Loading...
HomeMy WebLinkAbout6094-8s c u 1f GO ES L = FUSCOE 6171 G— AND LE r w CF- CHAIN LINK FENCE AND GATES 60U-35 DICEF ► T0,; Lux e«. CASE 3. . nEa s� REINFORCED CONCRETE PIPE a� rx� or use ra ae a rxc xs xux. r scv ,o Le,xr w u CASE 4. CASE 5 LOS ANGELES COUNTY DEPAR.MENT Or . LELIC WORKS PIPE BEDDING IN TRENCHES �jQBaQ >.2 CHAIN LINK FENCE AND GATES SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. TYPICAL ELEVATION SINGLE ORALN } c a c e.r.nux�� cnc x<r�mc zw.xx DOUBLE ORAIN R.C.P. COLLAR DETAIL a SAN BERNARDI„NO COUNTY FLOOD CONTROL DISTRICT itne C azz "A _enc. ere, f c 30ac p.z.:1 m re ED STRUCTURAL ANALLA s ps ® DIMENSION RED WHEN THs o. ps ®ENSDN rC GEE Di s o.c. A a = L L e — — eA IF J 1 SECTION B—B m � � NDTEs PLAN E,CEED sPs. A` ANGLE OF DIVERGENCE DR CONVERGENCE e SHALL NOT R6 W e' ps W D' ac. 'A"' ANCONCRETE P E EMBEDMINEII EUT DEPIHD (P) PERECTrBDr wNTu SITS PLAN �No T AAC AND THEP DCPPE SZE INGIAND ON PLAN. F� SPEC F CAT ON FOR THE PPE SFEE ZE NPOETED DN vIAN T� PER MPNUFACTURER L LEV TA /2 C fi®R�DG NHDAIL NATE 1112� CLEAR OFALL CONCRETEF011 TO SURFAC DN S OTHERWSE FLOOR OF STRUCTURE SHALL BE STEEL TROWELED TO SPRING LINE. SECTION A —A B. IRANsl ON ARUCTURE SHALL BE POURED IN CNE CONTINUOUSTHAT THE CONTORCTOR SHALL HAVE THE OFTION OFN OPERATION. E,CEUT AT THE SPEND LINE A CONAPRUCTION JOINT LONGITUDINAL KEEWALL 6. THE LENGTH OF THE STRUCTURE MAY BE INCREASED AT THE OPTON OF IN THE -GLE IN ANT OF GNNTANA AD PLAN NO 1111 TRANSITION STRUCTURE SINGLE RCP TO DOUBLE RCP (MODIFIED GREENBOOK STANDARD PLAN 343-2) HMONARCH HILLS TM 20010 H REFERENCED STANDARDS