HomeMy WebLinkAbout6175 - Cypress SD Phase I - Storm Drain PlanCY
P
R
E
S
S
A
V
E
.
ARROW BLVD.
UPLAND AVE.
SI
E
R
R
A
A
V
E
.
JU
N
I
P
E
R
A
V
E
.
VALENCIA AVE.
BE
N
N
E
T
T
A
V
E
.
SEVILLE AVE.
UPLAND AVE.
IVY AVE.
ORANGE WAY
SI
E
R
R
A
A
V
E
.
PAINE ST.
BARBEE ST.
FOOTHILL BLVD.
03/06/2024
[100 LF WILL BE CITY FURNISHED]
140
80
183
118
514
540
5,149
3
12
13
4
3/7/24
03/06/2024 3/7/24
03/06/2024 3/7/24
03/06/2024 3/7/24
03/06/2024 3/7/24
03/06/2024 3/7/24
03/06/2024 3/7/24
03/06/2024 3/7/24
03/06/2024 3/7/24
03/06/2024 3/7/24
BRICK AND MORTAR PIPE PLUG
DETAIL 2
FLOGARD CATCH BASIN CURB INLET FILTER
AND MONOLOTHIC SHAFT
MODIFIED MANHOLE PIPE TO PIPE
PLAN SECTION A-A
NOTE:
03/06/2024 3/7/24