HomeMy WebLinkAbout6313-1Sheet Index
SLOVER AVE
1 Cover Sheet
2 Irrigation Plan
SIERRA PARK MEDIAN
3 Irrigation Schedule
4 Irrigation Details
5 Irrigation Details
6 Irrigation Details
LANDSCAPE PLANS
7 Planting Plan
8 Planting Details
9 Specifications
Fontana, Ca
10 Specifications
I HAVE COMPLIED WITH THE CRITERIA OF
THE MWELO ORIDINANCE AND APPLIED
City Notes
THEM FOR THE EFFICIENT USE OF WATER IN
THE LANDSCAPE DESIGN PLAN.
A minimum 3- inch layer of mulch shall be applied on all exposed soil surfaces of planting Recirculating water systems shall be used for water features. - No Certificate of Occupancy shall be issued until a City landscape inspector has verified
areas except turf areas, creeping or rooting groundcovers, or direct seeding applications Pressure regulating devices are required if water pressure is below or exceeds the that all irrigation, grading, and planting have been completed in accordance with the
where mulch is contraindicated. recommended pressure of the specified irrigation devices. approved plans and specifications of FCC Section 28-1 17 at time of final inspection.
For soils less than six -percent (6%) organic matter in the top six (6) inches of soil, compost at Check valves or anti -drain valves are required on all sprinkler heads where low point An irrigation audit report shall be completed per FCC Section 28-106 at the time of final
p 02/ 10/2023
a rate of a minimum of four (4) cubic yards per one -thousand (1,000) square
be incorporated to depth inches into the
feet of drainage could occur. inspection.
A diagram the irrigation hydrozones be kept the irrigation With to landscape districts landscape, it be the
SIGNATURE DATE
permeable area shall a of six (6)
At the time of final inspection, the permit applicant must provide the owner
with a certificate of completion, certificate of installation, and an irrigation
landscape and maintenance.
soil. of plan showing shall with regard maintenance or public shall
of the property controller for subsequent management purposes. responsibility of the developer to comply with FCC Section 28-118, Special Landscape
schedule of A Certificate of Completion shall be filled out and certified by either the designer of the District Requirements.
landscape plans, irrigation plans, or the licensed landscape contractor for the project.
ABBREVIATIONS
General Notes
Field Inspection Requirements
Vicinity Map
AC ASPHALT CONCRETE PIP POURED IN PLACE
IRRIGATION
CJ COLD JOINT PROPERTY LINE
R
CENTERLINE or RAD RADIUS
THE CONTRACTOR SHALL CONTACT THE CITY'S COMMUNITY DEVELOPMENT ENGINEERING DEPT.
�ONC CONCRETE R RISER
1. FINAL LOCATION OF CONTROLLER TO BE DETERMINED IN THE FIELD WITH APPROVAL OF OWNER AND LANDSCAPE ARCHITECT.
PUBLIC WORKS INSPECTION SECTION (909)350-6633 AT LEAST 48 HOURS TO INSPECT THE
CONT CONTINUOUS RWD REDWOOD
DIA DIAMETER RS ROUGH SAWN
D.F. DOUGLAS FIR SL SCORELINE
2. REFER TO GENERAL IRRIGATION NOTES ON IRRIGATION PLAN.
FOLLOWING::
1. PRE -JOB CONFERENCE ONSITE.
2. COMPLETION OF FINISHED GRADE.
4LLE �t �....` ..
EA EACH SHT SHEET
EJ EXPANSION JOINT SPECS SPECIFICATIONS
EQ EQUAL SQ SQUARE
EXIST. EXISTING STD STANDARD
PLANTING
3. LAYOUT OF WOOD OR CONCRETE HEADERS BUT PRIOR TO INSTALLATION.
4. IRRIGATION INSTALLATION AT HE FOLLOWING POINTS:
\`
° \\
FRH FIRE HYDRANT STRUCT STRUCTURAL
FS FINISH SURFACE S4S SURFACE FOUR SIDES
FT FEET T TREAD
FTG FOOTING THK THICK
1. ALL BOX TREES ARE TO BE SELECTED BY THE LANDSCAPE ARCHITECT.
2. CONTRACTOR IS TO SPOT ALL PLANT MATERIAL AND HAVE LANDSCAPE ARCHITECT APPROVE THE SPOTTING PRIOR TO THE
EXCAVATION OF ANY PLANT PIT. ALLOW 48 HOURS LEAD TIME. ANY TREE, SHRUB, OR VINE THAT IS PLANTED WITHOUT
A. POINT OF CONNECTION TO MAIN.
B. BACKFLOW PREVENTION INSTALLATION PRIOR TO BACKFILL.
C. TRENCHING (TO CHECK DEPTH).
D. METER AND CONTROLLER PEDESTAL LOCATION.
"1
�
`�
- o
`~
\
GA GAUGE TOC TOP OF CONCRETE or CURE
GALV GALVANIZE(D) TYP TYPICAL
TOW TOP WALL
APPROVAL OF THE LANDSCAPE ARCHITECT MAY BE MOVED AT THE CONTRACTOR'S EXPENSE.
E. CONTROL VALVE INSTALLATION.
F. MAINLINE INSTALLATION WITH PRESSURE TEST AT 150 PSI FOR 4 HOURS.
GB GRADE OF
HP HIGH POINT TOF TOP OF FOOTING
3. REMOVE STAKES FROM ALL ESPALIERS AND VINES AND ATTACH TO WALLS, POST, ETC.
G. HEAD AND SWING JOINT INSTALLATION.
``
MAX MAXIMUM UNO UNLESS NOTED OTHERWISE
MIN MINIMUM VEH VEHICULAR
4. PRIOR TO PLANTING INSTALLATION, CONTRACTOR SHALL HAVE SOIL TESTED AND SEND RESULTS TO PUBLIC WORKS
INSPECTOR. REFER TO SPECIFICATIONS FOR SOIL PREPARATION INFORMATION.
H. HEAD COVERAGE.
I. SLEEVING.
y
NIC NOT IN CONTRACT VERT VERTICAL
NTS NOT TO SCALE WWM WOVEN WIRE MESH
OC ON CENTER WI WROUGHT IRON
5. CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT AND CITY INSPECTOR FOR FINAL INSPECTION WHEN INSTALLATION
5. WEED ABATEMENT.
6. ACCEPTANCE OF PLANT QUALITY AT DELIVERY SITE.
AAR
PA PLANTING AREA d NAIL PENNY SIZE
IS COMPLETE, AND FOR A FINAL MAINTENANCE INSPECTION AT THE END OF THE MAINTENANCE PERIOD.AN
MAINTENANCE NOTES
7. PLANT LAYOUT.
8. PLANT INSTALLATION.
9. FINAL INSPECTION.\
I AGREE TO COMPLY WITH THE
1. ALL CFD/LMD AREAS ARE TO BE MAINTAINED BY THE CONTRACTOR/DEVELOPER FOR A PERIOD OF 90 DAYS AND REQUEST
REQUIREMENTS OF THE STATE MODEL
A WALK-THRU EVERY 30 DAYS BY THE PUBLIC WORKS INSPECTION SECTION, ENGINEERING DIV. COM. DEV. DEPT.
a
-go
WATER EFFICIENT LANDSCAPE
ORDINANCE AND HAVE SUBMITTED A
COMPLETE LANDSCAPE DOCUMENT
PACKAGE.
2. ALL AREAS MUST BE MAINTAINED IN A HEALTHY, WEED FREE, AND VIGOROUS CONDITION PRIOR TO ACCEPTANCE BY THE CITY.
3. A MINIMUM OF ONE PUNCH LIST WILL BE DEVELOPED BY THE CITY TO NOTE DEFICIENCIES TO BE CORRECTED PRIOR TO
LEGAL DESCRIPTION: PARCEL NO. 1 OF PARCEL MAP NO. 20250, IN THE CITY
OF FONTANA, COUNTY OF SAN BERNADINO, STATE OF CALIFORNIA.
Turnover Items
1 HAVE COMPLIED WITH THE CRITERIA OF
THE ORIDINANCE AND APPLIED THEM
ACCORDINGLY FOR THE EFFICIENT USE OF
WATER IN THE LANDSCAPE AND GRADING
ACCEPTANCE.
Hold Harmless & Indemnification Clause
STATION POINTS LIMIT OF WORK: STA 10.00 - STA 23.00
l . PHOTO MYLAR "AS-BUILTS"
2. LAMINATED CONTROLLER CHARTS.
DESIGN PLAN.
CONTRACTOR AGREES THAT HE SHALL ASSUME SLOE RESPONSIBILITY FOR JOB SITE CONDITIONS
DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS
AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
3. BACKFLOW CERTIFICATION.
4. QUICK COUPLER KEYS WITH SWIVEL HOSE ADAPTER
5. CONTROLLER KEYS (2)
12/08/2022
SIGNATURE DATE
NORMAL WORKING HOURS, AND HOLD THE CITY AND THE LANDSCAPE ARCHITECT HARMLESS
FROM ANY AND ALL LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER, CITY OR
LANDSCAPE ARCHITECT.
6. VALVE BOX KEYS (2)
7. 1 YR. WRITTEN IRRIGATION GUARANTEE - INCLUDE COMPANY NAME, CONTACT PERSON,
TELEPHONE NUMBER AND BUSINESS ADDRESS.
BENCH MARK' HUNTER LANDSCAPEtXT
711 S. Fee Ana Street
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
ANDYEACARRIED OF DATE FORTHOIN A PROVAL DILIGENT SHOWN HEREON
O �PNDSCgp
���� F9
��
PREPARED UNDER THE suREimsioN OF:
CITY OF FONTANA, CALIFORNIA
SIERRA PARK STREET IMPROVEMENTS
DRAWN BY.
COVer Sheet
s AS Norm
DESIGNED BY:
DATE:
Fa6nary 101h, 2023
SAN BERNARDINO COUNTY TBM PER FIELD BOOK 4015/848 Placentia, California 92870
ELEVATION = 1019.83', DATUM = 1929 Ph: 714.986.2400
our Two waea�
��� DAYS 813W
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMANCE WITH
vavzozs
wT a'� 3
9r
RAILROAD SPIKE IN POWER POLE /71833, N.E. CORNER Fax: 714.986.2408
POPLAR AVE. & SANTA ANA AVE. EST. FROM SM B-38.
= M = W
mu ma +-400-sa-ago
A PURE sow w
W0°�01�0 � Aug
STANDARDS IN EFFECT.
F of cA F°
Thomas Hayes DATE 02.1023
�+m
APPa�Eo Bi APPROVED
0226'd'rczrav FOR
DRAWING NO.: j
6313 10
REV.
DESCRIPTION
DATE
ENGR.
CITY
DATE
GIA LAM KIM CRY ENGINEER R C.E 62296 DATE