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION
OF ROUGH GRADING.
33.ALL MANHOLES, CLEANOUTS FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING
CONTRACTOR UPON COMPLETION OF PAVING.
34.UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER
TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35.CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE
CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
36.AS-BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE
DRAWINGS TO THE CITY ENGINEER.
PRIVATE ENGINEER'S NOTICE TO CONTRACTORS:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A
SEARCH OF AVAILABLE RECORDS; TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON
THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON
THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR
STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS.
THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE
COURSE OF CONSTRUCTION OF THIS PROJECT; INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS SHALL APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD
THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE
OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ENGINEER PRIOR TO
THE COMMENCEMENT OF ANY WORK. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER OF ANY DISCREPANCY
BEGINNING OF WORK MEANS ACCEPTANCE OF CONDITIONS.
CONTRACTOR SHALL COMPLY WITH ALL N.P.D.E.S. REQUIREMENTS.
CONTRACTOR SHALL ADJUST TO FINISH GRADE ALL MANHOLE RIMS, WATER VALVE BOXES, UTILITY BOXES AND LIDS, ETC.
CONTRACTOR SHALL PROVIDE ALL THE NECESSARY PIPE FITTINGS TO COMPLETE THE WORK.
THE ENGINEER PREPARING THESE PLANS SHALL NOT BE HELD RESPONSIBLE OR LIABLE FOR UNAUTHORIZED CHANGES TO OR USES
THESE PLANS. ALL CHANGES TO THESE PLANS MUST BE REQUESTED IN WRITING AND MUST BE APPROVED BY THE ENGINEER OF
RECORD.
SEWER TREATMENT FACILITIES
INLAND EMPIRE UTILITY AGENCY
12645 6TH STREET
RANCHO CUCAMONGA, CA 91739
PHONE: 909.947.4131
SOLID WASTE:
BURRTEC WASTE
9454 CHERRY AVENUE
FONTANA, CA 92335
PHONE: 909.822-9739
TELEPHONE:
AT&T
11464 TELEGRAPH ROAD
SANTA FE SPRINGS, CA 90670
PHONE: 714.666.5415
CABLE SERVICES:
TIME WARNER CABLE
1205 DUPONT AVENUE
ONTARIO, CA 91761
PHONE: 909.390.4738
EXISTING SURFACE/CURB
FUTURE CURB
TURF
TURF
TURF
TURF
TURF
ROOOT
ROOOT
OOO
R
T
R
T
ROOOT
O
O
O
R
T
R
T
O
O
O
R
T
R
T
W/H
FIR
ERISER
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
RD
RD
RD
RD
RD
RD
RD
STOR
A
G
E
STOR
A
G
E
EL
E
C
T
R
I
C
A
L
R
O
O
M
STO
R
A
G
E
MPO
E
DS
DS
ELE
C
T
R
I
C
A
L
MPOE
W/H
FIRERISER
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
RD
ELEC
T
R
I
C
A
L
MPOE
W/H
FIR
E RIS
E
R
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
RD
RD
RD
RD
RD
1200A MAI
N
D
I
S
C
.
RES.METERSRES.METERS
TAP BOX
HOUSE METER
PV DISCNGOMMETER
PV DISC
RES.METERS
RES.METERSRES.METERS
MPOE
ELE
C
T
R
I
C
A
L
ELE
C
T
R
I
C
A
L
W/H
FIRERIS
E
R
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
RD
RD
RD
MPOE
ELECTRICALMPOE
W/H FIRERISER
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS DS
DS
RD
RD
RD
FIRERISER
STORAGE
DS
DS
DS
DS
DS DS
DSDS
DS
DS
DS
DS
DSDS
DS
DS
DSDSDS
DS
DS
DS
DS
DS DS DSDS
DS
DS
DS
DS
DS
DS
DS
DSDS
DS
DSDS
DS
DS DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DSDS
DS
DS
DS
DS
DS
DS
DS
DS DS DS DSDS DS DS DS
DS
DS
RD RD RD RD
RD
RD
RD
RD
RD
RDRDRD
RD
RD
RD
RD
RD
STOR
A
G
E
STO
R
A
G
E
MPOE
IDF
IDF
ELECTRICAL ROOM
ELECTRICAL ROOM
STORAGE STORAGE STORAGE REM
O
T
E
M
E
T
E
R
C
L
O
S
E
T
STO
R
A
G
E
STORAGEW.H.FIRERISER
DS
DS
DS
DS
W/H STORAGE
ELECTRICAL
W/H
FIR
E RISER
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
RD
RD
RD
MPO
E
DS
DS
DS
DS
ELEC
T
R
I
C
A
L
MPO
E
W/H
FIRE
RISE
R
DS
DSDS
DS
DS
DS
DS
DSDS
DS DSDS DS
DS
DS
DS
RD RDRD
MPOE
HB
ROOOT
ROOOT
OOO
R
T
R
T
ROOOT
O
O
O
R
T
R
T
O
O
O
R
T
R
T
HB
HB
HB
HB
4
5
6
7
7/17/2024
2
SECTIONS DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
7/17/24
TYPICAL SECTION
STA 291+64.67 TO STA 306+35.16
JOHN PREVITI AVENUE
TYPICAL SECTION
STA 139+31.23 TO STA 140+06.45
CITRUS AVENUE
TRANSITION SECTION
STA 144+16.98 TO STA 144+79.56
CITRUS AVENUE
TYPICAL SECTION
STA 135+39.86 TO STA 137+18.92
CITRUS AVENUE
12'12'
104'
6'
FUTURE
L.S.
14'
VARIES
40'-63'
6'
FUTURE
SDWK.
6'
FUTURE
L.S.
TYPICAL SECTION
STA 141+81.48 TO STA 144+16.98
CITRUS AVENUE
VARIES
17'-40'
FUTURE BY OTHERS
6'
FUTURE
SDWK.
VARIES
23'-0'VARIES
7'-9'
VARIES
10'-31'
VARIES
TYPICAL SECTION
STA 138+56.10 TO STA 139+31.23
CITRUS AVENUE
7/17/2024
3
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
7/17/24
DETAIL SHEET
CATCH BASIN #2
ACCESS RAMP #2
ACCESS RAMP #1
LOCAL DEPRESSION CATCH BASIN DETAIL
CATCH BASIN #1
CATCH BASIN #4CATCH BASIN #3
CATCH BASIN #5
JOHN PREVITI AVENUE
JOHN PREVITI AVENUE
CI
T
R
U
S
A
V
E
N
U
E
CI
T
R
U
S
A
V
E
N
U
E
JOHN PREVITI AVENUE
JOHN PREVITI AVENUE
JOHN PREVITI AVENUE
JOHN PREVITI AVENUE
CITRUS AVENUE
DRIVEWAY DETAIL
5'
(MIN.)
1'
(MIN.)
3
CEXISTING & NEW AC PAVEMENT TRANSITION DETAIL
SAWCUT AND REMOVE EXIST.
PAVEMENT
GRIND 2" MIN.
EXISTING PAVEMENT
AND OVERLAY 2" MIN.
EXISTING PAVEMENT NEW AC PAVEMENT
JOHN PREVITI AVENUE
3
BA.C./CONC. PAVING TRANSITION AT RAISED CROSSWALK
3
AACCESS RAMP & RAISED CROSSWALK
STREET CONSTRUCTION NOTES:
JOIN EXISTING CATCH BASIN
CONSTRUCT 18"x18" OLDCASTLE PRECAST CATCH BASIN (MODEL: CB-181830)
WITH GALVANIZED GRATE PER DETAIL ON SHEET 10 (OR APPROVED EQUAL)
CONSTRUCT 12" RCP STORM DRAIN LINE, TRENCH AND BEDDING DETAIL ON
SHEET 3
CONSTRUCT CONCRETE PIPE COLLAR PER CITY OF FONTANA STD. PLAN NO.
3022
23
24
25
26
FW FW FW
1787.65
LIPCL CB NO. 1
295+68.63
1787.75 TC
1786.75 FL
H=8"CF +4"DEP.=12"
1787.75
LIP
1786.89
LIP1786.69
LIP
1787.25
LIP
1788.30 TC
1787.63 FL
8" CF
1787.24 TC
1786.57 FL
8" CF
1787.39 TC
1786.72 FL
8" CF
1788.15 TC
1787.48 FL
8" CF
1787.54 TC
1786.54 FL
8" CF+ 4"H
1787.97 TC
1786.97 FL
8" CF+ 4"H
CL CB NO. 3
300+87.95
1805.32 TC
1804.32 FL
H=8"CF +4"DEP.=12"
1804.40
LIP
1804.73 TC
1804.06 FL
8" CF
1805.08 TC
1804.08 FL
8" CF+ 4"H
1804.18
LIP
1805.27
LIP
1805.39
LIP1804.82
LIP
1804.90 TC
1804.23 FL
8" CF
1805.77 TC
1805.10 FL
8" CF
1805.94 TC
1805.27 FL
8" CF
1805.56 TC
1804.56 FL
8" CF+ 4"H
1803.34 TG
1799.34 INV.
1799.00
INV.
1799.04
INV.
1799.28
INV.
1799.31
INV.
1808.44
LIP
1808.99 TC
1808.32 FL
8" CF
1808.27 TC
1807.27 FL
8" CF+ 4"H
1808.34
LIP
1807.97
LIP
CL CB NO. 5
135+57.86
1808.47 TC
1807.47 FL
H=8"CF +4"DEP.=12"
1808.84 TC
1808.17 FL
8" CF
1808.67 TC
1807.67 FL
8" CF+ 4"H
1808.13 TC
1807.46 FL
8" CF
1808.05 TC
1807.38 FL
8" CF
1807.63
LIP
1807.50
LIP
W W W W W
W
1787.11
LIP
1786.73
LIP1786.52
LIP
1787.53
LIP 1787.64
LIP
1787.07 TC
1786.40 FL
8" CF
1787.23 TC
1786.56 FL
8" CF
1787.39 TC
1786.39 FL
8" CF+ 4"H
1787.83 TC
1786.83 FL
8" CF+ 4"H
1788.03 TC
1787.36 FL
8" CF
1788.19 TC
1787.52 FL
8" CF
CL CB NO. 2
295+63.88
1787.61 TC
1786.61 FL
H=8"CF +4"DEP.=12"
W W W W W W W
1803.77
LIP
1803.99
LIP
1804.41
LIP
1804.85
LIP
CL CB NO. 4
300+75.96
1804.91 TC
1803.91 FL
H=8"CF +4"DEP.=12"
1804.32 TC
1803.65 FL
8" CF
1804.49 TC
1803.82 FL
8" CF
1805.53 TC
1804.86 FL
8" CF
1805.35 TC
1804.68 FL
8" CF
1804.67 TC
1803.67 FL
8" CF+ 4"H
1805.15 TC
1804.15 FL
8" CF+ 4"H
1804.98
LIP
1799.16
INV.
1803.34 TG
1799.34 INV.
1799.30
INV.
1799.25
INV.
W W W W W W W
W W W W W W
1803.53 TC
1802.86 FL
8" CF
1803.77 TC
1803.10 FL
8" CF
1803.22 TC
1802.55 FL
8" CF
1804.32 TC
1803.65 FL
8" CF
1803.65
FS
1803.77
FS
1804.40
FS
1804.52
FS
1803.27
FS
1803.39
FS
1803.77
FS
1803.89
FS
1804.01 TC
1803.34 FL
8" CF
1803.53 TC
1802.86 FL
8" CF
1803.77 TC
1803.10 FL
8" CF
1804.01 TC
1803.34 FL
8" CF
1803.22 TC
1802.55 FL
8" CF
3
B
1803.08 FS 1803.90 FS
1803.75 FS 1803.99 FS
7/17/2024
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
PROFILE
PLAN 1"= 40'
VERT 1"= 4'
HORIZ 1"= 40'
7/17/24 4
STREET CONSTRUCTION NOTES:
PROTECT IN PLACE
CONSTRUCT 6 1/2" AC PAVEMENT (MIN.) OVER 12" NATIVE MATERIAL COMPACTED TO
95% (SEE GENERAL NOTES 30 & 31).
CONSTRUCT 8" CF P.C.C. CURB & GUTTER PER CITY STD. PLAN NO. 1000.
CONSTRUCT 4" THICK P.C.C. SIDEWALK PER CITY STD. PLAN NO. 1006 (W= PER PLANS)
CONSTRUCT LOCAL DEPRESSION PER CITY OF FONTANA STD. PLAN NO. 3003, CASE
PER PLAN AND DETAILS ON SHEET 3.
PROVIDE 2" X 5' GRIND AND OVERLAY, SEE DETAIL C/3 ON SHEET 3
CONSTRUCT CATCH BASINS PER STORM DRAIN PLANS
ADJUST MANHOLE TO GRADE
INSTALL STREET LIGHT PER STREET LIGHT PLAN PER DWG. 6406LT
ADJUST WATER VALVE RIM TO GRADE
RESTRICTED USE AREA
P
1
2
5
7
10
14
18
19
21
22
291 292 293 294 295 296 297 298 299290
299
+
0
0
.
0
0
-
M
A
T
C
H
L
I
N
E
SEE
S
H
E
E
T
5
JOHN PREVITI AVENUE
PLAN & PROFILE
29
9
+
0
0
.
0
0
-
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
5
-1799 LT CURB
-1799 CL
-1799 RT CURB
ID
E
N
T
I
C
A
L
PO
I
N
T
S
1770 LT CURB-
1770 CL-
1770 RT CURB-
ID
E
N
T
I
C
A
L
PO
I
N
T
S
ID
E
N
T
I
C
A
L
PO
I
N
T
S
LEGEND:CN
AC PAVEMENT
P.C.C. SIDEWALK
A.C. PAVEMENT GRIND
AND OVERLAY
DEMOLISH AC
PAVEMENT
1
5
10
11
RESTRICTED USE AREA 22
**
**
ST
O
R
A
G
E
DS
DS
DS
DS
DS
DSDS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS DS
DS
DS
DS
DS
DS DS
DS
DS
DS
DS
DSDSDSDSDSDSDS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
RD
RD
RD
RD
RD
RD
RD
RD
RD RD
RD
RD
STORAGESTORAGE
MP
O
E
ID
F
EL
E
C
T
R
I
C
A
L
R
O
O
M
ST
O
R
A
G
E
ST
O
R
A
G
E
ST
O
R
A
G
E
REMOTE METER CLOSET
STORAGE
ST
O
R
A
G
E
W.
H
.
FI
R
E
RI
S
E
R
DS
DS
ELE
C
T
R
I
C
A
L
D
S
D
S
D
S
D
S
D
S
R
D
R
D
ELECTRICAL MPOE
DS
DS
DS
DS
DS
DS
DS
DS
RD
MP
O
E
HB
O O O
R
T
R
T
PA
T
I
O
/
BA
L
C
O
N
Y
M.
B
E
D
R
O
O
M
M.
B
A
T
H
M.
W
.
I
.
C
.
LI
V
I
N
G
KIT
C
H
E
N
BE
D
R
O
O
M
2
EN
T
R
Y
CO
A
T
DI
N
I
N
G
L.
P.
PA
T
I
O
/
BA
L
C
O
N
Y
M.
B
E
D
R
O
O
M
M.
B
A
T
H
M.
W
.
I
.
C
.
LI
V
I
N
G
KI
T
C
H
E
N
BE
D
R
O
O
M
2
W.
I
.
C
.
2
BA
T
H
2
EN
T
R
Y
CO
A
T
DI
N
I
N
G
L.
P.
EN
T
R
Y
PA
T
I
O
/
BA
L
C
O
N
Y
BE
D
R
O
O
M
W.I
.
C
.
BA
T
H
KIT
C
H
E
N
LI
V
I
N
G
DIN
I
N
G
CO
A
T
L.
P.
MPOE ELECTRICAL
DS
DS
DS
DS
DS
DS
DS
DS
DS
RD
RD
DS
DS
DS
BEDROOM 2
W.I.C. 2
BATH 2
E.P
.
MP
O
E
EL
E
C
T
R
I
C
A
L
HB
O O O
R
T
R
T
PA
T
I
O
/
BA
L
C
O
N
Y
M.
B
E
D
R
O
O
M
M.
B
A
T
H
M.
W
.
I
.
C
.
LI
V
I
N
G
KIT
C
H
E
N
BE
D
R
O
O
M
2
EN
T
R
Y
CO
A
T
DI
N
I
N
G
L.
P.
PA
T
I
O
/
BA
L
C
O
N
Y
M.
B
E
D
R
O
O
M
M.
B
A
T
H
M.
W
.
I
.
C
.
LI
V
I
N
G
KI
T
C
H
E
N
BE
D
R
O
O
M
2
W.
I
.
C
.
2
BA
T
H
2
EN
T
R
Y
CO
A
T
DI
N
I
N
G
L.
P.
EN
T
R
Y
PA
T
I
O
/
BA
L
C
O
N
Y
BE
D
R
O
O
M
W.I
.
C
.
BA
T
H
KIT
C
H
E
N
LI
V
I
N
G
DIN
I
N
G
CO
A
T
L.
P.
MPOE ELECTRICAL
DS
DS
DS
DS
DS
DS
DS
DS
DS
RD
RD
DS
DS
DS
BEDROOM 2
W.I.C. 2
BATH 2
E.P
.
MP
O
E
EL
E
C
T
R
I
C
A
L
290
291
292 293 294
295
29
6
2
9
7
2
9
8
2
9
9
29
2
+
5
6
.
2
4
E
C
17
8
1
.
3
6
T
C
29
3
+
7
5
.
1
8
B
C
17
8
2
.
8
6
T
C
296
+
7
2
.
3
7
E
C
179
1
.
0
3
T
C
29
1
+
6
7
.
8
0
17
7
9
.
5
4
T
C
29
3
+
7
5
.
1
8
B
C
17
8
2
.
8
6
T
C
296
+
7
2
.
3
7
E
C
179
1
.
0
3
T
C
29
2
+
5
6
.
2
4
E
C
17
8
1
.
2
2
F
S
29
1
+
6
4
.
6
7
B
C
17
7
9
.
3
1
F
S
29
3
+
7
5
.
1
8
B
C
17
8
2
.
7
2
F
S
296
+
7
2
.
3
7
E
C
179
0
.
8
9
F
S
L1
L2
C2 L4
L6
C5
C3
L
5
L
7
C1
L
3
C4
29
1
+
6
2
.
3
1
B
C
17
7
9
.
3
8
T
C
29
5
+
6
3
.
8
8
CL
C
B
N
O
.
2
W=
1
4
'
BE
G
I
N
C
O
N
S
T
.
JO
I
N
A
C
B
E
R
M
BE
G
I
N
C
O
N
S
T
.
JO
I
N
E
X
.
C
&
G
JOHN PREVITI AVENUE
29
5
+
6
8
.
6
3
CL
C
B
N
O
.
1
W=
1
4
'
5.66%
28
9
+
8
0
.
0
0
G
B
17
7
1
.
4
7
F
S
29
0
+
0
0
.
0
0
17
7
2
.
5
8
F
S
29
1
+
0
0
.
0
0
17
7
7
.
1
7
F
S
29
0
+
5
0
.
0
0
17
7
5
.
0
7
F
S
29
1
+
5
0
.
0
0
17
7
8
.
8
8
F
S
28
9
+
8
9
.
6
6
B
C
17
7
2
.
0
1
F
S
29
1
+
2
2
.
9
5
P
R
C
17
7
8
.
0
0
F
S
29
0
+
2
5
.
0
0
17
7
3
.
8
7
F
S
29
0
+
7
5
.
0
0
17
7
6
.
1
7
F
S
29
1
+
2
5
.
0
0
17
7
8
.
0
7
F
S
29
1
+
6
4
.
6
7
17
7
9
.
3
1
F
S
300.00' VC
28
9
+
8
0
.
0
0
B
V
C
17
7
1
.
4
7
F
S
PVI STA = 291+30.00
PVI ELEV = 1780.00
5.66%5.66%5.66%
29
2
+
0
0
.
0
0
17
8
0
.
3
4
T
C
29
2
+
5
0
.
0
0
17
8
1
.
2
7
T
C
29
2
+
5
6
.
2
4
E
C
17
8
1
.
3
6
T
C
29
2
+
8
0
.
0
0
E
V
C
17
8
1
.
6
4
T
C
1.00%
17
8
1
.
8
4
T
C
PROP. TOP OF
CURB @ 22' W'LY
EX. GROUND @ 22'
W'LY
29
2
+
2
5
.
0
0
17
8
0
.
8
6
T
C
29
1
+
7
5
.
0
0
17
7
9
.
7
3
T
C
29
1
+
6
7
.
8
0
17
7
9
.
5
4
T
C
BE
G
I
N
C
O
N
S
T
.
29
2
+
0
0
.
0
0
17
8
0
.
3
4
T
C
29
2
+
5
0
.
0
0
17
8
1
.
2
7
T
C
29
2
+
5
6
.
2
4
E
C
17
8
1
.
3
6
T
C
29
1
+
8
9
.
6
0
M
i
d
17
8
0
.
1
0
T
C
1.00%
29
2
+
8
0
.
0
0
E
V
C
17
8
1
.
6
4
T
C
17
8
1
.
8
4
T
C
PROP. TOP OF
CURB @ 22' E'LY
EX. GROUND @ 22'
E'LY
29
2
+
2
5
.
0
0
17
8
0
.
8
6
T
C
29
1
+
6
2
.
3
1
17
7
9
.
3
8
T
C
BE
G
I
N
C
O
N
S
T
.
2.90%
200.00' VC
29
3
+
0
0
.
0
0
B
V
C
17
8
1
.
7
0
F
S
29
5
+
0
0
.
0
0
E
V
C
17
8
5
.
6
0
F
S
PVI STA = 294+00.00
PVI ELEV = 1782.70
200.00' VC
29
5
+
2
5
.
0
0
B
V
C
17
8
6
.
3
2
F
S
29
7
+
2
5
.
0
0
E
V
C
17
9
2
.
6
7
F
S
PVI STA = 296+25.00
PVI ELEV = 1789.22
29
4
+
0
0
.
0
0
17
8
3
.
1
7
F
S
29
6
+
0
0
.
0
0
17
8
8
.
5
7
F
S
29
7
+
0
0
.
0
0
17
9
1
.
8
2
F
S
29
8
+
0
0
.
0
0
17
9
5
.
2
6
F
S
29
9
+
0
0
.
0
0
17
9
8
.
7
0
F
S
29
3
+
5
0
.
0
0
17
8
2
.
3
2
F
S
29
4
+
5
0
.
0
0
17
8
4
.
2
7
F
S
29
5
+
5
0
.
0
0
17
8
7
.
0
5
F
S
29
6
+
5
0
.
0
0
17
9
0
.
1
6
F
S
29
7
+
5
0
.
0
0
17
9
3
.
5
3
F
S
29
8
+
5
0
.
0
0
17
9
6
.
9
8
F
S
29
3
+
7
5
.
1
8
B
C
17
8
2
.
7
2
F
S
29
6
+
7
2
.
3
7
E
C
17
9
0
.
8
9
F
S
PROP. FIN.
SURFACE @ CL
EX. GROUND @ CL
29
5
+
7
5
.
0
0
17
8
7
.
8
1
F
S
29
6
+
2
5
.
0
0
17
8
9
.
3
6
F
S
29
6
+
7
5
.
0
0
17
9
0
.
9
8
F
S
29
3
+
2
5
.
0
0
17
8
1
.
9
8
F
S
29
3
+
7
5
.
0
0
17
8
2
.
7
2
F
S
29
4
+
2
5
.
0
0
17
8
3
.
6
9
F
S
29
4
+
7
5
.
0
0
17
8
4
.
9
0
F
S
2.90%
3.45%
2.90%2.90%
CURVE DATA
CURVE #
C1
C2
C3
C4
C5
RADIUS
397.00'
803.00'
353.00'
825.00'
375.00'
LENGTH
314.63'
91.43'
279.76'
91.57'
297.19'
DELTA
45°24'27"
6°31'26"
45°24'27"
6°21'35"
45°24'27"
LINE DATA
LINE #
L1
L2
L3
L4
L5
L6
L7
BEARING
N00°23'44"E
N00°23'44"E
N45°48'11"E
N00°23'44"E
N45°48'11"E
N00°23'44"E
N45°48'11"E
DISTANCE
6.44'
203.65'
630.22'
118.94'
274.59'
118.94'
630.22'
29
4
+
0
0
.
0
0
17
8
3
.
3
1
T
C
29
6
+
0
0
.
0
0
17
8
8
.
7
1
T
C
29
7
+
0
0
.
0
0
17
9
1
.
9
6
T
C
29
8
+
0
0
.
0
0
17
9
5
.
4
0
T
C
29
9
+
0
0
.
0
0
17
9
8
.
8
4
T
C
29
3
+
5
0
.
0
0
17
8
2
.
4
6
T
C
29
4
+
5
0
.
0
0
17
8
4
.
4
1
T
C
29
5
+
5
0
.
0
0
17
8
7
.
1
9
T
C
29
6
+
5
0
.
0
0
17
9
0
.
3
0
T
C
29
7
+
5
0
.
0
0
17
9
3
.
6
7
T
C
29
8
+
5
0
.
0
0
17
9
7
.
1
2
T
C
29
3
+
7
5
.
1
8
B
C
17
8
2
.
8
6
T
C
29
6
+
7
2
.
3
7
E
C
17
9
1
.
0
3
T
C
200.00' VC
29
3
+
0
0
.
0
0
B
V
C
17
8
1
.
8
4
T
C
29
5
+
0
0
.
0
0
E
V
C
17
8
5
.
7
4
T
C
PVI STA = 294+00.00
PVI ELEV = 1782.84
200.00' VC
29
5
+
2
5
.
0
0
B
V
C
17
8
6
.
4
6
T
C
29
7
+
2
5
.
0
0
E
V
C
17
9
2
.
8
1
T
C
PVI STA = 296+25.00
PVI ELEV = 1789.36
2.90%
3.45%
PROP. TOP OF
CURB @ 22' E'LY
EX. GROUND @ 22'
E'LY
29
5
+
7
5
.
0
0
17
8
7
.
9
5
T
C
29
6
+
2
5
.
0
0
17
8
9
.
5
0
T
C
29
6
+
7
5
.
0
0
17
9
1
.
1
2
T
C
29
3
+
2
5
.
0
0
17
8
2
.
1
2
T
C
29
3
+
7
5
.
0
0
17
8
2
.
8
6
T
C
29
4
+
2
5
.
0
0
17
8
3
.
8
3
T
C
29
4
+
7
5
.
0
0
17
8
5
.
0
4
T
C
29
5
+
6
3
.
8
8
17
8
7
.
6
1
T
C
CL
C
B
N
O
.
2
29
4
+
0
0
.
0
0
17
8
3
.
3
1
T
C
29
6
+
0
0
.
0
0
17
8
8
.
7
1
T
C
29
7
+
0
0
.
0
0
17
9
1
.
9
6
T
C
29
8
+
0
0
.
0
0
17
9
5
.
4
0
T
C
29
3
+
5
0
.
0
0
17
8
2
.
4
6
T
C
29
4
+
5
0
.
0
0
17
8
4
.
4
1
T
C
29
5
+
5
0
.
0
0
17
8
7
.
1
9
T
C
29
6
+
5
0
.
0
0
17
9
0
.
3
0
T
C
29
7
+
5
0
.
0
0
17
9
3
.
6
7
T
C
29
8
+
5
0
.
0
0
17
9
7
.
1
2
T
C
29
3
+
7
5
.
1
8
B
C
17
8
2
.
8
6
T
C
29
6
+
7
2
.
3
7
E
C
17
9
1
.
0
3
T
C
200.00' VC
29
3
+
0
0
.
0
0
B
V
C
17
8
1
.
8
4
T
C
29
5
+
0
0
.
0
0
E
V
C
17
8
5
.
7
4
T
C
PVI STA = 294+00.00
PVI ELEV = 1782.84
200.00' VC
29
5
+
2
5
.
0
0
B
V
C
17
8
6
.
4
6
T
C
29
7
+
2
5
.
0
0
E
V
C
17
9
2
.
8
1
T
C
PVI STA = 296+25.00
PVI ELEV = 1789.36
2.90%
3.45%
29
9
+
0
0
.
0
0
17
9
8
.
8
4
F
S
PROP. TOP OF
CURB @ 22' W'LY
EX. GROUND @ 22'
W'LY
29
5
+
7
5
.
0
0
17
8
7
.
9
5
T
C
29
6
+
2
5
.
0
0
17
8
9
.
5
0
T
C
29
6
+
7
5
.
0
0
17
9
1
.
1
2
T
C
29
3
+
2
5
.
0
0
17
8
2
.
1
2
T
C
29
3
+
7
5
.
0
0
17
8
2
.
8
6
T
C
29
4
+
2
5
.
0
0
17
8
3
.
8
3
T
C
29
4
+
7
5
.
0
0
17
8
5
.
0
4
T
C
29
5
+
6
8
.
6
3
17
8
7
.
7
5
T
C
CL
C
B
N
O
.
1
29
0
+
0
0
.
0
0
17
7
2
.
7
2
T
C
29
1
+
0
0
.
0
0
17
7
7
.
3
1
T
C
29
0
+
5
0
.
0
0
17
7
5
.
2
1
T
C
29
1
+
5
0
.
0
0
17
7
9
.
0
2
T
C
28
9
+
8
9
.
6
6
B
C
17
7
2
.
1
5
T
C
29
1
+
2
2
.
9
5
P
R
C
17
7
8
.
1
4
T
C
300.00' VC
28
9
+
8
0
.
0
0
B
V
C
17
7
1
.
6
1
T
C
PVI STA = 291+30.00
PVI ELEV = 1780.14
5.66%
29
0
+
2
5
.
0
0
17
7
4
.
0
1
T
C
29
0
+
7
5
.
0
0
17
7
6
.
3
1
T
C
29
1
+
6
7
.
8
0
17
7
9
.
5
4
T
C
1.00%29
2
+
8
0
.
0
0
E
V
C
17
8
1
.
5
0
29
2
+
0
0
.
0
0
17
8
0
.
2
0
F
S
29
2
+
5
0
.
0
0
17
8
1
.
1
3
F
S
29
2
+
5
6
.
2
4
E
C
17
8
1
.
2
2
F
S
29
1
+
8
9
.
6
0
M
i
d
17
7
9
.
9
6
F
S
17
8
1
.
7
0
F
S
PROP. FIN.
SURFACE @ CL
EX. GROUND @ CL
29
2
+
2
5
.
0
0
17
8
0
.
7
2
F
S
29
1
+
6
4
.
6
7
17
7
9
.
3
1
F
S
BE
G
I
N
C
O
N
S
T
.
29
2
+
8
0
.
0
0
E
V
C
17
8
1
.
5
0
F
S
1.00%1.00%1.00%
29
0
+
0
0
.
0
0
17
7
2
.
7
2
T
C
29
1
+
0
0
.
0
0
17
7
7
.
3
1
T
C
29
0
+
5
0
.
0
0
17
7
5
.
2
1
T
C
29
1
+
5
0
.
0
0
17
7
9
.
0
2
T
C
28
9
+
8
9
.
6
6
B
C
17
7
2
.
1
5
T
C
29
1
+
2
2
.
9
5
P
R
C
17
7
8
.
1
4
T
C
29
0
+
5
6
.
3
1
M
i
d
17
7
5
.
5
0
T
C
5.66%
300.00' VC
28
9
+
8
0
.
0
0
B
V
C
17
7
1
.
6
1
T
C
PVI STA = 291+30.00
PVI ELEV = 1780.14
29
0
+
2
5
.
0
0
17
7
4
.
0
1
T
C
29
0
+
7
5
.
0
0
17
7
6
.
3
1
T
C
29
1
+
2
5
.
0
0
17
7
8
.
2
1
T
C
29
1
+
6
2
.
3
1
17
7
9
.
3
8
T
C
7/17/2024
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
PROFILE
PLAN 1"= 40'
VERT 1"= 4'
HORIZ 1"= 40'
7/17/24 5
JOHN PREVITI AVENUE
PLAN & PROFILE
29
9
+
0
0
.
0
0
-
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
4
299 300 301 302 303 304 305 306 307
29
9
+
0
0
.
0
0
-
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
4
SE
E
S
H
E
E
T
6
1799 LT CURB-
1799 CL-
1799 RT CURB-
-1820 LT CURB
-1820 RT CURB
STREET CONSTRUCTION NOTES:
PROTECT IN PLACE
CONSTRUCT 6 1/2" AC PAVEMENT (MIN.) OVER 12" NATIVE MATERIAL COMPACTED TO
95% (SEE GENERAL NOTES 30 & 31).
CONSTRUCT 8" CF P.C.C. CURB & GUTTER PER CITY STD. PLAN NO. 1000.
CONSTRUCT CURB RETURN ACCESS RAMP PER CITY STD. PLAN NO. 1003 PER DETAIL
ON SHEET 3.
CONSTRUCT 4" THICK P.C.C. SIDEWALK PER CITY STD. PLAN NO. 1006 (W= PER PLANS)
CONSTRUCT COMMERCIAL DRIVEWAY PER CITY STD. PLAN NO. 1001 AND DETAIL ON
SHEET 3
CONSTRUCT LOCAL DEPRESSION PER CITY OF FONTANA STD. PLAN NO. 3003, CASE
PER PLAN AND DETAILS ON SHEET 3.
CONSTRUCT ACCESS RAMP & RAISED CROSSWALK PER DETAIL A/3 ON SHEET 3.
CONSTRUCT CATCH BASINS PER STORM DRAIN PLANS
INSTALL IRRIGATION PIPE SLEEVES 1-4" AND 2-3"
ADJUST MANHOLE TO GRADE
INSTALL STREET LIGHT PER STREET LIGHT PLAN PER DWG. 6406LT
ADJUST WATER VALVE RIM TO GRADE
RESTRICTED USE AREA
P
1
2
4
5
6
7
13
14
15
18
19
21
22
ID
E
N
T
I
C
A
L
PO
I
N
T
S
ID
E
N
T
I
C
A
L
PO
I
N
T
S
ID
E
N
T
I
C
A
L
PO
I
N
T
S
-1820 CL
LEGEND:CN
AC PAVEMENT
P.C.C. SIDEWALK
A.C. PAVEMENT GRIND
AND OVERLAY
DEMOLISH AC
PAVEMENT
1
5
10
11
RESTRICTED USE AREA 22
**
**LINE DATA
LINE #
L8
L9
L10
L11
BEARING
N90°00'00"E
N45°48'11"E
N90°00'00"E
N90°00'00"E
DISTANCE
43.30'
275.63'
42.11'
117.71'
CURVE DATA
CURVE #
C6
C7
C8
RADIUS
397.00'
353.00'
375.00'
LENGTH
306.24'
272.30'
289.27'
DELTA
44°11'49"
44°11'49"
44°11'49"
30
0
+
0
0
.
0
0
18
0
2
.
2
9
T
C
30
1
+
0
0
.
0
0
18
0
5
.
7
3
T
C
30
2
+
0
0
.
0
0
18
0
9
.
1
8
T
C
29
9
+
5
0
.
0
0
18
0
0
.
5
6
T
C
30
0
+
5
0
.
0
0
18
0
3
.
9
7
T
C
30
0
+
2
6
.
9
7
G
B
18
0
3
.
2
2
T
C
5.21%
2.00%
3.93%
3.45%
29
9
+
0
0
.
0
0
17
9
8
.
8
4
T
C
30
2
+
5
0
.
0
0
18
1
0
.
9
0
T
C
30
1
+
5
0
.
0
0
18
0
7
.
4
6
T
C
PROP. TOP OF
CURB @ 22' E'LY
EX. GROUND @ 22'
E'LY
30
0
+
7
5
.
9
6
18
0
4
.
9
1
T
C
CL
C
B
N
O
.
4
30
0
+
3
2
.
9
7
18
0
3
.
5
3
T
C
30
0
+
4
4
.
9
7
18
0
3
.
7
7
T
C
30
0
+
5
8
.
9
7
18
0
4
.
3
2
T
C
GB
GB
GB
3.45%
3.45%
30
0
+
0
0
.
0
0
18
0
2
.
1
5
F
S
30
1
+
0
0
.
0
0
18
0
5
.
5
9
F
S
30
2
+
0
0
.
0
0
18
0
9
.
0
4
F
S
29
9
+
5
0
.
0
0
18
0
0
.
4
2
F
S
30
0
+
5
0
.
0
0
18
0
3
.
8
7
F
S
30
1
+
5
0
.
0
0
18
0
7
.
3
2
F
S
30
2
+
5
0
.
0
0
18
1
0
.
7
6
F
S
299+87.13
1801.68 FS
C/L PROP.
DRIVEWAY (W=50')
29
9
+
8
7
.
1
3
18
0
1
.
7
0
F
S
29
9
+
0
0
.
0
0
17
9
8
.
7
0
F
S
PROP. FIN.
SURFACE @ CL
EX. GROUND @ CL3.45%
3.45%
30
0
+
0
0
.
0
0
18
0
2
.
2
9
T
C
30
1
+
0
0
.
0
0
18
0
5
.
7
3
T
C
30
2
+
0
0
.
0
0
18
0
9
.
1
8
T
C
29
9
+
5
0
.
0
0
18
0
0
.
5
6
T
C
30
0
+
5
0
.
0
0
18
0
3
.
9
7
T
C
30
0
+
2
6
.
9
7
G
B
18
0
3
.
2
2
T
C
29
9
+
0
0
.
0
0
17
9
8
.
8
4
T
C
5.21%
2.00%
3.93%
3.45%
30
2
+
5
0
.
0
0
18
1
0
.
9
0
T
C
30
1
+
5
0
.
0
0
18
0
7
.
4
6
T
C
PROP. TOP OF
CURB @ 22' W'LY
EX. GROUND @ 22'
W'LY
30
0
+
8
7
.
9
5
18
0
5
.
3
2
T
C
CL
C
B
N
O
.
3
GB
30
0
+
3
2
.
9
7
18
0
3
.
5
3
T
C
30
0
+
4
4
.
9
7
18
0
3
.
7
7
T
C
30
0
+
5
8
.
9
7
18
0
4
.
3
2
T
C
GB
GB
3.45%
HB
HB
DS
DS
DS
DS
DS
DS
DS
RD
RD
STORAGESTORAGE STORAGE
W/H
FIRE
RISER
DS
DS
DS
DS
DS DS
DS
DS
RD
EL
E
C
T
R
I
C
A
L
MP
O
E
W/
H
FI
R
E
RI
S
E
R
DSDS
DS
DS
DS DSDS
DS
DSDS
DS DS DS
DS
DS
DS
DSDSDSDS
DS
RD
RD
RD RD RD
PV
D
I
S
C
NGO
M
MET
E
R
PV
D
I
S
C
MPOE
EL
E
C
T
R
I
C
A
L
EL
E
C
T
R
I
C
A
L
W/
H
FI
R
E
RI
S
E
R
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DSDS
RD RD
RD
MPOE
E
L
E
C
T
R
I
C
A
L
M
P
O
E
DS
DS
DS
DS
DS
DS
DS
DS
DS
RD
W/H
FI
R
E
RI
S
E
R
DS
DS
DS
DSRD
DS
DS
DS DS
F
W
299 300 301 302 303
304
30
5
3
0
6
3
0
7
3
0
7
L
8
L9
C7
L
1
0
C8
L
1
1
C6
30
3
+
0
2
.
6
0
B
C
18
1
2
.
7
2
T
C
305
+
9
1
.
8
6
E
C
182
2
.
5
0
T
C
JOHN PREVITI AVENUE 305
+
9
1
.
8
6
E
C
182
2
.
9
5
T
C
305
+
9
1
.
8
6
E
C
182
2
.
4
3
F
S
30
3
+
0
2
.
6
0
B
C
18
1
2
.
5
8
F
S
30
3
+
0
2
.
6
0
B
C
18
1
2
.
7
2
T
C
306
+
3
5
.
1
6
E
C
R
182
3
.
8
3
T
C
306
+
3
3
.
9
7
B
C
R
182
2
.
8
8
T
C
30
0
+
8
7
.
9
5
CL
C
B
N
O
.
3
W=
1
4
'
30
0
+
7
5
.
9
6
CL
C
B
N
O
.
4
W=
1
4
'
30
4
+
0
0
.
0
0
18
1
6
.
4
0
T
C
30
5
+
0
0
.
0
0
18
2
0
.
1
7
T
C
30
3
+
5
0
.
0
0
18
1
4
.
5
1
T
C
30
4
+
5
0
.
0
0
18
1
8
.
2
9
T
C
30
3
+
0
2
.
6
0
B
C
18
1
2
.
7
2
T
C
30
5
+
9
1
.
8
6
E
C
18
2
2
.
9
5
T
C
30
3
+
0
0
.
0
0
G
B
18
1
2
.
6
3
T
C
30
4
+
5
0
.
0
0
G
B
18
1
8
.
2
9
T
C
30
5
+
9
4
.
9
8
G
B
18
2
3
.
0
4
T
C
30
4
+
0
0
.
0
0
18
1
6
.
4
0
T
C
3.77%
3.77%
30
2
+
5
0
.
0
0
18
1
0
.
9
0
T
C
PROP. TOP OF
CURB @ 22' W'LY
EX. GROUND @ 22'
W'LY
PORTION OF 200' VERTICAL CURVE
PVI STA. = 305+94.98
PVI ELEV. = 1823.76
L.O.C.= 140.18'
30
5
+
4
4
.
9
8
18
2
1
.
7
1
T
C
30
4
+
9
4
.
9
8
18
1
9
.
9
8
T
C
30
5
+
5
0
.
0
0
18
2
1
.
8
4
T
C
30
6
+
0
0
.
0
0
18
2
3
.
1
4
T
C
L.O.C.=54.61'
CURB RETURN
4 4 4 4
30
6
+
3
5
.
1
6
18
2
3
.
8
3
T
C
18
2
4
.
0
8
T
C
18
2
4
.
5
7
T
C
18
2
5
.
0
8
T
C
18
2
5
.
5
8
T
C
30
3
+
0
0
.
0
0
18
1
2
.
6
3
T
C
30
4
+
0
0
.
0
0
18
1
6
.
4
0
T
C
30
5
+
0
0
.
0
0
18
2
0
.
1
6
T
C
30
3
+
5
0
.
0
0
18
1
4
.
5
1
T
C
30
4
+
5
0
.
0
0
18
1
8
.
2
9
T
C
30
3
+
0
2
.
6
0
B
C
18
1
2
.
7
2
T
C
30
5
+
9
1
.
8
6
E
C
18
2
2
.
5
0
T
C
30
3
+
0
0
.
0
0
G
B
18
1
2
.
6
3
T
C
30
4
+
9
4
.
9
8
G
B
18
1
9
.
9
8
T
C
30
5
+
9
4
.
9
8
G
B
18
2
2
.
5
5
T
C
3.77%
30
4
+
0
0
.
0
0
18
1
6
.
4
0
T
C
30
2
+
5
0
.
0
0
18
1
0
.
9
0
T
C
PROP. TOP OF
CURB @ 22' E'LY
EX. GROUND @ 22'
E'LY
PORTION OF 200' VERTICAL CURVE
PVI STA. = 305+94.98
PVI ELEV. = 1823.76
L.O.C.= 138.99'
30
4
+
0
0
.
0
0
18
1
6
.
4
0
T
C
30
5
+
5
0
.
0
0
18
2
1
.
7
1
T
C
30
5
+
4
4
.
9
8
18
2
1
.
6
0
T
C
30
6
+
0
0
.
0
0
18
2
2
.
6
1
T
C
L.O.C.=55.34'
CURB RETURN
4 4 4
30
6
+
3
3
.
9
7
18
2
2
.
8
8
T
C
4
18
2
2
.
7
7
T
C
18
2
2
.
4
6
T
C
18
2
2
.
0
0
T
C
18
2
1
.
4
7
T
C
3.77%
3.77%
-0.80%
30
3
+
0
0
.
0
0
G
B
18
1
2
.
4
9
F
S
30
4
+
3
1
.
7
8
G
B
18
1
7
.
4
6
F
S
30
7
+
0
9
.
5
7
G
B
18
2
2
.
7
0
F
S
30
4
+
0
0
.
0
0
18
1
6
.
2
6
F
S
30
5
+
0
0
.
0
0
18
2
0
.
0
3
F
S
30
7
+
0
0
.
0
0
18
2
2
.
7
8
F
S
30
3
+
5
0
.
0
0
18
1
4
.
3
7
F
S
30
4
+
5
0
.
0
0
18
1
8
.
1
5
F
S
30
5
+
5
0
.
0
0
18
2
1
.
5
7
F
S
30
3
+
0
2
.
6
0
B
C
18
1
2
.
5
8
F
S
30
4
+
4
7
.
2
3
M
i
d
18
1
8
.
0
4
F
S
30
4
+
0
0
.
0
0
18
1
6
.
2
6
F
S
30
2
+
5
0
.
0
0
18
1
0
.
7
6
F
S
PROP. FIN.
SURFACE @ CL
EX. GROUND @ CL
30
5
+
4
4
.
9
8
18
2
1
.
4
4
F
S
30
6
+
4
4
.
9
8
18
2
2
.
9
3
F
S
200.00' VC
30
4
+
9
4
.
9
8
B
V
C
18
1
9
.
8
4
F
S
30
6
+
9
4
.
9
8
E
V
C
18
2
2
.
8
2
F
S
PVI STA = 305+94.98
PVI ELEV = 1823.62
30
2
+
5
0
.
0
0
18
1
0
.
7
6
F
S
30
6
+
0
0
.
0
0
18
2
2
.
5
5
F
S
30
6
+
5
0
.
0
0
18
2
2
.
9
5
F
S
30
5
+
9
4
.
9
8
18
2
2
.
4
7
F
S
3.77%
3.77%
-0.80%
3.77%
3.77%
-0.80%
7/17/2024
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
PROFILE
PLAN 1"= 40'
VERT 1"= 4'
HORIZ 1"= 40'
7/17/24 6
CITRUS AVENUE
PLAN & PROFILE
14
2
+
0
0
.
0
0
-
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
7
SEE SHEET 5
STREET CONSTRUCTION NOTES:
PROTECT IN PLACE
CONSTRUCT 6 1/2" AC PAVEMENT (MIN.) OVER 12" NATIVE MATERIAL COMPACTED TO
95% (SEE GENERAL NOTES 30 & 31).
CONSTRUCT 8" CF P.C.C. CURB & GUTTER PER CITY STD. PLAN NO. 1000.
CONSTRUCT 8" CF P.C.C. CURB PER CITY STD. PLAN NO. 1000.
CONSTRUCT CURB RETURN ACCESS RAMP PER CITY STD. PLAN NO. 1003 PER DETAIL
ON SHEET 3.
CONSTRUCT 4" THICK P.C.C. SIDEWALK PER CITY STD. PLAN NO. 1006 (W= PER PLANS)
CONSTRUCT LOCAL DEPRESSION PER CITY OF FONTANA STD. PLAN NO. 3003, CASE
PER PLAN AND DETAILS ON SHEET 3.
WARP MEDIAN TO WRAP AROUND MANHOLE PER BLOW UP DETAIL ON SHEET 6
PROVIDE 2" X 5' GRIND AND OVERLAY, SEE DETAIL C/3 ON SHEET 3
DEMOLISH EXISTING AC PAVEMENT
UNDERGROUND EXISTING POWER POLE PER SEPARATE PLANS
CONSTRUCT CATCH BASINS PER STORM DRAIN PLANS
INSTALL IRRIGATION PIPE SLEEVES 1-4" AND 2-3"
ADJUST MANHOLE TO GRADE
INSTALL STREET LIGHT PER STREET LIGHT PLAN PER DWG. 6406LT
ADJUST WATER VALVE RIM TO GRADE
RESTRICTED USE AREA
P
1
2
3
4
5
7
9
10
11
12
14
15
18
19
21
22
-1820 CL
-1820 MEDIAN
TC W'LY
-1820 MEDIAN
TC E'LY
-1820 RT CURB
-1820 LT CURB
JOHN PREVITI AVENUE
1810 CL-
1810 MEDIAN-
TC W'LY
1810 MEDIAN-
TC E'LY
1810 RT CURB-
1810 LT CURB-
LEGEND:CN
AC PAVEMENT
P.C.C. SIDEWALK
A.C. PAVEMENT GRIND
AND OVERLAY
DEMOLISH AC
PAVEMENT
1
5
10
11
RESTRICTED USE AREA 22
135 136 137 138 139 140 141 142
14
2
+
0
0
.
0
0
-
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
7
ID
E
N
T
I
C
A
L
PO
I
N
T
S
ID
E
N
T
I
C
A
L
PO
I
N
T
S
ID
E
N
T
I
C
A
L
PO
I
N
T
S
ID
E
N
T
I
C
A
L
PO
I
N
T
S
ID
E
N
T
I
C
A
L
PO
I
N
T
S
FW
FW
BI
K
E
LA
N
E
ST
O
P
ST
O
P
STOP
134 135 136 137 138 139 140 141 142
L12
L13
141+31.48 BC
1825.93TC
14
1
+
3
1
.
4
8
B
C
18
2
4
.
3
0
F
S
141+21.45 BCR
1825.58TC
306+35.16 ECR
1823.83TC
306+33.97 BCR
1822.88TC
FO
N
T
U
S
WA
Y
139+31.23 GB
1819.38FS
13
5
+
3
2
.
0
0
18
0
7
.
8
7
T
C
13
5
+
3
9
.
8
6
18
0
7
.
9
6
F
S
13
5
+
3
2
.
0
0
18
0
8
.
2
1
T
C
13
7
+
1
8
.
9
2
18
1
3
.
8
6
T
C
13
7
+
6
7
.
5
4
18
1
5
.
3
4
T
C
13
8
+
1
6
.
1
6
18
1
6
.
5
3
T
C
13
5
+
5
7
.
8
6
CL
C
B
N
O
.
5
W=
1
4
'
BE
G
I
N
C
O
N
S
T
.
JO
I
N
E
X
.
C
&
G
CITRUS AVENUE
C9 C
1
0
13
7
+
5
8
.
8
6
18
1
4
.
5
8
T
C
13
8
+
0
7
.
4
8
18
1
6
.
1
6
T
C
13
8
+
5
6
.
1
0
18
1
7
.
7
8
T
C
14
0
+
0
2
.
4
5
18
2
1
.
9
0
T
C
14
0
+
0
2
.
4
5
18
2
1
.
7
5
T
C
140+07.45 ECR
1821.47TC
13
9
+
6
1
.
4
7
18
1
9
.
6
9
E
P
18
1
9
.
6
1
F
L
-
G
B
14
0
+
0
0
.
0
0
18
2
0
.
6
5
E
P
18
2
0
.
5
7
F
L
14
0
+
5
0
.
0
0
18
2
1
.
8
4
E
P
18
2
1
.
7
6
F
L
14
1
+
0
0
.
0
0
18
2
3
.
0
2
E
P
18
2
2
.
9
4
F
L
14
1
+
5
0
.
0
0
18
2
4
.
0
7
E
P
18
2
3
.
9
9
F
L
14
2
+
0
0
.
0
0
18
2
5
.
3
4
E
P
18
2
5
.
2
6
F
L
L14
L15L16
L17
C1
2
C13
C14
C1
5
C16
C17
L18
C22
C23
LINE DATA
LINE #
L12
L13
L14
L15
L16
L17
L18
BEARING
N00°35'58"E
N00°35'58"E
N00°35'58"E
N00°35'58"E
N00°35'58"E
N00°35'58"E
N00°35'58"E
DISTANCE
467.59'
10.03'
226.86'
146.34'
186.92'
109.44'
591.62'
CURVE DATA
CURVE #
C9
C10
C12
C13
C14
C15
C16
C17
C19
C20
C21
C22
C23
RADIUS
35.00'
35.00'
4.00'
200.00'
200.00'
4.00'
200.00'
200.00'
3.00'
3.00'
3.00'
865.00'
825.00'
LENGTH
55.34'
54.61'
12.57'
49.11'
49.11'
12.57'
49.11'
49.11'
3.12'
6.24'
3.12'
71.84'
68.52'
DELTA
90°35'58"
89°24'02"
180°00'00"
14°04'12"
14°04'12"
180°00'00"
14°04'12"
14°04'12"
59°37'56"
119°15'52"
59°37'56"
4°45'31"
4°45'31"
13
9
+
2
5
.
6
0
18
1
9
.
6
9
T
C
13
9
+
2
8
.
1
9
18
1
9
.
7
6
T
C
13
9
+
3
3
.
3
6
18
1
9
.
9
1
T
C
13
9
+
3
5
.
9
5
18
1
9
.
9
9
T
C
C1
9
C20
C21
13
6
+
0
0
.
0
0
18
0
9
.
7
0
F
S
13
7
+
0
0
.
0
0
18
1
2
.
7
4
F
S
13
8
+
0
0
.
0
0
18
1
5
.
6
0
F
S
13
9
+
0
0
.
0
0
18
1
8
.
4
8
F
S
3.30%
3.24%
2.85%
2.86%
2.89%
13
5
+
4
2
.
0
3
G
B
18
0
7
.
7
9
F
S
13
6
+
0
0
.
0
0
G
B
18
0
9
.
7
0
F
S
13
6
+
5
0
.
0
0
G
B
18
1
1
.
3
2
F
S
13
7
+
5
0
.
0
0
G
B
18
1
4
.
1
7
F
S
13
8
+
5
0
.
0
0
G
B
18
1
7
.
0
3
F
S
13
5
+
5
0
.
0
0
18
0
8
.
0
5
F
S
13
6
+
5
0
.
0
0
18
1
1
.
3
2
F
S
13
8
+
5
0
.
0
0
18
1
7
.
0
3
F
S
EXISTING F.S. AT
CENTERLINE 13
7
+
6
7
.
5
4
18
1
4
.
6
7
F
S
13
8
+
1
6
.
1
6
18
1
6
.
0
6
F
S
PROP. F.S. AT
CENTERLINE
PROP. TOP OF
CURB @ 40' W'LY
2.85%
13
5
+
3
9
.
8
6
18
0
7
.
9
6
T
C
13
6
+
0
0
.
0
0
18
0
9
.
6
8
T
C
13
7
+
0
0
.
0
0
18
1
2
.
5
3
T
C
13
8
+
0
0
.
0
0
18
1
5
.
3
8
T
C
13
5
+
5
0
.
0
0
18
0
8
.
2
5
T
C
13
6
+
5
0
.
0
0
18
1
1
.
1
0
T
C
13
7
+
5
0
.
0
0
18
1
3
.
9
5
T
C
13
8
+
5
0
.
0
0
18
1
6
.
8
1
T
C
13
5
+
5
7
.
8
6
18
0
8
.
4
7
T
C
CL
C
B
N
O
.
5
EX. GROUND @ 40'
W'LY
BE
G
I
N
C
O
N
S
T
.
13
9
+
0
0
.
0
0
G
B
18
1
8
.
2
3
T
C
3.03%
3.00%
3.04%
3.03%
3.00%
13
6
+
0
0
.
0
0
18
0
9
.
3
6
T
C
13
7
+
0
0
.
0
0
18
1
2
.
3
6
T
C
13
8
+
0
0
.
0
0
18
1
5
.
3
6
T
C
13
9
+
0
0
.
0
0
18
1
8
.
3
9
T
C
13
5
+
5
0
.
0
0
18
0
7
.
8
4
T
C
13
6
+
5
0
.
0
0
18
1
0
.
8
7
T
C
13
7
+
5
0
.
0
0
18
1
3
.
8
6
T
C
13
8
+
5
0
.
0
0
18
1
6
.
8
7
T
C
13
5
+
4
1
.
9
9
18
0
7
.
6
0
T
C
13
7
+
5
3
.
5
1
18
1
3
.
9
7
T
C
EXISTING TOP OF
CURB @ 40' E'LY
13
7
+
5
3
.
5
1
18
1
3
.
9
7
T
C
GB
GB
GB
GB
2.86%
2.88%
2.94%
3.04%
2.90%
3.33%
3.33%
PROP. MEDIAN TC
@ RIGHT
13
5
+
3
2
.
0
0
18
0
7
.
8
7
T
C
13
8
+
0
0
.
0
0
18
1
5
.
9
5
T
C
13
5
+
3
2
.
0
0
G
B
18
0
7
.
8
7
T
C
13
6
+
5
0
.
0
0
G
B
18
1
1
.
3
5
T
C
13
7
+
5
0
.
0
0
G
B
18
1
4
.
3
2
T
C
13
8
+
5
6
.
1
0
G
B
18
1
7
.
7
8
T
C
EX. GROUND @ 7'
E'LY
13
7
+
5
8
.
8
6
18
1
4
.
5
8
T
C
13
8
+
0
7
.
4
8
18
1
6
.
1
6
T
C
L.O.C.=49.11'
L.O.C.=49.11'
13
9
+
0
0
.
0
0
G
B
18
1
9
.
0
3
T
C
13
9
+
0
0
.
0
0
G
B
18
1
9
.
0
3
T
C
13
6
+
0
0
.
0
0
G
B
18
0
9
.
8
8
T
C
13
7
+
0
0
.
0
0
G
B
18
1
2
.
8
7
T
C
3.30%
2.87%
2.90%
2.39%
2.57%
PROP. MEDIAN TC @ LEFT
L.O.C.=49.11'
L.O.C.=49.11'
13
5
+
3
0
.
0
0
18
0
8
.
1
4
T
C
13
8
+
0
0
.
0
0
18
1
6
.
1
1
T
C
13
5
+
5
0
.
0
0
18
0
8
.
8
0
T
C
13
7
+
5
0
.
0
0
18
1
4
.
8
4
T
C
13
8
+
5
0
.
0
0
18
1
7
.
5
0
T
C
13
5
+
3
0
.
0
0
G
B
18
0
8
.
1
4
T
C
13
8
+
5
0
.
0
0
G
B
18
1
7
.
5
0
T
C
13
8
+
1
6
.
1
6
18
1
6
.
5
3
T
C
13
7
+
6
7
.
5
4
18
1
5
.
3
4
T
C
3.30%
2.87%
2.90%
3.16%
2.84%
2.39%
2.57%
2.81%
PR
C
EC
13
7
+
1
8
.
9
2
18
1
3
.
8
6
T
C
EX. GROUND @ 7'
W'LY
13
6
+
0
0
.
0
0
G
B
18
1
0
.
4
5
T
C
13
7
+
0
0
.
0
0
G
B
18
1
3
.
2
6
T
C
13
6
+
5
0
.
0
0
18
1
1
.
8
6
T
C
13
9
+
0
0
.
0
0
G
B
18
1
8
.
9
5
T
C
EX. GROUND
@ 40' W'LY
4
L.O.C.=55.34'
CURB RETURN
L.O.C.=54.61'
CURB RETURN
4 4 4
4 4 4 4
3.10%
3.06%
3.48%
3.03%
14
0
+
0
0
.
0
0
18
2
1
.
2
4
T
C
14
0
+
0
7
.
4
5
18
2
1
.
4
7
T
C
14
1
+
2
1
.
4
5
18
2
5
.
5
8
T
C
18
2
2
.
0
0
T
C
18
2
2
.
4
6
T
C
18
2
2
.
7
7
T
C
18
2
2
.
8
8
T
C
18
2
3
.
8
3
T
C
18
2
4
.
0
8
T
C
18
2
4
.
5
7
T
C
18
2
5
.
0
8
T
C
14
0
+
0
7
.
4
5
G
B
18
2
1
.
4
7
T
C
14
1
+
2
1
.
4
5
G
B
18
2
5
.
5
8
T
C
13
9
+
5
0
.
0
0
18
1
9
.
7
0
T
C
13
9
+
7
5
.
0
0
18
2
0
.
4
7
T
C
EC
R
BC
R
EC
R
BC
R
13
9
+
8
2
.
4
5
18
2
0
.
7
0
T
C
14
1
+
8
1
.
4
8
18
2
7
.
6
7
T
C
EN
D
SU
P
E
R
-
EL
E
V
A
T
I
O
N
TR
A
N
S
I
T
I
O
N
14
2
+
0
0
.
0
0
18
2
8
.
2
3
T
C
GB
13
9
+
0
0
.
0
0
G
B
18
1
8
.
2
3
T
C
18
2
2
.
7
7
T
C
18
2
2
.
8
8
T
C
2.88%
14
0
+
0
0
.
0
0
18
2
1
.
6
9
T
C
13
9
+
5
0
.
0
0
G
B
18
2
0
.
3
9
T
C
14
0
+
0
2
.
4
5
G
B
18
2
1
.
7
5
T
C
13
9
+
7
5
.
0
0
18
2
1
.
0
4
T
C
PROP.
MEDIAN TC
@ LEFT
2.88%
2.60%
2.60%
13
9
+
5
0
.
0
0
18
2
0
.
3
9
T
C
EX. GROUND @ 7'
W'LY
13
9
+
0
0
.
0
0
G
B
18
1
8
.
9
5
T
C
14
1
+
0
0
.
0
0
18
2
3
.
5
4
F
S
2.41%
2.67%
14
1
+
5
0
.
0
0
G
B
18
2
4
.
7
5
F
S
13
9
+
5
0
.
0
0
G
B
18
1
9
.
9
2
F
S
14
1
+
3
1
.
4
8
B
C
18
2
4
.
3
0
F
S
14
0
+
6
5
.
2
3
18
2
2
.
7
0
F
S
13
9
+
0
0
.
0
0
18
1
8
.
4
8
F
S
13
9
+
7
5
.
0
0
18
2
0
.
5
3
F
S
14
0
+
0
0
.
0
0
18
2
1
.
1
3
F
S
14
0
+
2
5
.
0
0
18
2
1
.
7
3
F
S
14
1
+
8
1
.
4
8
18
2
5
.
5
9
F
S
EN
D
S
U
P
E
R
E
L
E
V
A
T
I
O
N
T
R
A
N
S
I
T
I
O
N
C/
L
I
N
T
E
R
S
E
C
T
I
O
N
14
0
+
3
1
.
4
8
18
2
1
.
8
9
F
S
BE
G
I
N
S
U
P
E
R
E
L
E
V
A
T
I
O
N
TR
A
N
S
I
T
I
O
N
13
9
+
3
1
.
2
3
18
1
9
.
3
8
F
S
EN
D
O
F
I
M
P
R
O
V
E
M
E
N
T
S
FO
R
M
O
N
T
E
R
A
D
O
S
I
T
E
EXISTING F.S. AT
CENTERLINE
14
2
+
0
0
.
0
0
18
2
6
.
0
9
F
S
150' SUPERELEVATION TRANSITION
2.80%
14
0
+
0
0
.
0
0
18
2
1
.
8
3
T
C
14
0
+
0
2
.
4
5
G
B
18
2
1
.
9
0
T
C
13
9
+
7
5
.
0
0
18
2
1
.
1
3
T
C
PROP.
MEDIAN TC
@ RIGHT
13
9
+
5
0
.
0
0
18
2
0
.
4
3
T
C
EX. GROUND @ 7'
E'LY
13
9
+
2
5
.
0
0
18
1
9
.
7
3
T
C
13
9
+
0
0
.
0
0
G
B
18
1
9
.
0
3
T
C
13
9
+
3
1
.
2
3
18
1
9
.
3
4
T
C
13
9
+
0
0
.
0
0
18
1
8
.
3
9
T
C
(
)
GB
2.20%
2.43%
2.31%
2.20%
2.23%
1.84%
14
1
+
3
1
.
4
8
B
C
18
2
3
.
7
8
F
S
14
0
+
0
0
.
0
0
18
2
0
.
8
7
T
C
14
1
+
0
0
.
0
0
18
2
3
.
2
0
T
C
13
9
+
3
1
.
2
3
18
1
9
.
3
4
T
C
14
2
+
0
0
.
0
0
18
2
5
.
2
2
T
C
EN
D
S
U
P
E
R
E
L
E
V
A
T
I
O
N
T
R
A
N
S
I
T
I
O
N
14
1
+
8
1
.
4
8
18
2
4
.
8
1
T
C
13
9
+
5
0
.
0
0
18
1
9
.
7
7
T
C
14
0
+
5
0
.
0
0
18
2
2
.
0
8
T
C
14
0
+
3
1
.
4
8
18
2
1
.
6
3
T
C
(
)
BE
G
I
N
S
U
P
E
R
E
L
E
V
A
T
I
O
N
TR
A
N
S
I
T
I
O
N
FUTURE CURB BY
OTHERS @ 40' E'LY
JO
I
N
E
X
.
14
1
+
5
0
.
0
0
18
2
4
.
1
2
T
C
EXISTING GROUND
@ 40' E'LY
7/17/2024
DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
PROFILE
PLAN 1"= 40'
VERT 1"= 4'
HORIZ 1"= 40'
7/17/24 7
CITRUS AVENUE
PLAN & PROFILE
142 143 144 145
14
2
+
0
0
.
0
0
-
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
6
STREET CONSTRUCTION NOTES:
PROTECT IN PLACE
CONSTRUCT 6 1/2" AC PAVEMENT (MIN.) OVER 12" NATIVE MATERIAL COMPACTED TO
95% (SEE GENERAL NOTES 30 & 31).
CONSTRUCT 8" CF P.C.C. CURB PER CITY STD. PLAN NO. 1000.
DEMOLISH EXISTING AC PAVEMENT
CONSTRUCT 8" AC DIKE PER CITY STD. PLAN NO. 1007.
CONSTRUCT TEMPORARY 4" AC OVER 95% COMPACTIVE SUBGRADE PER SOILS
ENGINEERS REPORT
ADJUST MANHOLE TO GRADE
INSTALL STREET LIGHT PER STREET LIGHT PLAN PER DWG. 6406LT
REMOVE EXISTING AC BERM
P
1
3
11
16
17
18
19
20
1830 LT CURB-
1830 CL-
1830 RT CURB-
14
2
+
0
0
.
0
0
-
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
6
LEGEND:CN
AC PAVEMENT
P.C.C. SIDEWALK
A.C. PAVEMENT GRIND
AND OVERLAY
DEMOLISH AC
PAVEMENT
1
5
10
11
RESTRICTED USE AREA 22
146 147
**
**
**
**
142
143
144
145
14
6
1
4
7
14
4
+
1
7
.
0
0
E
N
D
O
F
I
M
P
R
O
V
E
M
E
N
T
S
18
3
1
.
8
8
F
S
14
4
+
1
7
.
0
0
E
C
EN
D
O
F
C
U
R
B
/
BE
G
I
N
A
.
C
.
D
I
K
E
18
3
4
.
0
3
T
C
CI
T
R
U
S
A
V
E
N
U
E
14
4
+
7
9
.
5
6
E
N
D
O
F
I
M
P
R
O
V
E
M
E
N
T
S
EX
.
(
1
8
3
3
.
1
5
F
S
)
14
4
+
7
9
.
5
6
(1
8
3
5
.
3
1
)
TO
P
O
F
AC
D
I
K
E
JO
I
N
(1
8
3
4
.
9
5
F
S
)
14
2
+
0
0
.
0
0
18
2
5
.
3
4
E
P
18
2
5
.
2
6
F
L
14
2
+
5
0
.
0
0
18
2
6
.
8
8
E
P
18
2
6
.
8
0
F
L
14
3
+
0
0
.
0
0
18
2
8
.
5
1
E
P
18
2
8
.
4
3
F
L
14
3
+
5
0
.
0
0
18
3
0
.
0
4
E
P
18
2
9
.
9
6
F
L
14
4
+
0
0
.
0
0
18
3
1
.
4
2
E
P
18
3
1
.
3
4
F
L
14
4
+
1
7
.
0
0
18
3
1
.
8
8
E
P
18
3
1
.
8
0
F
L
C23
C24
14
2
+
0
0
.
0
0
18
2
6
.
0
9
F
S
14
3
+
0
0
.
0
0
18
2
8
.
7
5
F
S
14
4
+
0
0
.
0
0
18
3
1
.
4
2
F
S
2.20%
1.93%
2.67%
14
4
+
4
2
.
0
0
G
B
18
3
2
.
4
3
F
S
14
4
+
7
9
.
5
6
G
B
18
3
3
.
1
5
F
S
14
4
+
1
7
.
0
0
G
B
18
3
1
.
8
8
F
S
PROP. F.S. AT
CENTERLINE
EX. GROUND @
CENTERLINE
62.56'
TRANSITION
14
2
+
5
0
.
0
0
18
2
7
.
4
2
F
S
14
3
+
5
0
.
0
0
18
3
0
.
0
9
F
S
JO
I
N
E
X
.
(
)
FUTURE CENTERLINE
BY OTHERS
14
7
+
0
0
.
0
0
G
B
(1
8
4
0
.
2
6
F
G
)
14
6
+
5
0
.
0
0
G
B
(1
8
3
8
.
1
6
F
G
)
14
6
+
0
0
.
0
0
G
B
(1
8
3
6
.
4
6
F
G
)
14
5
+
5
0
.
6
3
G
B
(1
8
3
4
.
9
8
F
G
)
14
5
+
0
0
.
0
0
G
B
(1
8
3
3
.
6
5
F
G
)
(2.8%)
14
5
+
3
9
.
4
0
G
B
(1
8
3
4
.
7
6
F
G
)
(3.4%)
(3.4%)
(4.2%
)
14
5
+
6
6
.
4
9
G
B
(1
8
3
5
.
3
0
F
G
)
PROP. TOP OF
CURB @ 40' W'LY
EX. GROUND @ 40'
W'LY
2.67%
2.05%
14
3
+
0
0
.
0
0
18
3
0
.
9
0
T
C
14
4
+
0
0
.
0
0
18
3
3
.
5
8
T
C
14
2
+
5
0
.
0
0
18
2
9
.
5
7
T
C
14
3
+
5
0
.
0
0
18
3
2
.
2
4
T
C
14
2
+
0
0
.
0
0
18
2
8
.
2
3
T
C
14
4
+
7
9
.
5
6
G
B
18
3
5
.
3
1
T
C
PROP. TOP OF AC
DIKE @ 46' W'LY
JOIN EXISTING TOP
OF A.C. DIKE
ANGLE POINT
END CONC. CURB
BEGIN AC DIKE
62.56'
TRANSITION
14
4
+
1
7
.
0
0
18
3
4
.
0
3
T
C
FUTURE CURB
BY OTHERS
FUTURE CURB BY
OTHERS @ 40' E'LY
EX. GROUND @ 40'
E'LY
2.67%
14
4
+
0
0
.
0
0
18
3
0
.
5
5
T
C
14
2
+
0
0
.
0
0
18
2
5
.
2
2
T
C
14
3
+
0
0
.
0
0
18
2
7
.
8
8
T
C
14
2
+
5
0
.
0
0
18
2
6
.
5
5
T
C
14
3
+
5
0
.
0
0
18
2
9
.
2
2
T
C
CURVE DATA
CURVE #
C23
C24
RADIUS
865.00'
825.00'
LENGTH
227.53'
705.30'
DELTA
15°04'15"
48°58'57"
7/17/2024
8
CITRUS AVENUE SECTIONS DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
7/17/24
STA. 135+50.00 STA. 135+75.00 STA. 136+00.00 STA. 136+25.00
STA. 136+50.00 STA. 136+75.00 STA. 137+00.00 STA. 137+25.00
STA. 137+50.00 STA. 137+75.00 STA. 138+00.00 STA. 138+25.00
STA. 138+50.00 STA. 138+75.00 STA. 139+00.00 STA. 139+25.00
EXIST.
8" CURB &
GUTTER
42'
ASPHALT
6'
LS
6'
SW
8'
MEDIAN
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
0.9%
EXIST.
8" CURB &
GUTTER
42'
ASPHALT
6'
LS
6'
SW
8'
MEDIAN
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
1.2%
EXIST.
8" CURB &
GUTTER
42'
ASPHALT
6'
LS
6'
SW
8'
MEDIAN
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
1.5%EXIST.
8" CURB &
GUTTER
42'
ASPHALT
6'
LS
6'
SW
8'
MEDIAN
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
1.7%
EXIST.
8" CURB &
GUTTER
42'
ASPHALT
6'
LS
6'
SW
8'
MEDIAN
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
1.5%EXIST.
8" CURB &
GUTTER
42'
ASPHALT
6'
LS
6'
SW
8'
MEDIAN
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
1.5%
EXIST.
8" CURB &
GUTTER
42'
ASPHALT
6'
LS
6'
SW
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
8'
MEDIAN
1.5%
EXIST.
8" CURB &
GUTTER
41.91'
ASPHALT
6'
LS
6'
SW
VARIES
MEDIAN
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
1.8%
EXIST.
8" CURB &
GUTTER
6'
LS
6'
SW
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
30'
ASPHALT
VARIES
MEDIAN
2.0%
EXIST.
8" CURB &
GUTTER
6'
LS
6'
SW
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
30.65'
ASPHALT
VARIES
MEDIAN
2.1%
EXIST.
8" CURB &
GUTTER
6'
LS
6'
SW
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
34.28'
ASPHALT
VARIES
MEDIAN
2.1%EXIST.
DRIVEWAY
39.57'
ASPHALT
6'
LS
6'
SW
VARIES
MEDIAN
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
2.0%
EXIST.
8" CURB &
GUTTER
6'
LS
6'
SW
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
30'
ASPHALT
VARIES
MEDIAN
2'
ASPHALT
2.0%
EXIST.
8" CURB &
GUTTER
6'
LS
6'
SW
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
30'
ASPHALT
8'
MEDIAN
2'
ASPHALT
2.1%
EXIST.
8" CURB &
GUTTER
6'
LS
6'
SW
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
30'
ASPHALT
8'
MEDIAN
2'
ASPHALT
2.1%
EXIST.
8" CURB &
GUTTER
6'
LS
6'
SW
EXIST.
ASPHALT
1ST CAP
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
30'
ASPHALT
8'
MEDIAN
2'
ASPHALT
2.0%
7/17/2024
9
CITRUS AVENUE SECTIONS DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
7/17/24
STA. 139+50.00 STA. 139+75.00 STA. 140+00.00 STA. 140+25.00
STA. 140+50.00 STA. 140+75.00 STA. 141+00.00 STA. 141+25.00
STA. 141+50.00 STA. 141+75.00 STA. 142+00.00 STA. 142+25.00
STA. 142+50.00 STA. 142+75.00 STA. 143+00.00 STA. 143+25.00
6'
LS
6'
SW
EXIST.
GROUND
PROP. 8"
CURB &
GUTTER
PROP. 6"
MEDIAN
30'
ASPHALT
8'
MEDIAN
25'
ASPHALT
PROP. EP DAYLIGHT
LINE
2:1
SLOPE
4'
GRADED
SHOULDER
1.9%2.0%
6'
LS
6'
SW
EXIST.
GROUND
PROP. 8"
CURB &
GUTTER
PROP. 7"
MEDIAN
30'
ASPHALT
8'
MEDIAN
25'
ASPHALT
PROP.
EP
DAYLIGHT
LINE
2:1 SLOPE
4'
GRADED
SHOULDER
PROP.
FLOWLINE
1.5%2.0%
6'
LS
6'
SW
EXIST.
GROUND
PROP. 8"
CURB &
GUTTER
PROP. 8"
MEDIAN
30'
ASPHALT
8'
MEDIAN
25'
ASPHALT
PROP.
EP
DAYLIGHT
LINE
2:1 SLOPE
4'
GRADED
SHOULDER
PROP.
FLOWLINE
1.2%2.1%
43'
ASPHALT
EXIST.
GROUND PROP.
EP
DAYLIGHT
LINE
2:1
SLOPE
4'
GRADED
SHOULDER
7.11'
CURB
RAMP
1.89'
GUTTER
PROP. 8" CURB
& GUTTER
23'
SHOULDER
PROP.
FLOWLINE
0.1%2.1%
6'
LS
6'
SW
EXIST.
GROUND
PROP. 8"
CURB
40'
ASPHALT
23'
ASPHALT
4'
GRADED
SHOULDER
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1
SLOPE
2.3%
2.3%
EXIST.
GROUND PROP.
EP
DAYLIGHT
LINE
2:1 SLOPE
4'
GRADED
SHOULDER
40'
CURB FACE PROJECTION
23'
ASPHALT
PROP.
FLOWLINE
0.3%2.2%EXIST.
GROUND
PROP.
EP
DAYLIGHT
LINE
2:1
SLOPE
4'
GRADED
SHOULDER
23'
ASPHALT
40'
CURB FACE PROJECTION
PROP.
FLOWLINE
1.2%
2.2%
40'
CURB FACE PROJECTION
EXIST.
GROUND
23'
ASPHALT
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1
SLOPE
4'
GRADED
SHOULDER
1.6%
2.2%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB
20.23'
ASPHALT
4'
GRADED
SHOULDER
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.7
%
3.7
%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB
23'
ASPHALT
4'
GRADED
SHOULDER
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1
SLOPE
3.0%
3.0%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB
21.88'
ASPHALT
4'
GRADED
SHOULDER
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.6%
3.6%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB
17.82'
ASPHALT
4'
GRADED
SHOULDER
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.7%
3.7%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB
4.18'
AC
4'
GRADED
SHOULDER
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.7%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB
10.56'
ASPHALT
4'
GRADED
SHOULDER
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.7%
3.7%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB
14.65'
ASPHALT
4'
GRADED
SHOULDER
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.7
%
3.7%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB &
GUTTER
7'
AC
4'
GRADED
SHOULDER
PROP. EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.7%
3.7
%
7/17/2024
10
CITRUS AVENUE SECTIONS DATE:
SCALE:
DRAWING NO.
DATE
APPROVED BY:CHECKED BY:
DESIGNED BY:
DRAWN BY:
GIA LAM KIM / CITY ENGINEER R.C.E. 62296
CITY OF FONTANA, CALIFORNIA
DATECITYENGR.DATEREVISION DESCRIPTIONREV.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.DATE:
PREPARED UNDER THE SUPERVISION OF:
STEVEN L. ELLIS EXP. 12-31-25
STREET IMPROVEMENT PLANS
10
July 24
AS SHOWNJV
CA
SE/LAF
BENCH MARK:BASIS OF BEARINGS:
THE BEARINGS SHOWN HEREON ARE BASED THE ON NORTH AMERICAN
DATUM OF 1983 (NAD-83), SHOWN IN TERMS OF THE CALIFORNIA
COORDINATE SYSTEM OF 1983 (CCS-83), ZONE V (2011.00 EPOCH DATE)
AS DERIVED BY POSITIONS PUBLISHED BY CSRC. ALL COORDINATE
VALUES WERE SCALED TO GROUND BY APPLYING AN AVERAGE
COMBINATION FACTOR AS DETERMINED BY FEI POINTS 11012, 11014,
11022, 11025, 11029, AND 11034 AND HOLDING THE COMPUTED GRID
COORDINATE ON POINT 11015. INVERSES BETWEEN PROJECT
COORDINATES WILL PRODUCE GROUND DISTANCES. TO OBTAIN GRID
DISTANCES MULTIPLY GROUND DISTANCES BY 0.999888867
THE CONTOURS AND ELEVATIONS SHOWN HEREON
ARE BASED ON THE FOLLOWING BENCH MARK:
BM NO.: EV9274 ELEV.: 1508.56' (NGS BENCH MARK)
DATUM: NAVD 88 1993 ADJ
6406
909.581.06762850 Inland Empire Blvd
Ontario, California 91764 fuscoe.com
RFULLCIRCLETHINKING
E N G I N E E R I N G
FUSCOE
Suite B
7/17/24
STA. 143+50.00 STA. 143+75.00 STA. 144+00.00
STA. 144+25.00 STA. 144+50.00 STA. 144+75.00
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB &
GUTTER
0.65'
AC
4'
GRADED
SHOULDER
PROP. EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.7%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB
2.05'
AC
4'
GRADED
SHOULDER
PROP.
EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.7%
6'
LS
6'
SW
EXIST.
GROUND
40'
ASPHALT
PROP. 8"
CURB
4'
GRADED
SHOULDER
PROP. EP
DAYLIGHT
LINE
PROP.
FLOWLINE
2:1 SLOPE
3.7%
11.51'
EXIST.
GROUND
39.91'
ASPHALT
PROP. 8"
AC DIKE
PROP. EP
DAYLIGHT
LINE
4'
0.57'
3.6%
9.47'
EXIST.
GROUND
40.38'
ASPHALT
PROP. 8"
AC DIKE
PROP. EP
DAYLIGHT
LINE
9'
2.15'
3.4%
6.61'
40.9'
ASPHALT 7.37'
PROP. 8"
AC DIKE
EXIST.
GROUND
PROP. EP
DAYLIGHT
LINE3.3%
7/17/2024