HomeMy WebLinkAboutMWD's Additional Requirements,�nplll
.aaa�a� •,•�i//�TH
City of Fontana
/
Jeff Bonadiman, Vice President November 9, 1999
Bonadiman - McCain, Inc.
280 South Lena Road
P.O. Box 6444
San Berardino, CA 92412
RE: Slover Avenue Sewer
from Hemlock Avenue to Popular Avenue
MWD's Additional Requirements
Dear Mr. Bonadiman:
Enclosed for your use and action is a copy of L.D. King, Inc.'s memorandum dated October 14,1999 on MWD's
additional requirements to cross their water feeder transmission line on Slover Avenue.
If you have any questions, please contact the undersigned at (909) 350-6646.
Sincerely,
Community Development Department
En i eering Division
reg J. Bucknell, P.E.
Princip Civil Engineer/Special Projects
cc: City Engineer
Associate Engineer/Special Projects
Engineering Technician I/Special Projects
Public Works Inspector (JC)
Michael Thornton, P.E., L.D. King, Inc.
Penny Paulson, Office Manager, Bonadiman - McCain, Inc.
Joe Defillips, Project Superintendent, Bonadiman - McCain, Inc. (Field Delivered)
vwvw.fontana.org
8353 SIERRA AVENUE FONTANA, CAUFORNIA 92335-3528 (909) 350-7600
40 recycled paper
L1w11G
Engineers/Plariners
MEMORANDUM.
TO: Grego Bucknell, P E. PROJECT NO.:124-10
City o,Fontana
MOM: Michael Thornton" K . DATE: October 14,1999 -
I-D. King, Inc.
SUBJECT: Slover Avenue Sewer (hiemlock Avenue to Poplar Avenue)
Conference withMWD.'s Chorles Poling
(909) 780-1511, EA 2826"
Mr. Poling 'is aware that MWD .has provided permission to cross their Feeder. In -addition to the
requirements presented in their letter, he advised of the following requirements:
1. Ductile Iron or. Steel pipe must be used.
2. Pipe must be centered over the Feeder in accordance with Health Department Standards: "
3. The contractor must use mechanical or welded joints in MWD right-of-way.
4. The contractor must:provide him a minimum of two (2) days notice prior.to beginning work.
in MWD right-of-way.
5. Hand excavation is 'required within two (2) .feet of feeder,
.I advised Mr. Poling of the current schedule including potholing, of the. MWD Feeder.
Page 1 of 1
L.D. King, Inc. 2151 Convention Center Way, Suite 10013, Ontario, CA 91764-4464 (909) 937-0200 Fax: (909) 937-0202
The Contractor shall notify the Engineer and the appropriate regional notification center for
operators of subsurface installations at least 2 working days, but not more than 14 calendar
days, prior to performing any excavation or other work close to any underground pipeline,
conduit, duct, wire or other structure. Regional notification centers include but are not limited
to the following:
Underground Service Alert -Southern California (USA) 1(800)227-2600
The following utility/ municipal agencies have facilities within the limits of the subject
project:
AGENCY
CONTACT PHONE
rc g3cA. �2�)W� 446
Fontana Water Comptiny Al Krohn (909) 822-2201
Metropolitan Water District Charles Poling, R.E.✓ (909) 780-1511 Ext. 2826
Southern California Gas Co. Alan Keseloff (909) 335-7781
Pacific -Bell Steve. Randall, ✓ Route (714) 666-5500
Administrator.
Southern California Edison Fran Stewart ✓ (909) 357-6223
Co. �q�
Comcast Cable TV Paul Cyr ✓ (909) jM738
City of Fontana Greg Bucknell (909)3 50-6646
The initial written utility notification with preliminary plans was sent to utility agencies on
April 15, 1999 and contact has -continued at various times since.
The following utilities are expected to be relocated and/or installed prior to construction:
I UTILITY
Power poles,(13 poles
SCE
I
Telephone poles, (16 poles
+/-), Pac-Bell
Fire Hydrant(s), Fontana
Water Co
Water meter(s)
DETAILS
SCE to remove/relocate
and/or /install new polq(s)
behind proposed curb &
gutter
Pac-Bell to relocate behind
proposed curb & gutter
Fontana Water Co to relocate
out of proposed return(s)
Fontana Water Co. to
relocate .to behind. proposed
yr curb.
w' re uire coordination with Protection and/or installation of the following utility facilities ill q t
the contractor's operations.
APPROX. LOCATION
Various
Various
Sta 76+55; 36' left
Sta 80+ 05; 39' left
Sta 83+10; 39' left
Sta 83+85; 26' left
UTILITY APPROX. LOCATION DETAILS
I 10" Concrete H.P. MWD line ..Crossing Slover 500' west of Protect in place
Poplar
SP-15
• f7..
01
RECORD OF TELEPp
jNE CONVERSATION
f
.t a
r
By.
Project No.
Project Tide
Date
�/rs , Q�i Time _9; s�7 tam)(pm)
Individual 'r .-a�.A Prs6,s.," Title
Organization �"'` Location
Phone No. ( IZ$9 ) 726 - 5-11 Xop ARel
Subject
IZL
TEMS DISCUSSED s
p/ t��nq} ,fin ,,�► / �.�pgi �,, gP� Sn � p}
���:a»�,A �� r"•��% ��r��'+� /-v,.i+a e'"'V«':',.Arl�f 4�i..�6�vrF"..;.`�vti:�i�. L*_�+�.�8"C../?$.�� ��F •�4��.1:'^°'�".�°..s'wn..1:
WIN1hf'ek Fam 4.7
RECORD OF TELEP . jNE CONVERSATI
ON
f}
81
Project No.
Project Tide 0.1 AR
Date s ` Time '' (am)(pm)
Individual Title
Organization' Location
phnns Mn
WNW -Fisk Form 4-7
RECORD OF TELEPp-JNE CONVERSATION
By
Project No.
/ Project Tide
Oate g � � Time % (am) (pm)
Individual .''-+°'- Tide
Organization_, 6— C, Location
Phone No. (17C'q ) 33,! ' 77P%
Subject
ITEMS OISCUSSEO4.
�".jiP'"��"i� E.^.",.'.'�'�^7..✓ A�.F�s''g.-.��"'r'�a''r „a' "�*�fi�^�;^1..4"? :�^9*k.�'..f$,.�!'�-, �,-
f !` i ,dl; , y`�'�. ,?.,.,1.*...rrC..>' e„
fi pt/ V
r
Wiley -Pie Fore 4.7 1
RECORD OF TELEP�jNE CONVERSATION
Ia .
Project No.
Project Title
Oates / Time 3"t9 (am)(Pm)
Individual Title
Organization Location
Phone No. 1 7/4/
Subject
ITEMS OISCUSSEO
fs��
t
�
v
�.�'y1
u +
f,.C, �.w [.4n.J :'� ° e-, A.-]l �'!�"�s�.°°b_ `.����. ��'�✓�
end
\d
WNeyfink Fore 4.7
RECORD OF TELEPPjOE CONVERSATION
By.
Project No.
Project Title '
Date VIA l ime (pm) �.
Individual Title
OrganizatiorL,o^ti;t�' f,� .''Ji Location
Phone No. ( �09 ► go�o1 e�C� i
v-
Subject
ITEMS OISCUSSED
s�' �b°rAW bP".cA '! If /• .._ .i''Sw.
�(j,?.Q d%�,.A. Yw..� /' '� _�:%�i�l • /f.?,2'..AL% ..E`. n. �":P'...d: K,
` WIWl-Fisk Form 4.7
� RECORD OF TELEPPAE CONVERSATION
f,
ev
, Project Na.
Project Tide r
Oate /f ` Time .V C-96 (am)(pm)
Individual �'�% ��" r'"� Title
n
Organization Puss '.�. - �r!'Aft, A,.... lat"64 Location
�phnne Nn / A
Wiley-fink Fora\"
01
RECORD OF TELEP.JNE CONVERSATION
By
Project No.
p Project Tide
Date Time d62 (am)(pm)
Individual �efA yyy+++ Title
Lw 8
Organization '��'v�.r�.r+��^,� �^_rV Location '
Phens Mn_ / 701 1
w"V.F rk Farm 4-7
n
9-22-1999 7:59AM FROM J BURROWS FIELD OFF 909 386 8035 P.1
S.B. Co. TRANSP. DEPT. FLOOD CONTROL DISTRICT 825 E. Third Street, Rm. 147
San Bernardino CA 92415-0835
FAX
To: BARMY FOLEY
Engineering Technician I
City of Fontana
RE; Slover Avenue
Phone; (909) 350-7661
Fax! (909) 350-6618
CC:
Date. Wednesday, September 22, 1999
Number of pages including cover sheet: . • Z
From: KEV1NT BLAKESLEE, P.E.
Resident Engineer
Contracts/Inspection Division
Phone: (909) 397-2245
-Fax: (909) 386-8035
REMARKS: ❑ Review ❑ For your review ® Per your request ❑ To be completed '
Comments
Harry,
Attached is the last of utility contacts that I have for the Slover project. Buel Woolverton should be able to
help you if you need further info.
Kevin
9-22-1999 7:59AM FROM J BURROWS FIELD OFF 909 386 8035 P.2
M The Contractor shall notify the Engineer and the • appropriate regional notification center• for.
operators of subsurface installations at least 2 working days, but not more than 14 calendar
days, prior to performing any excavation or other work close to. any underground 'pipe,line,
conduit, duct, wire or other structure. Regional notification centers include but•are'not'limited-
to the following:
Underground -Service Alert-Southem California (USA)1(800)227-2600
The following utility/ municipal agencies have facilities within the limits of the subject.' •
project: ,
AGENCY, CONTACT i PHONE
Fontana Water Company • 'Al Krohn ' (909) 822-2201 _
Metropolitan Water District Charles Poling, R.E. . - (90.9) 780-1511 Ext: 2826
Southern California Gas Co. ;Alan Keseloff r' (909)' 335-7781
Pacific -Bell Steve Randall,Route (.714) 666-5500 • ,.•' '. ,
-Administrator.
Southern California Edison Fran Stewart•r''' (909)• 357-6223
Co. .�
Comcast Cable TV Paul Cyr .99
(909)9
City of Fontana Greg Bucknell (909) 35.0-6646
The initial written utility notification with preliminary plans was sent to utility agencies on
April 16, 1999 and contact has continued at- various times since.
The following utilities are expected to be relocated and/or installed •prior to coristruction:'; `
UTILITY APPROX. LOCATION DETAILS `•
Power poles,(13' poles +/-), Various SCE to remove/relocate'
SCE and/or /install new; pole{s):
behind- proposed ' . • curb & ;
gutter
Telephone poles, (16 poles Various Pac-Bell to relocate behind
Pac Bell proposed curb & .gutter
Fire Hydrant(s), Fontana Sta 76+55; 36' left Fontana Water Co to relocate'
Water Co : Sta 80+ 05; 39' left out of proposed returnO
Water meter(s) Sta 83+10; 39' left Fontana Water. • Co.:. ''to
Sta 83+85; 26' left relocate to behind. proposed '
Curb. ;
Protection and/or installation of the following utility facilities will require coordination -with
Ithe contractor's• operations. ;
UTILITY APPROX. LOCATION DETAILS
10" Concrete H.P. MWD line Crossing Slover 500' west of Protect in place ; •:
Poplar ,
L.D
J
0,1r-Y or- FL741,16 . 6po J 16.6-0 -6 6 46
7 iX-V
tole
QA+A ir`
LD
d�
Ail
_._ - • � -ice-�' -- - C==-- �_.. - .�_�
A'
--- __ .;1-V,4hJ_.:r[,VST/N way
ias OCI
I