Loading...
HomeMy WebLinkAboutAppendix K - Traffic Study Fontana Corporate Center TRAFFIC STUDY CITY OF FONTANA PREPARED BY: Aric Evatt, PTP aevatt@urbanxroads.com Charlene So, PE cso@urbanxroads.com DECEMBER 21, 2021 14102-02 TS Report.docx Fontana Corporate Center Traffic Study 14102-02 TS Report REV I TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................. I APPENDICES ........................................................................................................................................ III LIST OF EXHIBITS ................................................................................................................................... I LIST OF TABLES ..................................................................................................................................... I LIST OF ABBREVIATED TERMS ............................................................................................................... I 1 INTRODUCTION .......................................................................................................................... 1 1.1 Summary of Findings ..................................................................................................................... 1 1.2 Project Overview ........................................................................................................................... 3 1.3 Analysis Scenarios ......................................................................................................................... 3 1.4 Study Area ..................................................................................................................................... 5 1.5 Deficiencies ................................................................................................................................... 7 1.6 Recommendations ........................................................................................................................ 8 1.7 Queuing Analysis ......................................................................................................................... 10 1.8 Truck Access ................................................................................................................................ 12 1.9 Vehicle Miles Traveled (VMT) Analysis ....................................................................................... 12 2 METHODOLOGIES .................................................................................................................... 15 2.1 Level of Service ........................................................................................................................... 15 2.2 Intersection Capacity Analysis .................................................................................................... 15 2.3 Traffic Signal Warrant Analysis Methodology ............................................................................. 17 2.4 Minimum Level of Service (LOS) ................................................................................................. 18 2.5 Deficiency Criteria ....................................................................................................................... 18 2.6 Project Fair Share Calculation Methodology .............................................................................. 19 3 AREA CONDITIONS ................................................................................................................... 21 3.1 Existing Circulation Network ....................................................................................................... 21 3.2 General Plan Circulation Elements .............................................................................................. 21 3.3 Truck Routes ............................................................................................................................... 24 3.4 Bicycle & Pedestrian Facilities ..................................................................................................... 24 3.5 Transit Service ............................................................................................................................. 24 3.6 Existing Traffic Counts ................................................................................................................. 24 3.7 Existing (2021) Intersection Operations Analysis ....................................................................... 29 3.8 Existing (2021) Traffic Signal Warrants Analysis ......................................................................... 31 4 PROJECTED FUTURE TRAFFIC .................................................................................................... 33 4.1 Project Trip Generation ............................................................................................................... 33 4.2 Project Trip Distribution .............................................................................................................. 38 4.3 Modal Split .................................................................................................................................. 38 4.4 Project Trip Assignment .............................................................................................................. 38 4.5 Background Traffic ...................................................................................................................... 38 4.6 Cumulative Development Traffic ................................................................................................ 42 45 4.7 Near-Term Traffic Conditions...................................................................................................... 45 5 OPENING YEAR CUMULATIVE (2023) TRAFFIC CONDITIONS ...................................................... 47 5.1 Roadway Improvements ............................................................................................................. 47 5.2 Opening Year Cumulative (2023) Without Project Traffic Volume Forecasts ............................ 47 Fontana Corporate Center Traffic Study 14102-02 TS Report REV II 5.3 Opening Year Cumulative (2023) With Project Traffic Volume Forecasts .................................. 47 5.4 Intersection Operations Analysis ................................................................................................ 50 5.5 Traffic Signal Warrants Analysis .................................................................................................. 50 5.6 Deficiencies and Improvements ................................................................................................. 51 6 LOCAL AND REGIONAL FUNDING MECHANISMS ....................................................................... 53 6.1 Measure “I” Funds ...................................................................................................................... 53 6.2 City of Fontana Development Impact Fee (DIF) .......................................................................... 53 6.3 Fair Share Contribution ............................................................................................................... 54 7 VEHICLE MILES TRAVELED ........................................................................................................ 55 7.1 Project Screening ........................................................................................................................ 55 7.2 Conclusion ................................................................................................................................... 57 8 REFERENCES ............................................................................................................................. 59 Fontana Corporate Center Traffic Study 14102-02 TS Report REV III APPENDICES APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT APPENDIX 3.1: EXISTING & HISTORICAL TRAFFIC COUNTS APPENDIX 3.2: EXISTING (2021) CONDITIONS INTERSECTION OPERATIONS ANALYSIS WORKSHEETS APPENDIX 3.3: EXISTING (2021) CONDITIONS TRAFFIC SIGNAL WARRANT ANALYSIS WORKSHEETS APPENDIX 5.1: OPENING YEAR CUMULATIVE (2023) WITHOUT PROJECT CONDITIONS INTERSECTION OPERATIONS ANALYSIS WORKSHEETS APPENDIX 5.2: OPENING YEAR CUMULATIVE (2023) WITH PROJECT CONDITIONS INTERSECTION OPERATIONS ANALYSIS WORKSHEETS APPENDIX 5.3: OPENING YEAR CUMULATIVE (2023) WITH PROJECT CONDITIONS TRAFFIC SIGNAL WARRANT ANALYSIS WORKSHEETS APPENDIX 5.4: OPENING YEAR CUMULATIVE (2023) WITH PROJECT CONDITIONS INTERSECTION OPERATIONS ANALYSIS WORKSHEETS WITH IMPROVEMENTS APPENDIX 5.5: OPENING YEAR CUMULATIVE (2023) WITH PROJECT CONDITIONS QUEUING ANALYSIS APPENDIX 7.1: SBCTA VMT SCREENING EVALUATION Fontana Corporate Center Traffic Study 14102-02 TS Report REV IV This Page Intentionally Left Blank Fontana Corporate Center Traffic Study 14102-02 TS Report REV I LIST OF EXHIBITS EXHIBIT 1-1: LOCATION MAP ................................................................................................................ 2 EXHIBIT 1-2: PRELIMINARY SITE PLAN .................................................................................................. 4 EXHIBIT 1-3: STUDY AREA .................................................................................................................... 6 EXHIBIT 1-4: SITE ADJACENT ROADWAY AND SITE ACCESS RECOMMENDATIONS ................................. 9 EXHIBIT 1-5: TRUCK ACCESS AT DRIVEWAY 2 ...................................................................................... 13 EXHIBIT 1-6: TRUCK ACCESS AT DRIVEWAY 3 ...................................................................................... 14 EXHIBIT 3-1: EXISTING NUMBER OF THROUGH LANES AND INTERSECTION CONTROL ......................... 22 EXHIBIT 3-2: CITY OF FONTANA HIERARCHY OF STREETS .................................................................... 23 EXHIBIT 3-3: CITY OF FONTANA TRUCK ROUTES ................................................................................. 25 EXHIBIT 3-4: CITY OF FONTANA BICYCLE FACILITIES ............................................................................ 26 EXHIBIT 3-5: EXISTING PEDESTRIAN FACILITIES ................................................................................... 27 EXHIBIT 3-6: EXISTING TRANSIT ROUTES ............................................................................................ 28 EXHIBIT 3-7: EXISTING (2021) TRAFFIC VOLUMES ............................................................................... 30 EXHIBIT 4-1: PROJECT (PASSENGER CAR) TRIP DISTRIBUTION ............................................................. 39 EXHIBIT 4-2: PROJECT (TRUCKS) TRIP DISTRIBUTION .......................................................................... 40 EXHIBIT 4-3: PROJECT ONLY TRAFFIC VOLUMES ................................................................................. 41 EXHIBIT 4-4: CUMULATIVE DEVELOPMENT LOCATION MAP ............................................................... 43 EXHIBIT 4-5: CUMULATIVE ONLY TRAFFIC VOLUMES .......................................................................... 44 EXHIBIT 5-1: OPENING YEAR CUMULATIVE (2023) WITHOUT PROJECT TRAFFIC VOLUMES ................. 48 EXHIBIT 5-2: OPENING YEAR CUMULATIVE (2023) WITH PROJECT TRAFFIC VOLUMES ........................ 49 LIST OF TABLES TABLE 1-1: INTERSECTION ANALYSIS LOCATIONS ................................................................................. 5 TABLE 1-2: SUMMARY OF LOS .............................................................................................................. 7 TABLE 1-3: SUMMARY OF IMPROVEMENTS AND ROUGH ORDER OF MAGNITUDE COSTS ................... 11 TABLE 1-4: QUEUING ANALYSIS FOR OPENING YEAR CUMULATIVE (2023) CONDITIONS WITH PROJECT .......................................................................................................................................................... 12 TABLE 2-1: SIGNALIZED INTERSECTION LOS THRESHOLDS ................................................................... 16 TABLE 2-2: UNSIGNALIZED INTERSECTION LOS THRESHOLDS .............................................................. 17 TABLE 2-3: TRAFFIC SIGNAL WARRANT ANALYSIS LOCATIONS ............................................................ 18 TABLE 2-4: DETERMINATION OF EFECT ............................................................................................... 18 TABLE 3-1: INTERSECTION ANALYSIS FOR EXISTING (2021) CONDITIONS ............................................ 29 TABLE 4-1: EXISTING SURVEY DATA FOR EXISTING USE ...................................................................... 34 TABLE 4-2: PROJECT TRIP GENERATION RATES ................................................................................... 35 TABLE 4-3: TRIP GENERATION SUMMARY (ACTUAL VEHICLES) ........................................................... 35 TABLE 4-4: TRIP GENERATION SUMMARY (PCE) ................................................................................. 36 TABLE 4-5: TRIP GENERATION COMPARISON (PCE) ............................................................................ 36 TABLE 4-6: PROJECT TRIP GENERATION BASED ON 11TH EDITION ...................................................... 37 TABLE 4-7: CUMULATIVE DEVELOPMENT LAND USE SUMMARY ......................................................... 45 TABLE 5-1: INTERSECTION ANALYSIS FOR OPENING YEAR CUMULATIVE (2023) CONDITIONS ............. 50 TABLE 5-2: INTERSECTION DEFICIENCIES AND IMPROVEMENTS FOR OPENING YEAR CUMULATIVE (2023) CONDITIONS ........................................................................................................................... 51 TABLE 6-1: PROJECT FAIR SHARE CALCULATIONS FOR INTERSECTIONS ............................................... 54 Fontana Corporate Center Traffic Study 14102-02 TS Report REV II This Page Intentionally Left Blank Fontana Corporate Center Traffic Study 14102-02 TS Report REV II LIST OF ABBREVIATED TERMS (1) Reference ADT Average Daily Traffic APN Assessor’s Parcel Number CA MUTCD California Manual on Uniform Traffic Control Devices Caltrans California Department of Transportation CEQA California Environmental Quality Act CMP Congestion Management Program DIF Development Impact Fee FAR Floor to Area Ratio HCM Highway Capacity Manual ITE Institute of Transportation Engineers LOS Level of Service OPR Office of Planning and Research PHF Peak Hour Factor Project Fontana Corporate Center RTP Regional Transportation Plan SB 743 Senate Bill 743 SBCTA San Bernardino County Transportation Authority SCAG Southern California Association of Governments SCS Sustainable Communities Strategy SED Socio-Economic Data TAZ Traffic Analysis Zone TIA Traffic Impact Analysis TPA Transit Priority Area TS Traffic Study V/C Volume to Capacity VMT Vehicle Miles Traveled Fontana Corporate Center Traffic Study 14102-02 TS Report REV IIII This Page Intentionally Left Blank Fontana Corporate Center Traffic Study 14102-02 TS Report REV 11 1 INTRODUCTION This report presents the results of the Traffic Study (TS) for the proposed Fontana Corporate Center development (“Project”), which is located on the northeast corner of Commerce Way and Slover Avenue in the City of Fontana as shown on Exhibit 1-1. The purpose of this TS is to evaluate the potential deficiencies related to traffic, identify circulation system deficiencies that may result from the development of the proposed Project, and to recommend improvements to resolve identified deficiencies in order to achieve acceptable operational conditions at study area intersections and ensure consistency with the City’s General Plan. This TS has been prepared in accordance with the City of Fontana’s Traffic Impact Analysis (TIA) Guidelines for Vehicle Miles Traveled (VMT) and Level of Service Assessment (October 21, 2020) and through consultation with City of Fontana staff during the scoping process. (1) The Project traffic study scoping agreement is provided in Appendix 1.1 of this TS, which has been approved by the City of Fontana. 1.1 SUMMARY OF FINDINGS The Project is to construct the following improvements as design features in conjunction with development of the site: • Project to construct Slover Avenue at its ultimate half-width as a Primary Highway (104-foot right- of-way) from the Project’s western boundary to Business Drive consistent with the City’s standards. Additional details and intersection lane geometrics are provided in Section 1.6 Recommendations of this report. There are no off-site improvements recommended as the addition of Project traffic is not anticipated to result in any deficiencies based on the City’s thresholds. As such, the Project Applicant’s shall pay its requisite fees towards future regional roadway improvements consistent with the City’s requirements (see Section 6 Local and Regional Funding Mechanisms). As required by City Guidelines, a project level VMT analysis was conducted consistent with the requirements identified for single use warehouse projects. The Project was not found to exceed 15% below the County of San Bernardino’s baseline regional average VMT per Service Population measures of VMT. The Project’s impact to VMT is therefore presumed to be less than significant. Detail traffic analysis can be found in Section 7 Vehicle Miles Traveled Analysis of this TS. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 22 EXHIBIT 1-1: LOCATION MAP Fontana Corporate Center Traffic Study 14102-02 TS Report REV 33 1.2 PROJECT OVERVIEW The proposed Project is located north of Slover Avenue and west of Business Drive in the City of Fontana is proposing to redevelop the site with 2 warehouse buildings totaling 355,370 square feet. Building 1 to the east is to consist of 212,677 square feet of warehouse use and Building 2 to the west is to consist of 142,693 square feet of warehousing use. The Project is anticipated to be developed within a single phase with an Opening Year of 2023. The preliminary site plan for the proposed Project is shown on Exhibit 1-2. As indicated on Exhibit 1-2, access to the Project site will be provided to Slover Avenue via two driveways for each building. Driveway 1 is proposed to restrict access to right-in/right-out access only based on its proximity to Commerce Way. Driveway 2 would prohibit left-out access based on its proximity to the railroad. Driveway 3 would prohibit left-in access only also based on its proximity to the adjacent railroad. Driveway 4 would accommodate full access. Regional access to the Project site is available from the I-10 Freeway via Etiwanda Avenue and Cherry Avenue interchanges. Trips generated by the Project’s proposed land uses have been estimated based on trip generation rates collected by the Institute of Transportation Engineers (ITE) Trip Generation Manual, (10th Edition, 2017). The Project is anticipated to generate a total of 622 trip-ends per day with 59 AM peak hour trips and 68 PM peak hour trips (actual vehicles). The assumptions and methods used to estimate the Project’s trip generation characteristics are discussed in greater detail in Section 4.1 Project Trip Generation of this report. 1.3 ANALYSIS SCENARIOS For the purposes of this traffic study, potential deficiencies to traffic and circulation have been assessed for each of the following conditions: • Existing (2021) • Opening Year Cumulative (2023) Without Project • Opening Year Cumulative (2023) With Project Per the City’s Guidelines, projects that generate between 50 and 100 two-way peak hour trips only require an opening year assessment. As such, no future long-range (buildout) traffic conditions have been evaluated for the purposes of this TS. 1.3.1 EXISTING (2021) CONDITIONS Information for Existing (2021) conditions is disclosed to represent the baseline traffic conditions as they existed at the time this report was prepared. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 44 EXHIBIT 1-2: PRELIMINARY SITE PLAN Fontana Corporate Center Traffic Study 14102-02 TS Report REV 55 1.3.2 OPENING YEAR CUMULATIVE (2023) CONDITIONS The Opening Year Cumulative (2023) conditions analysis determines the potential near-term cumulative circulation system deficiencies. To account for background traffic growth, traffic associated with other known cumulative development projects in conjunction with an ambient growth from Existing (2021) conditions of 2.33% is included for Opening Year Cumulative (2023) traffic conditions. The near-term conditions analysis will be utilized to determine if improvements funded through regional transportation fee programs, such as the City’s Development Impact Fee (DIF) program, or other approved funding mechanisms can accommodate the long-range cumulative traffic at the target level of service (LOS) identified by the City of Fontana (lead agency). Other improvements needed beyond the “funded” improvements (such as localized improvements to non-DIF facilities) are identified as such. 1.4 STUDY AREA To ensure that this TS satisfies the City of Fontana’s traffic study requirements, Urban Crossroads, Inc. prepared a Project traffic study scoping package for review by City of Fontana staff prior to the preparation of this report. This agreement provides an outline of the Project study area, trip generation, trip distribution, and analysis methodology. The agreement approved by the City of Fontana is included in Appendix 1.1 of this TS. The 6 study area intersections shown on Exhibit 1-3 and listed in Table 1-1 were selected for evaluation in this TS based on consultation with City of Fontana staff. The study area includes intersections where the Project is anticipated to contribute 50 or more peak hour trips per the City of Fontana’s traffic study guidelines. (1) The “50 peak hour trip” criteria represent a minimum number of trips at which a typical intersection would have the potential to be substantively affected by a given development proposal. The 50 peak hour trip criterion is a traffic engineering rule of thumb that is accepted and widely used within San Bernardino County for estimating a potential area of influence (i.e., study area). TABLE 1-1: INTERSECTION ANALYSIS LOCATIONS ID Intersection Location Jurisdiction CMP? 1 Commerce Wy. & Slover Av. City of Fontana No 2 Driveway 1 & Slover Av. City of Fontana No 3 Driveway 2 & Slover Av. City of Fontana No 4 Driveway 3 & Slover Av. City of Fontana No 5 Driveway 4/Business Dr. & Slover Av. City of Fontana No 6 Mulberry Av. & Slover Av. City of Fontana No Fontana Corporate Center Traffic Study 14102-02 TS Report REV 66 EXHIBIT 1-3: STUDY AREA Fontana Corporate Center Traffic Study 14102-02 TS Report REV 77 The intent of a Congestion Management Program (CMP) is to more directly link land use, transportation, and air quality, thereby prompting reasonable growth management programs that will effectively utilize new transportation funds, alleviate traffic congestion and related deficiencies, and improve air quality. Counties within California have developed CMPs with varying methods and strategies to meet the intent of the CMP legislation. Study area intersections that are identified as CMP facilities in the County of San Bernardino per the San Bernardino County Transportation Authority (SBCTA) CMP are indicated on Table 1-1. (4) 1.5 DEFICIENCIES This section provides a summary of deficiencies by analysis scenario. Section 2 Methodologies provides information on the methodologies used in the analysis and Section 5 Opening Year Cumulative (2023) Traffic Conditions includes the detailed analysis. A summary of LOS results for all analysis scenarios is presented on Table 1-2. TABLE 1-2: SUMMARY OF LOS 1.5.2 EXISTING CONDITIONS None of study area intersections is currently operating at an unacceptable LOS (i.e., LOS D or worse) during the peak hours under Existing (2021) traffic conditions. 1.5.2 OPENING YEAR CUMULATIVE CONDITIONS None of study area intersections is anticipated to operate at an unacceptable LOS (i.e., LOS D or worse) during the peak hours under Opening Year Cumulative (2023) Without Project traffic conditions. One intersection is anticipated to operate at an unacceptable LOS (i.e., LOS D or worse) during the peak hours under Opening Year Cumulative (2023) With Project traffic conditions: • Driveway 4/Business Dr & Slover Av (#5) – LOS D in PM Peak Hour Only Fontana Corporate Center Traffic Study 14102-02 TS Report REV 88 1.6 RECOMMENDATIONS 1.6.1 SITE ADJACENT AND SITE ACCESS RECOMMENDATIONS The following recommendations are based on the minimum improvements needed to accommodate site access and maintain acceptable peak hour operations. The site adjacent recommendations are shown on Exhibit 1-4. Recommendation 1 – Driveway 1 and Slover Avenue (#2) – The following improvements are necessary to accommodate site access: • Project to install a stop control on the southbound approach (Project driveway). • Project to accommodate right turn lane on southbound approach. • Driveway will be restricted to right-in/right-out access only. Recommendation 2 – Driveway 2 and Slover Avenue (#3) – The following improvements are necessary to accommodate site access: • Project to install a stop control on the southbound approach (Project driveway). • Project to accommodate right turn lane on southbound approach. • Project to accommodate left turn lane on eastbound approach. • Driveway will be restricted to left-out access. Recommendation 3 – Driveway 3 and Slover Avenue (#4) – The following improvements are necessary to accommodate site access: • Project to install a stop control on the southbound approach (Project driveway). • Project to accommodate shared left-right turn lane on southbound approach. • Driveway will be restricted to left-in access. Recommendation 4 – Driveway 4 & Slover Avenue (#5) – The following improvements are necessary to accommodate site access: • Project to install a stop control on the southbound approach (Project driveway). • Project to accommodate shared left-through lane and right turn lane on southbound approach. • Project to accommodate left turn lane on eastbound approach by restriping the painted median on Slover Avenue. On-site traffic signing and striping should be implemented agreeable with the provisions of the California Manual on Uniform Traffic Control Devices (CA MUTCD) and in conjunction with detailed construction plans for the Project site. Sight distance at each project access point should be reviewed with respect to standard Caltrans and City of Fontana sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 99 EXHIBIT 1-4: SITE ADJACENT ROADWAY AND SITE ACCESS RECOMMENDATIONS Fontana Corporate Center Traffic Study 14102-02 TS Report REV 10 1.6.2 OFF-SITE RECOMMENDATIONS Under Opening Year Cumulative (2023) With Project traffic conditions, one intersection is anticipated to operate at an unacceptable LOS (LOS D) during the PM peak hour only. The addition of Project traffic to Opening Year Cumulative (2023) Without Project traffic conditions is anticipated to result in a new deficiency. As such, the Project should contribute its proportionate share towards the improvements needed to bring the intersection operations back to acceptable LOS (see Table 1-3). It should be noted that the intersection of Driveway 4/Business Drive at Slover Avenue currently meets peak hour volume-based traffic signal warrants but is not needed as it currently operates at an acceptable LOS. Lastly, the Project would be required to pay fair share fees consistent with the City’s requirements (see Section 6 Local and Regional Funding Mechanisms). 1.7 QUEUING ANALYSIS A queuing analysis was conducted along the site adjacent roadways of Slover Avenue and at the Project’s driveways for Opening Year Cumulative (2023) traffic conditions to determine the turn pocket lengths and lane geometric necessary to accommodate near-term 95th percentile queues and recommend storage lengths for the turning movements shown on Exhibit 1-4. The analysis was conducted for the weekday AM and weekday PM peak hours using the SimTraffic modeling software. The Opening Year Cumulative (2023) queuing results are provided in Table 1-4 and Appendix 5.5 of this TS. SimTraffic is designed to model networks of signalized and unsignalized intersections, with the primary purpose of checking and fine-tuning signal operations. SimTraffic uses the input parameters from Synchro (Version 11) to generate random simulations. The 95th percentile queue is not necessarily ever observed; it is simply based on statistical calculations (or Average Queue plus 1.65 standard deviations). The random simulations generated by SimTraffic have been utilized to determine the 95th percentile queue lengths observed for each turn lane. A SimTraffic simulation has been recorded 5 times, during the weekday AM and weekday PM peak hours, and has been seeded for 30-minute periods with 60-minute recording intervals. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 11 TABLE 1-3: SUMMARY OF IMPROVEMENTS AND ROUGH ORDER OF MAGNITUDE COSTS Fontana Corporate Center Traffic Study 14102-02 TS Report REV 12 TABLE 1-4: QUEUING ANALYSIS FOR OPENING YEAR CUMULATIVE (2023) CONDITIONS WITH PROJECT 1.8 TRUCK ACCESS Due to the typical wide turning radius of large trucks, a truck turning template has been overlaid on the site plan at each applicable Project driveway anticipated to be utilized by heavy trucks in order to determine appropriate curb radii and to verify that trucks will have sufficient space to execute turning maneuvers. A WB-67 truck (53-foot trailer) has been utilized for the purposes of this analysis. Exhibit 1-5 shows the ingress and egress truck turns from Driveway 2. Exhibit 1-6 shows the ingress and egress truck turns from Driveway 3. 1.9 VEHICLE MILES TRAVELED (VMT) ANALYSIS The Project was evaluated against City Guideline’s stated VMT screening criteria but was found to not meet the available screening thresholds. As required by City Guidelines, a project level VMT analysis was conducted consistent with the requirements identified for single use warehouse projects. The Project was not found to exceed 15% below the County of San Bernardino’s baseline regional average VMT per Service Population measures of VMT. The Project’s impact to VMT is therefore presumed to be less than significant. Detail traffic analysis can be found in Section 7 Vehicle Miles Traveled Analysis of this TS. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 13 EXHIBIT 1-5: TRUCK ACCESS AT DRIVEWAY 2 Fontana Corporate Center Traffic Study 14102-02 TS Report REV 14 EXHIBIT 1-6: TRUCK ACCESS AT DRIVEWAY 3 Fontana Corporate Center Traffic Study 14102-02 TS Report REV 15 2 METHODOLOGIES This section of the report presents the methodologies used to perform the traffic analyses summarized in this report. The methodologies described are generally consistent with the City of Fontana’s traffic study guidelines. (1) 2.1 LEVEL OF SERVICE Traffic operations of roadway facilities are described using the term "Level of Service" (LOS). LOS is a qualitative description of traffic flow based on several factors such as speed, travel time, delay, and freedom to maneuver. Six levels are typically defined ranging from LOS A, representing completely free-flow conditions, to LOS F, representing breakdown in flow resulting in stop-and-go conditions. LOS E represents operations at or near capacity, an unstable level where vehicles are operating with the minimum spacing for maintaining uniform flow. 2.2 INTERSECTION CAPACITY ANALYSIS The definitions of LOS for interrupted traffic flow (flow restrained by the existence of traffic signals and other traffic control devices) differ slightly depending on the type of traffic control. The LOS is typically dependent on the quality of traffic flow at the intersections along a roadway. The Highway Capacity Manual (HCM) methodology expresses the LOS at an intersection in terms of delay time for the various intersection approaches. (5) The HCM uses different procedures depending on the type of intersection control. 2.2.1 SIGNALIZED INTERSECTIONS The City of Fontana requires signalized intersection operations analysis based on the methodology described in the HCM (6th Edition). Intersection LOS operations are based on an intersection’s average control delay. Control delay includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. For signalized intersections, LOS is directly related to the average control delay per vehicle and is correlated to a LOS designation as described in Table 2-1. Study area intersections have been evaluated using the Synchro (Version 11) analysis software package. The traffic modeling and signal timing optimization software package Synchro (Version 11) is utilized to analyze signalized intersections within the study area. Synchro is a macroscopic traffic software program that is based on the signalized intersection capacity analysis as specified in the HCM. Macroscopic level models represent traffic in terms of aggregate measures for each movement at the study intersections. Equations are used to determine measures of effectiveness such as delay and queue length. The level of service and capacity analysis performed by Synchro takes into consideration optimization and coordination of signalized intersections within a network. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 16 TABLE 2-1: SIGNALIZED INTERSECTION LOS THRESHOLDS Description Average Control Delay (Seconds), V/C ≤ 1.0 Level of Service, V/C ≤ 1.0 Level of Service, V/C > 1.0 Operations with very low delay occurring with favorable progression and/or short cycle length. 0 to 10.00 A F Operations with low delay occurring with good progression and/or short cycle lengths. 10.01 to 20.00 B F Operations with average delays resulting from fair progression and/or longer cycle lengths. Individual cycle failures begin to appear. 20.01 to 35.00 C F Operations with longer delays due to a combination of unfavorable progression, long cycle lengths, or high V/C ratios. Many vehicles stop and individual cycle failures are noticeable. 35.01 to 55.00 D F Operations with high delay values indicating poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences. This is considered to be the limit of acceptable delay. 55.01 to 80.00 E F Operation with delays unacceptable to most drivers occurring due to over saturation, poor progression, or very long cycle lengths 80.01 and up F F Source: HCM, 6th Edition A saturation flow rate of 1900 has been utilized for all study area intersections located within the City of Fontana. The peak hour traffic volumes are adjusted using a peak hour factor (PHF) to reflect peak 15-minute volumes. Common practice for LOS analysis is to use a peak 15-minute rate of flow. However, flow rates are typically expressed in vehicles per hour. The PHF is the relationship between the peak 15-minute flow rate and the full hourly volume (e.g., PHF = [Hourly Volume] / [4 x Peak 15-minute Flow Rate]). The use of a 15-minute PHF produces a more detailed analysis as compared to analyzing vehicles per hour. Existing PHFs have been used for all analysis scenarios. Per the HCM, PHF values over 0.95 often are indicative of high traffic volumes with capacity constraints on peak hour flows while lower PHF values are indicative of greater variability of flow during the peak hour. (5) 2.2.2 UNSIGNALIZED INTERSECTIONS The City of Fontana require the operations of unsignalized intersections be evaluated using the methodology described the HCM. (5) The LOS rating is based on the weighted average control delay expressed in seconds per vehicle (see Table 2-2). Fontana Corporate Center Traffic Study 14102-02 TS Report REV 17 TABLE 2-2: UNSIGNALIZED INTERSECTION LOS THRESHOLDS Description Average Control Delay Per Vehicle (Seconds) Level of Service, V/C ≤ 1.0 Level of Service, V/C > 1.0 Little or no delays. 0 to 10.00 A F Short traffic delays. 10.01 to 15.00 B F Average traffic delays. 15.01 to 25.00 C F Long traffic delays. 25.01 to 35.00 D F Very long traffic delays. 35.01 to 50.00 E F Extreme traffic delays with intersection capacity exceeded. > 50.00 F F Source: HCM, 6th Edition At two-way or side-street stop-controlled intersections, LOS is calculated for each controlled movement and for the left turn movement from the major street, as well as for the intersection as a whole. For approaches composed of a single lane, the delay is computed as the average of all movements in that lane. Per the HCM, the highest delay and associated LOS on the minor approach is reported for two-way stop-controlled intersections. For all-way stop controlled intersections, LOS is computed for the intersection as a whole and the average delay is reported (similar to signalized intersections). 2.3 TRAFFIC SIGNAL WARRANT ANALYSIS METHODOLOGY The term "signal warrants" refers to the list of established criteria used by the Caltrans and other public agencies to quantitatively justify or ascertain the potential need for installation of a traffic signal at an otherwise unsignalized intersection. This TS uses the signal warrant criteria presented in the latest edition of the Caltrans California Manual on Uniform Traffic Control Devices (CA MUTCD). (6) The signal warrant criteria for Existing conditions are based upon several factors, including volume of vehicular and pedestrian traffic, frequency of accidents, and location of school areas. The Caltrans CA MUTCD indicates that the installation of a traffic signal should be considered if one or more of the signal warrants are met. (6) Specifically, this TS utilizes the Peak Hour Volume- based Warrant 3 as the appropriate representative traffic signal warrant analysis for existing study area intersections for all analysis scenarios. Warrant 3 is appropriate to use for this TS because it provides specialized warrant criteria for intersections with rural characteristics (e.g., located in communities with populations of less than 10,000 persons or with adjacent major streets operating above 40 miles per hour). For the purposes of this study, the speed limit was the basis for determining whether Urban or Rural warrants were used for a given intersection. Traffic signal warrant analyses were performed for the following unsignalized study area intersection shown in Table 2-3: Fontana Corporate Center Traffic Study 14102-02 TS Report REV 18 TABLE 2-3: TRAFFIC SIGNAL WARRANT ANALYSIS LOCATIONS ID Intersection Location Jurisdiction 3 Driveway 2 & Slover Av. Fontana 4 Driveway 3 & Slover Av. Fontana 5 Driveway 4/Business Dr. & Slover Av. Fontana The Existing conditions traffic signal warrant analysis is presented in the subsequent section, Section 3 Area Conditions of this report. The traffic signal warrant analyses for future conditions are presented in Section 5 Opening Year Cumulative (2023) Traffic Conditions of this report. It is important to note that a signal warrant defines the minimum condition under which the installation of a traffic signal might be warranted. Meeting this threshold condition does not require that a traffic control signal be installed at a particular location, but rather, that other traffic factors and conditions be evaluated in order to determine whether the signal is truly justified. It should also be noted that signal warrants do not necessarily correlate with LOS. An intersection may satisfy a signal warrant condition and operate at or above acceptable LOS or operate below acceptable LOS and not meet a signal warrant. Traffic signal warrant analysis has not been performed for unsignalized intersections with limited access/turn restrictions (e.g., right-in/right-out only). 2.4 MINIMUM LEVEL OF SERVICE (LOS) The City’s General Plan recommends a LOS standard of LOS C. Intersections which are forecast to operate at unsatisfactory conditions (i.e., at LOS worse than LOS C for City intersections) shall be identified as cumulatively deficient intersections. Therefore, any intersection operating at LOS D, E, or F will be considered deficient for the purposes of this analysis. (1) 2.5 DEFICIENCY CRITERIA For the intersections that lie within the City of Fontana, determination of direct project-related deficiencies will be based on a comparison of without and with project levels of service for each analysis year. A project-related deficiency occurs if project traffic increases the average delay at an intersection by more than the thresholds identified on Table 2-4. The thresholds for LOS A, B, and C do not apply to projects consistent with the General Plan. TABLE 2-4: DETERMINATION OF EFECT Pre-Project LOS Threshold1 A/B 10.0 Seconds C 8.0 Seconds D 5.0 Seconds E 3.0 Seconds F 1.0 Second Source: Fontana Traffic Study Guidelines, October 21, 2020. 1 Increase in delay Fontana Corporate Center Traffic Study 14102-02 TS Report REV 19 A Project’s contribution to a deficiency can be reduced/improved if the Project is required to implement or fund its fair share of improvements designed to alleviate the potential deficiency. 2.6 PROJECT FAIR SHARE CALCULATION METHODOLOGY In cases where this TS identifies that the proposed Project would have a cumulative effect to a roadway facility, and the recommended improvement is a fair share monetary contribution, the following methodology was applied to determine the fair share contribution. A project’s fair share contribution at an off-site study area intersection is determined based on the following equation, which is the ratio of Project traffic to net new traffic, where net new traffic is total future traffic (Opening Year Cumulative conditions) subtracts less baseline traffic: Project Fair Share % = Project Traffic / (Opening Year Cumulative Total Traffic – Existing Baseline Traffic) The Project fair share contribution calculations are presented in Section 6 Local and Regional Funding Mechanisms of this TS. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 20 This Page Intentionally Left Blank Fontana Corporate Center Traffic Study 14102-02 TS Report REV 21 3 AREA CONDITIONS This section provides a summary of the existing circulation network, the City of Fontana General Plan Circulation Network, and a review of existing peak hour intersection operations and traffic signal warrant analyses. 3.1 EXISTING CIRCULATION NETWORK Pursuant to the scoping agreement with City of Fontana staff (Appendix 1.1), the study area includes a total of 6 existing and future intersections as shown on Exhibit 3-1. Exhibit 3-1 illustrates the study area intersections located near the proposed Project and identifies the number of through traffic lanes for existing roadways and intersection traffic controls. 3.2 GENERAL PLAN CIRCULATION ELEMENTS As noted previously, the Project site is located within the City of Fontana. The roadway classifications and planned (ultimate) roadway cross-sections of the major roadways within the study area, as identified on City of Fontana General Plan Hierarchy of Streets, are described subsequently. Exhibit 3-2 shows the City of Fontana General Plan Circulation Element. The City of Fontana General Plan does not include roadway cross-sections in its General Plan. Primary Highways are four-lane roadways and may include a painted median. These roadways typically direct traffic through major development areas. The following study area roadway within the City of Fontana is classified as a Primary Highways: • Slover Avenue • Mulberry Avenue Modified Industrial Collector are two-lane streets, providing one lane in each direction. The following study area roadway within the study area is classified as a Modified Industrial Collector: • Commerce Way, south of Slover Avenue • Business Drive, south of Slover Avenue Fontana Corporate Center Traffic Study 14102-02 TS Report REV 22 EXHIBIT 3-1: EXISTING NUMBER OF THROUGH LANES AND INTERSECTION CONTROL Fontana Corporate Center Traffic Study 14102-02 TS Report REV 23 EXHIBIT 3-2: CITY OF FONTANA HIERARCHY OF STREETS Fontana Corporate Center Traffic Study 14102-02 TS Report REV 24 3.3 TRUCK ROUTES Exhibit 3-3 shows the City of Fontana truck routes. As shown, Slover Avenue and Mulberry Avenue are identified as truck routes. These truck routes have been utilized to route truck traffic associated with the proposed Project and future cumulative development projects for the purposes of this TS. 3.4 BICYCLE & PEDESTRIAN FACILITIES The City of Fontana bike facilities are shown on Exhibit 3-4. There are no existing bike facilities within the study area. However, Slover Avenue from Mulberry Avenue eastward is proposed Class II bike facilities. Exhibit 3-5 illustrates the existing pedestrian facilities, including sidewalks and crosswalks. As shown on Exhibit 3-5, there are limited pedestrian facilities within the study area. 3.5 TRANSIT SERVICE There are no transit services is provided within the study area. However, there are some transit services served by Omnitrans Transit Agency in the nearby roadways: • North of the Project - San Bernardino Avenue via Route 61 and I-10 via Route 290 • South of the Project - Jurupa Avenue via Route 82 The transit services are illustrated on Exhibit 3-6. Transit service is reviewed and updated by Omnitrans periodically to address ridership, budget, and community demand needs. Changes in land use can affect these periodic adjustments which may lead to either enhanced or reduced service where appropriate. 3.6 EXISTING TRAFFIC COUNTS The intersection LOS analysis is based on the traffic volumes observed during the peak hour conditions using traffic count data collected in September 2021. The following peak hours were selected for analysis: • Weekday AM Peak Hour (peak hour between 7:00 AM and 9:00 AM) • Weekday PM Peak Hour (peak hour between 4:00 PM and 6:00 PM) There were no observations made in the field that would indicate atypical traffic conditions on the count dates, such as construction activity or detour routes and near-by schools were in session and operating on normal schedules. The raw manual peak hour turning movement traffic count data sheets are included in Appendix 3.1. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 25 EXHIBIT 3-3: CITY OF FONTANA TRUCK ROUTES Fontana Corporate Center Traffic Study 14102-02 TS Report REV 26 EXHIBIT 3-4: CITY OF FONTANA BICYCLE FACILITIES Fontana Corporate Center Traffic Study 14102-02 TS Report REV 27 EXHIBIT 3-5: EXISTING PEDESTRIAN FACILITIES Fontana Corporate Center Traffic Study 14102-02 TS Report REV 28 EXHIBIT 3-6: EXISTING TRANSIT ROUTES Fontana Corporate Center Traffic Study 14102-02 TS Report REV 29 Slover Avenue between Commerce Way and Business Drive was collected via 24-hour tube count in September 2021, which was utilized to develop a peak-to-daily relationship in order to calculate daily traffic on other roadway segments. Where actual 24-hour tube count data was not available, Existing ADT volumes were based upon factored intersection peak hour counts collected by Urban Crossroads, Inc. using the following formula for each intersection leg: Weekday PM Peak Hour (Approach Volume + Exit Volume) x 12.08 = Leg Volume A comparison of the PM peak hour and daily traffic volumes indicated that the peak-to-daily relationship is approximately 8.28 percent. As such, the above equation utilizing a factor of 12.08 estimates the ADT volumes on the study area roadway segments assuming a peak-to-daily relationship of approximately 8.28 percent (i.e., 1/0.0828 = 12.08) and was assumed to sufficiently estimate ADT volumes for planning-level analyses. Existing weekday AM and weekday PM peak hour intersection volumes are shown on Exhibit 3-7. 3.7 EXISTING (2021) INTERSECTION OPERATIONS ANALYSIS Existing peak hour traffic operations have been evaluated for the study area intersections based on the analysis methodologies presented in Section 2.2 Intersection Capacity Analysis of this report. The intersection operations analysis results are summarized in Table 3-1 which indicates that all the study area intersections are currently operating at an acceptable LOS during the peak hours. The intersection operations analysis worksheets are included in Appendix 3.2 of this TS. TABLE 3-1: INTERSECTION ANALYSIS FOR EXISTING (2021) CONDITIONS Fontana Corporate Center Traffic Study 14102-02 TS Report REV 30 EXHIBIT 3-7: EXISTING (2021) TRAFFIC VOLUMES Fontana Corporate Center Traffic Study 14102-02 TS Report REV 31 3.8 EXISTING (2021) TRAFFIC SIGNAL WARRANTS ANALYSIS Traffic signal warrants for Existing traffic conditions are based on existing peak hour intersection turning volumes. The following unsignalized study area intersection currently meets peak hour volume-based traffic signal warrants for Existing (2021) traffic conditions (see Appendix 3.3): • Driveway 4/Business Dr & Slover Av (#5) Fontana Corporate Center Traffic Study 14102-02 TS Report REV 32 This Page Intentionally Left Blank Fontana Corporate Center Traffic Study 14102-02 TS Report REV 33 4 PROJECTED FUTURE TRAFFIC The proposed Project is located north of Slover Avenue and west of Business Drive in the City of Fontana is proposing to redevelop the site with 2 warehouse buildings totaling 355,370 square feet. Building 1 to the east is to consist of 212,677 square feet of warehouse use and Building 2 to the west is to consist of 142,693 square feet of warehousing use. The Project is anticipated to be developed within a single phase with an Opening Year of 2023. Access to the Project site will be provided to Slover Avenue via two driveways for each building. Driveway 1 is proposed to restrict access to right-in/right-out access only based on its proximity to Commerce Way. Driveway 2 would prohibit left-out access based on its proximity to the railroad. Driveway 3 would prohibit left-in access only also based on its proximity to the adjacent railroad. Driveway 4 would accommodate full access. Regional access to the Project site is available from the I-10 Freeway via Etiwanda Avenue and Cherry Avenue interchanges. 4.1 PROJECT TRIP GENERATION 4.1.1 EXISTING USE The site is currently occupied by a plant for a manufacturer of prefabricated building systems located at 13592 Slover Avenue in the City of Fontana. As such, for the purposes of this assessment, a credit has been taken for the trips associated with the existing uses. Traffic counts were collected at the driveways for the existing use on June 9th and 10th, 2021 (see Appendix 1.1). Table 4-1 summarizes the total trip generation for the existing site (accounting for all driveways). As shown on Table 4-1, the existing use generates 163 two-way trips per day, with 6 trips during the AM peak hour and 8 trips during the PM peak hour. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 34 TABLE 4-1: EXISTING SURVEY DATA FOR EXISTING USE 4.1.2 PROPOSED PROJECT In order to develop the traffic characteristics of the proposed project, trip-generation statistics published in the Institute of Transportation Engineers (ITE) Trip Generation Manual (10th Edition, 2017) was used to estimate the trip generation. Trip generation rates for the Project are shown in Table 4-2. Land Use In Out Total In Out Total Daily Day 1: June 9, 2021 Passenger Cars: 6 1 7 0 8 8 153 2-axle Trucks: 0 0 0 0 0 0 6 3-axle Trucks: 0 0 0 0 0 0 4 4+-axle Trucks: 0 0 0 0 0 0 6 Total Truck Trips: 0 0 0 0 0 0 16 Total Trips1 6 1 7 0 8 8 169 Day 2: June 10, 2021 Passenger Cars: 3 0 3 1 7 8 144 2-axle Trucks: 0 0 0 0 0 0 10 3-axle Trucks: 0 0 0 0 0 0 0 4+-axle Trucks: 1 1 2 0 0 0 2 Total Truck Trips: 1 1 2 0 0 0 12 Total Trips1 4 1 5 1 7 8 156 2-Day Average Trip Generation: Passenger Cars: 5 1 5 1 8 8 149 2-axle Trucks: 0 0 0 0 0 0 8 3-axle Trucks: 0 0 0 0 0 0 2 4+-axle Trucks: 1 1 1 0 0 0 4 Total Truck Trips: 1 1 1 0 0 0 14 Total Trips1 5 1 6 1 8 8 163 * Note: data collected on June 9 and 10, 2021. 1 Total Trips = Passenger Cars + Truck Trips. 2 Trip generation represents the sum of all driveways, by day. AM Peak Hour PM Peak Hour Fontana Corporate Center Traffic Study 14102-02 TS Report REV 35 TABLE 4-2: PROJECT TRIP GENERATION RATES The trip generation summary for the Project in actual vehicles is shown on Table 4-3. As shown on Table 4-3, the Project is anticipated to generate a total of 622 two-way trips per day with 59 AM peak hour trips and 68 PM peak hour trips. TABLE 4-3: TRIP GENERATION SUMMARY (ACTUAL VEHICLES) The trip generation summary for the Project in passenger car equivalent (PCE) is shown on Table 4-4. As shown on Table 4-4, the Project is anticipated to generate a total of 878 PCE two-way trips per day with 72 PCE AM peak hour trips and 83 PCE PM peak hour trips. ITE LU AM Peak Hour PM Peak Hour Land Use1 Units2 Code In Out Total In Out Total Actual Vehicle Trip Generation Rates: Warehousing3 TSF 150 0.131 0.039 0.170 0.051 0.139 0.190 1.740 Passenger Cars 0.114 0.034 0.148 0.044 0.118 0.162 1.270 2-Axle Trucks 0.003 0.001 0.004 0.001 0.003 0.005 0.078 3-Axle Trucks 0.004 0.001 0.005 0.002 0.004 0.006 0.097 4+-Axle Trucks 0.011 0.003 0.014 0.005 0.013 0.018 0.294 Passenger Car Equivalent (PCE) Trip Generation Rates:4 Warehousing3 TSF 150 0.131 0.039 0.170 0.051 0.139 0.190 1.740 Passenger Cars 0.114 0.034 0.148 0.044 0.118 0.162 1.270 2-Axle Trucks (PCE = 2.0)0.004 0.001 0.006 0.002 0.005 0.007 0.118 3-Axle Trucks (PCE = 2.5)0.007 0.002 0.009 0.003 0.009 0.012 0.194 4+-Axle Trucks (PCE = 3.0)0.032 0.010 0.042 0.014 0.039 0.054 0.882 1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Tenth Edition (2017). 2 TSF = thousand square feet 3 Vehicle Mix Source: ITE Trip Generation Handbook Supplement (2020), Appendix C. Truck Mix: South Coast Air Quality Management District’s (SCAQMD) recommended truck mix, by axle type. Normalized % - Without Cold Storage: 16.7% 2-Axle trucks, 20.7% 3-Axle trucks, 62.6% 4-Axle trucks. 4 PCE factors per City's Guidelines: 2-axle = 2.0; 3-axle = 2.5; 4+-axle = 3.0. Daily Land Use Quantity Units1 In Out Total In Out Total Daily Actual Vehicles: Warehousing 355.370 TSF Passenger Cars: 40 12 52 15 42 57 452 2-axle Trucks: 1 0 1 0 1 1 28 3-axle Trucks: 1 0 1 1 2 3 36 4+-axle Trucks: 4 1 5 2 5 7 106 Total Trucks:6 1 7 3 8 11 170 Total Trips (Actual Vehicles)2 46 13 59 18 50 68 622 1 TSF = thousand square feet 2 Total Trips = Passenger Cars + Truck Trips. AM Peak Hour PM Peak Hour Fontana Corporate Center Traffic Study 14102-02 TS Report REV 36 TABLE 4-4: TRIP GENERATION SUMMARY (PCE) 4.1.3 TRIP GENERATION COMPARISON Table 4-5 shows the trip generation comparison and the resulting net change in trips between the existing use and the proposed Project. As shown on Table 4-5, the proposed Project would result in a net increase of 697 two-way PCE trips per day and net increase of 60 PCE AM peak hour trips and 74 PCE PM peak hour trips. TABLE 4-5: TRIP GENERATION COMPARISON (PCE) 4.1.4 11TH EDITION ITE TRIP GENERATION RATES After the approved scope and while wrapping up the initial draft of the TS, the ITE released its latest Trip Generation Manual (11th Edition, 2021). Upon review of the updated trip generation rates for the proposed Warehousing use (ITE Land Use Code 150) shown on Table 4-6, it was determined that while there is a slight increase in daily traffic (based on PCE only) the trip Land Use Quantity Units1 In Out Total In Out Total Daily Passenger Car Equivalent (PCE): Warehousing 355.370 TSF Passenger Cars: 40 12 52 15 42 57 452 2-axle Trucks: 2 0 2 1 2 3 42 3-axle Trucks: 3 1 4 1 3 4 70 4+-axle Trucks: 11 3 14 5 14 19 314 Total Trucks (PCE):16 4 20 7 19 26 426 Total Trips (PCE)2 56 16 72 22 61 83 878 1 TSF = thousand square feet 2 Total Trips = Passenger Cars + Truck Trips. AM Peak Hour PM Peak Hour Trip Generation Comparison Quantity Units1 In Out Total In Out Total Daily Proposed Project 355.370 TSF Passenger Cars: 40 12 52 15 42 57 452 Total Truck Trips (PCE): 16 4 20 7 19 26 426 Total Trips2 56 16 72 22 61 83 878 Existing Use Passenger Cars: 5 1 6 1 8 9 149 Total Truck Trips (PCE): 3 3 6 0 0 0 32 Total Trips2 8 4 12 1 8 9 181 Variance Passenger Cars: 35 11 46 14 34 48 303 Total Truck Trips (PCE): 13 1 14 7 19 26 394 Total Trips2 48 12 60 21 53 74 697 1 TSF = thousand square feet 2 Total Trips = Passenger Cars + Truck Trips. AM Peak Hour PM Peak Hour Fontana Corporate Center Traffic Study 14102-02 TS Report REV 37 generation for the AM and PM peak hours show reductions in total traffic as compared to the 10th Edition based trip generation currently utilized in the traffic study for the operations analyses. As such, the analysis currently based on the 10th Edition rates are more conservative. TABLE 4-6: PROJECT TRIP GENERATION BASED ON 11TH EDITION ITE LU AM Peak Hour PM Peak Hour Land Use1 Units2 Code In Out Total In Out Total Actual Vehicle Trip Generation Rates: Warehousing3 TSF 150 0.131 0.039 0.170 0.050 0.130 0.180 1.710 Passenger Cars 0.116 0.034 0.150 0.042 0.108 0.150 1.110 2-Axle Trucks 0.002 0.001 0.003 0.003 0.002 0.005 0.100 3-Axle Trucks 0.002 0.002 0.004 0.003 0.003 0.006 0.124 4+-Axle Trucks 0.007 0.006 0.013 0.010 0.009 0.019 0.376 Passenger Car Equivalent (PCE) Trip Generation Rates:4 Warehousing3 TSF 150 0.131 0.039 0.170 0.050 0.130 0.180 1.710 Passenger Cars 0.116 0.034 0.150 0.042 0.108 0.150 1.110 2-Axle Trucks (PCE = 2.0)0.003 0.002 0.005 0.005 0.003 0.008 0.150 3-Axle Trucks (PCE = 2.5)0.004 0.004 0.008 0.006 0.006 0.012 0.248 4+-Axle Trucks (PCE = 3.0)0.021 0.017 0.038 0.030 0.026 0.056 1.127 1 Trip Generation & Vehicle Mix Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 TSF = thousand square feet 3 Truck Mix: South Coast Air Quality Management District’s (SCAQMD) recommended truck mix, by axle type. Normalized % - Without Cold Storage: 16.7% 2-Axle trucks, 20.7% 3-Axle trucks, 62.6% 4-Axle trucks. 4 PCE factors per City's Guidelines: 2-axle = 2.0; 3-axle = 2.5; 4+-axle = 3.0. Land Use Quantity Units1 In Out Total In Out Total Daily Actual Vehicles: Warehousing 355.370 TSF Passenger Cars: 41 12 53 15 38 53 394 2-axle Trucks: 1 0 1 1 1 2 36 3-axle Trucks: 1 1 2 1 1 2 44 4+-axle Trucks: 2 2 4 4 3 7 134 Total Trucks:4 3 7 6 5 11 214 Total Trips (Actual Vehicles)2 45 15 60 21 43 64 608 Passenger Car Equivalent (PCE): Warehousing 355.370 TSF Passenger Cars: 41 12 53 15 38 53 394 2-axle Trucks: 1 1 2 2 1 3 54 3-axle Trucks: 1 2 3 2 2 4 88 4+-axle Trucks: 7 6 13 11 9 20 400 Total Trucks (PCE):9 9 18 15 12 27 542 Total Trips (PCE)2 50 21 71 30 50 80 936 Project PCE (Table 4-3)56 16 72 22 61 83 878 Variance -6 5 -1 8 -11 -3 58 1 TSF = thousand square feet 2 Total Trips = Passenger Cars + Truck Trips. AM Peak Hour PM Peak Hour Daily Fontana Corporate Center Traffic Study 14102-02 TS Report REV 38 4.2 PROJECT TRIP DISTRIBUTION The Project trip distribution and assignment process represents the directional orientation of traffic to and from the Project site. Trip distribution is the process of identifying the probable destinations, directions or traffic routes that will be utilized by Project traffic. The potential interaction between the planned land uses and surrounding regional access routes are considered, to identify the route where the Project traffic would distribute. Separate distributions have been developed for passenger cars and trucks. Exhibits 4-1 and 4-2 illustrate the passenger car and truck trip distribution patterns through the study area intersections, respectively. 4.3 MODAL SPLIT The traffic reducing potential of public transit, walking, or bicycling have not been considered in this TS. Essentially, the traffic projections are "conservative" in that these alternative travel modes might be able to reduce the forecasted traffic volumes. 4.4 PROJECT TRIP ASSIGNMENT The assignment of traffic from the Project area to the adjoining roadway system is based upon the Project trip generation, trip distribution, and the arterial highway and local street system improvements that would be in place by the time of initial occupancy of the Project. Based on the identified Project traffic generation and trip distribution patterns, the Project only ADT and peak hour intersection turning movement volumes are shown on Exhibit 4-3. 4.5 BACKGROUND TRAFFIC Future year traffic forecasts have been based upon background (ambient) growth at 1.16% per year for 2023 traffic conditions, consistent with other recent studies performed in the area. The total ambient growth is 2.33% for 2023 traffic conditions (compounded growth of 1.16 percent per year over 2 years or 1.01162 years). The ambient growth factor is intended to approximate regional traffic growth. This ambient growth rate is added to existing traffic volumes to account for area-wide growth not reflected by cumulative development projects. Ambient growth has been added to daily and peak hour traffic volumes on surrounding roadways, in addition to traffic generated by the development of future projects that have been approved but not yet built and/or for which development applications have been filed and are under consideration by governing agencies. Opening Year Cumulative (2023) traffic volumes are provided in Section 5 of this TS. The traffic generated by the proposed Project was then manually added to the base volume to determine Opening Year Cumulative “With Project” forecasts. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 39 EXHIBIT 4-1: PROJECT (PASSENGER CAR) TRIP DISTRIBUTION Fontana Corporate Center Traffic Study 14102-02 TS Report REV 40 EXHIBIT 4-2: PROJECT (TRUCKS) TRIP DISTRIBUTION Fontana Corporate Center Traffic Study 14102-02 TS Report REV 41 EXHIBIT 4-3: PROJECT ONLY TRAFFIC VOLUMES Fontana Corporate Center Traffic Study 14102-02 TS Report REV 42 4.6 CUMULATIVE DEVELOPMENT TRAFFIC A cumulative project list was developed for the purposes of this analysis through consultation with planning and engineering staff from the City of Fontana. The cumulative project list includes known and foreseeable projects that are anticipated to contribute traffic to the study area intersections. Where applicable, cumulative projects anticipated to contribute measurable traffic (i.e., 50 or more peak hour trips) to study area intersections have been manually added to the study area network to generate Opening Year Cumulative (2023) forecasts. In other words, this list of cumulative development projects has been reviewed to determine which projects would likely contribute measurable traffic through the study area intersections (e.g., those cumulative projects in close proximity to the proposed Project). For the purposes of this analysis, the cumulative projects that were determined to affect one or more of the study area intersections are shown on Exhibit 4-4, listed in Table 4-7, and have been considered for inclusion. Although it is unlikely that all of these cumulative projects would be fully built and occupied by Years 2023, they have been included in an effort to conduct a conservative analysis and overstate as opposed to understate potential traffic deficiencies. Any other cumulative projects located beyond the cumulative study area that are not expected to contribute measurable traffic to study area intersections have not been included since the traffic would dissipate due to the distance from the Project site and study area intersections. Any additional traffic generated by other projects not on the cumulative projects list is likely accounted for through background ambient growth factors that have been applied to the peak hour volumes at study area intersections as discussed in Section 4.5 Background Traffic. Cumulative Only ADT and peak hour intersection turning movement volumes are shown on Exhibit 4-5. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 43 EXHIBIT 4-4: CUMULATIVE DEVELOPMENT LOCATION MAP Fontana Corporate Center Traffic Study 14102-02 TS Report REV 44 EXHIBIT 4-5: CUMULATIVE ONLY TRAFFIC VOLUMES Fontana Corporate Center Traffic Study 14102-02 TS Report REV 45 TABLE 4-7: CUMULATIVE DEVELOPMENT LAND USE SUMMARY 4.7 NEAR-TERM TRAFFIC CONDITIONS The “buildup” approach combines existing traffic counts with a background ambient growth factor to forecast the near-term 2023 traffic conditions. An ambient growth factor of 1.16% per year, compounded annually, accounts for background (area-wide) traffic increases that occur over time up to the years 2023 from the year 2021. Traffic volumes generated by cumulative development projects are then added to assess the Opening Year Cumulative (2023) traffic conditions. Lastly, Project traffic is added to assess “With Project” traffic conditions. The 2023 roadway network is similar to the existing conditions roadway network with the exception of intersections proposed to be developed by the Project. The near-term traffic analysis includes the following traffic conditions, with the various traffic components: • Opening Year Cumulative (2023) Without Project o Adjusted Existing 2021 counts o Ambient growth traffic (2.33%) o Cumulative Development Project traffic • Opening Year Cumulative (2023) With Project o Adjusted Existing 2021 counts o Ambient growth traffic (2.33%) o Cumulative Development Project traffic o Project traffic Fontana Corporate Center Traffic Study 14102-02 TS Report REV 46 This Page Intentionally Left Blank Fontana Corporate Center Traffic Study 14102-02 TS Report REV 47 5 OPENING YEAR CUMULATIVE (2023) TRAFFIC CONDITIONS This section discusses the methods used to develop Opening Year Cumulative (2023) Without and With Project traffic forecasts, and the resulting intersection operations and traffic signal warrant analyses. 5.1 ROADWAY IMPROVEMENTS The lane configurations and traffic controls assumed to be in place for Opening Year Cumulative (2023) conditions are consistent with those shown previously on Exhibit 3-1, with the exception of the following: • Project driveways and those facilities assumed to be constructed by the Project to provide site access are also assumed to be in place for Opening Year Cumulative conditions only (e.g., intersection and roadway improvements along the Project’s frontage and driveways). • Driveways and those facilities assumed to be constructed by cumulative developments to provide site access are also assumed to be in place for Opening Year Cumulative conditions only (e.g., intersection and roadway improvements along the cumulative development’s frontages and driveways). 5.2 OPENING YEAR CUMULATIVE (2023) WITHOUT PROJECT TRAFFIC VOLUME FORECASTS This scenario includes Existing traffic volumes plus an ambient growth factor of 2.33% plus traffic from pending and approved but not yet constructed known development projects in the area. The ADT and peak hour intersection turning movement volumes which can be expected for Opening Year Cumulative (2023) Without Project conditions are shown on Exhibit 5-1. 5.3 OPENING YEAR CUMULATIVE (2023) WITH PROJECT TRAFFIC VOLUME FORECASTS This scenario includes Existing traffic volumes, an ambient growth factor of 2.33%, traffic from pending and approved but not yet constructed known development projects in the area and the addition of Project traffic. The ADT and peak hour intersection turning movement volumes which can be expected for Opening Year Cumulative (2023) With Project conditions are shown on Exhibit 5-2. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 48 EXHIBIT 5-1: OPENING YEAR CUMULATIVE (2023) WITHOUT PROJECT TRAFFIC VOLUMES Fontana Corporate Center Traffic Study 14102-02 TS Report REV 49 EXHIBIT 5-2: OPENING YEAR CUMULATIVE (2023) WITH PROJECT TRAFFIC VOLUMES Fontana Corporate Center Traffic Study 14102-02 TS Report REV 50 5.4 INTERSECTION OPERATIONS ANALYSIS 5.4.1 OPENING YEAR CUMULATIVE (2023) WITHOUT PROJECT TRAFFIC CONDITIONS Opening Year Cumulative (2023) peak hour traffic operations have been evaluated for the study area intersections based on the analysis methodologies presented in Section 2.2 Intersection Capacity Analysis of this report. The intersection analysis results are summarized in Table 5-1, which indicate that none of study area intersections is anticipated to operate at an unacceptable LOS during the peak hours under Opening Year Cumulative (2023) Without Project. The intersection operations analysis worksheets for Opening Year Cumulative Without Project traffic conditions are included in Appendix 5.1 of this TS. TABLE 5-1: INTERSECTION ANALYSIS FOR OPENING YEAR CUMULATIVE (2023) CONDITIONS 5.4.2 OPENING YEAR CUMULATIVE (2023) WITH PROJECT TRAFFIC CONDITIONS As shown in Table 5-1, there is one of study area intersections anticipated to operate at an unacceptable LOS with the addition of Project traffic under Opening Year Cumulative (2023) With Project traffic conditions: • Driveway 4/Business Dr & Slover Av (#5) The intersection operations analysis worksheets for Opening Year Cumulative (2023) With Project traffic conditions are included in Appendix 5.2 of this TS. 5.5 TRAFFIC SIGNAL WARRANTS ANALYSIS Traffic signal warrants have been performed (based on CA MUTCD) for Opening Year Cumulative (2023) traffic conditions based on peak hour intersection turning movements volumes or planning level (ADT) volumes. No additional unsignalized study area intersections is anticipated to meet a traffic signal warrant under Opening Year Cumulative (2023) With Project traffic Fontana Corporate Center Traffic Study 14102-02 TS Report REV 51 conditions. Traffic signal warrants for Opening Year Cumulative (2023) With Project traffic conditions are included in Appendix 5.3. 5.6 DEFICIENCIES AND IMPROVEMENTS This section provides a summary of deficiencies, based on the City of Fontana’s deficiency criteria discussed in Section 2.6 Deficiency Criteria, and improvements needed to improve operations back to acceptable levels. The addition of Project traffic is anticipated to result in a peak hour operations deficiency during the PM peak hour at the intersection of Driveway 4/Business Drive and Slover Avenue. As such, the following improvements have been recommended for those intersections exceeding the City’s thresholds as listed in Table 2-4 in order to bring the intersection operations back to acceptable levels. It should be noted that the intersection currently meets peak hour volume-based traffic signal warrants for Existing conditions. The intersection operations analysis worksheets for Opening Year Cumulative (2023) With Project with improvements are included in Appendix 5.4 of this TS. TABLE 5-2: INTERSECTION DEFICIENCIES AND IMPROVEMENTS FOR OPENING YEAR CUMULATIVE (2023) CONDITIONS Fontana Corporate Center Traffic Study 14102-02 TS Report REV 52 This Page Intentionally Left Blank Fontana Corporate Center Traffic Study 14102-02 TS Report REV 53 6 LOCAL AND REGIONAL FUNDING MECHANISMS Transportation improvements within the City of Fontana are funded through a combination of construction of off-site improvements, development impact fee programs or fair share contributions, such as the City of Fontana DIF program. Identification and timing of needed improvements is generally determined through local jurisdictions based upon a variety of factors. 6.1 MEASURE “I” FUNDS In 2004, the voters of San Bernardino County approved the 30-year extension of Measure “I”, a one-half of one percent sales tax on retail transactions, through the year 2040, for transportation projects including, but not limited to, infrastructure improvements, commuter rail, public transit, and other identified improvements. The Measure “I” extension requires that a regional traffic impact fee be created to ensure development is paying its fair share. A regional Nexus study was prepared by SBCTA and concluded that each jurisdiction should include a regional fee component in their local programs in order to meet the Measure “I” requirement. The regional component assigns specific facilities and cost sharing formulas to each jurisdiction and was most recently updated in May 2018. Revenues collected through these programs are used in tandem with Measure “I” funds to deliver projects identified in the Nexus Study. While Measure “I” is a self-executing sales tax administered by SBCTA, it bears discussion here because the funds raised through Measure “I” have funded in the past and will continue to fund new transportation facilities in San Bernardino County, including within the City of Fontana. 6.2 CITY OF FONTANA DEVELOPMENT IMPACT FEE (DIF) The City of Fontana adopted the latest update to their DIF program in February 2016. Fees from new residential, commercial, and industrial development are collected to fund Measure “I” compliant regional facilities as well as local facilities. Under the City’s DIF program, the City may grant to developers a credit against specific components of fees when those developers construct certain facilities and landscaped medians identified in the list of improvements funded by the DIF program. After the City’s DIF fees are collected, they are placed in a separate restricted use account pursuant to the requirements of Government Code sections 66000 et seq. The timing to use the DIF fees is established through periodic capital improvement programs which are overseen by the City’s Engineering Department. Periodic traffic counts, review of traffic accidents, and a review of traffic trends throughout the City are also periodically performed by City staff and consultants. The City uses this data to determine the timing of the improvements listed in its facilities list. The City also uses this data to ensure that the improvements listed on the facilities list are constructed before the LOS falls below the LOS performance standards adopted by the City. In this way, the improvements are constructed before the LOS falls below the City’s LOS performance thresholds. The City’s DIF program establishes a timeline to fund, design, and build the improvements. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 54 6.3 FAIR SHARE CONTRIBUTION Project improvement may include a combination of fee payments to established programs, construction of specific improvements, payment of a fair share contribution toward future improvements or a combination of these approaches. Improvements constructed by development may be eligible for a fee credit or reimbursement through the program where appropriate (to be determined at the City’s discretion). When off-site improvements are identified with a minor share of responsibility assigned to proposed development, the approving jurisdiction may elect to collect a fair share contribution or require the development to construct improvements. Detailed fair share calculations, for each peak hour, has been provided on Table 6-1 for the applicable deficient study area intersections. These fees are collected with the proceeds solely used as part of a funding mechanism aimed at ensuring that regional highways and arterial expansions keep pace with the projected population increases. TABLE 6-1: PROJECT FAIR SHARE CALCULATIONS FOR INTERSECTIONS Fontana Corporate Center Traffic Study 14102-02 TS Report REV 55 7 VEHICLE MILES TRAVELED Changes to California Environmental Quality Act (CEQA) Guidelines were adopted in December 2018, which require all lead agencies to adopt VMT as a replacement for automobile delay-based LOS as the measure for identifying transportation impacts for land use projects. This statewide mandate went into effect July 1, 2020. To aid in this transition, the Governor’s Office of Planning and Research (OPR) released a Technical Advisory on Evaluating Transportation Impacts in CEQA (December of 2018) (Technical Advisory). (8) Based on OPR’s Technical Advisory specific procedures for complying with the new CEQA requirements for VMT analysis the City of Fontana adopted Traffic Impact Analysis Guidelines for Vehicle Miles Traveled and Level of Service Assessment (City Guidelines), which documents the City’s VMT analysis methodology and approved impact thresholds. The VMT screening evaluation presented in this report has been developed based on the adopted City Guidelines. (1) The City Guidelines identify that the SBCTA VMT Screening Tool (Screening Tool) is utilized to assess project VMT screening criteria. The Screening Tool uses the project’s assessor’s parcel number (APN) to determine if its location meets one or more of the VMT screening thresholds for land use projects. 7.1 PROJECT SCREENING The City Guidelines provides information on appropriate screening thresholds that can be used to identify when a proposed land use project is anticipated to result in a less than significant impact without conducting a more detailed project-level assessment. Screening thresholds are broken into the following four steps: • Step 1: Transit Priority Area (TPA) Screening • Step 2: Low VMT Area Screening • Step 3: Low Project Type Screening • Step 4: Project net daily trips less than 500 ADT 7.1.1 STEP 1: TPA SCREENING Consistent with guidance identified in the City Guidelines, projects located within a Transit Priority Area (TPA) (i.e., within ½ mile of an existing “major transit stop”1 or an existing stop along a “high-quality transit corridor”2) may be presumed to have a less than significant impact absent substantial evidence to the contrary. However, the presumption may NOT be appropriate if a project: • Has a Floor Area Ratio (FAR) of less than 0.75; 1 Pub. Resources Code, § 21064.3 (“‘Major transit stop’ means a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.”). 2 Pub. Resources Code, § 21155 (“For purposes of this section, a high-quality transit corridor means a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.”). Fontana Corporate Center Traffic Study 14102-02 TS Report REV 56 • Includes more parking for use by residents, customers, or employees of the project than required by the jurisdiction (if the jurisdiction requires the project to supply parking); • Is inconsistent with the applicable Sustainable Communities Strategy (as determined by the lead agency, with input from the Metropolitan Planning Organization); or • Replaces affordable residential units with a smaller number of moderate- or high-income residential units. Based on the Screening Tool results presented in Attachment A, the Project site is not located within ½ mile of an existing major transit stop, or along a high-quality transit corridor. TPA screening criteria is not met. 7.1.2 STEP 2: LOW VMT AREA SCREENING As described in the City Guidelines, “residential and office projects located within a low VMT generating area may be presumed to have a less than significant impact absent substantial evidence to the contrary. In addition, other employment-related and mixed-use land use projects may qualify for the use of screening if the project can reasonably be expected to generate VMT per resident, per worker, or per service population that is similar to the existing land uses in the low VMT area.” The Screening Tool uses the sub-regional SBTAM to measure VMT performance within individual traffic analysis zones (TAZ’s) within the City. The Project’s physical location based on parcel number is selected in the Screening Tool to determine project generated VMT as compared to the City’s threshold. The parcel containing the proposed Project was selected and the Screening Tool was run for the Production/Attraction (PA) VMT per service population measure of VMT. The Project is not located within a low VMT generating zone as compared to the City threshold of 15% below baseline County of San Bernardino PA VMT per service population (see Appendix 7.1). Low VMT Area screening criteria is not met. 7.1.3 STEP 3: LOW PROJECT TYPE SCREENING City Guidelines state that local serving retail projects less than 50,000 square feet may be presumed to have a less than significant impact. In addition to local serving retail, other local serving land uses such as public facilities, day care centers, gas stations, etc. would tend to provide local services and result in reducing overall VMT. Project Type screening criteria is not met. 7.1.4 STEP 4: PROJECT NET DAILY TRIPS LESS THAN 500 ADT SCREENING Identified in City Guidelines, Projects that generate fewer than 500 ADT would not cause a substantial increase in the total citywide or regional VMT and are therefore presumed to have less than significant impact on VMT. Trips generated by the Project’s proposed land use have been estimated based on trip generation rates collected by the ITE Trip Generation Manual. (2) The existing land use has been estimated to generate 163 vehicle trip-ends per day. Whereas the Fontana Corporate Center Traffic Study 14102-02 TS Report REV 57 proposed Project is estimated to generate 622 vehicle trip-ends per day. Resulting in a net new increase of 459 vehicle trip-ends per day, which would not exceed the City’s screening threshold of 500 ADT. Project net daily trips less than 500 ADT screening criteria is met. 7.2 CONCLUSION Based on our findings, the Project was found to meet the project net daily trips less than 500 ADT screening criteria. Therefore, the Project would result in a less than significant impact for VMT; no further VMT analysis required. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 58 This Page Intentionally Left Blank Fontana Corporate Center Traffic Study 14102-02 TS Report REV 59 8 REFERENCES 1. City of Fontana Public Works Department. Traffic Impact Analysis (TIA) Guidelines for Vehicle Miles Traveled (VMT) and Level of Service Assessment. Fontana : s.n., October 21, 2020. 2. Institute of Transportation Engineers (ITE). Trip Generation Manual. 10th Edition. 2017. 3. WSP. High Cube Warehouse Trip Generation Study. January 29, 2019. 4. San Bernardino Associated Governments. Congestion Management Program for County of San Bernardino. County of San Bernardino : s.n., Updated June 2016. 5. Transportation Research Board. Highway Capacity Manual (HCM). 6th Edition. s.l. : National Academy of Sciences, 2016. 6. California Department of Transportation. California Manual on Uniform Traffic Control Devices (MUTCD). [book auth.] California Department of Transportation. California Manual on Uniform Traffic Control Devices (CAMUTCD). 2017. 7. Institute of Transportation Engineers. Trip Generation Manaul Supplement. February 2020. 8. Office of Planning and Research. Technical Advisory on Evaluating Transportation Impacts in CEQA. State of California : s.n., December 2018. 9. San Bernardino County Transportation Authority (SBCTA). Recommended Traffic Impact Analysis Guidelines for Vehicle Miles Traveled and Level of Service Assessment. February 2020. 10. Southern California Association of Governments. Employment Density Study. October 2001. Fontana Corporate Center Traffic Study 14102-02 TS Report REV 60 This Page Intentionally Left Blank Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 1.1:    APPROVED TRAFFIC STUDY SCOPING AGREEMENT     Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank     Traffic Impact Analysis -14-Al 2008 Preparation Guide This letter acknowledges the Riverside County Transportation Department requirements for traffic impact analysis of the following project. The analysis must follow the Riverside County Transportation Department Traffic Study Guidelines dated February 2005. Case No. (i.e. TR, PM, CUP, PP) Related Cases - SP No. EIR No. GPA No. CZ No. Project Name: Project Address: Project Description: Consultant Developer Name: Address: Telephone: Fax: A. Trip Generation Source: (ITE 7th Edition or other) Current GP Land Use Proposed Land Use Current Zoning Proposed Zoning Current Trip Generation Proposed Trip Generation In Out Total In Out Total AM Trips PM Trips Internal Trip Allowance Yes No (% Trip Discount) Pass-By Trip Allowance Yes No (% Trip Discount) A trip discount is allowed for appropriate land uses . The trips at adjacent study area intersections and project driveways shall be indicated on a report figure. B.Trip Geographic Distribution:N % S % E % W % (attach exhibit for detailed assignment) C. Background Traffic Phase Year(s) _________________ Annual Ambient Growth Rate: % Other area projects to be analyzed: Model/Forecast methodology tment requirements for traffic he Riverside County Transportation This letter acknowledges the City of Fontana Engineering Department requirements for traffic impact analysis of the following project. The analysis must follow the SBCTA Congestion Management Plan (CMP) Guidelines Updated 2016. 1.1-1 Traffic Impact Analysis -5- Preparation Guide D. Study intersections: 1. 2. 3. 4. 5. E. Study Roadway Segments: 1. 2. 3. 4. 5. E. Other Jurisdictional Impacts Is this project within a City’s Sphere of Influence or one-mile radius of City boundaries? Yes No If so, name of City Jurisdiction: F. Site Plan (please attach reduced copy) G. Specific issues to be addressed in the Study (in addition to the standard analysis described in the Guideline)(To be filled out by Transportation Department) H. Existing Conditions Traffic count data must be new or recent. Provide traffic count dates if using other than new counts. Date of counts______________________________________________________________________ NOTE* Traffic Study Submittal Form and appropriate fee must be submitted with, or prior to submittal of this form. Transportation Department staff will not process the Scoping Agreement prior to receipt of the fee. Recommended by: ______________________________ _________ Consultant’s Representative Date Scoping Agreement Submitted on _____________ Revised on ___________________ Approved Scoping Agreement: 6. 7. 8. 9. 10. 6. 7. 8. 9. 10. 1.1-2 14102-02 TA Scope REV August 31, 2021 Mr. Mahmoud Khodr City of Fontana 8353 Sierra Avenue Fontana, CA 92335 SUBJECT: SCOPING AGREEMENT FOR THE FONTANA CORPORATE CENTER TRAFFIC ASSESSMENT Dear Mr. Mahmoud Khodr: The firm of Urban Crossroads, Inc. is pleased to submit this letter documenting the recommended Scope of Work for the traffic assessment in support of the proposed Fontana Corporate Center development (Project), which is located north of Slover Avenue and west of Business Drive in the City of Fontana. Exhibit 1 depicts the location of the proposed Project in relation to the existing roadway network. It is our understanding that the Project is to amend the existing Fontana Gateway Specific Plan to develop 2 warehouses totaling 355,370 square feet. Building 1 to the east is to consist of 212,677 square feet of warehouse use and Building 2 to the west is to consist of 142,693 square feet of warehousing use. A preliminary site plan for the proposed Project is shown on Exhibit 2. As indicated on Exhibit 2, access to the Project site will be provided to Slover Avenue via two driveways for each building. Driveway 1 is proposed to restrict access to right-in/right-out access only based on its proximity to Commerce Way, Driveway 2 would prohibit left-out access based on its proximity to the railroad, and Driveway 3 would prohibit left-in access only also based on its proximity to the adjacent railroad. Driveway 4 would accommodate full access. Our goal is to obtain comments from City of Fontana staff, to ensure that the traffic assessment fully addresses the potential impacts of the proposed Project. The remainder of this letter describes the draft proposed analysis methodology, project trip generation, trip distribution, and project traffic assignment/project trips on the surrounding roadway network, which have been used to establish the draft proposed project study area and analysis locations. STUDY AREA The purpose of this traffic analysis is to evaluate the peak hour operations of study area intersections based on the proposed distribution of Project traffic. Exhibit 3 presents the proposed study area intersection analysis locations (and listed on Table 1). The study area intersections will be evaluated using the HCM 6th Edition methodology. 1.1-3 Mr. Mahmoud Khodr City of Fontana August 31, 2021 Page 2 of 8 14102-02 TA Scope REV TABLE 1: STUDY AREA INTERSECTIONS ANALYSIS SCENARIOS The analysis of peak hour operations at study area intersections will be provided for the following analysis scenarios: Existing (2021) Conditions Opening Year Cumulative (2023) Without Project Conditions Opening Year Cumulative (2023) With Project Conditions EXISTING COUNT DATA The Fontana Unified School District is back in session for the 2021-2022 school year as of August 6, 2021. As such, new traffic counts will be conducted for the study area intersections as identified in Table 1. Existing intersection turning movement counts will be collected at the study area intersection locations during the weekday AM (7-9AM) and weekday PM (4-6PM). Existing (2021) traffic counts will be compared to historic count data for the purposes of determining if any further adjustments are necessary to the baseline traffic. If applicable, an ambient growth rate of 1.16 percent per year is proposed to adjust the historic count data to the current baseline year (2021). The growth rate is based on the average growth for population (1.06% per year), households (1.43% per year), and employment (0.97% per year) between 2016 and 2045 in the 2020 SCAG RTP/SCS for the City of Fontana (Connect SoCal, adopted September 3, 2020). TRIP GENERATION EXISTING USE The site is currently occupied by a plant for a manufacturer of prefabricated building systems located at 13592 Slover Avenue in the City of Fontana. As such, for the purposes of this assessment, a credit has been taken for the trips associated with the existing uses. Traffic counts were collected at the driveways for the existing use on June 9th and 10th, 2021. A summary of the count data collected is provided in Attachment A. Table A-1 in Attachment A provides a detailed summary of the counts collected at each driveway location. Table 2 summarizes the total trip generation for the existing site # Intersection Jurisdiction 1 Commerce Wy. & Slover Av.Fontana 2 Driveway 1 & Slover Av.Fontana 3 Driveway 2 & Slover Av.Fontana 4 Driveway 3 & Slover Av.Fontana 5 Driveway 4/Business Dr. & Slover Av. Fontana 6 Mulberry Av. & Slover Av.Fontana 1.1-4 Mr. Mahmoud Khodr City of Fontana August 31, 2021 Page 3 of 8 14102-02 TA Scope REV (accounting for all driveways). As shown on Table 2, the existing use generates 163 two-way trips per day, with 6 trips during the AM peak hour and 8 trips during the PM peak hour. TABLE 2: EXISTING SURVEY DATA FOR EXISTING USE Land Use In Out Total In Out Total Daily Day 1: June 9, 2021 Passenger Cars: 6 1 7 0 8 8 153 2-axle Trucks: 0 0 0 0 0 0 6 3-axle Trucks: 0 0 0 0 0 0 4 4+-axle Trucks: 0 0 0 0 0 0 6 Total Truck Trips: 0 0 0 0 0 0 16 Total Trips1 6 1 7 0 8 8 169 Day 2: June 10, 2021 Passenger Cars: 3 0 3 1 7 8 144 2-axle Trucks: 0 0 0 0 0 0 10 3-axle Trucks: 0 0 0 0 0 0 0 4+-axle Trucks: 1 1 2 0 0 0 2 Total Truck Trips: 1 1 2 0 0 0 12 Total Trips1 4 1 5 1 7 8 156 2-Day Average Trip Generation: Passenger Cars: 5 1 5 1 8 8 149 2-axle Trucks: 0 0 0 0 0 0 8 3-axle Trucks: 0 0 0 0 0 0 2 4+-axle Trucks: 1 1 1 0 0 0 4 Total Truck Trips: 1 1 1 0 0 0 14 Total Trips1 5 1 6 1 8 8 163 * Note: data collected on June 9 and 10, 2021. 1 Total Trips = Passenger Cars + Truck Trips. 2 Trip generation represents the sum of all driveways, by day. AM Peak Hour PM Peak Hour 1.1-5 Mr. Mahmoud Khodr City of Fontana August 31, 2021 Page 4 of 8 14102-02 TA Scope REV PROPOSED PROJECT The Project is proposing to redevelop the site with 2 warehouse buildings totaling 355,370 square feet (see Exhibit 1). Vehicular access to the site would be provided via two driveways for each building along Slover Avenue. Trip generation represents the amount of traffic that is attracted and produced by a development and is based upon the specific land uses planned for a given project. In order to develop the traffic characteristics of the proposed project, trip-generation statistics published in the Institute of Transportation Engineers (ITE) Trip Generation Manual (10th Edition, 2017) was used to estimate the trip generation. Trip generation rates for the Project are shown in Table 3. TABLE 3: TRIP GENERATION RATES The trip generation summary for the Project in actual vehicles is shown on Table 4. As shown on Table 4, the Project is anticipated to generate a total of 622 two-way trips per day with 59 AM peak hour trips and 68 PM peak hour trips. ITE LU AM Peak Hour PM Peak Hour Land Use1 Units2 Code In Out Total In Out Total Actual Vehicle Trip Generation Rates: Warehousing3 TSF 150 0.131 0.039 0.170 0.051 0.139 0.190 1.740 Passenger Cars 0.114 0.034 0.148 0.044 0.118 0.162 1.270 2-Axle Trucks 0.003 0.001 0.004 0.001 0.003 0.005 0.078 3-Axle Trucks 0.004 0.001 0.005 0.002 0.004 0.006 0.097 4+-Axle Trucks 0.011 0.003 0.014 0.005 0.013 0.018 0.294 Passenger Car Equivalent (PCE) Trip Generation Rates:4 Warehousing3 TSF 150 0.131 0.039 0.170 0.051 0.139 0.190 1.740 Passenger Cars 0.114 0.034 0.148 0.044 0.118 0.162 1.270 2-Axle Trucks (PCE = 2.0)0.004 0.001 0.006 0.002 0.005 0.007 0.118 3-Axle Trucks (PCE = 2.5)0.007 0.002 0.009 0.003 0.009 0.012 0.194 4+-Axle Trucks (PCE = 3.0)0.032 0.010 0.042 0.014 0.039 0.054 0.882 1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Tenth Edition (2017). 2 TSF = thousand square feet 3 Vehicle Mix Source: ITE Trip Generation Handbook Supplement (2020), Appendix C. Truck Mix: South Coast Air Quality Management District’s (SCAQMD) recommended truck mix, by axle type. Normalized % - Without Cold Storage: 16.7% 2-Axle trucks, 20.7% 3-Axle trucks, 62.6% 4-Axle trucks. 4 PCE factors per City's Guidelines: 2-axle = 2.0; 3-axle = 2.5; 4+-axle = 3.0. Daily 1.1-6 Mr. Mahmoud Khodr City of Fontana August 31, 2021 Page 5 of 8 14102-02 TA Scope REV TABLE 4: TRIP GENERATION SUMMARY (ACTUAL VEHICLES) The trip generation summary for the Project in passenger car equivalent (PCE) is shown on Table 5. As shown on Table 5, the Project is anticipated to generate a total of 878 PCE two-way trips per day with 72 PCE AM peak hour trips and 83 PCE PM peak hour trips. TABLE 5: TRIP GENERATION SUMMARY (PCE) TRIP GENERATION COMPARISON Table 6 shows the trip generation comparison and the resulting net change in trips between the existing use and the proposed Project. As shown on Table 6, the proposed Project would result in a net increase of 697 two-way PCE trips per day and net increase of 60 PCE AM peak hour trips and 74 PCE PM peak hour trips. Land Use Quantity Units 1 In Out Total In Out Total Daily Actual Vehicles: Warehousing 355.370 TSF Passenger Cars: 40 12 52 15 42 57 452 2-axle Trucks: 1 0 1 0 1 1 28 3-axle Trucks: 1 0 1 1 2 3 36 4+-axle Trucks: 4 1 5 2 5 7 106 Total Trucks:6 1 7 3 8 11 170 Total Trips (Actual Vehicles)2 46 13 59 18 50 68 622 1 TSF = thousand square feet 2 Total Trips = Passenger Cars + Truck Trips. AM Peak Hour PM Peak Hour Land Use Quantity Units 1 In Out Total In Out Total Daily Passenger Car Equivalent (PCE): Warehousing 355.370 TSF Passenger Cars: 40 12 52 15 42 57 452 2-axle Trucks: 2 0 2 1 2 3 42 3-axle Trucks: 3 1 4 1 3 4 70 4+-axle Trucks: 11 3 14 5 14 19 314 Total Trucks (PCE):16 4 20 7 19 26 426 Total Trips (PCE)2 56 16 72 22 61 83 878 1 TSF = thousand square feet 2 Total Trips = Passenger Cars + Truck Trips. AM Peak Hour PM Peak Hour 1.1-7 Mr. Mahmoud Khodr City of Fontana August 31, 2021 Page 6 of 8 14102-02 TA Scope REV TABLE 6: TRIP GENERATION COMPARISON According to the City’s Traffic Impact Analysis Guidelines, a focused traffic analysis would be required if the AM or PM peak hour trip generation is between 50 and 100 vehicle trips. TRIP DISTRIBUTION Trip distribution is the process of identifying the probable destinations, directions, or traffic routes that will be utilized by Project traffic. The potential interaction between the planned land uses and surrounding regional access routes are considered, to identify the route where the Project traffic would distribute. Exhibits 4 and 5 illustrate the passenger car and truck trip distribution patterns through the study area intersections, respectively. LEVEL OF SERVICE (LOS) CRITERIA The City of Fontana has set the goal for acceptable LOS as LOS C or better, wherever feasible (see Goal #1, Policy #12 of the City of Fontana General Plan Circulation Element). However, in some instances maintaining the LOS C threshold within a built environment may require extensive roadway widening that could affect existing uses, property rights and substantial costs associated with implementing these improvements. In the event that the improvements required to maintain LOS C is determined to be infeasible, the City of Fontana recognizes that LOS D may be considered the worst acceptable level of service in urbanized areas of the City. Trip Generation Comparison Quantity Units1 In Out Total In Out Total Daily Proposed Project 355.370 TSF Passenger Cars: 40 12 52 15 42 57 452 Total Truck Trips (PCE): 16 4 20 7 19 26 426 Total Trips2 56 16 72 22 61 83 878 Existing Use Passenger Cars: 5 1 6 1 8 9 149 Total Truck Trips (PCE): 3 3 6 0 0 0 32 Total Trips2 8 4 12 1 8 9 181 Variance Passenger Cars: 35 11 46 14 34 48 303 Total Truck Trips (PCE): 13 1 14 7 19 26 394 Total Trips2 48 12 60 21 53 74 697 1 TSF = thousand square feet 2 Total Trips = Passenger Cars + Truck Trips. AM Peak Hour PM Peak Hour 1.1-8 Mr. Mahmoud Khodr City of Fontana August 31, 2021 Page 7 of 8 14102-02 TA Scope REV DEFICIENCY CRITERIA – INTERSECTIONS For the intersections that lie within the City of Fontana, determination of whether the Project has an adverse effect on intersection operations will be based on a comparison of without and with project levels of service. A deficiency occurs if project traffic increases the average delay at an intersection by more than the thresholds identified on Table 7. The thresholds for LOS A, B, and C do not apply to projects consistent with the General Plan. The deficiency criteria will be applied to Opening Year Cumulative traffic conditions to determine off-site construct obligations and will recommend improvements needed to reduce delays to pre-project conditions (as applicable). TABLE 7: INTERSECTION DEFICIENCY CRITERIA AMBIENT GROWTH Consistent with other studies performed in the area, an ambient growth rate of 1.16% per year is proposed for the study area intersections to approximate background traffic growth not identified by nearby cumulative development projects. The rate will be compounded over a two-year period (i.e., 1.01162years = 1.0233 or 2.33% for 2023). SPECIAL ISSUES The following special issues will also be addressed as part of the focused traffic assessment: Conduct traffic signal warrant analysis for all future unsignalized study area intersections. Provide a queuing analysis for Project driveways and the site adjacent intersections of Business Drive at Slover Avenue and Commerce Way at Slover Avenue. Vehicle Miles Traveled (VMT) analysis will be addressed under separate cover. However, findings will be summarized in the traffic study. Pre-Project LOS Deficiency Criteria1 LOS A/B 10.0 Seconds LOS C 8.0 Seconds LOS D 5.0 Seconds LOS E 2.0 Seconds LOS F 1.0 Second 1 Increase in delay. 1.1-9 Mr. Mahmoud Khodr City of Fontana August 31, 2021 Page 8 of 8 14102-02 TA Scope REV OPEN ITEMS – CUMULATIVE DEVELOPMENT PROJECTS We request that City staff provide a list/map of cumulative projects for inclusion in the traffic study. SIGNAL TIMING It is requested that the City provide any signal timing that should be considered for signalized study area intersections within the City. The analysis findings and recommendations (if applicable) will be presented in a draft report for the City’s review. If you have any questions, please contact me directly at (949) 861-0177. Respectfully submitted, Charlene So, PE Associate Principal 1.1-10 14102-02 TA Scope REV EXHIBIT 1: LOCATION MAP 1.1-11 14102-02 TA Scope REV EXHIBIT 2:PRELIMINARY SITE PLAN 1.1-12 EXHIBIT 3: STUDY AREA 1.1-13 14102-02 TA Scope REV EXHIBIT 4:PROJECT (PASSENGER CAR)TRIP DISTRIBUTION 1.1-14 14102-02 TA Scope REV EXHIBIT 5:PROJECT (TRUCK)TRIP DISTRIBUTION 1.1-15 This Page Intentionally Left Blank 1.1-16 Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 3.1:    EXISTING & HISTORICAL TRAFFIC COUNTS     Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank     T42321 DATE:LOCATION:PROJECT #:JN14102Thu, Sep 9, 21 NORTH & SOUTH:LOCATION #:1 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:0 1 0 0 1 0 1 2 0 1 2 0 0 0 0 0 0 0 0 0 7:00 AM 4 0 4 0 0 0 0 69 12 8 108 0 205 0 0 0 0 0 2 0 0 07:15 AM 5 0 1 0 0 0 0 64 8 7 111 0 196 0 0 0 0 0 0 0 0 07:30 AM 3 0 2 0 0 0 0 65 10 9 141 0 230 0 0 0 0 0 0 0 0 07:45 AM 7 0 4 0 0 0 0 74 7 14 145 0 251 0 0 0 0 0 0 0 0 08:00 AM 4 0 2 0 0 0 1 65 6 6 112 0 196 0 0 1 0 1 1 0 0 08:15 AM 4 0 3 0 0 0 0 71 5 3 96 0 182 0 0 0 0 0 2 0 1 0 8:30 AM 6 0 1 0 0 0 0 63 11 5 105 0 191 1 0 0 0 1 1 0 0 0 8:45 AM 3 0 2 0 0 0 0 65 6 4 76 0 156 0 0 0 0 0 2 0 0 0 VOLUMES 36 0 19 0 0 0 1 536 65 56 894 0 1,607 1 0 1 0 2 8 0 1 0APPROACH %65%0%35%0%0%0%0%89%11%6%94%0%APP/DEPART 55 /0 0 /122 602 /555 950 /930 0 BEGIN PEAK HRVOLUMES 19 0 11 0 0 0 0 272 37 38 505 0 882 2 0 0 0APPROACH %63%0%37%0%0%0%0%88%12%7%93%0%PEAK HR FACTOR 0.682 0.000 0.954 0.854 0.878 APP/DEPART 30 /0 0 /75 309 /283 543 /524 0 4:00 PM 8 0 11 0 0 0 0 151 4 2 151 0 327 0 0 0 0 0 7 0 0 04:15 PM 14 0 5 0 0 0 0 122 0 0 117 0 258 0 0 0 0 0 3 0 0 04:30 PM 10 0 8 0 0 0 0 158 3 0 146 0 325 0 0 0 0 0 7 0 0 04:45 PM 3 0 3 0 0 0 0 150 3 3 101 0 263 0 0 0 1 1 3 0 0 05:00 PM 10 0 8 0 0 0 0 151 4 0 142 0 315 0 0 0 0 0 6 0 1 05:15 PM 2 0 2 0 0 0 0 115 3 0 96 0 218 0 0 0 0 0 1 0 0 05:30 PM 4 0 0 0 0 0 0 88 3 1 98 0 194 0 0 0 0 0 0 0 0 05:45 PM 6 0 2 0 0 0 0 93 1 0 90 0 192 0 0 0 0 0 2 0 1 0VOLUMES57 0 39 0 0 0 0 1,028 21 6 941 0 2,092 0 0 0 1 1 29 0 2 0APPROACH %59%0%41%0%0%0%0%98%2%1%99%0%APP/DEPART 96 /0 0 /26 1,049 /1,068 947 /998 0 BEGIN PEAK HRVOLUMES 35 0 27 0 0 0 0 581 10 5 515 0 1,173 20 0 0 0 APPROACH %56%0%44%0%0%0%0%98%2%1%99%0% PEAK HR FACTOR 0.816 0.000 0.918 0.850 0.897 APP/DEPART 62 /0 0 /14 591 /609 520 /550 0 Commerce NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Commerce E SIDE W SIDE S SIDE N SIDE TOTAL E SIDE W SIDE S SIDE N SIDE TOTAL ES WS SS NS TOTAL7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RTOR INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Fontana CommerceSlover U-TURNS Commerce Commerce Slover Slover BICYCLE CROSSINGS AMPMAM7:00 AM PM4:00 PM ALL PED AND BIKE PEDESTRIAN CROSSINGS Add U-Turns to Left Turns 3.1-1 0 0 0 0 TOTAL 0 0 0 0 0 PM 0 0 0 0 0 AM 0 950 947 1,897 1,928 998 930 0 0 0 894 941 1,835 TOTALPMAM56 6 62 1 0 1 AMPMTOTAL1,564 1,028 536 86 21 65 555 1,068 1,623 1,651 1,049 602 122 AM 36 0 19 55 26 PM 57 0 39 96 148 TOTAL 93 0 58 151 0 0 0 0 TOTAL 0 0 0 0 0 PM 0 0 0 0 0 AM 0 543 520 1,063 1,074 550 524 0 0 0 505 515 1,020 TOTALPMAMAM 7:00 AM 8:45 AM 38 5 43 0 0 0 #N/A AMPMTOTAL853 581 272 PM 4:00 PM 3:45 PM 47 10 37 283 609 892 900 591 309 75 AM 19 0 11 30 14 PM 35 0 27 62 89 Total 54 0 38 92 Commerce AimTD LLC TURNING MOVEMENT COUNTS Commerce SloverSloverFontana JN14102 ALL HOURS Commerce Commerce SloverSloverPEAK HOUR 3.1-2 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH:Commerce LOCATION #: 1 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 1:NOTES:AM ▲ PASSENGER PM N VEHICLES MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010120120 0000 7:00 AM 1 0 2 0 0 0 0 49 10 7 78 0 147 00000 10007:15 AM 1 0 1 0 0 0 0 42 4 5 79 0 132 00000 00007:30 AM 0 0 1 0 0 0 0 39 8 6 94 0 148 00000 00007:45 AM 4 0 3 0 0 0 0 53 6 12 103 0 181 00000 00008:00 AM 1 0 1 0 0 0 0 43 4 4 66 0 119 00000 10008:15 AM 1 0 2 0 0 0 0 31 1 2 58 0 95 00000 20008:30 AM 2 0 1 0 0 0 0 32 3 2 54 0 94 00000 10008:45 AM 0 0 2 0 0 0 0 32 4 2 46 0 86 00000 2000VOLUMES10 0 13 0 0 0 0 321 40 40 578 0 1,002 0000 0 7000 APPROACH % 43% 0% 57% 0% 0% 0% 0% 89% 11% 6% 94% 0% APP/DEPART 23 /0 0 /80 361 /334 618 /588 0 BEGIN PEAK HR VOLUMES 6 0 7 0 0 0 0 183 28 30 354 0 608 1000 APPROACH % 46% 0% 54% 0% 0% 0% 0% 87% 13% 8% 92% 0% PEAK HR FACTOR 0.464 0.000 0.894 0.835 0.840 APP/DEPART 13 /0 0 /58 211 /190 384 /360 0 4:00 PM 6 0 8 0 0 0 0 126 2 1 114 0 257 00000 50004:15 PM 11 0 5 0 0 0 0 91 0 0 93 0 200 00000 30004:30 PM 8 0 6 0 0 0 0 127 2 0 115 0 258 00000 60004:45 PM 3 0 2 0 0 0 0 115 2 2 77 0 201 00011 20005:00 PM 6 0 7 0 0 0 0 118 0 0 115 0 246 00000 50005:15 PM 2 0 2 0 0 0 0 80 2 0 74 0 160 00000 10005:30 PM 3 0 0 0 0 0 0 60 1 0 70 0 134 00000 00005:45 PM 1 0 2 0 0 0 0 69 0 0 63 0 135 00000 2000VOLUMES40 0 32 0 0 0 0 786 9 3 721 0 1,591 0001 1 24 0 0 0APPROACH % 56% 0% 44% 0% 0% 0% 0% 99% 1% 0% 100% 0%APP/DEPART 72 /0 0 /11 795 /819 724 /761 0 BEGIN PEAK HRVOLUMES 28 0 21 0 0 0 0 459 6 2 399 0 916 16 0 0 0APPROACH % 57% 0% 43% 0% 0% 0% 0% 99% 1% 0% 99% 0%PEAK HR FACTOR 0.766 0.000 0.901 0.874 0.888 APP/DEPART 49 /0 0 /8 465 /481 402 /427 0 Commerce NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Commerce RTORU-TURNS Commerce Commerce Slover Slover AM7:00 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-3 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Commerce LOCATION #: 1 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 2:NOTES:AM ▲ 2-AXLE PM N WORK MD ◄ W E ►VEHICLES/OTHER S TRUCKS OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010120120 0000 7:00 AM 1 0 2 0 0 0 0 0 1 1 9 0 14 00000 10007:15 AM 0 0 0 0 0 0 0 7 2 0 8 0 17 00000 0000 7:30 AM 1 0 0 0 0 0 0 5 0 2 11 0 19 00000 0000 7:45 AM 1 0 0 0 0 0 0 6 1 0 7 0 15 00000 00008:00 AM 0 0 1 0 0 0 0 5 1 1 11 0 19 00000 00008:15 AM 1 0 0 0 0 0 0 9 2 1 17 0 30 00000 00108:30 AM 0 0 0 0 0 0 0 7 1 3 11 0 22 00000 0000 8:45 AM 0 0 0 0 0 0 0 12 0 1 8 0 21 00000 0000 VOLUMES 4 0 3 0 0 0 0 51 8 9 82 0 157 0000 0 1010APPROACH % 57% 0% 43% 0% 0% 0% 0% 86% 14% 10% 90% 0%APP/DEPART 7 /0 0 /17 59 /54 91 /86 0 BEGIN PEAK HR VOLUMES 3 0 2 0 0 0 0 18 4 3 35 0 65 1000 APPROACH % 60% 0% 40% 0% 0% 0% 0% 82% 18% 8% 92% 0%PEAK HR FACTOR 0.417 0.000 0.611 0.731 0.855 APP/DEPART 5 /0 0 /7 22 /20 38 /38 0 4:00 PM 1 0 1 0 0 0 0 4 0 0 11 0 17 00000 1000 4:15 PM 0 0 0 0 0 0 0 11 0 0 8 0 19 00000 0000 4:30 PM 1 0 1 0 0 0 0 10 0 0 9 0 21 00000 00004:45 PM 0 0 0 0 0 0 0 6 0 1 6 0 13 00000 00005:00 PM 2 0 0 0 0 0 0 7 2 0 9 0 20 00000 00105:15 PM 0 0 0 0 0 0 0 7 0 0 3 0 10 00000 0000 5:30 PM 0 0 0 0 0 0 0 6 0 0 5 0 11 00000 0000 5:45 PM 0 0 0 0 0 0 0 4 0 0 6 0 10 00000 0000VOLUMES4 0 2 0 0 0 0 55 2 1 57 0 121 0000 0 1010APPROACH % 67% 0% 33% 0% 0% 0% 0% 96% 4% 2% 98% 0%APP/DEPART 6 /0 0 /3 57 /57 58 /61 0 BEGIN PEAK HR VOLUMES 2 0 2 0 0 0 0 31 0 1 34 0 70 1000APPROACH % 50% 0% 50% 0% 0% 0% 0% 100% 0% 3% 97% 0%PEAK HR FACTOR 0.500 0.000 0.705 0.795 0.833 APP/DEPART 4 /0 0 /1 31 /33 35 /36 0 Commerce NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Commerce RTORU-TURNS Commerce Commerce Slover Slover AM7:00 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-4 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Commerce LOCATION #: 1 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 3:NOTES:AM ▲ 3-AXLE PM NTRUCKSMD◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010120120 0000 7:00 AM 1 0 0 0 0 0 0 6 0 0 5 0 12 00000 00007:15 AM 0 0 0 0 0 0 0 5 1 1 6 0 13 00000 0000 7:30 AM 1 0 0 0 0 0 0 6 0 0 7 0 14 00000 0000 7:45 AM 0 0 0 0 0 0 0 6 0 0 7 0 13 00000 00008:00 AM 0 0 0 0 0 0 1 4 0 0 10 0 15 00101 00008:15 AM 0 0 0 0 0 0 0 10 0 0 5 0 15 00000 00008:30 AM 1 0 0 0 0 0 0 11 0 0 10 0 22 00000 0000 8:45 AM 0 0 0 0 0 0 0 7 0 0 5 0 12 00000 0000 VOLUMES 3 0 0 0 0 0 1 55 1 1 55 0 116 0010 1 0000APPROACH % 100% 0% 0% 0% 0% 0% 2% 96% 2% 2% 98% 0%APP/DEPART 3 /0 0 /2 57 /55 56 /59 0 BEGIN PEAK HR VOLUMES 2 0 0 0 0 0 0 23 1 1 25 0 52 0000 APPROACH % 100% 0% 0% 0% 0% 0% 0% 96% 4% 4% 96% 0%PEAK HR FACTOR 0.500 0.000 1.000 0.929 0.929 APP/DEPART 2 /0 0 /2 24 /23 26 /27 0 4:00 PM 0 0 0 0 0 0 0 5 1 1 6 0 13 00000 0000 4:15 PM 0 0 0 0 0 0 0 3 0 0 1 0 4 00000 0000 4:30 PM 0 0 1 0 0 0 0 9 0 0 7 0 17 00000 10004:45 PM 0 0 0 0 0 0 0 3 0 0 0 0 3 00000 00005:00 PM 0 0 0 0 0 0 0 4 0 0 7 0 11 00000 00005:15 PM 0 0 0 0 0 0 0 7 0 0 6 0 13 00000 0000 5:30 PM 0 0 0 0 0 0 0 3 0 0 6 0 9 00000 0000 5:45 PM 0 0 0 0 0 0 0 1 0 0 5 0 6 00000 0000VOLUMES0 0 1 0 0 0 0 35 1 1 38 0 76 0000 0 1000APPROACH % 0% 0% 100% 0% 0% 0% 0% 97% 3% 3% 97% 0%APP/DEPART 1 /0 0 /2 36 /36 39 /38 0 BEGIN PEAK HR VOLUMES 0 0 1 0 0 0 0 20 1 1 14 0 37 1000APPROACH % 0% 0% 100% 0% 0% 0% 0% 95% 5% 7% 93% 0%PEAK HR FACTOR 0.250 0.000 0.583 0.536 0.544 APP/DEPART 1 /0 0 /2 21 /21 15 /14 0 Commerce NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Commerce RTORU-TURNS Commerce Commerce Slover Slover AM7:00 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-5 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Commerce LOCATION #: 1 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 4:NOTES:AM ▲ 4 OR MORE PM N AXLE MD ◄ W E ► TRUCKS OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010120120 0000 7:00 AM 1 0 0 0 0 0 0 14 1 0 16 0 32 00000 0000 7:15 AM 4 0 0 0 0 0 0 10 1 1 18 0 34 00000 00007:30 AM 1 0 1 0 0 0 0 15 2 1 29 0 49 00000 00007:45 AM 2 0 1 0 0 0 0 9 0 2 28 0 42 00000 00008:00 AM 3 0 0 0 0 0 0 13 1 1 25 0 43 00000 0000 8:15 AM 2 0 1 0 0 0 0 21 2 0 16 0 42 00000 0000 8:30 AM 3 0 0 0 0 0 0 13 7 0 30 0 53 10001 00008:45 AM 3 0 0 0 0 0 0 14 2 1 17 0 37 00000 0000VOLUMES19 0 3 0 0 0 0 109 16 6 179 0 332 1000 1 0000APPROACH % 86% 0% 14% 0% 0% 0% 0% 87% 13% 3% 97% 0% APP/DEPART 22 /0 0 /23 125 /112 185 /197 0 BEGIN PEAK HRVOLUMES 8 0 2 0 0 0 0 48 4 4 91 0 157 0000APPROACH % 80% 0% 20% 0% 0% 0% 0% 92% 8% 4% 96% 0%PEAK HR FACTOR 0.625 0.000 0.765 0.792 0.801 APP/DEPART 10 /0 0 /8 52 /50 95 /99 0 4:00 PM 1 0 2 0 0 0 0 16 1 0 20 0 40 00000 10004:15 PM 3 0 0 0 0 0 0 17 0 0 15 0 35 00000 00004:30 PM 1 0 0 0 0 0 0 12 1 0 15 0 29 00000 00004:45 PM 0 0 1 0 0 0 0 26 1 0 18 0 46 00000 1000 5:00 PM 2 0 1 0 0 0 0 22 2 0 11 0 38 00000 1000 5:15 PM 0 0 0 0 0 0 0 21 1 0 13 0 35 00000 00005:30 PM 1 0 0 0 0 0 0 19 2 1 17 0 40 00000 00005:45 PM 5 0 0 0 0 0 0 19 1 0 16 0 41 00000 0010VOLUMES13 0 4 0 0 0 0 152 9 1 125 0 304 0000 0 3010 APPROACH % 76% 0% 24% 0% 0% 0% 0% 94% 6% 1% 99% 0% APP/DEPART 17 /0 0 /10 161 /156 126 /138 0 BEGIN PEAK HRVOLUMES 5 0 3 0 0 0 0 71 3 0 68 0 150 2000APPROACH % 63% 0% 38% 0% 0% 0% 0% 96% 4% 0% 100% 0% PEAK HR FACTOR 0.667 0.000 0.685 0.850 0.815 APP/DEPART 8 /0 0 /3 74 /74 68 /73 0 Commerce NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Commerce RTORU-TURNS Commerce Commerce Slover Slover AM7:00 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-6 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Commerce LOCATION #: 1 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 5:NOTES:AM ▲ RV PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010120120 0000 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00007:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00008:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00008:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00005:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00005:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 Commerce NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Commerce RTORU-TURNS Commerce Commerce Slover Slover AM7:00 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-7 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Commerce LOCATION #: 1 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 6:NOTES:AM ▲ PM N BUSES MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010120120 0000 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00007:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00007:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00008:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00008:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00008:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HRVOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00004:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00005:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00005:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00005:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 Commerce NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Commerce RTORU-TURNS Commerce Commerce Slover Slover AM7:00 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-8 T42321 DATE:LOCATION:PROJECT #:JN14102Thu, Sep 9, 21 NORTH & SOUTH:LOCATION #:2 EAST & WEST:CONTROL:STOP N/S NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT 0 TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:0 1 0 0 1 0 0 2 0 0 2 0 0 0 0 0 X X X X 7:00 AM 2 0 2 0 0 0 3 48 9 12 116 2 194 0 0 1 1 2 0 0 0 07:15 AM 2 0 0 0 0 0 2 44 8 5 110 0 171 1 0 0 0 1 0 0 0 07:30 AM 3 0 2 0 0 1 1 53 15 18 156 0 249 0 0 0 0 0 0 0 0 07:45 AM 3 0 5 0 0 0 0 46 22 18 164 1 259 0 0 0 0 0 0 0 0 08:00 AM 8 0 4 0 0 0 1 53 10 19 101 0 196 0 0 0 0 0 0 0 0 08:15 AM 1 0 2 0 0 0 2 69 12 8 111 1 206 0 0 1 0 1 0 0 0 0 8:30 AM 3 0 8 0 0 0 0 61 7 9 108 0 196 0 0 0 0 0 0 0 0 0 8:45 AM 7 0 7 0 0 0 0 62 9 8 74 0 167 0 0 0 0 0 0 0 0 0 VOLUMES 29 0 30 0 0 1 9 436 92 97 940 4 1,638 1 0 2 1 4 0 0 0 0APPROACH %49%0%51%0%0%100%2%81%17%9%90%0%APP/DEPART 59 /11 1 /189 537 /467 1,041 /971 0 BEGIN PEAK HRVOLUMES 15 0 13 0 0 1 4 221 59 63 532 2 910 0 0 0 0APPROACH %54%0%46%0%0%100%1%78%21%11%89%0%PEAK HR FACTOR 0.583 0.250 0.855 0.816 0.878 APP/DEPART 28 /5 1 /122 284 /234 597 /549 0 4:00 PM 14 0 11 0 0 1 0 148 6 4 133 0 317 0 0 0 0 0 0 0 0 04:15 PM 8 0 17 1 0 2 0 135 6 2 103 0 274 0 0 0 0 0 0 0 0 04:30 PM 20 0 30 0 0 2 0 154 5 7 115 0 333 0 0 0 0 0 0 0 0 04:45 PM 4 0 13 0 0 0 0 156 5 1 101 0 280 0 0 0 0 0 0 0 0 05:00 PM 24 0 10 2 0 2 0 157 1 3 118 0 317 0 0 0 0 0 0 0 0 05:15 PM 6 0 7 1 0 0 0 129 3 4 88 0 238 0 0 0 0 0 0 0 0 05:30 PM 3 0 8 0 0 0 0 98 2 3 97 0 211 0 0 0 1 1 0 0 0 05:45 PM 3 0 5 0 0 1 0 91 2 4 85 0 191 0 0 0 0 0 0 0 0 0VOLUMES82 0 101 4 0 8 0 1,068 30 28 840 0 2,161 0 0 0 1 1 0 0 0 0APPROACH %45%0%55%33%0%67%0%97%3%3%97%0%APP/DEPART 183 /0 12 /57 1,098 /1,174 868 /930 0 BEGIN PEAK HRVOLUMES 56 0 70 3 0 6 0 602 17 13 437 0 1,204 0 0 0 0 APPROACH %44%0%56%33%0%67%0%97%3%3%97%0% PEAK HR FACTOR 0.630 0.563 0.961 0.821 0.904 APP/DEPART 126 /0 9 /30 619 /675 450 /499 0 Business NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Business E SIDE W SIDE S SIDE N SIDE TOTAL E SIDE W SIDE S SIDE N SIDE TOTAL ES WS SS NS TOTAL7:00 AM 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0 4:00 PM 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0 RTOR INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Fontana BusinessSlover U-TURNS Business Business Slover Slover BICYCLE CROSSINGS AMPMAM7:30 AM PM4:00 PM ALL PED AND BIKE PEDESTRIAN CROSSINGS Add U-Turns to Left Turns 3.1-9 13 9 0 4 TOTAL 11 12 8 0 4 PM 0 1 1 0 0 AM 11 1,041 868 1,909 1,901 930 971 4 0 4 940 840 1,780 TOTALPMAM97 28 125 9 0 9 AMPMTOTAL1,504 1,068 436 122 30 92 467 1,174 1,641 1,635 1,098 537 189 AM 29 0 30 59 57 PM 82 0 101 183 246 TOTAL 111 0 131 242 10 7 0 3 TOTAL 5 9 6 0 3 PM 0 1 1 0 0 AM 5 597 450 1,047 1,048 499 549 2 0 2 532 437 969 TOTALPMAMAM 7:30 AM 8:45 AM 63 13 76 4 0 4 #N/A AMPMTOTAL823 602 221 PM 4:00 PM 3:45 PM 76 17 59 234 675 909 903 619 284 122 AM 15 0 13 28 30 PM 56 0 70 126 152 Total 71 0 83 154 Business AimTD LLC TURNING MOVEMENT COUNTS Business SloverSloverFontana JN14102 ALL HOURS Business Business SloverSloverPEAK HOUR 3.1-10 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH:Business LOCATION #: 2 THURSDAY EAST & WEST:Slover CONTROL: STOP N/S CLASS 1:NOTES:AM ▲ PASSENGER PM N VEHICLES MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010020020 XXXX 7:00 AM 1 0 2 0 0 0 3 28 8 10 86 2 140 00101 00007:15 AM 1 0 0 0 0 0 2 23 7 4 75 0 112 10001 00007:30 AM 0 0 1 0 0 1 1 26 11 17 109 0 166 00000 00007:45 AM 2 0 1 0 0 0 0 26 19 17 121 1 187 00000 00008:00 AM 2 0 4 0 0 0 1 35 8 18 62 0 130 00000 00008:15 AM 0 0 0 0 0 0 1 33 8 6 69 1 118 00000 00008:30 AM 1 0 6 0 0 0 0 34 6 6 57 0 110 00000 00008:45 AM 4 0 1 0 0 0 0 34 4 3 44 0 90 00000 0000VOLUMES11 0 15 0 0 1 8 239 71 81 623 4 1,053 1010 2 0000 APPROACH % 42% 0% 58% 0% 0% 100% 3% 75% 22% 11% 88% 1% APP/DEPART 26 /11 1 /153 318 /254 708 /635 0 BEGIN PEAK HR VOLUMES 4 0 6 0 0 1 3 120 46 58 361 2 601 0000 APPROACH % 40% 0% 60% 0% 0% 100% 2% 71% 27% 14% 86% 0% PEAK HR FACTOR 0.417 0.250 0.939 0.757 0.803 APP/DEPART 10 /5 1 /104 169 /126 421 /366 0 4:00 PM 10 0 9 0 0 1 0 126 2 1 99 0 248 00000 00004:15 PM 6 0 16 1 0 2 0 105 3 1 79 0 213 00000 00004:30 PM 17 0 29 0 0 2 0 127 3 5 90 0 273 00000 00004:45 PM 4 0 9 0 0 0 0 124 2 1 76 0 216 00000 00005:00 PM 23 0 10 2 0 2 0 124 0 1 91 0 253 00000 00005:15 PM 3 0 6 1 0 0 0 95 1 1 71 0 178 00000 00005:30 PM 3 0 7 0 0 0 0 74 0 2 68 0 154 00011 00005:45 PM 1 0 3 0 0 1 0 70 0 2 59 0 136 00000 0000VOLUMES67 0 89 4 0 8 0 845 11 14 633 0 1,671 0001 1 0000APPROACH % 43% 0% 57% 33% 0% 67% 0% 99% 1% 2% 98% 0%APP/DEPART 156 /0 12 /24 856 /939 647 /708 0 BEGIN PEAK HRVOLUMES 37 0 63 1 0 5 0 482 10 8 344 0 950 0000APPROACH % 37% 0% 63% 17% 0% 83% 0% 98% 2% 2% 98% 0%PEAK HR FACTOR 0.543 0.500 0.946 0.880 0.870 APP/DEPART 100 /0 6 /18 492 /546 352 /386 0 Business NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Business RTORU-TURNS Business Business Slover Slover AM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-11 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Business LOCATION #: 2 THURSDAY EAST & WEST:Slover CONTROL: STOP N/S CLASS 2:NOTES:AM ▲ 2-AXLE PM N WORK MD ◄ W E ►VEHICLES/OTHER S TRUCKS OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010020020 XXXX 7:00 AM 0 0 0 0 0 0 0 3 0 0 11 0 14 00000 00007:15 AM 0 0 0 0 0 0 0 8 0 0 9 0 17 00000 0000 7:30 AM 1 0 0 0 0 0 0 4 0 0 14 0 19 00000 0000 7:45 AM 0 0 1 0 0 0 0 5 2 0 7 0 15 00000 00008:00 AM 2 0 0 0 0 0 0 6 0 1 8 0 17 00000 00008:15 AM 0 0 1 0 0 0 0 5 1 2 18 0 27 00000 00008:30 AM 1 0 1 0 0 0 0 5 1 1 11 0 20 00000 0000 8:45 AM 2 0 2 0 0 0 0 9 2 3 7 0 25 00000 0000 VOLUMES 6 0 5 0 0 0 0 45 6 7 85 0 154 0000 0 0000APPROACH % 55% 0% 45% 0% 0% 0% 0% 88% 12% 8% 92% 0%APP/DEPART 11 /0 0 /13 51 /50 92 /91 0 BEGIN PEAK HR VOLUMES 3 0 2 0 0 0 0 20 3 3 47 0 78 0000 APPROACH % 60% 0% 40% 0% 0% 0% 0% 87% 13% 6% 94% 0%PEAK HR FACTOR 0.625 0.000 0.821 0.625 0.722 APP/DEPART 5 /0 0 /6 23 /22 50 /50 0 4:00 PM 2 0 0 0 0 0 0 5 0 0 8 0 15 00000 0000 4:15 PM 2 0 0 0 0 0 0 10 2 0 8 0 22 00000 0000 4:30 PM 0 0 1 0 0 0 0 10 1 0 9 0 21 00000 00004:45 PM 0 0 1 0 0 0 0 3 1 0 6 0 11 00000 00005:00 PM 1 0 0 0 0 0 0 7 0 0 7 0 15 00000 00005:15 PM 0 0 0 0 0 0 0 9 1 0 2 0 12 00000 0000 5:30 PM 0 0 1 0 0 0 0 3 1 0 5 0 10 00000 0000 5:45 PM 0 0 0 0 0 0 0 3 0 2 6 0 11 00000 0000VOLUMES5 0 3 0 0 0 0 50 6 2 51 0 117 0000 0 0000APPROACH % 63% 0% 38% 0% 0% 0% 0% 89% 11% 4% 96% 0%APP/DEPART 8 /0 0 /8 56 /53 53 /56 0 BEGIN PEAK HR VOLUMES 4 0 2 0 0 0 0 28 4 0 31 0 69 0000APPROACH % 67% 0% 33% 0% 0% 0% 0% 88% 13% 0% 100% 0%PEAK HR FACTOR 0.750 0.000 0.667 0.861 0.784 APP/DEPART 6 /0 0 /4 32 /30 31 /35 0 Business NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Business RTORU-TURNS Business Business Slover Slover AM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-12 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Business LOCATION #: 2 THURSDAY EAST & WEST:Slover CONTROL: STOP N/S CLASS 3:NOTES:AM ▲ 3-AXLE PM NTRUCKSMD◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010020020 XXXX 7:00 AM 0 0 0 0 0 0 0 5 0 0 5 0 10 00000 00007:15 AM 1 0 0 0 0 0 0 4 0 0 6 0 11 00000 0000 7:30 AM 1 0 0 0 0 0 0 8 2 0 6 0 17 00000 0000 7:45 AM 0 0 1 0 0 0 0 6 0 0 6 0 13 00000 00008:00 AM 0 0 0 0 0 0 0 2 0 0 10 0 12 00000 00008:15 AM 0 0 0 0 0 0 1 10 0 0 6 0 17 00101 00008:30 AM 0 0 0 0 0 0 0 11 0 0 8 0 19 00000 0000 8:45 AM 0 0 0 0 0 0 0 4 1 0 5 0 10 00000 0000 VOLUMES 2 0 1 0 0 0 1 50 3 0 52 0 109 0010 1 0000APPROACH % 67% 0% 33% 0% 0% 0% 2% 93% 6% 0% 100% 0%APP/DEPART 3 /0 0 /3 54 /51 52 /55 0 BEGIN PEAK HR VOLUMES 1 0 1 0 0 0 0 26 2 0 28 0 59 0000 APPROACH % 50% 0% 50% 0% 0% 0% 0% 90% 7% 0% 100% 0%PEAK HR FACTOR 0.500 0.000 0.659 0.700 0.868 APP/DEPART 2 /0 0 /2 29 /27 28 /30 0 4:00 PM 1 0 1 0 0 0 0 4 1 0 6 0 13 00000 0000 4:15 PM 0 0 0 0 0 0 0 3 0 0 1 0 4 00000 0000 4:30 PM 0 0 0 0 0 0 0 8 1 0 5 0 14 00000 00004:45 PM 0 0 1 0 0 0 0 5 0 0 1 0 7 00000 00005:00 PM 0 0 0 0 0 0 0 4 0 0 7 0 11 00000 00005:15 PM 0 0 0 0 0 0 0 5 0 0 5 0 10 00000 0000 5:30 PM 0 0 0 0 0 0 0 5 0 0 6 0 11 00000 0000 5:45 PM 0 0 0 0 0 0 0 1 0 0 6 0 7 00000 0000VOLUMES1 0 2 0 0 0 0 35 2 0 37 0 77 0000 0 0000APPROACH % 33% 0% 67% 0% 0% 0% 0% 95% 5% 0% 100% 0%APP/DEPART 3 /0 0 /2 37 /37 37 /38 0 BEGIN PEAK HR VOLUMES 1 0 2 0 0 0 0 20 2 0 13 0 38 0000APPROACH % 33% 0% 67% 0% 0% 0% 0% 91% 9% 0% 100% 0%PEAK HR FACTOR 0.375 0.000 0.611 0.542 0.679 APP/DEPART 3 /0 0 /2 22 /22 13 /14 0 Business NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Business RTORU-TURNS Business Business Slover Slover AM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-13 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Business LOCATION #: 2 THURSDAY EAST & WEST:Slover CONTROL: STOP N/S CLASS 4:NOTES:AM ▲ 4 OR MORE PM N AXLE MD ◄ W E ► TRUCKS OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010020020 XXXX 7:00 AM 1 0 0 0 0 0 0 12 1 2 14 0 30 00011 0000 7:15 AM 0 0 0 0 0 0 0 9 1 1 20 0 31 00000 00007:30 AM 1 0 1 0 0 0 0 15 2 1 27 0 47 00000 00007:45 AM 1 0 2 0 0 0 0 9 1 1 30 0 44 00000 00008:00 AM 4 0 0 0 0 0 0 10 2 0 21 0 37 00000 0000 8:15 AM 1 0 1 0 0 0 0 21 3 0 18 0 44 00000 0000 8:30 AM 1 0 1 0 0 0 0 11 0 2 32 0 47 00000 00008:45 AM 1 0 4 0 0 0 0 15 2 2 18 0 42 00000 0000VOLUMES10 0 9 0 0 0 0 102 12 9 180 0 322 0001 1 0000APPROACH % 53% 0% 47% 0% 0% 0% 0% 89% 11% 5% 95% 0% APP/DEPART 19 /0 0 /20 114 /112 189 /190 0 BEGIN PEAK HRVOLUMES 7 0 4 0 0 0 0 55 8 2 96 0 172 0000APPROACH % 64% 0% 36% 0% 0% 0% 0% 87% 13% 2% 98% 0%PEAK HR FACTOR 0.688 0.000 0.656 0.790 0.915 APP/DEPART 11 /0 0 /10 63 /59 98 /103 0 4:00 PM 1 0 1 0 0 0 0 13 3 3 20 0 41 00000 00004:15 PM 0 0 1 0 0 0 0 17 1 1 15 0 35 00000 00004:30 PM 3 0 0 0 0 0 0 9 0 2 11 0 25 00000 00004:45 PM 0 0 2 0 0 0 0 24 2 0 18 0 46 00000 0000 5:00 PM 0 0 0 0 0 0 0 22 1 2 13 0 38 00000 0000 5:15 PM 3 0 1 0 0 0 0 20 1 3 10 0 38 00000 00005:30 PM 0 0 0 0 0 0 0 16 1 1 18 0 36 00000 00005:45 PM 2 0 2 0 0 0 0 17 2 0 14 0 37 00000 0000VOLUMES9 0 7 0 0 0 0 138 11 12 119 0 296 0000 0 0000 APPROACH % 56% 0% 44% 0% 0% 0% 0% 93% 7% 9% 91% 0% APP/DEPART 16 /0 0 /23 149 /145 131 /128 0 BEGIN PEAK HRVOLUMES 4 0 4 0 0 0 0 63 6 6 64 0 147 0000APPROACH % 50% 0% 50% 0% 0% 0% 0% 91% 9% 9% 91% 0% PEAK HR FACTOR 0.667 0.000 0.663 0.761 0.799 APP/DEPART 8 /0 0 /12 69 /67 70 /68 0 Business NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Business RTORU-TURNS Business Business Slover Slover AM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-14 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Business LOCATION #: 2 THURSDAY EAST & WEST:Slover CONTROL: STOP N/S CLASS 5:NOTES:AM ▲ RV PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010020020 XXXX 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00007:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00008:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00008:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00005:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00005:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 Business NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Business RTORU-TURNS Business Business Slover Slover AM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-15 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Business LOCATION #: 2 THURSDAY EAST & WEST:Slover CONTROL: STOP N/S CLASS 6:NOTES:AM ▲ PM N BUSES MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:010010020020 XXXX 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00007:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00007:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00008:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00008:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00008:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HRVOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00004:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00005:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00005:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00005:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 Business NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Business RTORU-TURNS Business Business Slover Slover AM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com 3.1-16 T42321 DATE:LOCATION:PROJECT #:JN14102Thu, Sep 9, 21 NORTH & SOUTH:LOCATION #:3 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:1 X 1 X X X X 2 0 1 2 X 0 0 0 0 0 X 0 X 7:00 AM 36 0 39 0 0 0 0 37 13 30 95 0 250 0 0 0 0 0 19 0 6 07:15 AM 33 0 38 0 0 0 0 32 12 33 86 0 234 0 0 0 0 0 13 0 1 07:30 AM 46 0 35 0 0 0 0 36 19 41 125 0 302 0 0 0 0 0 19 0 3 07:45 AM 52 0 30 0 0 0 0 37 14 54 135 0 322 0 0 0 0 0 10 0 7 08:00 AM 27 0 36 0 0 0 0 49 8 40 104 0 264 0 0 0 0 0 21 0 1 08:15 AM 27 0 37 0 0 0 0 54 17 25 83 0 243 0 0 0 0 0 24 0 2 0 8:30 AM 32 0 32 0 0 0 0 54 15 32 84 0 249 0 0 0 1 1 12 0 2 0 8:45 AM 26 0 27 0 0 0 0 55 14 31 61 0 214 0 0 0 0 0 13 0 6 0 VOLUMES 279 0 274 0 0 0 0 354 112 286 773 0 2,078 0 0 0 1 1 131 0 28 0APPROACH %50%0%50%0%0%0%0%76%24%27%73%0%APP/DEPART 553 /0 0 /397 466 /629 1,059 /1,052 0 BEGIN PEAK HRVOLUMES 152 0 138 0 0 0 0 176 58 160 447 0 1,131 74 0 13 0APPROACH %52%0%48%0%0%0%0%75%25%26%74%0%PEAK HR FACTOR 0.884 0.000 0.824 0.803 0.878 APP/DEPART 290 /0 0 /218 234 /314 607 /599 0 4:00 PM 48 0 56 0 0 0 0 128 31 36 79 0 378 0 0 0 0 0 21 0 3 04:15 PM 32 0 47 0 0 0 0 131 22 34 72 0 338 0 0 0 0 0 21 0 3 04:30 PM 36 0 32 0 0 0 0 168 26 28 81 0 371 0 0 0 1 1 16 0 1 04:45 PM 26 0 44 0 0 0 0 147 22 33 75 0 347 0 0 0 0 0 16 0 4 05:00 PM 48 0 41 0 0 0 0 144 25 45 71 0 374 0 0 0 0 0 19 0 4 05:15 PM 40 0 39 0 0 0 0 118 19 31 51 0 298 0 0 0 0 0 16 0 2 05:30 PM 34 0 42 0 0 0 0 71 25 33 67 0 272 0 0 0 0 0 14 0 5 05:45 PM 36 0 43 0 0 0 0 81 15 33 65 0 273 0 0 0 0 0 21 0 3 0VOLUMES300 0 344 0 0 0 0 988 185 273 561 0 2,651 0 0 0 1 1 144 0 25 0APPROACH %47%0%53%0%0%0%0%84%16%33%67%0%APP/DEPART 644 /0 0 /457 1,173 /1,333 834 /861 0 BEGIN PEAK HRVOLUMES 142 0 179 0 0 0 0 574 101 131 307 0 1,434 74 0 11 0 APPROACH %44%0%56%0%0%0%0%85%15%30%70%0% PEAK HR FACTOR 0.772 0.000 0.870 0.952 0.948 APP/DEPART 321 /0 0 /231 675 /754 438 /449 0 Mulberry NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE Mulberry E SIDE W SIDE S SIDE N SIDE TOTAL E SIDE W SIDE S SIDE N SIDE TOTAL ES WS SS NS TOTAL7:00 AM 0 0 1 0 1 0 0 1 0 1 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 1 0 1 0 0 1 0 1 0 0 0 0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 1 0 1 0 0 0 0 0 0 0 1 0 1 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 1 0 1 0 0 0 0 0 0 0 1 0 1 BICYCLE CROSSINGS AMPMAM7:30 AM PM4:00 PM ALL PED AND BIKE PEDESTRIAN CROSSINGS RTOR INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Fontana MulberrySlover U-TURNS Mulberry Mulberry Slover Slover Add U-Turns to Left Turns 3.1-17 0 0 0 0 TOTAL 0 0 0 0 0 PM 0 0 0 0 0 AM 0 1,059 834 1,893 1,913 861 1,052 0 0 0 773 561 1,334 TOTALPMAM286 273 559 0 0 0 AMPMTOTAL1,342 988 354 297 185 112 629 1,333 1,962 1,639 1,173 466 397 AM 279 0 274 553 457 PM 300 0 344 644 854 TOTAL 579 0 618 1,197 0 0 0 0 TOTAL 0 0 0 0 0 PM 0 0 0 0 0 AM 0 607 438 1,045 1,048 449 599 0 0 0 447 307 754 TOTALPMAMAM 7:30 AM 8:45 AM 160 131 291 0 0 0 #N/A AMPMTOTAL750 574 176 PM 4:00 PM 3:45 PM 159 101 58 314 754 1,068 909 675 234 218 AM 152 0 138 290 231 PM 142 0 179 321 449 Total 294 0 317 611 Mulberry AimTD LLC TURNING MOVEMENT COUNTS Mulberry SloverSloverFontana JN14102 ALL HOURS Mulberry Mulberry SloverSloverPEAK HOUR 3.1-18 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH:Mulberry LOCATION #: 3 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 1:NOTES:AM ▲ PASSENGER PM N VEHICLES MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:1X1XXXX2012X 0X0X 7:00 AM 28 0 25 0 0 0 0 20 10 26 69 0 178 00000 130507:15 AM 27 0 20 0 0 0 0 15 7 19 57 0 145 00000 120007:30 AM 42 0 23 0 0 0 0 16 11 32 83 0 207 00000 130107:45 AM 40 0 20 0 0 0 0 16 11 40 103 0 230 00000 80608:00 AM 21 0 27 0 0 0 0 32 7 29 60 0 176 00000 170108:15 AM 20 0 24 0 0 0 0 20 13 18 53 0 148 00000 190008:30 AM 22 0 19 0 0 0 0 27 13 20 39 0 140 00011 90208:45 AM 22 0 20 0 0 0 0 25 10 16 31 0 124 00000 11060VOLUMES222 0 178 0 0 0 0 171 82 200 495 0 1,348 0001 1 102 0 21 0 APPROACH % 56% 0% 45% 0% 0% 0% 0% 68% 32% 29% 71% 0% APP/DEPART 400 /0 0 /281 253 /350 695 /717 0 BEGIN PEAK HR VOLUMES 123 0 94 0 0 0 0 84 42 119 299 0 761 57 0 8 0 APPROACH % 57% 0% 43% 0% 0% 0% 0% 67% 33% 28% 72% 0% PEAK HR FACTOR 0.835 0.000 0.808 0.731 0.827 APP/DEPART 217 /0 0 /161 126 /178 418 /422 0 4:00 PM 40 0 37 0 0 0 0 108 27 30 50 0 292 00000 150304:15 PM 26 0 36 0 0 0 0 103 19 26 53 0 263 00000 190204:30 PM 32 0 20 0 0 0 0 142 24 22 57 0 297 00011 100104:45 PM 23 0 33 0 0 0 0 114 19 26 54 0 269 00000 120305:00 PM 41 0 34 0 0 0 0 120 16 36 50 0 297 00000 170305:15 PM 34 0 29 0 0 0 0 92 10 22 36 0 223 00000 150105:30 PM 28 0 31 0 0 0 0 56 15 24 43 0 197 00000 110305:45 PM 29 0 31 0 0 0 0 63 10 25 44 0 202 00000 17010VOLUMES253 0 251 0 0 0 0 798 140 211 387 0 2,040 0001 1 116 0 17 0APPROACH % 50% 0% 50% 0% 0% 0% 0% 85% 15% 35% 65% 0%APP/DEPART 504 /0 0 /350 938 /1,050 598 /640 0 BEGIN PEAK HRVOLUMES 121 0 126 0 0 0 0 467 89 103 214 0 1,121 56 0 9 0APPROACH % 49% 0% 51% 0% 0% 0% 0% 84% 16% 32% 67% 0%PEAK HR FACTOR 0.802 0.000 0.837 0.994 0.944 APP/DEPART 247 /0 0 /192 556 /594 318 /335 0 Mulberry NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE MulberryAM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com RTORU-TURNS Mulberry Mulberry Slover Slover 3.1-19 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Mulberry LOCATION #: 3 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 2:NOTES:AM ▲ 2-AXLE PM N WORK MD ◄ W E ►VEHICLES/OTHER S TRUCKS OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:1X1XXXX2012X 0 X 0 X 7:00 AM 3 0 6 0 0 0 0 2 1 2 8 0 22 00000 40107:15 AM 5 0 10 0 0 0 0 5 3 5 5 0 33 00000 0010 7:30 AM 2 0 6 0 0 0 0 3 1 3 9 0 24 00000 4010 7:45 AM 2 0 5 0 0 0 0 5 1 5 6 0 24 00000 00008:00 AM 3 0 2 0 0 0 0 5 1 5 13 0 29 00000 10008:15 AM 4 0 7 0 0 0 0 5 1 2 12 0 31 00000 30008:30 AM 5 0 5 0 0 0 0 6 0 5 7 0 28 00000 1000 8:45 AM 0 0 2 0 0 0 0 10 1 4 9 0 26 00000 0000 VOLUMES 24 0 43 0 0 0 0 41 9 31 69 0 217 0000 0 13 0 3 0APPROACH % 36% 0% 64% 0% 0% 0% 0% 82% 18% 31% 69% 0%APP/DEPART 67 /0 0 /40 50 /84 100 /93 0 BEGIN PEAK HR VOLUMES 11 0 20 0 0 0 0 18 4 15 40 0 108 8010 APPROACH % 35% 0% 65% 0% 0% 0% 0% 82% 18% 27% 73% 0%PEAK HR FACTOR 0.705 0.000 0.917 0.764 0.871 APP/DEPART 31 /0 0 /19 22 /38 55 /51 0 4:00 PM 2 0 6 0 0 0 0 4 1 2 6 0 21 00000 4000 4:15 PM 1 0 2 0 0 0 0 8 2 4 7 0 24 00000 1010 4:30 PM 2 0 3 0 0 0 0 9 2 3 8 0 27 00000 20004:45 PM 0 0 4 0 0 0 0 4 0 5 5 0 18 00000 20005:00 PM 1 0 1 0 0 0 0 5 2 4 6 0 19 00000 10105:15 PM 1 0 1 0 0 0 0 8 1 3 2 0 16 00000 0000 5:30 PM 1 0 4 0 0 0 0 2 2 2 3 0 14 00000 3000 5:45 PM 1 0 6 0 0 0 0 1 2 2 6 0 18 00000 3000VOLUMES9 0 27 0 0 0 0 41 12 25 43 0 157 0000 0 16 0 2 0APPROACH % 25% 0% 75% 0% 0% 0% 0% 77% 23% 37% 63% 0%APP/DEPART 36 /0 0 /37 53 /68 68 /52 0 BEGIN PEAK HR VOLUMES 5 0 15 0 0 0 0 25 5 14 26 0 90 9010APPROACH % 25% 0% 75% 0% 0% 0% 0% 83% 17% 35% 65% 0%PEAK HR FACTOR 0.625 0.000 0.682 0.909 0.833 APP/DEPART 20 /0 0 /19 30 /40 40 /31 0 Mulberry NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE MulberryAM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com RTORU-TURNS Mulberry Mulberry Slover Slover 3.1-20 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Mulberry LOCATION #: 3 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 3:NOTES:AM ▲ 3-AXLE PM NTRUCKSMD◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:1X1XXXX2012X 0 X 0 X 7:00 AM 2 0 3 0 0 0 0 4 1 0 3 0 13 00000 20007:15 AM 0 0 2 0 0 0 0 4 0 3 6 0 15 00000 1000 7:30 AM 0 0 2 0 0 0 0 6 2 1 7 0 18 00000 1000 7:45 AM 3 0 3 0 0 0 0 7 0 4 3 0 20 00000 20008:00 AM 2 0 3 0 0 0 0 2 0 3 9 0 19 00000 20008:15 AM 1 0 2 0 0 0 0 10 0 1 3 0 17 00000 20008:30 AM 2 0 5 0 0 0 0 10 1 1 7 0 26 00000 1000 8:45 AM 2 0 2 0 0 0 0 3 1 4 3 0 15 00000 2000 VOLUMES 12 0 22 0 0 0 0 46 5 17 41 0 143 0000 0 13 0 0 0APPROACH % 35% 0% 65% 0% 0% 0% 0% 90% 10% 29% 71% 0%APP/DEPART 34 /0 0 /22 51 /68 58 /53 0 BEGIN PEAK HR VOLUMES 6 0 10 0 0 0 0 25 2 9 22 0 74 7000 APPROACH % 38% 0% 63% 0% 0% 0% 0% 93% 7% 29% 71% 0%PEAK HR FACTOR 0.667 0.000 0.675 0.646 0.925 APP/DEPART 16 /0 0 /11 27 /35 31 /28 0 4:00 PM 3 0 3 0 0 0 0 5 0 2 3 0 16 00000 1000 4:15 PM 0 0 2 0 0 0 0 3 0 2 1 0 8 00000 1000 4:30 PM 1 0 3 0 0 0 0 8 0 2 4 0 18 00000 10004:45 PM 0 0 3 0 0 0 0 6 0 0 1 0 10 00000 10005:00 PM 4 0 2 0 0 0 0 2 2 1 3 0 14 00000 10005:15 PM 2 0 4 0 0 0 0 2 3 2 4 0 17 00000 1000 5:30 PM 1 0 1 0 0 0 0 0 5 4 5 0 16 00000 0020 5:45 PM 0 0 3 0 0 0 0 1 0 1 6 0 11 00000 1000VOLUMES11 0 21 0 0 0 0 27 10 14 27 0 110 0000 0 7020APPROACH % 34% 0% 66% 0% 0% 0% 0% 73% 27% 34% 66% 0%APP/DEPART 32 /0 0 /24 37 /48 41 /38 0 BEGIN PEAK HR VOLUMES 4 0 11 0 0 0 0 22 0 6 9 0 52 4000APPROACH % 27% 0% 73% 0% 0% 0% 0% 100% 0% 40% 60% 0%PEAK HR FACTOR 0.625 0.000 0.688 0.625 0.722 APP/DEPART 15 /0 0 /6 22 /33 15 /13 0 Mulberry NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE MulberryAM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com RTORU-TURNS Mulberry Mulberry Slover Slover 3.1-21 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Mulberry LOCATION #: 3 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 4:NOTES:AM ▲ 4 OR MORE PM N AXLE MD ◄ W E ► TRUCKS OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:1X1XXXX2012X 0 X 0 X 7:00 AM 3 0 5 0 0 0 0 11 1 2 15 0 37 00000 0000 7:15 AM 1 0 6 0 0 0 0 8 2 6 18 0 41 00000 00007:30 AM 2 0 4 0 0 0 0 11 5 5 26 0 53 00000 10107:45 AM 7 0 2 0 0 0 0 9 2 5 23 0 48 00000 00108:00 AM 1 0 4 0 0 0 0 10 0 3 22 0 40 00000 1000 8:15 AM 2 0 4 0 0 0 0 19 3 4 15 0 47 00000 0020 8:30 AM 3 0 3 0 0 0 0 11 1 6 31 0 55 00000 10008:45 AM 2 0 3 0 0 0 0 17 2 7 18 0 49 00000 0000VOLUMES21 0 31 0 0 0 0 96 16 38 168 0 370 0000 0 3040APPROACH % 40% 0% 60% 0% 0% 0% 0% 86% 14% 18% 82% 0% APP/DEPART 52 /0 0 /54 112 /127 206 /189 0 BEGIN PEAK HRVOLUMES 12 0 14 0 0 0 0 49 10 17 86 0 188 2040APPROACH % 46% 0% 54% 0% 0% 0% 0% 83% 17% 17% 83% 0%PEAK HR FACTOR 0.722 0.000 0.670 0.831 0.887 APP/DEPART 26 /0 0 /27 59 /63 103 /98 0 4:00 PM 3 0 10 0 0 0 0 11 3 2 20 0 49 00000 10004:15 PM 5 0 7 0 0 0 0 17 1 2 11 0 43 00000 00004:30 PM 1 0 6 0 0 0 0 9 0 1 12 0 29 00000 30004:45 PM 3 0 4 0 0 0 0 23 3 2 15 0 50 00000 1010 5:00 PM 2 0 4 0 0 0 0 17 5 4 12 0 44 00000 0000 5:15 PM 3 0 5 0 0 0 0 16 5 4 9 0 42 00000 00105:30 PM 4 0 6 0 0 0 0 13 3 3 16 0 45 00000 00005:45 PM 6 0 3 0 0 0 0 16 3 5 9 0 42 00000 0020VOLUMES27 0 45 0 0 0 0 122 23 23 104 0 344 0000 0 5040 APPROACH % 38% 0% 63% 0% 0% 0% 0% 84% 16% 18% 82% 0% APP/DEPART 72 /0 0 /46 145 /167 127 /131 0 BEGIN PEAK HRVOLUMES 12 0 27 0 0 0 0 60 7 7 58 0 171 5010APPROACH % 31% 0% 69% 0% 0% 0% 0% 90% 10% 11% 89% 0% PEAK HR FACTOR 0.750 0.000 0.644 0.739 0.855 APP/DEPART 39 /0 0 /14 67 /87 65 /70 0 Mulberry NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE MulberryAM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com RTORU-TURNS Mulberry Mulberry Slover Slover 3.1-22 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Mulberry LOCATION #: 3 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 5:NOTES:AM ▲ RV PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:1X1XXXX2012X 0 X 0 X 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00007:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00008:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00008:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00005:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00005:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 Mulberry NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE MulberryAM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com RTORU-TURNS Mulberry Mulberry Slover Slover 3.1-23 DATE:LOCATION:Fontana PROJECT #: JN141029/9/21 NORTH & SOUTH: Mulberry LOCATION #: 3 THURSDAY EAST & WEST:Slover CONTROL: SIGNAL CLASS 6:NOTES:AM ▲ PM N BUSES MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL NRR SRR ERR WRRLANES:1X1XXXX2012X 0 X 0 X 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00007:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00007:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00008:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00008:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00008:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HRVOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00004:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00005:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00005:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 00005:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000 VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 /0 0 /0 0 /0 0 /0 0 Mulberry NORTH SIDE Slover WEST SIDE EAST SIDE Slover SOUTH SIDE MulberryAM7:30 AM PM4:00 PM INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com RTORU-TURNS Mulberry Mulberry Slover Slover 3.1-24 Counts Unlimited Inc. 25286 Jaclyn Avenue Moreno Valley, CA 92557 951-485-7934 File Name : FOMUSLPM Site Code : 9202016 Start Date : 7/21/2009 Page No : 1 City of Fontana N/S: Mulberry Avenue E/W: Slover Avenue Weather: Sunny Groups Printed- Total Volume Slover Avenue Westbound Mulberry Avenue Northbound Slover Avenue Eastbound Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total 03:00 PM 23 69 92 24 21 45 69 18 87 224 03:15 PM 39 98 137 20 26 46 72 17 89 272 03:30 PM 26 94 120 36 41 77 107 26 133 330 03:45 PM 30 78 108 22 21 43 56 11 67 218 Total 118 339 457 102 109 211 304 72 376 1044 04:00 PM 29 77 106 26 25 51 63 15 78 235 04:15 PM 35 47 82 30 14 44 51 15 66 192 04:30 PM 37 64 101 22 28 50 82 19 101 252 04:45 PM 25 60 85 33 23 56 65 17 82 223 Total 126 248 374 111 90 201 261 66 327 902 Grand Total 244 587 831 213 199 412 565 138 703 1946 Apprch %29.4 70.6 51.7 48.3 80.4 19.6 Total %12.5 30.2 42.7 10.9 10.2 21.2 29 7.1 36.1 Slover Avenue Westbound Mulberry Avenue Northbound Slover Avenue Eastbound Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total Peak Hour Analysis From 03:00 PM to 04:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 03:15 PM 03:15 PM 39 98 137 20 26 46 72 17 89 272 03:30 PM 26 94 120 36 41 77 107 26 133 330 03:45 PM 30 78 108 22 21 43 56 11 67 218 04:00 PM 29 77 106 26 25 51 63 15 78 235 Total Volume 124 347 471 104 113 217 298 69 367 1055 % App. Total 26.3 73.7 47.9 52.1 81.2 18.8 PHF .795 .885 .859 .722 .689 .705 .696 .663 .690 .799 3.1-25 Counts Unlimited Inc. 25286 Jaclyn Avenue Moreno Valley, CA 92557 951-485-7934 File Name : FOMUSLPM Site Code : 9202016 Start Date : 7/21/2009 Page No : 2 City of Fontana N/S: Mulberry Avenue E/W: Slover Avenue Weather: Sunny Slover Avenue Slover Avenue Mulberry Avenue Thru347 Left124 OutTotalIn411 471 882 Left 104 Right 113 Out TotalIn 193 217 410 Thru298 Right69 TotalOutIn451 367 818 Peak Hour Begins at 03:15 PM Total Volume Peak Hour Data North Peak Hour Analysis From 03:00 PM to 04:30 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:15 PM 03:15 PM 03:00 PM +0 mins.39 98 137 20 26 46 69 18 87 +15 mins.26 94 120 36 41 77 72 17 89 +30 mins.30 78 108 22 21 43 107 26 133 +45 mins.29 77 106 26 25 51 56 11 67 Total Volume 124 347 471 104 113 217 304 72 376 % App. Total 26.3 73.7 47.9 52.1 80.9 19.1 PHF .795 .885 .859 .722 .689 .705 .710 .692 .707 3.1-26 N S EW NOT TO SCALE City of Fontana Mulberry Avenue and Slover Avenue Slover Ave.Mulberry Ave0604_Mulberry_Slover 3.1-27 A816DATE:CITY:FontanaJOB #:JN14102LOCATION:CLASS4 Slover between Commerce and BusinessAMEASTBOUNDPMEASTBOUNDTIME 1 2 345678910111213TOTAL Time 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL0:000 12 001500103002212:001 32 50 3 701130300650:150 15 000100501002212:150 35 90 10 600190300820:300 8 203300301002012:300 55 30 7 801130100880:450 12 100500401002312:450 40130 7 600130300821:000 6 101100100001013:000 45 60 4 301170000761:151 9 002500200001913:150 32 60 13 600140200731:300 4 401100400001413:301 84 70 10 6021602001281:450 3 100400300001113:450 47 50 6 300140200772:000 8 002100300001414:002 62 90 3 600150110992:150 2 102900301001814:150 50 90 10 703120100922:300 7 300400300001714:300 82190 4 6002001001322:450 11 100600201002114:450 67140 3 801901001033:000 9 200200303001915:000 75100 6 4011301001103:150 4 100600400001515:152 53 60 6 60190100843:300 12 200300201002015:301 104170 7 5001300001473:450 25 300700101003715:450 99160 4 301601001304:000 15 000000102001816:000122140 3 5031202101624:150 18 400400302003116:151 75220 11 3001401001274:301 22 600200200003316:300 125140 6 704901001664:450 41 501601100005516:451 101210 2 4002302001545:000 24 702101302004017:000 102280 5 3041403001595:150 21 302500600003717:150 70140 4 2072000001175:300 30 101500302004217:300 56 60 3 303170000885:450 41 101500201005117:450 64 70 4 104130200956:000 30 802901601005718:000 62 80 3 400171000956:150 28 604500601005018:150 34 70 3 502150000666:301 31 304701400005118:300 42 70 3 40240000626:450 39 703200800005918:450 24 70 4 500180000587:000 36 15027001201007319:000 33 60 1 301190000637:150 39 506500901006519:150 26 50 2 204100000497:300 38 4046001401006719:300 18 20 0 002110000337:450 48 9056001000007819:450 24 30 0 20371000408:000 37 8044011003006720:000 25 30 0 200130100448:150 28 10059002002007420:15022 30 0 20040000318:300 27 110211001201006420:300 24 50 2 40060000418:450 29 11066011301006720:450 15 20 0 30150100279:000 33 14089001102007721:000 11 30 1 40160100279:150 25 8089001100006121:150 15 30 0 30070000289:300 25 180104011302007321:300 17 30 0 10170000299:450 33 15012700902007821:450 17 40 0 001801003110:000 21 80712011900006822:000 22 10 0 000500002810:150 27 140611021001007122:150 14 10 0 100300001910:300 25 80119012002007622:300 11 00 1 300400001910:451 16 100101301805006422:450 8 00 0 300400001511:000 28 14089011401007523:000 7 20 0 400100001411:150 44 7031001900007423:150 4 10 1 100201001011:300 33 7072021401006623:300 6 20 0 301501001811:451 34 80311002301008123:450 5 30 0 0004000012TOTAL5 1,113 277 0 159 274 0 16 350 0 51 0 0 2,245TOTAL9 2,163 361 0 162 177 0 56 523 2 40 2 0 3,495AM PEAK HOUR11:00 AMPM PEAK HOUR4:00 PMAM PEAK VOLUME296PM PEAK VOLUME609CLASS 1Class 1 — MotorcyclesCLASS 83 to 4 Axles, Single TrailerTOTAL: AM+PM14 3,276 638 0 321 451 0 72 873 2 91 2 0 5,740CLASS 2Passenger CarsCLASS 95 Axles, Single Trailer% OF TOTAL0.2% 57.1% 11.1% 0.0% 5.6% 7.9% 0.0% 1.3% 15.2% 0.0% 1.6% 0.0% 0.0% 100.0%CLASS 32 Axles, 4-Tire Single UnitsCLASS 106 or More Axles, Single TrailerCLASS 4BusesCLASS 115 or Less Axles, Multi-TrailersClass12 3 4 5 6 7 8 9 10 11 12 13CLASS 52 Axles, 6-Tire Single UnitsCLASS 126 Axles, Multi-Trailers CLASS 63 Axles, Single UnitCLASS 137 or More Axles, Multi-TrailersTOTAL: ALL34 7,553 1,551 1 753 989 1 215 ### 2 206 10 0 13,315CLASS 74 or More Axles, Single Unit% OF TOTAL0.6% 131.6% 27.0% 0.0% 13.1% 17.2% 0.0% 3.7% 34.8% 0.0% 3.6% 0.2% 0.0% 100.0% 24-HOUR ROADWAY SEGMENT COUNTS (WITH FHWA CLASSIFICATION)PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.comThursday, September 09, 20213.1-28 DATE:CITY:FontanaJOB #:JN14102LOCATION:CLASS4 Slover between Commerce and BusinessAMWESTBOUNDPMWESTBOUNDTIME 1 2 345678910111213TOTALTime 1 2 3 4 5678910111213TOTAL0:000 9 101100702002112:00052 90 811022100001030:150 8 000200903002212:15148 111 3600170200890:300 5 000400400001312:30065 120 78021701101130:450 8 104300503002412:45054 110125002401001071:000 5 101000501001313:00146 100 6601130210861:150 2 100400503001513:15057 50 6804130100941:300 6 103300303001913:30173 60 97051603001201:450 8 100400501001913:45064 70 4600150200982:000 5 102400701002014:00062 80116031402001062:150 7 001200304001714:15149 130 4402100010842:300 8 100500400001814:300106 210 95031000001542:45011 001200301001814:45178 120 23031302001143:00111 000400902002715:00058 120 68051400001033:15019 301500403003515:15354 120 7601110100953:30139 700500900006115:301111 170 43011501001533:45057 6011100302008015:45084 180 8600900001254:00026 3005001201004716:00191 270 76051600001534:15024 401400602004116:15077 190 61021002001174:300371400400401006016:30193 240 76021300001464:4508716035008031012316:45059 230 40041301001045:00054 5046001101008117:00099 220 4503900001425:1505011096001302009117:15062 150 1502110000965:30070120930015000010917:30062 90 4605120100995:4511131101110012000014917:45052 150 2505100100906:00153 9026002005009618:00041 110 2302140000736:151551406120015020010518:15135 60 240080100576:3016513013120318000012518:30042 130 070170000706:4507817057008000011518:45036 70 110260000537:000721301070013010011619:00026 60 240390000507:15068210490114010011819:15033 40 440030100497:3008419010110222020015019:30036 10 0104100000527:45199160870622000015919:45024 40 120030100358:0005222010120219010011820:00027 30 320060000418:15052140137011200009920:15016 20 150150200328:30046170990622010011020:30035 50 340020000498:45036160510001300008020:45026 10 251160000429:00036 80711052602009521:00048 50 150060100669:15037120124031404008621:15047 90 1301130010759:300331802360418000010221:30045 90 0301110110719:4504212012140318010010221:45042 60 03011401106810:0003119012150419010010122:00033 30 23001100105310:15025140109043100009322:15034 70 2600703005910:3004614011100018020010122:30029 20 17001102005210:45035120310012703009122:45119 20 0101802003411:000511801080524030011923:00012 30 3100800002711:15052190590718040011423:150 7 10 1500800002211:3004811010110722010011023:300 9 10 2100201001611:4504916045011802009523:450 5 00 12006010015TOTAL7 1,914 464 0 256 324 0 65 617 0 75 1 0 3,723TOTAL13 2,363 449 1 176 214 1 78 510 0 40 7 0 3,852AM PEAK HOUR7:15 AMPM PEAK HOUR3:30 PMAM PEAK VOLUME545PM PEAK VOLUME548CLASS 1Class 1 — MotorcyclesCLASS 83 to 4 Axles, Single TrailerTOTAL: AM+PM20 4,277 913 1 432 538 1 143 ### 0 115 8 0 7,575CLASS 2Passenger CarsCLASS 95 Axles, Single Trailer% OF TOTAL0.3% 56.5% 12.1% 0.0% 5.7% 7.1% 0.0% 1.9% 14.9% 0.0% 1.5% 0.1% 0.0% 100.0%CLASS 32 Axles, 4-Tire Single UnitsCLASS 106 or More Axles, Single TrailerCLASS 4BusesCLASS 115 or Less Axles, Multi-TrailersClass12 3 45 678910111213CLASS 52 Axles, 6-Tire Single UnitsCLASS 126 Axles, Multi-TrailersCLASS 63 Axles, Single UnitCLASS 137 or More Axles, Multi-TrailersCLASS 74 or More Axles, Single Unit24-HOUR ROADWAY SEGMENT COUNTS (WITH FHWA CLASSIFICATION)PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.comThursday, September 09, 20213.1-29 3.1-30 Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 3.2:    EXISTING (2021) CONDITIONS INTERSECTION OPERATIONS ANALYSIS WORKSHEETS     Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank      Page 1 of 1 1: Commerce Wy. & Slover Av. PHF:0.878 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 410170000421515176001339 2: Driveway 1 & Slover Av. PHF:0.920 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 00000004380081001,248 3: Driveway 2 & Slover Av. PHF:0.920 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 00000004380081001248 4: Driveway 3 & Slover Av. PHF:0.920 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 00000004380081001,248 5: Driveway 4/Business Dr. & Slover Av. PHF:0.878 7:30 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 340250000365737077701,342 6: Mulberry Av. & Slover Av. PHF:0.878 7:30 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 186020100003058522366101,660 9/9/2021 Volume Development ‐ AM Peak Hour 9/9/2021 9/9/2021 3.2-1 Page 1 of 1 1: Commerce Wy. & Slover Av. PHF:0.897 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 47037000078418870601,599 2: Driveway 1 & Slover Av. PHF:0.920 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 00000008210071401,534 3: Driveway 2 & Slover Av. PHF:0.920 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 00000008210071401,534 4: Driveway 3 & Slover Av. PHF:0.920 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 00000008210071401,534 5: Driveway 4/Business Dr. & Slover Av. PHF:0.904 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 710830000786352564301,642 6: Mulberry Av. & Slover Av. PHF:0.948 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2021 PCE: 1830265000075111816848501,969 9/9/2021 Volume Development ‐ PM Peak Hour 9/9/2021 9/9/2021 3.2-2 Timings Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/04/2021 Existing (2021) - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 1 Lane Group EBT WBL WBT NBL NBT Ø4 Ø5 Lane Configurations Traffic Volume (vph) 421 51 760 41 0 Future Volume (vph) 421 51 760 41 0 Turn Type NA Prot NA Perm NA Protected Phases 2 1 6 8 4 5 Permitted Phases 8 Detector Phase 21688 Switch Phase Minimum Initial (s) 15.0 5.0 15.0 5.0 5.0 7.0 5.0 Minimum Split (s)22.3 10.0 22.3 26.0 26.0 26.6 10.0 Total Split (s)22.4 10.0 22.4 26.0 26.0 26.6 10.0 Total Split (%)26.4% 11.8% 26.4% 30.6% 30.6% 31% 12% Yellow Time (s)4.3 3.0 4.3 3.0 3.0 3.6 3.0 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.3 5.0 6.3 5.0 5.0 Lead/Lag Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None None None None None Intersection Summary Cycle Length: 85 Actuated Cycle Length: 44.1 Natural Cycle: 85 Control Type: Actuated-Uncoordinated Splits and Phases: 1: Commerce Wy/Driveway & Slover Av 3.2-3 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/04/2021 Existing (2021) - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 421 51 51 760 0 41 0 17 0 0 0 Future Volume (veh/h) 0 421 51 51 760 0 41 0 17 0 0 0 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 0 478 58 58 864 0 47 0 17 0 0 0 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, %000000000000 Cap, veh/h 5 1329 161 110 2195 0 316 0 105 0 124 0 Arrive On Green 0.00 0.41 0.41 0.06 0.61 0.00 0.07 0.00 0.07 0.00 0.00 0.00 Sat Flow, veh/h 1810 3243 392 1810 3705 0 1810 0 1610 0 1900 0 Grp Volume(v), veh/h 0 265 271 58 864 0 47 0 17 0 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1829 1810 1805 0 1810 0 1610 0 1900 0 Q Serve(g_s), s 0.0 3.7 3.7 1.1 4.5 0.0 0.9 0.0 0.4 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 3.7 3.7 1.1 4.5 0.0 0.9 0.0 0.4 0.0 0.0 0.0 Prop In Lane 1.00 0.21 1.00 0.00 1.00 1.00 0.00 0.00 Lane Grp Cap(c), veh/h 5 740 750 110 2195 0 316 0 105 0 124 0 V/C Ratio(X) 0.00 0.36 0.36 0.53 0.39 0.00 0.15 0.00 0.16 0.00 0.00 0.00 Avail Cap(c_a), veh/h 248 798 808 248 2195 0 1240 0 928 0 1095 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 Uniform Delay (d), s/veh 0.0 7.4 7.4 16.6 3.7 0.0 16.3 0.0 16.1 0.0 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.3 0.3 1.4 0.1 0.0 0.5 0.0 1.5 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.8 0.8 0.4 0.1 0.0 0.4 0.0 0.2 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 7.7 7.7 18.0 3.8 0.0 16.8 0.0 17.6 0.0 0.0 0.0 LnGrp LOS AAABAABABAAA Approach Vol, veh/h 536 922 64 0 Approach Delay, s/veh 7.7 4.7 17.0 0.0 Approach LOS A A B Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 7.2 21.2 8.0 0.0 28.5 8.0 Change Period (Y+Rc), s 5.0 6.3 5.6 5.0 6.3 * 5.6 Max Green Setting (Gmax), s 5.0 16.1 21.0 5.0 16.1 * 21 Max Q Clear Time (g_c+I1), s 3.1 5.7 0.0 0.0 6.5 2.9 Green Ext Time (p_c), s 0.0 2.1 0.0 0.0 3.7 0.3 Intersection Summary HCM 6th Ctrl Delay 6.3 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 3.2-4 HCM 6th TWSC Fontana Gateway (JN 14102) 5: Business & Slover Av 10/04/2021 Existing (2021) - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 3 Intersection Int Delay, s/veh 1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 365 73 70 777 34 25 Future Vol, veh/h 365 73 70 777 34 25 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 50 - 0 0 Veh in Median Storage, # 0 - - 0 2 - Grade, % 0 - - 0 0 - Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 0 00000 Mvmt Flow 415 83 80 883 39 28 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 498 0 1059 249 Stage 1 - - - - 457 - Stage 2 - - - - 602 - Critical Hdwy - - 4.1 - 6.8 6.9 Critical Hdwy Stg 1 - - - - 5.8 - Critical Hdwy Stg 2 - - - - 5.8 - Follow-up Hdwy - - 2.2 - 3.5 3.3 Pot Cap-1 Maneuver - - 1076 - 223 757 Stage 1 - - - - 610 - Stage 2 - - - - 515 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1076 - 206 757 Mov Cap-2 Maneuver - - - - 398 - Stage 1 - - - - 610 - Stage 2 - - - - 477 - Approach EB WB NB HCM Control Delay, s 0 0.7 12.8 HCM LOS B Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)398 757 - - 1076 - HCM Lane V/C Ratio 0.097 0.038 - - 0.074 - HCM Control Delay (s) 15 9.9 - - 8.6 - HCM Lane LOS C A - - A - HCM 95th %tile Q(veh) 0.3 0.1 - - 0.2 - 3.2-5 Timings Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/04/2021 Existing (2021) - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 4 Lane Group EBT WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 305 223 661 186 201 Future Volume (vph) 305 223 661 186 201 Turn Type NA Prot NA Prot Perm Protected Phases 4382 Permitted Phases 2 Detector Phase 43822 Switch Phase Minimum Initial (s) 7.0 5.0 7.0 7.0 7.0 Minimum Split (s)30.3 10.0 13.3 12.6 12.6 Total Split (s)31.0 14.0 45.0 15.0 15.0 Total Split (%)51.7% 23.3% 75.0% 25.0% 25.0% Yellow Time (s)4.3 3.0 4.3 3.6 3.6 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.3 5.0 6.3 5.6 5.6 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Recall Mode None None None None None Intersection Summary Cycle Length: 60 Actuated Cycle Length: 48.2 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 6: Mulberry Av & Slover Av 3.2-6 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/04/2021 Existing (2021) - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 305 85 223 661 186 201 Future Volume (veh/h) 305 85 223 661 186 201 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 347 82 253 751 211 144 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, %000000 Cap, veh/h 638 149 318 1886 316 281 Arrive On Green 0.22 0.22 0.18 0.52 0.17 0.17 Sat Flow, veh/h 3000 678 1810 3705 1810 1610 Grp Volume(v), veh/h 214 215 253 751 211 144 Grp Sat Flow(s),veh/h/ln 1805 1778 1810 1805 1810 1610 Q Serve(g_s), s 4.1 4.2 5.3 4.9 4.3 3.2 Cycle Q Clear(g_c), s 4.1 4.2 5.3 4.9 4.3 3.2 Prop In Lane 0.38 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 396 390 318 1886 316 281 V/C Ratio(X) 0.54 0.55 0.80 0.40 0.67 0.51 Avail Cap(c_a), veh/h 1136 1119 415 3558 433 386 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.6 13.6 15.5 5.7 15.1 14.7 Incr Delay (d2), s/veh 1.4 1.5 7.1 0.2 5.1 3.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 1.3 2.2 0.7 2.0 1.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 15.0 15.1 22.6 5.8 20.3 17.8 LnGrp LOS B B C A C B Approach Vol, veh/h 429 1004 355 Approach Delay, s/veh 15.0 10.1 19.2 Approach LOS B B B Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 12.5 11.9 14.9 26.8 Change Period (Y+Rc), s 5.6 5.0 6.3 6.3 Max Green Setting (Gmax), s 9.4 9.0 24.7 38.7 Max Q Clear Time (g_c+I1), s 6.3 7.3 6.2 6.9 Green Ext Time (p_c), s 0.7 0.1 2.5 6.1 Intersection Summary HCM 6th Ctrl Delay 13.1 HCM 6th LOS B 3.2-7 Timings Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/04/2021 Existing (2021) - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 1 Lane Group EBT WBL WBT NBL NBT Ø4 Ø5 Lane Configurations Traffic Volume (vph) 784 8 706 47 0 Future Volume (vph) 784 8 706 47 0 Turn Type NA Prot NA Perm NA Protected Phases 2 1 6 8 4 5 Permitted Phases 8 Detector Phase 21688 Switch Phase Minimum Initial (s) 48.0 5.0 15.0 5.0 5.0 7.0 5.0 Minimum Split (s)54.3 10.0 22.3 26.0 26.0 26.6 10.0 Total Split (s)57.4 10.0 57.4 26.0 26.0 26.6 10.0 Total Split (%)47.8% 8.3% 47.8% 21.7% 21.7% 22% 8% Yellow Time (s)4.3 3.0 4.3 3.0 3.0 3.6 3.0 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.3 5.0 6.3 5.0 5.0 Lead/Lag Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None None None None None Intersection Summary Cycle Length: 120 Actuated Cycle Length: 75.7 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Splits and Phases: 1: Commerce Wy/Driveway & Slover Av 3.2-8 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/04/2021 Existing (2021) - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 784 18 8 706 0 47 0 37 0 0 0 Future Volume (veh/h) 0 784 18 8 706 0 47 0 37 0 0 0 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 0 871 20 9 784 0 52 0 19 0 0 0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, %000000000000 Cap, veh/h 3 2494 57 21 2797 0 201 0 86 0 102 0 Arrive On Green 0.00 0.69 0.69 0.01 0.77 0.00 0.05 0.00 0.05 0.00 0.00 0.00 Sat Flow, veh/h 1810 3607 83 1810 3705 0 1810 0 1610 0 1900 0 Grp Volume(v), veh/h 0 436 455 9 784 0 52 0 19 0 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1885 1810 1805 0 1810 0 1610 0 1900 0 Q Serve(g_s), s 0.0 6.8 6.8 0.3 4.3 0.0 1.9 0.0 0.8 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 6.8 6.8 0.3 4.3 0.0 1.9 0.0 0.8 0.0 0.0 0.0 Prop In Lane 1.00 0.04 1.00 0.00 1.00 1.00 0.00 0.00 Lane Grp Cap(c), veh/h 3 1248 1303 21 2797 0 201 0 86 0 102 0 V/C Ratio(X) 0.00 0.35 0.35 0.43 0.28 0.00 0.26 0.00 0.22 0.00 0.00 0.00 Avail Cap(c_a), veh/h 130 1329 1388 130 2797 0 651 0 487 0 575 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 Uniform Delay (d), s/veh 0.0 4.4 4.4 34.1 2.2 0.0 32.0 0.0 31.5 0.0 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.2 0.2 5.2 0.1 0.0 1.4 0.0 2.7 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 1.4 1.5 0.2 0.3 0.0 0.9 0.0 0.4 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 4.5 4.5 39.3 2.3 0.0 33.4 0.0 34.1 0.0 0.0 0.0 LnGrp LOS A A A D A A C A C A A A Approach Vol, veh/h 891 793 71 0 Approach Delay, s/veh 4.5 2.7 33.6 0.0 Approach LOS A A C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.8 54.3 9.3 0.0 60.1 9.3 Change Period (Y+Rc), s 5.0 6.3 5.6 5.0 6.3 * 5.6 Max Green Setting (Gmax), s 5.0 51.1 21.0 5.0 51.1 * 21 Max Q Clear Time (g_c+I1), s 2.3 8.8 0.0 0.0 6.3 3.9 Green Ext Time (p_c), s 0.0 5.8 0.0 0.0 5.5 0.3 Intersection Summary HCM 6th Ctrl Delay 4.9 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 3.2-9 HCM 6th TWSC Fontana Gateway (JN 14102) 5: Business & Slover Av 10/04/2021 Existing (2021) - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 3 Intersection Int Delay, s/veh 1.7 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 786 35 25 643 71 83 Future Vol, veh/h 786 35 25 643 71 83 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 150 - 0 0 Veh in Median Storage, # 0 - - 0 2 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 0 00000 Mvmt Flow 873 39 28 714 79 92 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 912 0 1306 456 Stage 1 - - - - 893 - Stage 2 - - - - 413 - Critical Hdwy - - 4.1 - 6.8 6.9 Critical Hdwy Stg 1 - - - - 5.8 - Critical Hdwy Stg 2 - - - - 5.8 - Follow-up Hdwy - - 2.2 - 3.5 3.3 Pot Cap-1 Maneuver - - 755 - 154 557 Stage 1 - - - - 365 - Stage 2 - - - - 642 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 755 - 148 557 Mov Cap-2 Maneuver - - - - 320 - Stage 1 - - - - 365 - Stage 2 - - - - 618 - Approach EB WB NB HCM Control Delay, s 0 0.4 16 HCM LOS C Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)320 557 - - 755 - HCM Lane V/C Ratio 0.247 0.166 - - 0.037 - HCM Control Delay (s) 19.9 12.7 - - 9.9 - HCM Lane LOS C B - - A - HCM 95th %tile Q(veh) 1 0.6 - - 0.1 - 3.2-10 Timings Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/04/2021 Existing (2021) - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 4 Lane Group EBT WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 751 168 485 183 265 Future Volume (vph) 751 168 485 183 265 Turn Type NA Prot NA Prot Perm Protected Phases 4382 Permitted Phases 2 Detector Phase 43822 Switch Phase Minimum Initial (s) 7.0 5.0 7.0 7.0 7.0 Minimum Split (s)12.6 10.0 13.3 12.6 12.6 Total Split (s)32.0 13.0 45.0 15.0 15.0 Total Split (%)53.3% 21.7% 75.0% 25.0% 25.0% Yellow Time (s)3.6 3.0 4.3 3.6 3.6 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)5.6 5.0 6.3 5.6 5.6 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Recall Mode None None Min None None Intersection Summary Cycle Length: 60 Actuated Cycle Length: 56.5 Natural Cycle: 50 Control Type: Actuated-Uncoordinated Splits and Phases: 6: Mulberry Av & Slover Av 3.2-11 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/04/2021 Existing (2021) - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 751 118 168 485 183 265 Future Volume (veh/h) 751 118 168 485 183 265 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 791 112 177 511 193 201 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %000000 Cap, veh/h 1223 173 224 2186 297 264 Arrive On Green 0.39 0.39 0.12 0.61 0.16 0.16 Sat Flow, veh/h 3270 449 1810 3705 1810 1610 Grp Volume(v), veh/h 450 453 177 511 193 201 Grp Sat Flow(s),veh/h/ln 1805 1819 1810 1805 1810 1610 Q Serve(g_s), s 10.5 10.5 4.9 3.4 5.2 6.2 Cycle Q Clear(g_c), s 10.5 10.5 4.9 3.4 5.2 6.2 Prop In Lane 0.25 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 695 701 224 2186 297 264 V/C Ratio(X) 0.65 0.65 0.79 0.23 0.65 0.76 Avail Cap(c_a), veh/h 922 929 280 2703 329 293 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.0 13.0 22.0 4.7 20.2 20.6 Incr Delay (d2), s/veh 2.2 2.2 10.4 0.1 6.0 12.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.4 3.5 2.4 0.6 2.5 2.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 15.2 15.2 32.4 4.7 26.2 33.5 LnGrp LOS B B C A C C Approach Vol, veh/h 903 688 394 Approach Delay, s/veh 15.2 11.9 29.9 Approach LOS B B C Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 14.1 11.4 26.2 37.6 Change Period (Y+Rc), s 5.6 5.0 * 6.3 6.3 Max Green Setting (Gmax), s 9.4 8.0 * 26 38.7 Max Q Clear Time (g_c+I1), s 8.2 6.9 12.5 5.4 Green Ext Time (p_c), s 0.3 0.0 7.4 3.9 Intersection Summary HCM 6th Ctrl Delay 16.9 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 3.2-12 Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 3.3:    EXISTING (2021) CONDITIONS TRAFFIC SIGNAL WARRANT ANALYSIS WORKSHEETS     Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank     California MUTCD 2014 Edition (FHWA's MUTCD 2009, as amended for use in California) Figure 4C-4. Warrant 3, Peak Hour (70% Factor) Traffic Conditions = Existing (2019) Conditions - Weekday PM Peak Hour Major Street Name =Slover Avenue Total of Both Approaches (VPH) =1084 Number of Approach Lanes Major Street =2 Minor Street Name =Driveway 4 / Business Drive High Volume Approach (VPH) =127 Number of Approach Lanes Minor Street =1 (COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 64 km/h OR ABOVE 40 mph ON MAJOR STREET) WARRANTED FOR A SIGNAL *Note: 100 vph applies as the lower threshold for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold for a minor-street approach with one lane1084127 0 100 200 300 400 500 300 400 500 600 700 800 900 1000 1100 1200 1300Minor Street - Higher-Volume Approach (VPH)Major Street - Total of Both Approaches (VPH) 1 Lane (Major) & 1 Lane (Minor) 2+ Lanes (Major) & 1 Lane (Minor) OR 1 Lane (Major) & 2+ Lanes (Minor) 2+ Lanes (Major) & 2+ Lanes (Minor) Major Street Approaches Minor Street Approaches 3.3-1 This Page Intentionally Left Blank 3.3-2 Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 5.1:    OPENING YEAR CUMULATIVE (2023) WITHOUT PROJECT CONDITIONS INTERSECTION  OPERATIONS ANALYSIS WORKSHEETS     Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank     Page 1 of 1 1: Commerce Wy. & Slover Av. PHF:0.878 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 420170000788525284101,792 2: Driveway 1 & Slover Av. PHF:0.920 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 00000008060089301,699 3: Driveway 2 & Slover Av. PHF:0.920 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 00000008060089301,699 4: Driveway 3 & Slover Av. PHF:0.920 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 00000008060089301,699 5: Driveway 4/Business Dr. & Slover Av. PHF:0.878 7:30 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 340250000732747285901,795 6: Mulberry Av. & Slover Av. PHF:0.878 7:30 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 190020600006708722874002,120 9/9/2021 Volume Development ‐ AM Peak Hour 9/9/2021 9/9/2021 5.1-1 Page 1 of 1 1: Commerce Wy. & Slover Av. PHF:0.897 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 4803700009021881,07902,093 2: Driveway 1 & Slover Av. PHF:0.920 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 0000000940001,08702,027 3: Driveway 2 & Slover Av. PHF:0.920 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 0000000940001,08702,027 4: Driveway 3 & Slover Av. PHF:0.920 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 0000000940001,08702,027 5: Driveway 4/Business Dr. & Slover Av. PHF:0.904 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 72085000090436261,01502,137 6: Mulberry Av. & Slover Av. PHF:0.948 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 NP: 1870271000086812117285302,472 9/9/2021 Volume Development ‐ PM Peak Hour 9/9/2021 9/9/2021 5.1-2 Timings Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 1 Lane Group EBT WBL WBT NBL NBT Ø4 Ø5 Lane Configurations Traffic Volume (vph) 788 52 841 42 0 Future Volume (vph) 788 52 841 42 0 Turn Type NA Prot NA Perm NA Protected Phases 2 1 6 8 4 5 Permitted Phases 8 Detector Phase 21688 Switch Phase Minimum Initial (s) 15.0 5.0 15.0 5.0 5.0 7.0 5.0 Minimum Split (s)22.3 10.0 22.3 26.0 26.0 26.6 10.0 Total Split (s)22.4 10.0 22.4 26.0 26.0 26.6 10.0 Total Split (%)26.4% 11.8% 26.4% 30.6% 30.6% 31% 12% Yellow Time (s)4.3 3.0 4.3 3.0 3.0 3.6 3.0 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.3 5.0 6.3 5.0 5.0 Lead/Lag Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None None None None None Intersection Summary Cycle Length: 85 Actuated Cycle Length: 44.6 Natural Cycle: 85 Control Type: Actuated-Uncoordinated Splits and Phases: 1: Commerce Wy/Driveway & Slover Av 5.1-3 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 788 52 52 841 0 42 0 17 0 0 0 Future Volume (veh/h) 0 788 52 52 841 0 42 0 17 0 0 0 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 0 895 59 59 956 0 48 0 17 0 0 0 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, %000000000000 Cap, veh/h 5 1410 93 112 2197 0 316 0 106 0 126 0 Arrive On Green 0.00 0.41 0.41 0.06 0.61 0.00 0.07 0.00 0.07 0.00 0.00 0.00 Sat Flow, veh/h 1810 3438 227 1810 3705 0 1810 0 1610 0 1900 0 Grp Volume(v), veh/h 0 470 484 59 956 0 48 0 17 0 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1859 1810 1805 0 1810 0 1610 0 1900 0 Q Serve(g_s), s 0.0 7.6 7.6 1.2 5.2 0.0 0.9 0.0 0.4 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 7.6 7.6 1.2 5.2 0.0 0.9 0.0 0.4 0.0 0.0 0.0 Prop In Lane 1.00 0.12 1.00 0.00 1.00 1.00 0.00 0.00 Lane Grp Cap(c), veh/h 5 740 763 112 2197 0 316 0 106 0 126 0 V/C Ratio(X) 0.00 0.63 0.63 0.53 0.44 0.00 0.15 0.00 0.16 0.00 0.00 0.00 Avail Cap(c_a), veh/h 247 795 819 247 2197 0 1236 0 925 0 1091 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 Uniform Delay (d), s/veh 0.0 8.6 8.6 16.6 3.8 0.0 16.4 0.0 16.1 0.0 0.0 0.0 Incr Delay (d2), s/veh 0.0 1.5 1.5 1.4 0.1 0.0 0.5 0.0 1.5 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 1.8 1.9 0.4 0.2 0.0 0.4 0.0 0.2 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 10.1 10.1 18.1 3.9 0.0 16.9 0.0 17.6 0.0 0.0 0.0 LnGrp LOS ABBBAABABAAA Approach Vol, veh/h 954 1015 65 0 Approach Delay, s/veh 10.1 4.8 17.0 0.0 Approach LOS B A B Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 7.3 21.3 8.0 0.0 28.6 8.0 Change Period (Y+Rc), s 5.0 6.3 5.6 5.0 6.3 * 5.6 Max Green Setting (Gmax), s 5.0 16.1 21.0 5.0 16.1 * 21 Max Q Clear Time (g_c+I1), s 3.2 9.6 0.0 0.0 7.2 2.9 Green Ext Time (p_c), s 0.0 2.9 0.0 0.0 3.9 0.3 Intersection Summary HCM 6th Ctrl Delay 7.7 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 5.1-4 HCM 6th TWSC Fontana Gateway (JN 14102) 5: Business & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 3 Intersection Int Delay, s/veh 1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 732 74 72 859 34 25 Future Vol, veh/h 732 74 72 859 34 25 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 50 - 0 0 Veh in Median Storage, # 0 - - 0 2 - Grade, % 0 - - 0 0 - Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 0 00000 Mvmt Flow 832 84 82 976 39 28 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 916 0 1526 458 Stage 1 - - - - 874 - Stage 2 - - - - 652 - Critical Hdwy - - 4.1 - 6.8 6.9 Critical Hdwy Stg 1 - - - - 5.8 - Critical Hdwy Stg 2 - - - - 5.8 - Follow-up Hdwy - - 2.2 - 3.5 3.3 Pot Cap-1 Maneuver - - 753 - 111 555 Stage 1 - - - - 373 - Stage 2 - - - - 486 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 753 - 99 555 Mov Cap-2 Maneuver - - - - 284 - Stage 1 - - - - 373 - Stage 2 - - - - 433 - Approach EB WB NB HCM Control Delay, s 0 0.8 16.4 HCM LOS C Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)284 555 - - 753 - HCM Lane V/C Ratio 0.136 0.051 - - 0.109 - HCM Control Delay (s) 19.7 11.8 - - 10.4 - HCM Lane LOS C B - - B - HCM 95th %tile Q(veh) 0.5 0.2 - - 0.4 - 5.1-5 Timings Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 4 Lane Group EBT WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 670 228 740 190 206 Future Volume (vph) 670 228 740 190 206 Turn Type NA Prot NA Prot Perm Protected Phases 4382 Permitted Phases 2 Detector Phase 43822 Switch Phase Minimum Initial (s) 7.0 5.0 7.0 7.0 7.0 Minimum Split (s)30.3 10.0 13.3 12.6 12.6 Total Split (s)31.0 14.0 45.0 15.0 15.0 Total Split (%)51.7% 23.3% 75.0% 25.0% 25.0% Yellow Time (s)4.3 3.0 4.3 3.6 3.6 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.3 5.0 6.3 5.6 5.6 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Recall Mode None None None None None Intersection Summary Cycle Length: 60 Actuated Cycle Length: 55.4 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 6: Mulberry Av & Slover Av 5.1-6 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 670 87 228 740 190 206 Future Volume (veh/h) 670 87 228 740 190 206 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 761 84 259 841 216 150 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, %000000 Cap, veh/h 1084 120 313 2177 291 259 Arrive On Green 0.33 0.33 0.17 0.60 0.16 0.16 Sat Flow, veh/h 3373 362 1810 3705 1810 1610 Grp Volume(v), veh/h 419 426 259 841 216 150 Grp Sat Flow(s),veh/h/ln 1805 1835 1810 1805 1810 1610 Q Serve(g_s), s 10.2 10.2 7.0 6.1 5.7 4.3 Cycle Q Clear(g_c), s 10.2 10.2 7.0 6.1 5.7 4.3 Prop In Lane 0.20 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 597 607 313 2177 291 259 V/C Ratio(X) 0.70 0.70 0.83 0.39 0.74 0.58 Avail Cap(c_a), veh/h 885 899 323 2772 337 300 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 14.7 14.7 20.1 5.2 20.2 19.6 Incr Delay (d2), s/veh 1.8 1.8 15.3 0.1 10.0 4.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.4 3.4 3.7 1.0 3.0 1.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.5 16.5 35.4 5.3 30.2 23.9 LnGrp LOS B B D A C C Approach Vol, veh/h 845 1100 366 Approach Delay, s/veh 16.5 12.4 27.6 Approach LOS B B C Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 13.7 13.7 23.0 36.7 Change Period (Y+Rc), s 5.6 5.0 6.3 6.3 Max Green Setting (Gmax), s 9.4 9.0 24.7 38.7 Max Q Clear Time (g_c+I1), s 7.7 9.0 12.2 8.1 Green Ext Time (p_c), s 0.4 0.0 4.5 7.0 Intersection Summary HCM 6th Ctrl Delay 16.3 HCM 6th LOS B 5.1-7 Timings Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 1 Lane Group EBT WBL WBT NBL NBT Ø4 Ø5 Lane Configurations Traffic Volume (vph) 902 8 1079 48 0 Future Volume (vph) 902 8 1079 48 0 Turn Type NA Prot NA Perm NA Protected Phases 2 1 6 8 4 5 Permitted Phases 8 Detector Phase 21688 Switch Phase Minimum Initial (s) 48.0 5.0 15.0 5.0 5.0 7.0 5.0 Minimum Split (s)54.3 10.0 22.3 26.0 26.0 26.6 10.0 Total Split (s)57.4 10.0 57.4 26.0 26.0 26.6 10.0 Total Split (%)47.8% 8.3% 47.8% 21.7% 21.7% 22% 8% Yellow Time (s)4.3 3.0 4.3 3.0 3.0 3.6 3.0 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.3 5.0 6.3 5.0 5.0 Lead/Lag Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None None None None None Intersection Summary Cycle Length: 120 Actuated Cycle Length: 75.8 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Splits and Phases: 1: Commerce Wy/Driveway & Slover Av 5.1-8 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 902 18 8 1079 0 48 0 37 0 0 0 Future Volume (veh/h) 0 902 18 8 1079 0 48 0 37 0 0 0 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 0 1002 20 9 1199 0 53 0 19 0 0 0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, %000000000000 Cap, veh/h 3 2502 50 21 2796 0 201 0 87 0 103 0 Arrive On Green 0.00 0.69 0.69 0.01 0.77 0.00 0.05 0.00 0.05 0.00 0.00 0.00 Sat Flow, veh/h 1810 3620 72 1810 3705 0 1810 0 1610 0 1900 0 Grp Volume(v), veh/h 0 500 522 9 1199 0 53 0 19 0 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1887 1810 1805 0 1810 0 1610 0 1900 0 Q Serve(g_s), s 0.0 8.2 8.2 0.3 7.8 0.0 2.0 0.0 0.8 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 8.2 8.2 0.3 7.8 0.0 2.0 0.0 0.8 0.0 0.0 0.0 Prop In Lane 1.00 0.04 1.00 0.00 1.00 1.00 0.00 0.00 Lane Grp Cap(c), veh/h 3 1248 1304 21 2796 0 201 0 87 0 103 0 V/C Ratio(X) 0.00 0.40 0.40 0.43 0.43 0.00 0.26 0.00 0.22 0.00 0.00 0.00 Avail Cap(c_a), veh/h 130 1328 1388 130 2796 0 651 0 487 0 575 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 Uniform Delay (d), s/veh 0.0 4.6 4.6 34.1 2.6 0.0 32.0 0.0 31.4 0.0 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.2 0.2 5.2 0.1 0.0 1.5 0.0 2.7 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 1.7 1.8 0.2 0.5 0.0 0.9 0.0 0.4 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 4.8 4.8 39.3 2.7 0.0 33.5 0.0 34.1 0.0 0.0 0.0 LnGrp LOS A A A D A A C A C A A A Approach Vol, veh/h 1022 1208 72 0 Approach Delay, s/veh 4.8 3.0 33.6 0.0 Approach LOS A A C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.8 54.3 9.4 0.0 60.1 9.4 Change Period (Y+Rc), s 5.0 6.3 5.6 5.0 6.3 * 5.6 Max Green Setting (Gmax), s 5.0 51.1 21.0 5.0 51.1 * 21 Max Q Clear Time (g_c+I1), s 2.3 10.2 0.0 0.0 9.8 4.0 Green Ext Time (p_c), s 0.0 7.1 0.0 0.0 9.9 0.3 Intersection Summary HCM 6th Ctrl Delay 4.8 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 5.1-9 HCM 6th TWSC Fontana Gateway (JN 14102) 5: Business & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 3 Intersection Int Delay, s/veh 1.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 904 36 26 1015 72 85 Future Vol, veh/h 904 36 26 1015 72 85 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 150 - 0 0 Veh in Median Storage, # 0 - - 0 2 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 0 00000 Mvmt Flow 1004 40 29 1128 80 94 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 1044 0 1646 522 Stage 1 - - - - 1024 - Stage 2 - - - - 622 - Critical Hdwy - - 4.1 - 6.8 6.9 Critical Hdwy Stg 1 - - - - 5.8 - Critical Hdwy Stg 2 - - - - 5.8 - Follow-up Hdwy - - 2.2 - 3.5 3.3 Pot Cap-1 Maneuver - - 674 - 92 505 Stage 1 - - - - 312 - Stage 2 - - - - 503 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 674 - 88 505 Mov Cap-2 Maneuver - - - - 260 - Stage 1 - - - - 312 - Stage 2 - - - - 481 - Approach EB WB NB HCM Control Delay, s 0 0.3 18.9 HCM LOS C Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)260 505 - - 674 - HCM Lane V/C Ratio 0.308 0.187 - - 0.043 - HCM Control Delay (s) 24.9 13.8 - - 10.6 - HCM Lane LOS C B - - B - HCM 95th %tile Q(veh) 1.3 0.7 - - 0.1 - 5.1-10 Timings Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 4 Lane Group EBT WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 868 172 853 187 271 Future Volume (vph) 868 172 853 187 271 Turn Type NA Prot NA Prot Perm Protected Phases 4382 Permitted Phases 2 Detector Phase 43822 Switch Phase Minimum Initial (s) 7.0 5.0 7.0 7.0 7.0 Minimum Split (s)12.6 10.0 13.3 12.6 12.6 Total Split (s)32.0 13.0 45.0 15.0 15.0 Total Split (%)53.3% 21.7% 75.0% 25.0% 25.0% Yellow Time (s)3.6 3.0 4.3 3.6 3.6 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)5.6 5.0 6.3 5.6 5.6 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Recall Mode None None Min None None Intersection Summary Cycle Length: 60 Actuated Cycle Length: 58.2 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 6: Mulberry Av & Slover Av 5.1-11 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/05/2021 Opening Year Cumulative (2023) Without Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 868 121 172 853 187 271 Future Volume (veh/h) 868 121 172 853 187 271 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 914 115 181 898 197 207 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %000000 Cap, veh/h 1302 164 227 2239 295 262 Arrive On Green 0.40 0.40 0.13 0.62 0.16 0.16 Sat Flow, veh/h 3321 406 1810 3705 1810 1610 Grp Volume(v), veh/h 511 518 181 898 197 207 Grp Sat Flow(s),veh/h/ln 1805 1827 1810 1805 1810 1610 Q Serve(g_s), s 12.9 12.9 5.3 6.9 5.6 6.8 Cycle Q Clear(g_c), s 12.9 12.9 5.3 6.9 5.6 6.8 Prop In Lane 0.22 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 728 737 227 2239 295 262 V/C Ratio(X) 0.70 0.70 0.80 0.40 0.67 0.79 Avail Cap(c_a), veh/h 868 879 264 2546 310 276 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.6 13.6 23.3 5.3 21.6 22.1 Incr Delay (d2), s/veh 3.2 3.1 12.9 0.1 7.1 16.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.4 4.5 2.7 1.3 2.8 3.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.8 16.8 36.2 5.4 28.7 38.1 LnGrp LOS B B D A C D Approach Vol, veh/h 1029 1079 404 Approach Delay, s/veh 16.8 10.6 33.5 Approach LOS B B C Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 14.5 11.9 28.4 40.3 Change Period (Y+Rc), s 5.6 5.0 * 6.3 6.3 Max Green Setting (Gmax), s 9.4 8.0 * 26 38.7 Max Q Clear Time (g_c+I1), s 8.8 7.3 14.9 8.9 Green Ext Time (p_c), s 0.2 0.0 7.2 7.6 Intersection Summary HCM 6th Ctrl Delay 16.8 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 5.1-12 Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 5.2:    OPENING YEAR CUMULATIVE (2023) WITH PROJECT CONDITIONS INTERSECTION  OPERATIONS ANALYSIS WORKSHEETS     Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank     Page 1 of 1 1: Commerce Wy. & Slover Av. PHF:0.878 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 420170000809525284701,819 2: Driveway 1 & Slover Av. PHF:0.920 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 00000208310089961,738 3: Driveway 2 & Slover Av. PHF:0.920 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 000004138180090141,740 4: Driveway 3 & Slover Av. PHF:0.920 7:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 000402081800903141,741 5: Driveway 4/Business Dr. & Slover Av. PHF:0.878 7:30 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 34 0 25 3 0 1 12 736 74 72 882 8 1,846 6: Mulberry Av. & Slover Av. PHF:0.878 7:30 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 195020600006748922876102,152 9/9/2021 Volume Development ‐ AM Peak Hour 9/9/2021 9/9/2021 5.2-1 Page 1 of 1 1: Commerce Wy. & Slover Av. PHF:0.897 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 4803700009111881,10802,131 2: Driveway 1 & Slover Av. PHF:0.920 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 0000080950001,11222,072 3: Driveway 2 & Slover Av. PHF:0.920 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 0 0 0 0 0 16 5 945 0 0 1,098 1 2,065 4: Driveway 3 & Slover Av. PHF:0.920 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 0 0 0 17 0 7 0 945 0 0 1,093 6 2,068 5: Driveway 4/Business Dr. & Slover Av. PHF:0.904 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 72 0 85 11 0 2 5 921 36 26 1,024 3 2,184 6: Mulberry Av. & Slover Av. PHF:0.948 4:00 Count Date: NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR TOTAL 2023 WP: 1890271000088712617286302,508 9/9/2021 Volume Development ‐ PM Peak Hour 9/9/2021 9/9/2021 5.2-2 Timings Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 1 Lane Group EBT WBL WBT NBL NBT Ø4 Ø5 Lane Configurations Traffic Volume (vph) 809 52 847 42 0 Future Volume (vph) 809 52 847 42 0 Turn Type NA Prot NA Perm NA Protected Phases 2 1 6 8 4 5 Permitted Phases 8 Detector Phase 21688 Switch Phase Minimum Initial (s) 15.0 5.0 15.0 5.0 5.0 7.0 5.0 Minimum Split (s)22.3 10.0 22.3 26.0 26.0 26.6 10.0 Total Split (s)22.4 10.0 22.4 26.0 26.0 26.6 10.0 Total Split (%)26.4% 11.8% 26.4% 30.6% 30.6% 31% 12% Yellow Time (s)4.3 3.0 4.3 3.0 3.0 3.6 3.0 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.3 5.0 6.3 5.0 5.0 Lead/Lag Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None None None None None Intersection Summary Cycle Length: 85 Actuated Cycle Length: 44.6 Natural Cycle: 95 Control Type: Actuated-Uncoordinated Splits and Phases: 1: Commerce Wy/Driveway & Slover Av 5.2-3 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 809 52 52 847 0 42 0 17 0 0 0 Future Volume (veh/h) 0 809 52 52 847 0 42 0 17 0 0 0 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 0 919 59 59 962 0 48 0 17 0 0 0 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, %000000000000 Cap, veh/h 5 1413 91 112 2197 0 316 0 106 0 126 0 Arrive On Green 0.00 0.41 0.41 0.06 0.61 0.00 0.07 0.00 0.07 0.00 0.00 0.00 Sat Flow, veh/h 1810 3444 221 1810 3705 0 1810 0 1610 0 1900 0 Grp Volume(v), veh/h 0 482 496 59 962 0 48 0 17 0 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1860 1810 1805 0 1810 0 1610 0 1900 0 Q Serve(g_s), s 0.0 7.9 7.9 1.2 5.2 0.0 0.9 0.0 0.4 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 7.9 7.9 1.2 5.2 0.0 0.9 0.0 0.4 0.0 0.0 0.0 Prop In Lane 1.00 0.12 1.00 0.00 1.00 1.00 0.00 0.00 Lane Grp Cap(c), veh/h 5 740 763 112 2197 0 316 0 106 0 126 0 V/C Ratio(X) 0.00 0.65 0.65 0.53 0.44 0.00 0.15 0.00 0.16 0.00 0.00 0.00 Avail Cap(c_a), veh/h 247 795 819 247 2197 0 1236 0 925 0 1091 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 Uniform Delay (d), s/veh 0.0 8.7 8.7 16.6 3.8 0.0 16.4 0.0 16.1 0.0 0.0 0.0 Incr Delay (d2), s/veh 0.0 1.7 1.7 1.4 0.1 0.0 0.5 0.0 1.5 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 2.0 2.0 0.4 0.2 0.0 0.4 0.0 0.2 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 10.4 10.3 18.1 4.0 0.0 16.9 0.0 17.6 0.0 0.0 0.0 LnGrp LOS ABBBAABABAAA Approach Vol, veh/h 978 1021 65 0 Approach Delay, s/veh 10.4 4.8 17.0 0.0 Approach LOS B A B Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 7.3 21.3 8.0 0.0 28.6 8.0 Change Period (Y+Rc), s 5.0 6.3 5.6 5.0 6.3 * 5.6 Max Green Setting (Gmax), s 5.0 16.1 21.0 5.0 16.1 * 21 Max Q Clear Time (g_c+I1), s 3.2 9.9 0.0 0.0 7.2 2.9 Green Ext Time (p_c), s 0.0 2.9 0.0 0.0 3.9 0.3 Intersection Summary HCM 6th Ctrl Delay 7.8 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 5.2-4 HCM 6th TWSC Fontana Gateway (JN 14102) 2: Slover Av & Drw 1 10/05/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 3 Intersection Int Delay, s/veh 0 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 831 899 6 0 2 Future Vol, veh/h 0 831 899 6 0 2 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 00000 Mvmt Flow 0 903 977 7 0 2 Major/Minor Major1 Major2 Minor2 Conflicting Flow All - 0 - 0 - 492 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.9 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.3 Pot Cap-1 Maneuver 0 - - - 0 528 Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, %- - - Mov Cap-1 Maneuver -----528 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB SB HCM Control Delay, s 0 0 11.8 HCM LOS B Minor Lane/Major Mvmt EBT WBT WBRSBLn1 Capacity (veh/h)- - - 528 HCM Lane V/C Ratio - - - 0.004 HCM Control Delay (s) - - - 11.8 HCM Lane LOS - - - B HCM 95th %tile Q(veh) - - - 0 5.2-5 HCM 6th TWSC Fontana Gateway (JN 14102) 3: Slover Av & Drw 2 10/05/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 13 818 901 4 0 4 Future Vol, veh/h 13 818 901 4 0 4 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 100 ----0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 00000 Mvmt Flow 14 889 979 4 0 4 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 983 0 - 0 - 492 Stage 1 ------ Stage 2 ------ Critical Hdwy 4.1 ----6.9 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy 2.2 ----3.3 Pot Cap-1 Maneuver 711 - - - 0 528 Stage 1 - - - - 0 - Stage 2 - - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver 711 ----528 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB SB HCM Control Delay, s 0.2 0 11.9 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)711 - - - 528 HCM Lane V/C Ratio 0.02 - - - 0.008 HCM Control Delay (s) 10.2 - - - 11.9 HCM Lane LOS B - - - B HCM 95th %tile Q(veh) 0.1 - - - 0 5.2-6 HCM 6th TWSC Fontana Gateway (JN 14102) 4: Slover Av & Drw 3 10/05/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 5 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 818 903 14 4 2 Future Vol, veh/h 0 818 903 14 4 2 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 2 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 00000 Mvmt Flow 0 889 982 15 4 2 Major/Minor Major1 Major2 Minor2 Conflicting Flow All - 0 - 0 1435 499 Stage 1 - - - - 990 - Stage 2 - - - - 445 - Critical Hdwy - - - - 6.8 6.9 Critical Hdwy Stg 1 - - - - 5.8 - Critical Hdwy Stg 2 - - - - 5.8 - Follow-up Hdwy - - - - 3.5 3.3 Pot Cap-1 Maneuver 0 - - - 127 522 Stage 1 0 - - - 325 - Stage 2 0 - - - 619 - Platoon blocked, %- - - Mov Cap-1 Maneuver - - - - 127 522 Mov Cap-2 Maneuver - - - - 289 - Stage 1 - - - - 325 - Stage 2 - - - - 619 - Approach EB WB SB HCM Control Delay, s 0 0 15.8 HCM LOS C Minor Lane/Major Mvmt EBT WBT WBRSBLn1 Capacity (veh/h)- - - 340 HCM Lane V/C Ratio - - - 0.019 HCM Control Delay (s) - - - 15.8 HCM Lane LOS - - - C HCM 95th %tile Q(veh) - - - 0.1 5.2-7 HCM 6th TWSC Fontana Gateway (JN 14102) 5: Business/Drw 4 & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 6 Intersection Int Delay, s/veh 1.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 12 736 74 72 882 8 34 0 25 3 0 1 Future Vol, veh/h 12 736 74 72 882 8 34 0 25 3 0 1 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 50 - - 50 ----0--- Veh in Median Storage, # - 0 - - 0 - - 2 - - 2 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 0 00000000000 Mvmt Flow 14 836 84 82 1002 9 39 0 28 3 0 1 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1011 0 0 920 0 0 1571 2081 460 1617 2119 506 Stage 1 ------906906-1171 1171 - Stage 2 ------6651175 - 446 948 - Critical Hdwy 4.1 - - 4.1 - - 7.5 6.5 6.9 7.5 6.5 6.9 Critical Hdwy Stg 1 ------6.55.5-6.55.5- Critical Hdwy Stg 2 ------6.55.5-6.55.5- Follow-up Hdwy 2.2 - - 2.2 - - 3.5 4 3.3 3.5 4 3.3 Pot Cap-1 Maneuver 694 - - 750 - - 76 54 554 70 51 517 Stage 1 ------301358-208269- Stage 2 ------420268-567342- Platoon blocked, % - - - - Mov Cap-1 Maneuver 694 - - 750 - - 68 47 554 60 45 517 Mov Cap-2 Maneuver ------225184-181170- Stage 1 ------295351-204240- Stage 2 ------373239-527335- Approach EB WB NB SB HCM Control Delay, s 0.2 0.8 19 22 HCM LOS C C Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)225 554 694 - - 750 - - 216 HCM Lane V/C Ratio 0.172 0.051 0.02 - - 0.109 - - 0.021 HCM Control Delay (s) 24.3 11.8 10.3 - - 10.4 - - 22 HCM Lane LOS C B B - - B - - C HCM 95th %tile Q(veh) 0.6 0.2 0.1 - - 0.4 - - 0.1 5.2-8 Timings Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 7 Lane Group EBT WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 674 228 761 195 206 Future Volume (vph) 674 228 761 195 206 Turn Type NA Prot NA Prot Perm Protected Phases 4382 Permitted Phases 2 Detector Phase 43822 Switch Phase Minimum Initial (s) 7.0 5.0 7.0 7.0 7.0 Minimum Split (s)30.3 10.0 13.3 12.6 12.6 Total Split (s)31.0 14.0 45.0 15.0 15.0 Total Split (%)51.7% 23.3% 75.0% 25.0% 25.0% Yellow Time (s)4.3 3.0 4.3 3.6 3.6 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.3 5.0 6.3 5.6 5.6 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Recall Mode None None None None None Intersection Summary Cycle Length: 60 Actuated Cycle Length: 55.5 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 6: Mulberry Av & Slover Av 5.2-9 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 8 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 674 89 228 761 195 206 Future Volume (veh/h) 674 89 228 761 195 206 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 766 86 259 865 222 150 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, %000000 Cap, veh/h 1085 122 313 2177 295 262 Arrive On Green 0.33 0.33 0.17 0.60 0.16 0.16 Sat Flow, veh/h 3367 367 1810 3705 1810 1610 Grp Volume(v), veh/h 423 429 259 865 222 150 Grp Sat Flow(s),veh/h/ln 1805 1834 1810 1805 1810 1610 Q Serve(g_s), s 10.4 10.4 7.0 6.4 6.0 4.4 Cycle Q Clear(g_c), s 10.4 10.4 7.0 6.4 6.0 4.4 Prop In Lane 0.20 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 599 608 313 2177 295 262 V/C Ratio(X) 0.71 0.71 0.83 0.40 0.75 0.57 Avail Cap(c_a), veh/h 877 891 320 2748 335 298 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 14.8 14.8 20.3 5.3 20.3 19.6 Incr Delay (d2), s/veh 1.9 1.8 15.6 0.1 10.8 4.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.4 3.5 3.7 1.1 3.2 1.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.7 16.7 35.9 5.4 31.1 23.8 LnGrp LOS B B D A C C Approach Vol, veh/h 852 1124 372 Approach Delay, s/veh 16.7 12.4 28.2 Approach LOS B B C Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 13.9 13.8 23.2 37.0 Change Period (Y+Rc), s 5.6 5.0 6.3 6.3 Max Green Setting (Gmax), s 9.4 9.0 24.7 38.7 Max Q Clear Time (g_c+I1), s 8.0 9.0 12.4 8.4 Green Ext Time (p_c), s 0.4 0.0 4.5 7.2 Intersection Summary HCM 6th Ctrl Delay 16.5 HCM 6th LOS B 5.2-10 Timings Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 1 Lane Group EBT WBL WBT NBL NBT Ø4 Ø5 Lane Configurations Traffic Volume (vph) 911 8 1108 48 0 Future Volume (vph) 911 8 1108 48 0 Turn Type NA Prot NA Perm NA Protected Phases 2 1 6 8 4 5 Permitted Phases 8 Detector Phase 21688 Switch Phase Minimum Initial (s) 48.0 5.0 15.0 5.0 5.0 7.0 5.0 Minimum Split (s)54.3 10.0 22.3 26.0 26.0 26.6 10.0 Total Split (s)57.4 10.0 57.4 26.0 26.0 26.6 10.0 Total Split (%)47.8% 8.3% 47.8% 21.7% 21.7% 22% 8% Yellow Time (s)4.3 3.0 4.3 3.0 3.0 3.6 3.0 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.3 5.0 6.3 5.0 5.0 Lead/Lag Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None None None None None Intersection Summary Cycle Length: 120 Actuated Cycle Length: 75.9 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Splits and Phases: 1: Commerce Wy/Driveway & Slover Av 5.2-11 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 1: Commerce Wy/Driveway & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 911 18 8 1108 0 48 0 37 0 0 0 Future Volume (veh/h) 0 911 18 8 1108 0 48 0 37 0 0 0 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 0 1012 20 9 1231 0 53 0 19 0 0 0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, %000000000000 Cap, veh/h 3 2502 49 21 2796 0 201 0 87 0 103 0 Arrive On Green 0.00 0.69 0.69 0.01 0.77 0.00 0.05 0.00 0.05 0.00 0.00 0.00 Sat Flow, veh/h 1810 3621 72 1810 3705 0 1810 0 1610 0 1900 0 Grp Volume(v), veh/h 0 505 527 9 1231 0 53 0 19 0 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1887 1810 1805 0 1810 0 1610 0 1900 0 Q Serve(g_s), s 0.0 8.3 8.3 0.3 8.1 0.0 2.0 0.0 0.8 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 8.3 8.3 0.3 8.1 0.0 2.0 0.0 0.8 0.0 0.0 0.0 Prop In Lane 1.00 0.04 1.00 0.00 1.00 1.00 0.00 0.00 Lane Grp Cap(c), veh/h 3 1248 1304 21 2796 0 201 0 87 0 103 0 V/C Ratio(X) 0.00 0.40 0.40 0.43 0.44 0.00 0.26 0.00 0.22 0.00 0.00 0.00 Avail Cap(c_a), veh/h 130 1328 1389 130 2796 0 651 0 487 0 575 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 Uniform Delay (d), s/veh 0.0 4.6 4.6 34.1 2.7 0.0 32.0 0.0 31.4 0.0 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.2 0.2 5.2 0.1 0.0 1.5 0.0 2.7 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 1.7 1.8 0.2 0.6 0.0 0.9 0.0 0.4 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 4.8 4.8 39.3 2.8 0.0 33.5 0.0 34.1 0.0 0.0 0.0 LnGrp LOS A A A D A A C A C A A A Approach Vol, veh/h 1032 1240 72 0 Approach Delay, s/veh 4.8 3.1 33.6 0.0 Approach LOS A A C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.8 54.3 9.4 0.0 60.1 9.4 Change Period (Y+Rc), s 5.0 6.3 5.6 5.0 6.3 * 5.6 Max Green Setting (Gmax), s 5.0 51.1 21.0 5.0 51.1 * 21 Max Q Clear Time (g_c+I1), s 2.3 10.3 0.0 0.0 10.1 4.0 Green Ext Time (p_c), s 0.0 7.2 0.0 0.0 10.3 0.3 Intersection Summary HCM 6th Ctrl Delay 4.8 HCM 6th LOS A Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 5.2-12 HCM 6th TWSC Fontana Gateway (JN 14102) 2: Slover Av & Drw 1 10/05/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 3 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 950 1112 2 0 8 Future Vol, veh/h 0 950 1112 2 0 8 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 00000 Mvmt Flow 0 1033 1209 2 0 9 Major/Minor Major1 Major2 Minor2 Conflicting Flow All - 0 - 0 - 606 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.9 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.3 Pot Cap-1 Maneuver 0 - - - 0 445 Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, %- - - Mov Cap-1 Maneuver -----445 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB SB HCM Control Delay, s 0 0 13.3 HCM LOS B Minor Lane/Major Mvmt EBT WBT WBRSBLn1 Capacity (veh/h)- - - 445 HCM Lane V/C Ratio - - - 0.02 HCM Control Delay (s) - - - 13.3 HCM Lane LOS - - - B HCM 95th %tile Q(veh) - - - 0.1 5.2-13 HCM 6th TWSC Fontana Gateway (JN 14102) 3: Slover Av & Drw 2 10/05/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 5 945 1098 1 0 16 Future Vol, veh/h 5 945 1098 1 0 16 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 100 ----0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 00000 Mvmt Flow 5 1027 1193 1 0 17 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1194 0 - 0 - 597 Stage 1 ------ Stage 2 ------ Critical Hdwy 4.1 ----6.9 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy 2.2 ----3.3 Pot Cap-1 Maneuver 592 - - - 0 451 Stage 1 - - - - 0 - Stage 2 - - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver 592 ----451 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB SB HCM Control Delay, s 0.1 0 13.3 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)592 - - - 451 HCM Lane V/C Ratio 0.009 - - - 0.039 HCM Control Delay (s) 11.1 - - - 13.3 HCM Lane LOS B - - - B HCM 95th %tile Q(veh) 0 - - - 0.1 5.2-14 HCM 6th TWSC Fontana Gateway (JN 14102) 4: Slover Av & Drw 3 10/05/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 5 Intersection Int Delay, s/veh 0.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 945 1093 6 17 7 Future Vol, veh/h 0 945 1093 6 17 7 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 2 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 00000 Mvmt Flow 0 1027 1188 7 18 8 Major/Minor Major1 Major2 Minor2 Conflicting Flow All - 0 - 0 1706 598 Stage 1 - - - - 1192 - Stage 2 - - - - 514 - Critical Hdwy - - - - 6.8 6.9 Critical Hdwy Stg 1 - - - - 5.8 - Critical Hdwy Stg 2 - - - - 5.8 - Follow-up Hdwy - - - - 3.5 3.3 Pot Cap-1 Maneuver 0 - - - 84 450 Stage 1 0 - - - 255 - Stage 2 0 - - - 571 - Platoon blocked, %- - - Mov Cap-1 Maneuver - - - - 84 450 Mov Cap-2 Maneuver - - - - 228 - Stage 1 - - - - 255 - Stage 2 - - - - 571 - Approach EB WB SB HCM Control Delay, s 0 0 20 HCM LOS C Minor Lane/Major Mvmt EBT WBT WBRSBLn1 Capacity (veh/h)- - - 266 HCM Lane V/C Ratio - - - 0.098 HCM Control Delay (s) - - - 20 HCM Lane LOS - - - C HCM 95th %tile Q(veh) - - - 0.3 5.2-15 HCM 6th TWSC Fontana Gateway (JN 14102) 5: Business/Drw 4 & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 6 Intersection Int Delay, s/veh 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 5 921 36 26 1024 3 72 0 85 11 0 2 Future Vol, veh/h 5 921 36 26 1024 3 72 0 85 11 0 2 Conflicting Peds, #/hr 0 00001000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 150 - - 0 - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 2 - - 2 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 0 00000000000 Mvmt Flow 6 1023 40 29 1138 3 80 0 94 12 0 2 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1142 0 0 1063 0 0 1682 - 532 1723 2274 572 Stage 1 ------1055 - - 1199 1199 - Stage 2 ------627--5241075 - Critical Hdwy 4.1 - - 4.1 - - 7.5 - 6.9 7.5 6.5 6.9 Critical Hdwy Stg 1 ------6.5--6.55.5- Critical Hdwy Stg 2 ------6.5--6.55.5- Follow-up Hdwy 2.2 - - 2.2 - - 3.5 - 3.3 3.5 4 3.3 Pot Cap-1 Maneuver 619 - - 663 - - ~ 63 0 497 59 41 468 Stage 1 ------2450-200261- Stage 2 ------4430-510298- Platoon blocked, % - - - - Mov Cap-1 Maneuver 618 - - 663 - - ~ 60 - 497 46 39 468 Mov Cap-2 Maneuver ------205--170175- Stage 1 ------243--198249- Stage 2 ------422--409295- Approach EB WB NB SB HCM Control Delay, s 0.1 0.3 22.8 25.7 HCM LOS C D Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)205 497 618 - - 663 - - 188 HCM Lane V/C Ratio 0.39 0.19 0.009 - - 0.044 - - 0.077 HCM Control Delay (s) 33.4 13.9 10.9 - - 10.7 - - 25.7 HCM Lane LOS D B B - - B - - D HCM 95th %tile Q(veh) 1.7 0.7 0 - - 0.1 - - 0.2 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 5.2-16 Timings Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 7 Lane Group EBT WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 887 172 863 189 271 Future Volume (vph) 887 172 863 189 271 Turn Type NA Prot NA Prot Perm Protected Phases 4382 Permitted Phases 2 Detector Phase 43822 Switch Phase Minimum Initial (s) 7.0 5.0 7.0 7.0 7.0 Minimum Split (s)12.6 10.0 13.3 12.6 12.6 Total Split (s)32.0 13.0 45.0 15.0 15.0 Total Split (%)53.3% 21.7% 75.0% 25.0% 25.0% Yellow Time (s)3.6 3.0 4.3 3.6 3.6 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)5.6 5.0 6.3 5.6 5.6 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Recall Mode None None Min None None Intersection Summary Cycle Length: 60 Actuated Cycle Length: 58.5 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 6: Mulberry Av & Slover Av 5.2-17 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 6: Mulberry Av & Slover Av 10/05/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour Synchro 11 Report Urban Crossroads, Inc.Page 8 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 887 126 172 863 189 271 Future Volume (veh/h) 887 126 172 863 189 271 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 934 121 181 908 199 207 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %000000 Cap, veh/h 1309 170 227 2249 294 261 Arrive On Green 0.41 0.41 0.13 0.62 0.16 0.16 Sat Flow, veh/h 3309 416 1810 3705 1810 1610 Grp Volume(v), veh/h 525 530 181 908 199 207 Grp Sat Flow(s),veh/h/ln 1805 1825 1810 1805 1810 1610 Q Serve(g_s), s 13.5 13.5 5.4 7.0 5.7 6.8 Cycle Q Clear(g_c), s 13.5 13.5 5.4 7.0 5.7 6.8 Prop In Lane 0.23 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 735 743 227 2249 294 261 V/C Ratio(X) 0.71 0.71 0.80 0.40 0.68 0.79 Avail Cap(c_a), veh/h 860 870 261 2522 307 273 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.7 13.7 23.5 5.3 21.8 22.3 Incr Delay (d2), s/veh 3.5 3.4 13.2 0.1 7.6 16.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.7 4.7 2.8 1.3 2.9 3.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 17.2 17.1 36.7 5.4 29.4 38.8 LnGrp LOS B B D A C D Approach Vol, veh/h 1055 1089 406 Approach Delay, s/veh 17.2 10.6 34.2 Approach LOS B B C Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 14.6 12.0 28.9 40.8 Change Period (Y+Rc), s 5.6 5.0 * 6.3 6.3 Max Green Setting (Gmax), s 9.4 8.0 * 26 38.7 Max Q Clear Time (g_c+I1), s 8.8 7.4 15.5 9.0 Green Ext Time (p_c), s 0.2 0.0 7.1 7.7 Intersection Summary HCM 6th Ctrl Delay 17.1 HCM 6th LOS B Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 5.2-18 Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 5.3:    OPENING YEAR CUMULATIVE (2023) WITH PROJECT CONDITIONS TRAFFIC SIGNAL  WARRANT ANALYSIS WORKSHEETS   Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank  California MUTCD 2014 (FHWA's MUTCD 2009, as amended for use in California) Figure 4C-103 (CA). Traffic Signal Warrants Worksheet (Average Traffic Estimate Form) ____________TRAFFIC CONDITIONS DIST CO RTE PM CALC DATE Jurisdiction:City of Fontana CHK DATE Major Street:Slover Ave Critical Approach Speed (Major) 50 mph Minor Street:Driveway 2 Critical Approach Speed (Minor) 25 mph Major Street Approach Lanes =2 lane Minor Street Approach Lanes 1 lane Major Street Future ADT =18,572 vpd Minor Street Future ADT =85 vpd Speed limit or critical speed on major street traffic > 64 km/h (40 mph); ….…...√ or In built up area of isolated community of < 10,000 population …………….….…. Number of lanes for moving traffic on each approach Urban Rural Urban Rural 1 18,000 5,600 2,400 1,680 2 +18,572 1 85 9,600 6,720 *2,400 1,680 2 + 2 +9,600 6,720 3,200 2,240 1 2 +8,000 5,600 3,200 2,240 Satisfied Not Satisfied XX Number of lanes for moving traffic on each approach Urban Rural Urban Rural 1 112,000 8,400 1,200 850 2 +18,572 1 85 14,400 10,080 *1,200 850 2 + 2 +14,400 10,080 1,600 1,120 1 2 +12,000 8,400 1,600 1,120 No one condition satisfied, but following conditions fulfilled 80% of more ….. A B 5% 10% Note: To be used only for NEW INTERSECTIONS or other locations where it is not reasonable to count actual traffic volumes. The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal. Combination of CONDITIONS A + B 2 CONDITIONS 80% 2 CONDITIONS 80% Satisfied Not Satisfied XX on Major Street Minor Street Approach (Total of Both Approaches) (One Direction Only) Major Street Minor Street Major Street Minor Street CONDITION B - Interruption of Continuous Traffic Vehicles Per Day Vehicles Per Day on Higher-Volume XX Major Street Minor Street Approach (Total of Both Approaches) (One Direction Only) CONDITION A - Minimum Vehicular Volume Vehicles Per Day Satisfied Not Satisfied Vehicles Per Day on on Higher-Volume RURAL (R) (Based on Estimated Average Daily Traffic - See Note) URBAN RURAL Minimum Requirements XX EADT 2023 WP MT 10/05/21 MT 10/05/21 5.3-1 California MUTCD 2014 (FHWA's MUTCD 2009, as amended for use in California) Figure 4C-103 (CA). Traffic Signal Warrants Worksheet (Average Traffic Estimate Form) ____________TRAFFIC CONDITIONS DIST CO RTE PM CALC DATE Jurisdiction:City of Fontana CHK DATE Major Street:Slover Ave Critical Approach Speed (Major) 50 mph Minor Street:Driveway 3 Critical Approach Speed (Minor) 25 mph Major Street Approach Lanes =2 lane Minor Street Approach Lanes 1 lane Major Street Future ADT =18,570 vpd Minor Street Future ADT =96 vpd Speed limit or critical speed on major street traffic > 64 km/h (40 mph); ….…...√ or In built up area of isolated community of < 10,000 population …………….….…. Number of lanes for moving traffic on each approach Urban Rural Urban Rural 1 18,000 5,600 2,400 1,680 2 +18,570 1 96 9,600 6,720 *2,400 1,680 2 + 2 +9,600 6,720 3,200 2,240 1 2 +8,000 5,600 3,200 2,240 Satisfied Not Satisfied XX Number of lanes for moving traffic on each approach Urban Rural Urban Rural 1 112,000 8,400 1,200 850 2 +18,570 1 96 14,400 10,080 *1,200 850 2 + 2 +14,400 10,080 1,600 1,120 1 2 +12,000 8,400 1,600 1,120 No one condition satisfied, but following conditions fulfilled 80% of more ….. A B 6% 11% Note: To be used only for NEW INTERSECTIONS or other locations where it is not reasonable to count actual traffic volumes. The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal. Combination of CONDITIONS A + B 2 CONDITIONS 80% 2 CONDITIONS 80% Satisfied Not Satisfied XX on Major Street Minor Street Approach (Total of Both Approaches) (One Direction Only) Major Street Minor Street Major Street Minor Street CONDITION B - Interruption of Continuous Traffic Vehicles Per Day Vehicles Per Day on Higher-Volume XX Major Street Minor Street Approach (Total of Both Approaches) (One Direction Only) CONDITION A - Minimum Vehicular Volume Vehicles Per Day Satisfied Not Satisfied Vehicles Per Day on on Higher-Volume RURAL (R) (Based on Estimated Average Daily Traffic - See Note) URBAN RURAL Minimum Requirements XX EADT 2023 WP MT 10/05/21 MT 10/05/21 5.3-2 Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 5.4:    OPENING YEAR CUMULATIVE (2023) WITH PROJECT CONDITIONS INTERSECTION  OPERATIONS ANALYSIS WORKSHEETS WITH IMPROVEMENTS  Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank     Timings Fontana Gateway (JN 14102) 5: Business/Drw 4 & Slover Av 10/07/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour With Improvement Synchro 11 Report Urban Crossroads, Inc.Page 1 Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)12 736 72 882 34 0 25 3 0 Future Volume (vph)12 736 72 882 34 0 25 3 0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 2 6 8 4 Permitted Phases 26884 Detector Phase 226688844 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Minimum Split (s)20.8 20.8 20.8 20.8 20.3 20.3 20.3 20.3 20.3 Total Split (s)39.0 39.0 39.0 39.0 21.0 21.0 21.0 21.0 21.0 Total Split (%)65.0% 65.0% 65.0% 65.0% 35.0% 35.0% 35.0% 35.0% 35.0% Yellow Time (s)4.8 4.8 4.8 4.8 3.6 3.6 3.6 3.6 3.6 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.8 6.8 6.8 6.8 5.6 5.6 5.6 Lead/Lag Lead-Lag Optimize? Recall Mode Min Min Min Min None None None None None Intersection Summary Cycle Length: 60 Actuated Cycle Length: 43.3 Natural Cycle: 45 Control Type: Actuated-Uncoordinated Splits and Phases: 5: Business/Drw 4 & Slover Av 5.4-1 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 5: Business/Drw 4 & Slover Av 10/07/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour With Improvement Synchro 11 Report Urban Crossroads, Inc.Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 12 736 74 72 882 8 34 0 25 3 0 1 Future Volume (veh/h) 12 736 74 72 882 8 34 0 25 3 0 1 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 14 836 84 82 1002 9 39 0 28 3 0 1 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, %000000000000 Cap, veh/h 413 1731 174 441 1916 17 372 0 163 280 25 38 Arrive On Green 0.52 0.52 0.52 0.52 0.52 0.52 0.10 0.00 0.10 0.10 0.00 0.10 Sat Flow, veh/h 566 3312 333 617 3666 33 1511 0 1610 876 245 374 Grp Volume(v), veh/h 14 456 464 82 493 518 39 0 28 4 0 0 Grp Sat Flow(s),veh/h/ln 566 1805 1840 617 1805 1894 1511 0 1610 1494 0 0 Q Serve(g_s), s 0.5 5.3 5.3 3.2 5.9 5.9 0.0 0.0 0.5 0.0 0.0 0.0 Cycle Q Clear(g_c), s 6.5 5.3 5.3 8.5 5.9 5.9 0.7 0.0 0.5 0.7 0.0 0.0 Prop In Lane 1.00 0.18 1.00 0.02 1.00 1.00 0.75 0.25 Lane Grp Cap(c), veh/h 413 943 962 441 943 990 372 0 163 343 0 0 V/C Ratio(X) 0.03 0.48 0.48 0.19 0.52 0.52 0.10 0.00 0.17 0.01 0.00 0.00 Avail Cap(c_a), veh/h 670 1762 1796 721 1762 1849 897 0 752 873 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 7.3 5.0 5.0 7.8 5.2 5.2 13.6 0.0 13.5 13.3 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.4 0.4 0.2 0.5 0.4 0.1 0.0 0.5 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.5 0.5 0.2 0.5 0.5 0.2 0.0 0.2 0.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 7.3 5.4 5.4 8.0 5.6 5.6 13.7 0.0 14.0 13.4 0.0 0.0 LnGrp LOS AAAAAABABBAA Approach Vol, veh/h 934 1093 67 4 Approach Delay, s/veh 5.4 5.8 13.9 13.4 Approach LOS AABB Timer - Assigned Phs 2468 Phs Duration (G+Y+Rc), s 24.0 8.9 24.0 8.9 Change Period (Y+Rc), s 6.8 5.6 6.8 5.6 Max Green Setting (Gmax), s 32.2 15.4 32.2 15.4 Max Q Clear Time (g_c+I1), s 8.5 2.7 10.5 2.7 Green Ext Time (p_c), s 5.5 0.0 6.7 0.2 Intersection Summary HCM 6th Ctrl Delay 5.9 HCM 6th LOS A 5.4-2 Timings Fontana Gateway (JN 14102) 5: Business/Drw 4 & Slover Av 10/07/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour With Improvement Synchro 11 Report Urban Crossroads, Inc.Page 1 Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)5 921 26 1024 72 0 85 11 0 Future Volume (vph)5 921 26 1024 72 0 85 11 0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 2 6 8 4 Permitted Phases 26884 Detector Phase 226688844 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Minimum Split (s)20.8 20.8 20.8 20.8 20.3 20.3 20.3 20.3 20.3 Total Split (s)39.0 39.0 39.0 39.0 21.0 21.0 21.0 21.0 21.0 Total Split (%)65.0% 65.0% 65.0% 65.0% 35.0% 35.0% 35.0% 35.0% 35.0% Yellow Time (s)4.8 4.8 4.8 4.8 3.6 3.6 3.6 3.6 3.6 All-Red Time (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)6.8 6.8 6.8 6.8 5.6 5.6 5.6 Lead/Lag Lead-Lag Optimize? Recall Mode Min Min Min Min None None None None None Intersection Summary Cycle Length: 60 Actuated Cycle Length: 44.8 Natural Cycle: 50 Control Type: Actuated-Uncoordinated Splits and Phases: 5: Business/Drw 4 & Slover Av 5.4-3 HCM 6th Signalized Intersection Summary Fontana Gateway (JN 14102) 5: Business/Drw 4 & Slover Av 10/07/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour With Improvement Synchro 11 Report Urban Crossroads, Inc.Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 5 921 36 26 1024 3 72 0 85 11 0 2 Future Volume (veh/h) 5 921 36 26 1024 3 72 0 85 11 0 2 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 6 1023 40 29 1138 3 80 0 94 12 0 2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, %000000000000 Cap, veh/h 334 1757 69 355 1832 5 447 0 263 329 14 27 Arrive On Green 0.50 0.50 0.50 0.50 0.50 0.50 0.16 0.00 0.16 0.16 0.00 0.16 Sat Flow, veh/h 501 3542 138 539 3693 10 1526 0 1610 888 89 163 Grp Volume(v), veh/h 6 521 542 29 556 585 80 0 94 14 0 0 Grp Sat Flow(s),veh/h/ln 501 1805 1875 539 1805 1898 1526 0 1610 1139 0 0 Q Serve(g_s), s 0.3 7.5 7.5 1.5 8.2 8.2 0.0 0.0 1.9 0.0 0.0 0.0 Cycle Q Clear(g_c), s 8.5 7.5 7.5 8.9 8.2 8.2 1.4 0.0 1.9 1.4 0.0 0.0 Prop In Lane 1.00 0.07 1.00 0.01 1.00 1.00 0.86 0.14 Lane Grp Cap(c), veh/h 334 895 930 355 895 942 447 0 263 370 0 0 V/C Ratio(X) 0.02 0.58 0.58 0.08 0.62 0.62 0.18 0.00 0.36 0.04 0.00 0.00 Avail Cap(c_a), veh/h 528 1595 1657 564 1595 1678 820 0 681 722 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 9.8 6.5 6.5 9.7 6.7 6.7 13.3 0.0 13.5 12.9 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.6 0.6 0.1 0.7 0.7 0.2 0.0 0.8 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 1.1 1.1 0.1 1.2 1.3 0.5 0.0 0.6 0.1 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.8 7.1 7.1 9.8 7.4 7.4 13.5 0.0 14.4 12.9 0.0 0.0 LnGrp LOS AAAAAABABBAA Approach Vol, veh/h 1069 1170 174 14 Approach Delay, s/veh 7.1 7.4 14.0 12.9 Approach LOS AABB Timer - Assigned Phs 2468 Phs Duration (G+Y+Rc), s 24.9 11.6 24.9 11.6 Change Period (Y+Rc), s 6.8 5.6 6.8 5.6 Max Green Setting (Gmax), s 32.2 15.4 32.2 15.4 Max Q Clear Time (g_c+I1), s 10.5 3.4 10.9 3.9 Green Ext Time (p_c), s 6.3 0.0 7.1 0.5 Intersection Summary HCM 6th Ctrl Delay 7.8 HCM 6th LOS A 5.4-4 Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 5.5:    OPENING YEAR CUMULATIVE (2023) WITH PROJECT CONDITIONS QUEUING  ANALYSIS  Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank         Queuing and Blocking Report AM Fontana Gateway (JN 14102) SimTraffic Report 10/07/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour With Improvement Urban Crossroads, Inc.Page 1 Intersection: 1: Commerce Wy/Driveway & Slover Av Movement EB EB WB WB WB NB NB Directions Served T TR L T TR L TR Maximum Queue (ft) 255 225 87 164 160 73 31 Average Queue (ft) 112 89 29 87 96 28 11 95th Queue (ft)206 183 69 160 168 57 35 Link Distance (ft)460 460 139 139 593 Upstream Blk Time (%)0 2 3 Queuing Penalty (veh)0 8 12 Storage Bay Dist (ft)150 100 Storage Blk Time (%)3 0 2 0 Queuing Penalty (veh) 0 0 1 0 Intersection: 2: Slover Av & Drw 1 Movement WB WB SB Directions Served T TR R Maximum Queue (ft)78 104 25 Average Queue (ft)8 12 2 95th Queue (ft)50 64 15 Link Distance (ft)304 304 200 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Slover Av & Drw 2 Movement EB SB Directions Served L R Maximum Queue (ft)39 31 Average Queue (ft)5 4 95th Queue (ft)26 20 Link Distance (ft)188 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) 5.5-1 Queuing and Blocking Report AM Fontana Gateway (JN 14102) SimTraffic Report 10/07/2021 Opening Year Cumulative (2023) With Project - AM Peak Hour With Improvement Urban Crossroads, Inc.Page 2 Intersection: 4: Slover Av & Drw 3 Movement WB SB Directions Served T LR Maximum Queue (ft)8 35 Average Queue (ft) 0 8 95th Queue (ft)6 30 Link Distance (ft) 176 173 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Business/Drw 4 & Slover Av Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR LT R LTR Maximum Queue (ft)42 121 133 68 137 133 53 44 33 Average Queue (ft)7 43 46 23 41 39 20 18 3 95th Queue (ft)29 101 110 52 99 101 46 45 17 Link Distance (ft)176 176 827 827 192 192 164 Upstream Blk Time (%)0 0 Queuing Penalty (veh)0 0 Storage Bay Dist (ft)50 50 Storage Blk Time (%)0 5 2 3 Queuing Penalty (veh) 0 1 10 2 Zone Summary Zone wide Queuing Penalty: 34 5.5-2 Queuing and Blocking Report PM Fontana Gateway (JN 14102) SimTraffic Report 10/07/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour With Improvement Page 1 Urban Crossroads, Inc. Intersection: 1: Commerce Wy/Driveway & Slover Av Movement EB EB WB WB WB NB NB Directions Served T TR L T TR L TR Maximum Queue (ft) 355 297 35 157 172 81 53 Average Queue (ft) 117 87 6 106 115 35 23 95th Queue (ft)251 210 25 190 196 65 49 Link Distance (ft)460 460 139 139 593 Upstream Blk Time (%) 0 10 12 Queuing Penalty (veh) 0 56 65 Storage Bay Dist (ft)150 100 Storage Blk Time (%)5 10 0 Queuing Penalty (veh) 0 1 0 Intersection: 2: Slover Av & Drw 1 Movement WB WB SB Directions Served T TR R Maximum Queue (ft) 238 239 31 Average Queue (ft) 56 61 6 95th Queue (ft)181 189 26 Link Distance (ft)304 304 200 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 1 1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Slover Av & Drw 2 Movement EB WB WB SB Directions Served L T TR R Maximum Queue (ft)30 6 10 35 Average Queue (ft)3 0 0 13 95th Queue (ft)17 4 7 38 Link Distance (ft)208 208 188 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 100 Storage Blk Time (%) Queuing Penalty (veh) 5.5-3 Queuing and Blocking Report PM Fontana Gateway (JN 14102) SimTraffic Report 10/07/2021 Opening Year Cumulative (2023) With Project - PM Peak Hour With Improvement Page 2 Urban Crossroads, Inc. Intersection: 4: Slover Av & Drw 3 Movement EB EB SB Directions Served T T LR Maximum Queue (ft)26 46 69 Average Queue (ft)2 2 23 95th Queue (ft)19 26 54 Link Distance (ft)208 208 173 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Business/Drw 4 & Slover Av Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR LT R LTR Maximum Queue (ft)30 147 158 43 128 112 83 58 30 Average Queue (ft)4 73 73 12 52 53 37 34 9 95th Queue (ft)20 133 139 36 102 99 69 59 31 Link Distance (ft)176 176 827 827 192 192 164 Upstream Blk Time (%)0 0 Queuing Penalty (veh)0 0 Storage Bay Dist (ft) 100 150 Storage Blk Time (%)2 0 Queuing Penalty (veh)0 0 Zone Summary Zone wide Queuing Penalty: 123 5.5-4 Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  APPENDIX 7.1:    SBCTA VMT SCREENING EVALUATION     Fontana Corporate Center Traffic Study    14102‐02 TS Report.docx  This Page Intentionally Left Blank     October 6, 2021 Mr. David Ornelas T&B Planning 3200 El Camino Real, Suite 100 Irvine, CA 92602 SUBJECT: FONTANA CORPORATE CENTER VEHICLE MILES TRAVELED (VMT) SCREENING EVALUATION Dear Mr. David Ornelas: The following VMT Analysis has been prepared for the proposed Fontana Corporate Center development (Project), which is located north of Slover Avenue and west of Business Drive in the City of Fontana. PROJECT DESCRIPTION It is our understanding that the Project is to amend the existing Fontana Gateway Specific Plan to develop 2 warehouses totaling 355,370 square feet. Building 1 to the east is to consist of 212,677 square feet of warehouse use and Building 2 to the west is to consist of 142,693 square feet of warehousing use. BACKGROUND Changes to California Environmental Quality Act (CEQA) Guidelines were adopted in December 2018, which require all lead agencies to adopt VMT as a replacement for automobile delay-based level of service (LOS) as the measure for identifying transportation impacts for land use projects. This statewide mandate went into effect July 1, 2020. To aid in this transition, the Governor’s Office of Planning and Research (OPR) released a Technical Advisory on Evaluating Transportation Impacts in CEQA (December of 2018) (Technical Advisory). (1) Based on OPR’s Technical Advisory specific procedures for complying with the new CEQA requirements for VMT analysis the City of Fontana adopted Traffic Impact Analysis Guidelines for Vehicle Miles Traveled and Level of Service Assessment (City Guidelines) (2), which documents the City’s VMT analysis methodology and approved impact thresholds. The VMT screening evaluation presented in this report has been developed based on the adopted City Guidelines. PROJECT SCREENING The City Guidelines describe specific “screening thresholds” that can be used to identify when a proposed land use project is anticipated to result in a less than significant impact without conducting a more detailed project level VMT analysis. Screening thresholds are described in the following four steps: 7.1-1 • Step 1: Transit Priority Area (TPA) Screening • Step 2: Low VMT Area Screening • Step 3: Low Project Type Screening • Step 4: Project net daily trips less than 500 ADT Consistent with City Guidelines a land use project needs only to satisfy one of the above screening thresholds to result in a less than significant impact. For the purposes of this analysis, the initial VMT screening process has been conducted with the SBCTA VMT Screening Tool (Screening Tool), which uses screening criteria consistent with the screening thresholds recommended in the Technical Advisory and City Guidelines. STEP 1: TPA SCREENING Consistent with guidance identified in the City Guidelines, projects located within a Transit Priority Area (TPA) (i.e., within ½ mile of an existing “major transit stop”1 or an existing stop along a “high-quality transit corridor”2) may be presumed to have a less than significant impact absent substantial evidence to the contrary. However, the presumption may not be appropriate if a project: • Has a Floor Area Ratio (FAR) of less than 0.75; • Includes more parking for use by residents, customers, or employees of the project than required by the jurisdiction (if the jurisdiction requires the project to supply parking); • Is inconsistent with the applicable Sustainable Communities Strategy (as determined by the lead agency, with input from the Metropolitan Planning Organization); or • Replaces affordable residential units with a smaller number of moderate- or high-income residential units. Based on the Screening Tool results presented in Attachment A, the Project site is not located within ½ mile of an existing major transit stop, or along a high-quality transit corridor. TPA screening criteria is not met. STEP 2: LOW VMT AREA SCREENING As noted in the City Guidelines, “Residential and office projects located within a low VMT-generating area may be presumed to have a less than significant impact absent substantial evidence to the contrary. In addition, other employment-related and mixed-use land use projects may qualify for the use of screening if the project can reasonably be expected to generate VMT per resident, per worker, or per 1 Pub. Resources Code, § 21064.3 (“‘Major transit stop’ means a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.”). 2 Pub. Resources Code, § 21155 (“For purposes of this section, a high-quality transit corridor means a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.”). 7.1-2 service population that is similar to the existing land uses in the low VMT area.” 3 The Screening Tool uses the sub-regional San Bernardino County Transportation Analysis Model (SBTAM) to measure VMT performance within San Bernardino County for individual traffic analysis zones (TAZ’s) within each city. The Project’s physical location based on APN is input into the Screening Tool to determine the VMT generated within the respective TAZ as compared to the jurisdictional average inclusive of a particular threshold (i.e., 15% below baseline County of San Bernardino VMT per service population). Based on the Screening Tool results, the Project is not located within a low VMT generating zone as compared to the City’s adopted threshold of 15% below baseline County of San Bernardino VMT per service population. (See Attachment A). Low VMT Area screening criteria is not met. STEP 3: LOW PROJECT TYPE SCREENING The City Guidelines identify that local serving retail with buildings less than 50,000 square feet or other local serving essential services (e.g., day care centers, public schools, medical/dental office buildings, etc.) are presumed to have a less than significant impact absent substantial evidence to the contrary. The proposed Project is not considered a local serving use based on the examples provided in the City Guidelines.4 Low Project Type screening criteria is not met. STEP 4: PROJECT NET DAILY TRIPS LESS THAN 500 ADT SCREENING Projects that generate fewer than 500 net average daily trips (ADT) (stated in actual vehicles) are deemed to not cause a substantial increase in the total citywide or regional VMT and are therefore presumed to have a less than significant impact on VMT. Substantial evidence in support this daily trip threshold is documented in the City Guidelines.5 The trip generation rates used for this analysis are based on the trip generation statistics published in the Institute of Transportation Engineer (ITE) Trip Generation Manual (10th Edition, 2017). (3) The existing land use has been estimated to generate 163 vehicle trip-ends per day. Whereas the proposed Project is estimated to generate 622 vehicle trip-ends per day. Resulting in a net new increase of 459 vehicle trip-ends per day, which would not exceed the City’s screening threshold of 500 ADT. Project net daily trips less than 500 ADT screening criteria is met. 3 City Guidelines; Page 12. 4 City Guidelines; Page 13. 5 City Guidelines; Appendix B. 7.1-3 CONCLUSION Based on our findings, the Project was found to meet the project net daily trips less than 500 ADT screening criteria. Therefore, the Project would result in a less than significant impact for VMT; no further VMT analysis required. If you have any questions, please contact me directly at 949-660-1994. Respectfully submitted, URBAN CROSSROADS, INC. Alexander So Senior Analyst 7.1-4 REFERENCES 1. Office of Planning and Research. Technical Advisory on Evaluating Transportation Impacts in CEQA. State of California : s.n., December 2018. 2. City of Fontana Traffic Engineering Division. Traffic Impact Analysis Guidelines for Vehicle Miles Traveled and Level of Service Assessment. City of Fontana : s.n., October 2020. 3. Institute of Transportation Engineers. Trip Generation Manual. 10th Edition. 2017. 7.1-5 ATTACHMENT A SBCTA VMT SCREENING TOOL 7.1-6 7.1-7 ATTACHMENT B PROJECT TRIP GENERATION 7.1-8 TABLE 1: CURRENTLY APPROVED TRIP GENERATION 7.1-9 TABLE 2: PROPOSED PROJECT TRIP GENERATION RATES TABLE 3: PROPOSED PROJECT TRIP GENERATION SUMMARY Land Use Quantity Units1 In Out Total In Out Total Daily Actual Vehicles: Warehousing 355.370 TSF Passenger Cars: 40 12 52 15 42 57 452 2-axle Trucks: 1 0 1 0 1 1 28 3-axle Trucks: 1 0 1 1 2 3 36 4+-axle Trucks: 4 1 5 2 5 7 106 Total Trucks:6 1 7 3 8 11 170 Total Trips (Actual Vehicles)2 46 13 59 18 50 68 622 1 TSF = thousand square feet 2 Total Trips = Passenger Cars + Truck Trips. AM Peak Hour PM Peak Hour 7.1-10 TABLE 4: TRIP GENERATION COMPARISON Trip Generation Comparison In Out Total In Out Total Daily Proposed Project Passenger Cars: 40 12 52 15 42 57 452 Total Truck Trips (Actual)6 1 7 3 8 11 170 Total Trips2 46 13 59 18 50 68 622 Existing Use Passenger Cars: 5 1 6 1 8 9 149 Total Truck Trips (Actual)1 1 2 0 0 0 14 Total Trips2 6 2 8 1 8 9 163 Variance Passenger Cars: 35 11 46 14 34 48 303 Total Truck Trips (Actual)5 0 5 3 8 11 156 Total Trips2 40 11 51 17 42 59 459 1 TSF = thousand square feet 2 Total Trips = Passenger Cars + Truck Trips. AM Peak Hour PM Peak Hour 7.1-11 This Page Intentionally Left Blank 7.1-12